PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
29.000
|
$500.000
|
$2,500.000
|
$2,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
11.000
|
$10.000
|
$50.000
|
$20.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
861.000
|
$25.000
|
$20.000
|
$20.000
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
42.000
|
$60.000
|
$100.000
|
$75.000
|
|
|
REMOVING CONC (CURB OR CURB & GUTTER)
|
LF
|
2,218.000
|
$20.000
|
$10.000
|
$15.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
1,953.000
|
$13.000
|
$20.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
22,964.000
|
$12.000
|
$27.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
350.000
|
$24.000
|
$25.000
|
$50.000
|
|
|
BLOCK SODDING
|
SY
|
13,385.000
|
$3.560
|
$5.000
|
$5.000
|
|
|
VEGETATIVE WATERING
|
MG
|
110.240
|
$150.000
|
$50.000
|
$100.000
|
|
|
PROOF ROLLING
|
HR
|
25.000
|
$100.000
|
$110.000
|
$150.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
519.000
|
$40.000
|
$80.000
|
$50.000
|
|
|
ASPH (RC-250)
|
GAL
|
3,016.000
|
$5.000
|
$5.000
|
$10.000
|
|
|
AGGR (TY-B GR-5)
|
CY
|
108.000
|
$100.000
|
$150.000
|
$150.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
17,973.000
|
$90.000
|
$100.000
|
$95.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
357.000
|
$95.000
|
$150.000
|
$110.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG76-22
|
TON
|
4,700.000
|
$95.000
|
$110.000
|
$105.000
|
|
|
CONC PVMT (JOINTED - CPCD) (10")
|
SY
|
2,198.000
|
$92.000
|
$100.000
|
$95.000
|
|
|
CONC PVMT (JOINTED-CPCD)(HES)(10")
|
SY
|
1,352.000
|
$105.000
|
$120.000
|
$105.000
|
|
|
CUT & RESTORING PAV
|
SY
|
394.000
|
$145.000
|
$100.000
|
$150.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
5,471.000
|
$135.000
|
$130.000
|
$200.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
8,769.000
|
$10.000
|
$5.000
|
$5.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
12.000
|
$250.000
|
$250.000
|
$225.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
42.000
|
$300.000
|
$300.000
|
$275.000
|
|
|
RETAINING WALL (CONC BLOCK)
|
SF
|
155.000
|
$65.000
|
$60.000
|
$100.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
3,910.000
|
$120.000
|
$60.000
|
$60.000
|
|
|
RAIL (HANDRAIL)(TY C)
|
LF
|
76.000
|
$135.000
|
$300.000
|
$250.000
|
|
|
RAIL (HANDRAIL)(DECORATIVE)
|
LF
|
999.000
|
$150.000
|
$110.000
|
$200.000
|
|
|
CONC BOX CULV (8 FT X 5 FT)
|
LF
|
432.000
|
$600.000
|
$600.000
|
$650.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
3,670.000
|
$100.000
|
$100.000
|
$150.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,760.000
|
$140.000
|
$140.000
|
$180.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
3,188.000
|
$160.000
|
$180.000
|
$200.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
2.000
|
$3,000.000
|
$4,000.000
|
$4,000.000
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
16.000
|
$4,380.000
|
$5,000.000
|
$6,500.000
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
11.000
|
$4,900.000
|
$6,000.000
|
$6,500.000
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
7.000
|
$4,900.000
|
$5,500.000
|
$5,500.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
13.000
|
$5,200.000
|
$6,500.000
|
$5,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$11,000.000
|
$6,000.000
|
$6,500.000
|
|
|
INLET (COMPL)(CURB)(TY 2)(10')
|
EA
|
9.000
|
$11,000.000
|
$7,000.000
|
$5,500.000
|
|
|
INLET (COMPL)(CURB)(TY 2)(15')
|
EA
|
4.000
|
$12,000.000
|
$9,000.000
|
$10,000.000
|
|
|
INLET (COMPL)(CURB)(TY 2)(5')
|
EA
|
2.000
|
$7,760.000
|
$5,500.000
|
$5,500.000
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
1.000
|
$20,000.000
|
$30,000.000
|
$35,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$20,000.000
|
$30,000.000
|
$18,000.000
|
|
|
CLEAN EXIST CULVERTS
|
CY
|
81.000
|
$135.000
|
$100.000
|
$250.000
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
1.000
|
$15,000.000
|
$15,000.000
|
$4,000.000
|
|
|
REMOVE STR (BOLLARD)
