|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
2.000
|
$788.380
|
$750.000
|
$5,940.000
|
$1,459.070
|
$3,500.000
|
$1,500.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,639.000
|
$18.000
|
$12.000
|
$12.770
|
$4.900
|
$7.000
|
$15.260
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
9,009.000
|
$12.000
|
$12.000
|
$22.960
|
$8.660
|
$13.000
|
$16.800
|
|
|
EMBANK (FINAL)(DC)(TY C) CSBE
|
CY
|
342.000
|
$80.000
|
$72.000
|
$41.040
|
$57.520
|
$210.000
|
$61.800
|
|
|
BLADING
|
STA
|
279.000
|
$52.500
|
$90.000
|
$70.200
|
$200.400
|
$220.000
|
$141.700
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
12.360
|
$676.000
|
$525.000
|
$468.720
|
$449.400
|
$1,500.000
|
$420.000
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
12.360
|
$582.000
|
$495.000
|
$345.600
|
$321.000
|
$1,500.000
|
$300.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,343.000
|
$31.500
|
$12.250
|
$30.240
|
$37.160
|
$12.000
|
$11.720
|
|
|
PROOF ROLLING
|
HR
|
25.000
|
$71.000
|
$85.000
|
$59.400
|
$111.830
|
$75.000
|
$109.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
42,468.000
|
$34.250
|
$36.000
|
$35.600
|
$38.210
|
$42.000
|
$42.120
|
|
|
REWORK BS MATL (TY B)(11")(DENS CONT)
|
SY
|
3,574.000
|
$3.000
|
$5.000
|
$1.330
|
$1.550
|
$3.000
|
$2.720
|
|
|
REWORK BS MTL (TY C)(11")(DENS CONT)
|
SY
|
123,422.000
|
$2.250
|
$1.900
|
$1.330
|
$2.650
|
$3.000
|
$2.280
|
|
|
PRIME COAT (RC-250)
|
GAL
|
33,436.000
|
$3.250
|
$3.400
|
$3.430
|
$4.100
|
$3.000
|
$4.310
|
|
|
AGGR(TY-B GR-5 SAC-B)
|
CY
|
1,086.000
|
$65.000
|
$52.000
|
$71.430
|
$62.210
|
$65.000
|
$65.150
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
1,689.000
|
$90.000
|
$78.000
|
$99.750
|
$89.930
|
$75.000
|
$84.160
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
1,267.000
|
$95.200
|
$78.000
|
$89.410
|
$89.900
|
$90.000
|
$86.340
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
51,674.000
|
$3.250
|
$3.000
|
$2.970
|
$3.270
|
$3.500
|
$3.240
|
|
|
ASPH (CRS-1P OR AC-15P)
|
GAL
|
63,833.000
|
$2.850
|
$3.000
|
$2.720
|
$3.400
|
$3.200
|
$3.450
|
|
|
HMCL ACP TY-F SAC-B AC-1.5
|
TON
|
245.000
|
$140.000
|
$150.000
|
$189.000
|
$184.200
|
$135.000
|
$139.400
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
96.000
|
$140.000
|
$175.000
|
$156.600
|
$166.140
|
$135.000
|
$162.200
|
|
|
PLANE ASPH CONC PAV (1" TO 3")
|
SY
|
960.000
|
$10.000
|
$4.000
|
$12.960
|
$13.880
|
$6.000
|
$17.440
|
|
|
STRUCT EXCAV (BRIDGE)
|
CY
|
72.000
|
$51.990
|
$35.000
|
$27.000
|
$12.160
|
$38.000
|
$25.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
125.900
|
$193.000
|
$155.000
|
$135.000
|
$170.430
|
$210.000
|
$150.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
208.000
|
$20.000
|
$4.000
|
$10.800
|
$10.700
|
$20.000
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,600.000
|
$30.000
|
$18.000
|
$37.800
|
$34.780
|
$15.000
|
$30.000
|
|
|
CL C CONC (CULV)
|
CY
|
3.800
|
$1,469.150
|
$1,000.000
|
$2,700.000
|
$1,605.000
|
$2,100.000
|
$2,500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
45.900
|
$800.000
|
$550.000
|
$486.000
|
$535.000
|
$600.000
|
$450.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
340.000
|
$35.000
|
$33.000
|
$64.800
|
$32.100
|
$38.000
|
$30.000
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
960.000
|
$70.000
|
$64.000
|
$62.640
|
$73.210
|
$75.000
|
$58.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
400.000
|
$236.920
|
$340.000
|
$648.000
|
$377.240
|
$310.000
|
$450.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
80.000
|
$75.000
|
$54.000
|
$59.400
|
$97.860
|
$53.000
|
$52.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
150.000
|
$175.000
|
$95.000
|
$140.400
|
$147.200
|
$107.000
|
$120.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
93.000
|
$135.200
|
$130.000
|
$178.200
|
$186.820
|
