EASTLAND SH 6 (0257-03-033)

Items: 122

County: EASTLAND
Length: N/A
Highway: SH 6
District: BROWNWOOD
Control Number: 0257-03-033
DBE Goal: N/A
Project: C 257-3-33
Guaranty: N/A
Time: 223 WORKING DAYS
Engineer's Estimate: $10,872,477.63
Date: 01/06/2022 (4 years ago)
Contract Number: N/A
Type: HIGHWAY IMPROVEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (2)
E
Engineer's Estimate
$10,872,477.63
$10,087,854.94
Over/Under Est: -7.22% -$784,622.69
Over/Under Est: -3.81% -$414,267.66
Amt Left: 3.67% $370,355.03
Subcontractor Percentage Amount
4-WAY HAULERS, LLC 6.31% $692,673.28
CRUZ HERNANDEZ CONCRETE CONSTRUCTION 5.80% $636,688.59
WILKO INDUSTRIAL, L.L.C. 1.68% $184,420.14
D. I. J. CONSTRUCTION, INC. 1.38% $151,487.98
DUSTIN ALLEN, INC. 1.32% $144,901.54
BEAR CREEK CONSTRUCTION, LLC 0.82% $90,014.59
STRUCTURAL INTEGRITY GROUP LLC 0.65% $71,353.03
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.44% $48,300.51
FC TRAFFIC CONTROL, INC. 0.33% $36,225.39
MARCOM'S MOWING SERVICE, LLC 0.21% $23,052.52
DALLAS LITE AND BARRICADE, INC. 0.18% $19,759.30
PROFESSIONAL TRAFFIC CONTROL LLC 0.17% $18,661.56
PINNACLE GRINDING AND GROOVING LLC 0.17% $18,661.56
PRECISION PAVEMENT MAINTENANCE, LLC 0.06% $6,586.43
NIXON ENGINEERING 0.00% $0.00
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.00% $0.00
Total: 19.52% $2,142,786.42

Bid Items & Bid Tabulations

122 Total 0 of 122
EASTLAND  |  SH 6  |  BROWNWOOD  |  0257-03-033  |  01/06/2022  |  $10,872,477.63  |  C 257-3-33  |  HWY IMPRV  |  223 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
JAY MILLS CONTRACTING, INCORPORATED
PREPARING ROW
STA 428.000 $900.000 $500.000 $450.000
REMOV STAB BASE AND ASPH PAV (10"-18")
SY 178.000 $8.050 $25.000 $15.000
EXCAVATION (ROADWAY)
CY 18,015.000 $15.000 $12.000 $12.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 7,383.000 $18.000 $12.000 $8.000
BLADING
STA 428.070 $200.000 $250.000 $150.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 228,757.000 $0.150 $0.120 $0.130
DRILL SEEDING (TEMP) (WARM)
SY 114,378.000 $0.150 $0.100 $0.100
DRILL SEEDING (TEMP) (COOL)
SY 114,378.000 $0.150 $0.100 $0.100
VEGETATIVE WATERING
MG 5,138.000 $10.000 $5.000 $14.000
PROOF ROLLING
HR 18.000 $120.000 $120.000 $85.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 11,833.000 $40.000 $45.000 $39.250
RWRK BS MTL (TY C)(0"-15")(DENS CONT)
SY 30,637.000 $8.000 $3.000 $2.500
PRIME COAT (RC-250)
GAL 6,976.000 $4.000 $5.000 $5.500
FOG SEAL (CSS-1H)
GAL 46,242.000 $4.000 $1.000 $3.500
ASPH (AC-20-5TR)
GAL 48,614.000 $4.000 $4.000 $4.000
ASPH (CRS-2P)
GAL 57,874.000 $4.500 $3.500 $3.750
AGGR(TY-B GR-5 SAC-B)
CY 254.000 $120.000 $150.000 $105.000
AGGR(TY-PB GR-3 SAC-B)
CY 2,723.000 $150.000 $125.000 $110.000
D-GR HMA(SQ) TY-B PG64-22
TON 132.000 $76.740 $150.000 $125.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 250.000 $77.550 $75.000 $130.000
PLANE ASPH CONC PAV(0" TO 2")
SY 6,041.000 $0.800 $2.800 $3.000
TEMPORARY SPL SHORING
SF 391.000 $30.000 $50.000 $44.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 6.000 $145.000 $200.000 $137.500
CONC STR REPAIR (PAN GIRDER HOLE REPR)
EA 52.000 $60.000 $100.000 $60.500
RIPRAP (CONC)(5 IN)
CY 34.300 $429.130 $650.000 $575.000
RIPRAP (MOW STRIP)(4 IN)
CY 88.000 $500.000 $550.000 $570.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 225.000 $40.000 $75.000 $27.500
MULTI-LAYER POLYMER OVERLAY
SY 756.000 $40.000 $65.000 $57.750
RETROFIT RAIL (TY T131RC)
LF 370.000 $150.000 $275.000 $295.000
