PREPARING ROW
|
STA
|
428.000
|
$900.000
|
$500.000
|
$450.000
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
178.000
|
$8.050
|
$25.000
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
18,015.000
|
$15.000
|
$12.000
|
$12.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
7,383.000
|
$18.000
|
$12.000
|
$8.000
|
|
|
BLADING
|
STA
|
428.070
|
$200.000
|
$250.000
|
$150.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
228,757.000
|
$0.150
|
$0.120
|
$0.130
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
114,378.000
|
$0.150
|
$0.100
|
$0.100
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
114,378.000
|
$0.150
|
$0.100
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
5,138.000
|
$10.000
|
$5.000
|
$14.000
|
|
|
PROOF ROLLING
|
HR
|
18.000
|
$120.000
|
$120.000
|
$85.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
11,833.000
|
$40.000
|
$45.000
|
$39.250
|
|
|
RWRK BS MTL (TY C)(0"-15")(DENS CONT)
|
SY
|
30,637.000
|
$8.000
|
$3.000
|
$2.500
|
|
|
PRIME COAT (RC-250)
|
GAL
|
6,976.000
|
$4.000
|
$5.000
|
$5.500
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
46,242.000
|
$4.000
|
$1.000
|
$3.500
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
48,614.000
|
$4.000
|
$4.000
|
$4.000
|
|
|
ASPH (CRS-2P)
|
GAL
|
57,874.000
|
$4.500
|
$3.500
|
$3.750
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
254.000
|
$120.000
|
$150.000
|
$105.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
2,723.000
|
$150.000
|
$125.000
|
$110.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
132.000
|
$76.740
|
$150.000
|
$125.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
250.000
|
$77.550
|
$75.000
|
$130.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
6,041.000
|
$0.800
|
$2.800
|
$3.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
391.000
|
$30.000
|
$50.000
|
$44.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
6.000
|
$145.000
|
$200.000
|
$137.500
|
|
|
CONC STR REPAIR (PAN GIRDER HOLE REPR)
|
EA
|
52.000
|
$60.000
|
$100.000
|
$60.500
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
34.300
|
$429.130
|
$650.000
|
$575.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
88.000
|
$500.000
|
$550.000
|
$570.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
225.000
|
$40.000
|
$75.000
|
$27.500
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
756.000
|
$40.000
|
$65.000
|
$57.750
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
370.000
|
$150.000
|
$275.000
|
$295.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
1,166.000
|
$100.000
|
$85.000
|
$72.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
32.000
|
$150.000
|
$100.000
|
$80.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
168.000
|
$100.000
|
$95.000
|
$75.000
|
|
|
CMP AR (GAL STL DES 4)
|
LF
|
68.000
|
$120.000
|
$125.000
|
$90.000
|
|
|
CMP AR (GAL STL DES 6)
|
LF
|
8.000
|
$165.000
|
$250.000
|
$150.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
10.000
|
$700.000
|
$800.000
|
$770.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
5.000
|
$700.000
|
$900.000
|
$1,100.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
10.000
|
$900.000
|
$1,500.000
|
$1,320.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
8.000
|
$150.000
|
$140.000
|
$100.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
11.000
|
$5,000.000
|
$8,500.000
|
$6,600.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
3.000
|
$6,000.000
|
$10,000.000
|
$8,800.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
3.000
|
$6,000.000
|
$13,500.000
|
$7,810.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
1.000
|
$7,000.000
|
$15,000.000
|
$8,800.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$8,000.000
|
$11,000.000
|
$14,300.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
2.000
|
$12,000.000
|
$16,500.000
|
$11,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
2.000
|
$15,000.000
|
$23,500.000
|
$13,200.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
118.000
|
$550.000
|
$1,250.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$1,250.000
|
$1,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,500.000
|
$2,200.000
|
$2,000.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (P)
|
EA
|
18.000
|
$2,000.000
|
$2,300.000
|
$2,150.000
|
|
|
SET (TY II) (DES 4) (CMP) (6: 1) (P)
|
EA
|
6.000
|
$4,300.000
|
$4,000.000
|
$3,650.000
|
|
|
SET (TY II) (DES 6) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$16,000.000
|
$8,000.000
|
$9,125.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
41.000
|
$1,500.000
|
$1,500.000
|
$1,320.000
|
|
|
DIAMOND GRINDING SLAB
|
SY
|
756.000
|
$10.000
|
$30.000
|
$25.500
|
|
|
REMOV STR (PIPE)
|
EA
|
33.000
|
$500.000
|
$500.000
|
$475.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$800,000.000
|
$900,000.000
|
$750,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$20,000.000
|
$3,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
180.000
|
$10.000
|
$10.000
|
$16.500
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,052.000
|
$4.000
|
$3.000
|
$3.850
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,052.000
|
$1.000
|
$0.500
|
$1.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,460.000
|
$5.000
|
$5.000
|
$6.600
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,460.000
|
$1.000
|
$1.000
|