|
EA
|
2.000
|
$200.000
|
$250.000
|
$650.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,300,500.000
|
$1,591,000.000
|
$2,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
35.000
|
$10,000.000
|
$20,000.000
|
$15,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
200.000
|
$24.480
|
$25.000
|
$35.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
200.000
|
$8.300
|
$5.000
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,995.000
|
$5.000
|
$3.000
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,995.000
|
$1.000
|
$0.500
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
885.000
|
$7.000
|
$5.000
|
$5.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
885.000
|
$1.470
|
$1.000
|
$2.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
7,734.000
|
$72.000
|
$60.000
|
$50.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
40.000
|
$34.000
|
$125.000
|
$200.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$50.000
|
$125.000
|
$200.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
40.000
|
$11.500
|
$50.000
|
$50.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$15.500
|
$50.000
|
$50.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
899.000
|
$5.000
|
$8.000
|
$18.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
14,784.000
|
$35.000
|
$20.000
|
$31.000
|
|
|
CONC CURB (SPECIAL) (TYPE II)
|
LF
|
115.000
|
$42.000
|
$40.000
|
$55.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
1,083.000
|
$150.000
|
$125.000
|
$110.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
403.000
|
$100.000
|
$75.000
|
$75.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
5,962.000
|
$135.000
|
$100.000
|
$90.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,431.000
|
$50.000
|
$75.000
|
$50.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
5,197.000
|
$60.000
|
$55.000
|
$65.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
196.000
|
$110.000
|
$125.000
|
$88.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
2.000
|
$2,600.000
|
$2,000.000
|
$2,000.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
5.000
|
$1,800.000
|
$2,000.000
|
$2,200.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
2.000
|
$1,800.000
|
$2,500.000
|
$2,200.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
36.000
|
$3,300.000
|
$2,000.000
|
$2,000.000
|
|
|
CONC SIDEWALK (SPECIAL)(TY FW)
|
SY
|
467.000
|
$167.000
|
$250.000
|
$135.000
|
|
|
CURB RAMPS (SPECIAL)
|
SY
|
369.000
|
$320.000
|
$150.000
|
$180.000
|
|
|
CONCRETE SIDEWALK (STEPS)
|
SY
|
20.000
|
$140.000
|
$500.000
|
$500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
79.000
|
$5.000
|
$5.000
|
$2.620
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
22.000
|
$250.000
|
$200.000
|
$500.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
5.000
|
$270.000
|
$300.000
|
$750.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$460.000
|
$400.000
|
$1,000.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
616.000
|
$25.000
|
$20.000
|
$20.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
170.000
|
$15.000
|
$25.000
|
$23.500
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
782.000
|
$20.000
|
$30.000
|
$28.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
664.000
|
$2.000
|
$2.000
|
$1.500
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
260.000
|
$2.000
|
$1.500
|
$1.600
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
390.000
|
$2.000
|
$2.000
|
$1.750
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
65.000
|
$2.000
|
$2.000
|
$2.000
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
707.000
|
$2.500
|
$3.000
|
$2.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
7.000
|
$1,050.000
|
$1,000.000
|
$1,050.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
|
EA
|
1.000
|
$4,200.000
|
$6,000.000
|
$6,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
61.000
|
$30.000
|
$50.000
|
$38.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$700.000