$130.000
|
$160.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
70.000
|
$290.000
|
$170.000
|
$270.000
|
$380.840
|
$160.000
|
$250.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
174.000
|
$194.440
|
$225.000
|
$324.000
|
$234.950
|
$165.000
|
$300.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
10.000
|
$8,000.000
|
$3,500.000
|
$5,940.000
|
$3,190.000
|
$8,500.000
|
$5,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$850.000
|
$725.000
|
$918.000
|
$1,118.450
|
$850.000
|
$850.000
|
|
|
SET (TY II) (30 IN) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$3,500.000
|
$1,000.000
|
$2,160.000
|
$2,082.900
|
$1,500.000
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$4,000.000
|
$925.000
|
$2,160.000
|
$2,011.400
|
$2,000.000
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,500.000
|
$1,400.000
|
$2,700.000
|
$2,456.900
|
$2,000.000
|
$2,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$3,200.000
|
$1,200.000
|
$2,700.000
|
$2,170.900
|
$2,300.000
|
$2,500.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$5,200.000
|
$3,300.000
|
$4,320.000
|
$5,601.300
|
$3,500.000
|
$4,000.000
|
|
|
SET (TY II) (48 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$6,000.000
|
$4,750.000
|
$5,400.000
|
$7,981.560
|
$5,000.000
|
$5,000.000
|
|
|
SET (TY II) (DES 7) (CMP) (4: 1) (C)
|
EA
|
2.000
|
$4,000.000
|
$4,000.000
|
$5,400.000
|
$1,167.960
|
$2,800.000
|
$5,000.000
|
|
|
DIAMOND GRINDING SLAB
|
SY
|
960.000
|
$20.000
|
$12.000
|
$59.400
|
$10.170
|
$23.000
|
$10.000
|
|
|
REMOV STR (PIPE)
|
LF
|
980.000
|
$19.920
|
$16.000
|
$16.200
|
$8.790
|
$20.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$435,000.000
|
$350,000.000
|
$357,213.920
|
$355,122.300
|
$400,000.000
|
$496,891.880
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$2,000.000
|
$3,500.000
|
$2,700.000
|
$7,844.130
|
$3,000.000
|
$4,626.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
150.000
|
$30.000
|
$35.000
|
$22.680
|
$36.850
|
$40.000
|
$21.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
150.000
|
$10.000
|
$12.000
|
$10.800
|
$3.760
|
$9.000
|
$13.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,746.000
|
$5.000
|
$2.500
|
$2.320
|
$3.200
|
$3.500
|
$2.150
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,746.000
|
$1.300
|
$0.750
|
$0.810
|
$1.000
|
$1.500
|
$0.750
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
4,890.000
|
$4.200
|
$5.000
|
$3.620
|
$6.420
|
$6.000
|
$3.350
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
4,890.000
|
$1.650
|
$0.800
|
$0.650
|
$2.400
|
$1.000
|
$0.600
|
|
|
CONSTRUCTING DETOURS
|
SY
|
15,518.000
|
$18.800
|
$17.000
|
$19.440
|
$11.970
|
$15.000
|
$27.760
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
300.000
|
$15.000
|
$10.000
|
$36.000
|
$9.450
|
$34.000
|
$33.330
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
510.000
|
$12.740
|
$10.000
|
$21.600
|
$7.560
|
$15.000
|
$20.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
300.000
|
$12.000
|
$10.000
|
$32.400
|
$9.450
|
$34.000
|
$30.000
|
|
|
INTERSECTIONS (SURF TREAT)
|
SY
|
1,881.000
|
$22.000
|
$18.500
|
$11.880
|
$21.300
|
$16.000
|
$28.260
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
4,105.900
|
$20.000
|
$15.000
|
$11.880
|
$22.020
|
$16.000
|
$23.080
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
11.000
|
$30.000
|
$25.000
|
$11.880
|
$24.520
|
$400.000
|
$36.800
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,500.000
|
$25.000
|
$23.000
|
$22.200
|
$22.000
|
$23.000
|
$20.560
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,575.000
|
$2,285.000
|
$2,244.240
|
$2,223.460
|
$2,300.000
|
$2,078.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
100.000
|
$20.630
|
$24.000
|
$22.730
|
$22.520
|
$25.000
|
$21.050
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,405.000
|