CMP (GAL STL 24 IN)
LF 1,166.000 $100.000 $85.000 $72.000
CMP (GAL STL 30 IN)
LF 32.000 $150.000 $100.000 $80.000
CMP AR (GAL STL DES 3)
LF 168.000 $100.000 $95.000 $75.000
CMP AR (GAL STL DES 4)
LF 68.000 $120.000 $125.000 $90.000
CMP AR (GAL STL DES 6)
LF 8.000 $165.000 $250.000 $150.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 10.000 $700.000 $800.000 $770.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 5.000 $700.000 $900.000 $1,100.000
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
LF 10.000 $900.000 $1,500.000 $1,320.000
RC PIPE (CL III)(24 IN)
LF 8.000 $150.000 $140.000 $100.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 11.000 $5,000.000 $8,500.000 $6,600.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 3.000 $6,000.000 $10,000.000 $8,800.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 3.000 $6,000.000 $13,500.000 $7,810.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $7,000.000 $15,000.000 $8,800.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $8,000.000 $11,000.000 $14,300.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $12,000.000 $16,500.000 $11,000.000
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
EA 2.000 $15,000.000 $23,500.000 $13,200.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 118.000 $550.000 $1,250.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $1,250.000 $1,200.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,500.000 $2,200.000 $2,000.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 18.000 $2,000.000 $2,300.000 $2,150.000
SET (TY II) (DES 4) (CMP) (6: 1) (P)
EA 6.000 $4,300.000 $4,000.000 $3,650.000
SET (TY II) (DES 6) (CMP) (6: 1) (P)
EA 2.000 $16,000.000 $8,000.000 $9,125.000
CLEAN EXIST CULVERTS
EA 41.000 $1,500.000 $1,500.000 $1,320.000
DIAMOND GRINDING SLAB
SY 756.000 $10.000 $30.000 $25.500
REMOV STR (PIPE)
EA 33.000 $500.000 $500.000 $475.000
MOBILIZATION
LS 1.000 $800,000.000 $900,000.000 $750,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $20,000.000 $3,000.000 $8,500.000
ROCK FILTER DAMS (REMOVE)
LF 180.000 $10.000 $10.000 $16.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,052.000 $4.000 $3.000 $3.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,052.000 $1.000 $0.500 $1.100
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,460.000 $5.000 $5.000 $6.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,460.000 $1.000 $1.000 $1.100
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
LF 180.000 $130.000 $40.000 $49.500
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 600.000 $25.000 $15.000 $7.300
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 360.000 $15.000 $10.000 $5.250
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 600.000 $8.000 $15.000 $7.300
INTERSECTIONS (ACP)
SY 768.000 $50.000 $20.000 $55.000
DRIVEWAYS (ACP)
SY 2,818.000 $40.000 $20.000 $36.000
DRIVEWAYS (SURF TREAT)
SY 887.000 $20.000 $30.000 $21.000
TURNOUTS (ACP)
SY 222.000 $120.000 $75.000 $55.000
RUMBLE STRIPS (SHOULDER)
LF 85,613.000 $0.200 $0.180 $0.170
RUMBLE STRIPS (CENTERLINE)
LF 42,807.000 $0.200 $0.180 $0.170
MTL W-BEAM GD FEN (STEEL POST)
LF 625.000 $35.000 $40.000 $42.750
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 3.000 $2,100.000 $2,500.000 $3,190.000
TL-3 31" SHORT RADIUS (COMPLETE)
EA 1.000 $17,000.000 $25,000.000 $44,000.000
REMOVE METAL BEAM GUARD FENCE
LF 458.000 $2.500 $5.000 $3.300
GUARDRAIL END TREATMENT (INSTALL)