$1.100
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
|
LF
|
180.000
|
$130.000
|
$40.000
|
$49.500
|
|
|
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
|
LF
|
600.000
|
$25.000
|
$15.000
|
$7.300
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
360.000
|
$15.000
|
$10.000
|
$5.250
|
|
|
PORT CTB (STKPL)(SGL SLP)(TY 1)
|
LF
|
600.000
|
$8.000
|
$15.000
|
$7.300
|
|
|
INTERSECTIONS (ACP)
|
SY
|
768.000
|
$50.000
|
$20.000
|
$55.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,818.000
|
$40.000
|
$20.000
|
$36.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
887.000
|
$20.000
|
$30.000
|
$21.000
|
|
|
TURNOUTS (ACP)
|
SY
|
222.000
|
$120.000
|
$75.000
|
$55.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
85,613.000
|
$0.200
|
$0.180
|
$0.170
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
42,807.000
|
$0.200
|
$0.180
|
$0.170
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
625.000
|
$35.000
|
$40.000
|
$42.750
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$2,100.000
|
$2,500.000
|
$3,190.000
|
|
|
TL-3 31" SHORT RADIUS (COMPLETE)
|
EA
|
1.000
|
$17,000.000
|
$25,000.000
|
$44,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
458.000
|
$2.500
|
$5.000
|
$3.300
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
7.000
|
$2,600.000
|
$3,000.000
|
$3,960.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$270.000
|
$250.000
|
$330.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,000.000
|
$1,500.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,200.000
|
$1,000.000
|
$1,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$10,000.000
|
$10,000.000
|
$10,250.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
1.000
|
$375.000
|
$600.000
|
$577.500
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
10.000
|
$200.000
|
$250.000
|
$220.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
2.000
|
$210.000
|
$300.000
|
$297.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$800.000
|
$1,000.000
|
$1,039.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$785.000
|
$1,100.000
|
$1,138.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$880.000
|
$1,500.000
|
$1,375.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
10.000
|
$455.000
|
$550.000
|
$528.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
11.000
|
$425.000
|
$600.000
|
$616.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
2.000
|
$550.000
|
$550.000
|
$561.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
15.000
|
$100.000
|
$150.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
4.000
|
$40.000
|
$30.000
|
$23.100
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
28.000
|
$100.710
|
$100.000
|
$99.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
17.000
|
$40.000
|
$40.000
|
$50.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
8,278.000
|
$0.250
|
$0.350
|
$0.330
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
170,746.000
|
$0.200
|
$0.250
|
$0.240
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,160.000
|
$0.600
|
$0.800
|
$0.660
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
52.000
|
$10.000
|
$12.000
|
$8.800
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
115,484.000
|
$0.200
|
$0.120
|
$0.090
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
9,950.000
|
$0.500
|
$0.420
|
$0.420
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
620.000
|
$0.600
|
$1.500
|
$1.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
51,429.000
|
$1.000
|
$1.000
|
$1.500
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
581.000
|
$1.200
|
$2.000
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,030.000
|
$0.810
|
$2.000
|
$1.650
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
74.000
|
$5.940
|
$30.000
|
$27.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
4.000
|
$135.000
|
$500.000
|
$440.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
4.000
|
$350.000
|
$1,000.000
|
$880.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$160.000
|
$500.000
|
$495.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
4,139.000
|
$0.400
|
$0.440
|
$0.440
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
85,529.000
|
$0.400
|
$0.440
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,975.000
|
$0.400
|
$0.440
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
58,320.000
|
$0.400
|
$0.440
|
$0.440
|
|
REFL PAV MRKR TY I-C
|
EA
|
302.000
|
$5.000
|
$8.000
|
$7.700
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,442.000
|
$4.000
|
$8.000
|
$7.700
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
3.000
|
$1,300.000
|
$500.000
|
$800.000
|
|
|
SP MIXES SP-C SAC-B PG76-22
|
TON
|
25,863.000
|
$90.000
|
$91.000
|
$102.500
|
|
|
BONDING COURSE
|
GAL
|
370.000
|
$1.400
|
$6.000
|
$3.300
|
|
|
CEMENT
|
TON
|
1,377.000
|
$200.000
|
$200.000
|
$195.000
|
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
3,166.000
|
$550.000
|
$650.000
|
$670.000
|
|
|
FOAMED ASPHALT TREAT (12")(DC)
|
SY
|
229,155.000
|
$5.000
|
$2.400
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
360.000
|
$60.000
|
$100.000
|
$95.000
|
|
|
TMA (STATIONARY)
|
DAY
|
261.000
|
$200.000
|
$150.000
|
$205.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
224.000
|
$60.000
|
$50.000
|
$82.500
|
|
Totals: |
$10,872,477.629
|
$10,087,854.940
|
$10,458,209.970
|