|
$600.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$750.000
|
$700.000
|
$680.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$750.000
|
$800.000
|
$830.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$800.000
|
$1,000.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
4.000
|
$1,100.000
|
$1,100.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
51.000
|
$700.000
|
$500.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
1.000
|
$700.000
|
$500.000
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
79.000
|
$100.000
|
$150.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
32,936.000
|
$0.350
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
32,936.000
|
$0.250
|
$0.300
|
$0.300
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
9,222.000
|
$0.600
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,524.000
|
$0.850
|
$1.000
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,559.000
|
$1.200
|
$1.000
|
$1.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
400.000
|
$1.000
|
$1.000
|
$1.250
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
652.000
|
$2.500
|
$5.000
|
$5.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
281.000
|
$10.000
|
$8.000
|
$7.760
|
|
REFL PAV MRK TY I (W)(SYMBOL)(100MIL)
|
EA
|
2.000
|
$750.000
|
$750.000
|
$554.010
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,756.000
|
$0.250
|
$0.600
|
$0.550
|
|
|
PAVEMENT SEALER 12"
|
LF
|
562.000
|
$1.000
|
$0.700
|
$0.660
|
|
|
PAVEMENT SEALER 24"
|
LF
|
129.000
|
$3.000
|
$4.000
|
$3.320
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
22,568.000
|
$0.500
|
$0.750
|
$0.720
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
800.000
|
$0.500
|
$1.000
|
$0.830
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
14,779.000
|
$0.500
|
$0.750
|
$0.720
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
408.000
|
$2.500
|
$7.000
|
$5.540
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
39,446.000
|
$1.000
|
$0.700
|
$0.820
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,756.000
|
$0.250
|
$1.250
|
$1.160
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
562.000
|
$0.250
|
$2.000
|
$1.660
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
129.000
|
$0.500
|
$2.000
|
$1.660
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
20.000
|
$1.000
|
$25.000
|
$11.080
|
|
|
INSTALL HWY TRF SIG (FLASH BEACON)
|
EA
|
1.000
|
$4,500.000
|
$7,500.000
|
$8,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$5,000.000
|
$5,000.000
|
$3,500.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$400.000
|
$250.000
|
$300.000
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
8.000
|
$100.000
|
$150.000
|
$125.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
|
LF
|
833.000
|
$2.000
|
$80.000
|
$80.000
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
4.000
|
$4,500.000
|
$5,000.000
|
$4,600.000
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$10,000.000
|
$3,000.000
|
$2,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(28')LUM
|
EA
|
1.000
|
$6,300.000
|
$6,000.000
|
$6,300.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
1.000
|
$6,800.000
|
$9,000.000
|
$9,500.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
1.000
|
$7,500.000
|
$9,500.000
|
$9,900.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
1.000
|
$7,900.000
|
$10,000.000
|
$11,000.000
|
|
|
TREE PROTECTION
|
EA
|
25.000
|
$300.000
|
$500.000
|
$250.000
|
|
|
MOVE AND RESET PRECAST CONC WHEEL STOP
|
EA
|
11.000
|
$30.000
|
$100.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$5,000.000
|
$15,000.000
|
$25,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
80.000
|
$60.000
|
$80.000
|
$350.000
|
|
|
TEMPORARY PAVEMENT
|
LF
|
146.000
|
$115.000
|
$25.000
|
$100.000
|
|
|
INSTALL 1" GAS LINE
|
LF
|
425.000
|
$90.000
|
$80.000
|
$80.000
|
|
|
INSTALL 2" GAS LINE
|
LF
|
6,933.000
|
$95.000
|
$120.000
|
$120.000
|
|
|
INSTALL 3" GAS LINE