EA 7.000 $2,600.000 $3,000.000 $3,960.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $270.000 $250.000 $330.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $1,500.000 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,200.000 $1,000.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $10,000.000 $10,000.000 $10,250.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $375.000 $600.000 $577.500
MAILBOX INSTALL-S (WC-POST) TY 3
EA 10.000 $200.000 $250.000 $220.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 2.000 $210.000 $300.000 $297.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $800.000 $1,000.000 $1,039.500
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $785.000 $1,100.000 $1,138.500
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $880.000 $1,500.000 $1,375.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 10.000 $455.000 $550.000 $528.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 11.000 $425.000 $600.000 $616.000
RELOCATE SM RD SN SUP&AM TY TWT
EA 2.000 $550.000 $550.000 $561.000
REMOVE SM RD SN SUP&AM
EA 15.000 $100.000 $150.000 $110.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 4.000 $40.000 $30.000 $23.100
INSTL OM ASSM (OM-2Y)(WC)GND
EA 28.000 $100.710 $100.000 $99.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 17.000 $40.000 $40.000 $50.600
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 8,278.000 $0.250 $0.350 $0.330
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 170,746.000 $0.200 $0.250 $0.240
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,160.000 $0.600 $0.800 $0.660
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 52.000 $10.000 $12.000 $8.800
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 115,484.000 $0.200 $0.120 $0.090
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 9,950.000 $0.500 $0.420 $0.420
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 620.000 $0.600 $1.500 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 51,429.000 $1.000 $1.000 $1.500
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 581.000 $1.200 $2.000 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,030.000 $0.810 $2.000 $1.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 74.000 $5.940 $30.000 $27.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $135.000 $500.000 $440.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 4.000 $350.000 $1,000.000 $880.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $160.000 $500.000 $495.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 4,139.000 $0.400 $0.440 $0.440
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 85,529.000 $0.400 $0.440 $0.440
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,975.000 $0.400 $0.440 $0.440
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 58,320.000 $0.400 $0.440 $0.440
REFL PAV MRKR TY I-C
EA 302.000 $5.000 $8.000 $7.700
REFL PAV MRKR TY II-A-A
EA 1,442.000 $4.000 $8.000 $7.700
TREE REMOVAL (4" - 12" DIA)
EA 3.000 $1,300.000 $500.000 $800.000
SP MIXES SP-C SAC-B PG76-22
TON 25,863.000 $90.000 $91.000 $102.500
BONDING COURSE
GAL 370.000 $1.400 $6.000 $3.300
CEMENT
TON 1,377.000 $200.000 $200.000 $195.000
ASPHALT BINDER (PG 64-22)
TON 3,166.000 $550.000 $650.000 $670.000
FOAMED ASPHALT TREAT (12")(DC)
SY 229,155.000 $5.000 $2.400 $3.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 360.000 $60.000 $100.000 $95.000
TMA (STATIONARY)
DAY 261.000 $200.000 $150.000 $205.000
TMA (MOBILE OPERATION)
HR 224.000 $60.000 $50.000 $82.500
Totals: $10,872,477.629 $10,087,854.940 $10,458,209.970