|
LF
|
285.000
|
$105.000
|
$140.000
|
$160.000
|
|
|
INSTALL 4" CASING PIPE
|
LF
|
172.000
|
$100.000
|
$500.000
|
$200.000
|
|
|
INSTALL 6" CASING PIPE
|
LF
|
174.000
|
$130.000
|
$600.000
|
$400.000
|
|
|
RECONNECT EXISTING SERVICE
|
EA
|
57.000
|
$650.000
|
$10,000.000
|
$500.000
|
|
|
REMOVE EXISTING GAS PIPE
|
LF
|
7,259.000
|
$20.000
|
$40.000
|
$600.000
|
|
|
REMOVE STRUCTURAL MANHOLE
|
EA
|
8.000
|
$600.000
|
$2,500.000
|
$1,500.000
|
|
|
REM/ABAN/PRSSR GRT EXIST SWR LN(2"-12")
|
LF
|
6,129.000
|
$10.000
|
$20.000
|
$20.000
|
|
|
REMOVE CLEANOUT
|
EA
|
3.000
|
$450.000
|
$750.000
|
$2,000.000
|
|
|
VACUUM TEST FOR WASTEWATER MANHOLE
|
EA
|
24.000
|
$100.000
|
$500.000
|
$3,000.000
|
|
|
PRE/POST TELEVISION INSPECTION
|
LF
|
7,216.000
|
$75.000
|
$7.000
|
$5.000
|
|
|
ROCK FOUNDATION
|
CY
|
72.160
|
$35.000
|
$100.000
|
$80.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
72.160
|
$25.000
|
$200.000
|
$200.000
|
|
|
48" PRECAST CONCRETE MANHOLE
|
EA
|
24.000
|
$8,300.000
|
$7,000.000
|
$5,000.000
|
|
|
CLEANOUT
|
EA
|
21.000
|
$4,500.000
|
$750.000
|
$1,000.000
|
|
|
RECONNECT EXISTING SEWER MAINS
|
EA
|
13.000
|
$3,600.000
|
$2,500.000
|
$1,500.000
|
|
|
8" SDR-26 PVC GRAVITY SEWER LINE
|
LF
|
7,049.000
|
$85.000
|
$100.000
|
$90.000
|
|
|
10" SDR-26 PVC GRAVITY SEWER LINE
|
LF
|
167.000
|
$100.000
|
$110.000
|
$100.000
|
|
|
ENCASEMT FOR 8"SWR LN(BORE OR OPEN-CUT)
|
LF
|
40.000
|
$187.000
|
$140.000
|
$300.000
|
|
|
RECONNECT EXIST. SEWER SERVICE
|
EA
|
21.000
|
$750.000
|
$1,800.000
|
$2,750.000
|
|
|
TRENCH SAFETY(DEPTHS GREATER THAN 5 FT)
|
LF
|
7,216.000
|
$2.000
|
$5.000
|
$5.000
|
|
|
PLUG WASTEWATER LINE
|
EA
|
2.000
|
$250.000
|
$1,000.000
|
$1,500.000
|
|
|
REMOVE EXIST PLUG
|
EA
|
1.000
|
$250.000
|
$750.000
|
$3,500.000
|
|
|
TEMPORARY PAVEMENT REPAIR
|
LF
|
7,216.000
|
$35.000
|
$3.000
|
$60.000
|
|
|
CAST IRON FITTINGS
|
TON
|
4.310
|
$3,000.000
|
$7,500.000
|
$18,000.000
|
|
|
CUT AND PLUG WATER MAIN FOR TEST
|
EA
|
2.000
|
$3,500.000
|
$750.000
|
$1,500.000
|
|
|
TRENCH EXCAVATION SAFETY AND SUPPORT
|
LF
|
14,700.000
|
$2.000
|
$5.000
|
$5.000
|
|
|
ROCK FOUNDATION
|
CY
|
73.490
|
$35.000
|
$100.000
|
$80.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
73.490
|
$25.000
|
$200.000
|
$200.000
|
|
|
DISPOSE HEAVY CHLORINATED WATER MAIN
|
LS
|
2.000
|
$2,400.000
|
$5,000.000
|
$15,000.000
|
|
|
INSTALL NEW WATER METER AND BOX
|
EA
|
126.000
|
$750.000
|
$1,250.000
|
$750.000
|
|
|
ABANDN EXIST WTR LINE/PRSSR GRT(2"-12")
|
LF
|
9,997.000
|
$15.000
|
$20.000
|
$15.000
|
|
|
CUT AND PLUG EXIST WATER LINE (2"-12")
|
EA
|
16.000
|
$1,700.000
|
$500.000
|
$1,000.000
|
|
|
CONN PROP 6" WTR LN TO EXIST 2" WTR LN
|
EA
|
5.000
|
$800.000
|
$2,500.000
|
$750.000
|
|
|
CONN PROP 6" WTR LN TO EXIST 4" WTR LN
|
EA
|
5.000
|
$945.000
|
$3,500.000
|
$1,000.000
|
|
|
CONN PROP 6" WTR LN TO EXIST 6" WTR LN
|
EA
|
9.000
|
$1,100.000
|
$4,500.000
|
$1,200.000
|
|
|
CONN PROP 6" WTR LN TO EXIST 8" WTR LN
|
EA
|
3.000
|
$1,500.000
|
$5,500.000
|
$1,500.000
|
|
|
2" GATE VALVE
|
EA
|
5.000
|
$1,500.000
|
$1,250.000
|
$2,000.000
|
|
|
4" GATE VALVE
|
EA
|
3.000
|
$1,975.000
|
$1,500.000
|
$2,200.000
|
|
|
6" GATE VALVE
|
EA
|
77.000
|
$2,400.000
|
$2,000.000
|
$2,600.000
|
|
|
8" GATE VALVE
|
EA
|
3.000
|
$2,850.000
|
$2,500.000
|
$3,000.000
|
|
|
4" DR-25 C900 PVC WATER LINE
|
LF
|
5.000
|
$45.000
|
$40.000
|
$400.000
|
|
|
6" DR-25 C900 PVC WATER LINE
|
LF
|
14,700.000
|
$45.000
|
$45.000
|
$90.000
|
|
|
WATER SERVICE CONNECTIONS
|
EA
|
126.000
|
$1,000.000
|
$1,500.000
|
$4,000.000
|
|
|
INSTALL NEW FIRE HYDRANT
|
EA
|
34.000
|
$6,380.000
|
$5,000.000
|
$5,500.000
|
|
|
REMOVE EXIST FIRE HYDRANT
|
EA
|
14.000
|
$825.000
|
$1,250.000
|
$1,000.000
|
|
|
REMOVE EXIST WATER METER
|
EA
|
39.000
|
$500.000
|
$750.000
|
$750.000
|
|
|
REMOVE EXIST PLUG
|
EA
|
2.000
|
$500.000
|
$1,500.000
|
$1,500.000
|
|
Totals: |
$15,659,403.550
|
$16,887,011.550
|
$22,800,240.110
|