$5.000
|
$2.750
|
$2.700
|
$2.680
|
$3.000
|
$2.500
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
$2,500.000
|
$2,885.000
|
$2,831.760
|
$2,805.540
|
$3,000.000
|
$2,622.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
4.000
|
$10,000.000
|
$10,000.000
|
$10,260.000
|
$10,505.000
|
$11,000.000
|
$9,550.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
6.000
|
$1,675.000
|
$2,750.000
|
$2,160.000
|
$2,200.000
|
$1,000.000
|
$2,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$800.000
|
$2,300.000
|
$810.000
|
$825.000
|
$750.000
|
$750.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
9.000
|
$205.000
|
$187.000
|
$172.800
|
$171.200
|
$200.000
|
$160.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$550.000
|
$627.000
|
$910.130
|
$901.700
|
$630.000
|
$842.710
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,200.000
|
$814.000
|
$1,047.050
|
$1,037.360
|
$820.000
|
$969.490
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
12.000
|
$550.000
|
$352.000
|
$651.350
|
$645.320
|
$360.000
|
$603.100
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
18.000
|
$700.000
|
$451.000
|
$754.030
|
$747.060
|
$460.000
|
$698.190
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$300.000
|
$385.000
|
$756.000
|
$723.230
|
$400.000
|
$675.920
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$350.000
|
$462.000
|
$800.280
|
$792.870
|
$470.000
|
$741.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
27.000
|
$110.000
|
$75.000
|
$108.000
|
$107.000
|
$100.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
12.000
|
$25.000
|
$22.000
|
$21.600
|
$21.400
|
$30.000
|
$20.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
14.000
|
$64.970
|
$60.500
|
$79.750
|
$79.010
|
$60.000
|
$73.840
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
32.000
|
$40.000
|
$33.540
|
$32.930
|
$32.620
|
$35.000
|
$30.490
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
116,760.000
|
$0.170
|
$0.110
|
$0.110
|
$0.250
|
$0.110
|
$0.100
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
116,760.000
|
$0.200
|
$0.260
|
$0.260
|
$0.250
|
$0.260
|
$0.240
|
|
|
WK ZN PAV MRK REMOV (REFL) TY I-C
|
EA
|
600.000
|
$2.860
|
$3.630
|
$3.560
|
$3.850
|
$3.640
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
2,075.000
|
$4.420
|
$3.630
|
$3.560
|
$3.850
|
$3.640
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
EA
|
1,790.000
|
$2.000
|
$3.250
|
$3.190
|
$2.570
|
$3.250
|
$2.950
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
|
EA
|
6,210.000
|
$2.000
|
$3.250
|
$3.190
|
$2.570
|
$3.250
|
$2.950
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
70.000
|
$17.370
|
$11.000
|
$10.800
|
$19.260
|
$11.030
|
$10.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
5,620.000
|
$1.160
|
$1.250
|
$0.490
|
$1.520
|
$0.600
|
$1.370
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
225.000
|
$0.600
|
$1.160
|
$1.130
|
$1.440
|
$1.160
|
$1.050
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
135.000
|
$10.000
|
$12.100
|
$11.880
|
$11.770
|
$12.130
|
$11.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,620.000
|
$0.450
|
$0.390
|
$0.380
|
$0.370
|
$0.390
|
$0.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
56,200.000
|
$0.450
|
$0.360
|
$0.360
|
$0.340
|
$0.360
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
4,648.000
|
$0.450
|
$0.370
|
$0.370
|
$0.370
|
$0.370
|
$0.340
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
33,300.000
|
$0.500
|
$0.360
|
$0.360
|
$0.340
|
$0.360
|
$0.330
|
|
REFL PAV MRKR TY I-C
|
EA
|
150.000
|
$4.000
|
$4.790
|
$4.700
|
$3.910
|
$4.800
|
$4.350
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
663.000
|
$4.000
|
$4.790
|
$4.700
|
$3.910
|
$4.800
|
$4.350
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
90,000.000
|
$0.440
|
$0.540
|
$0.540
|
$0.410
|
$0.690
|
$0.630
|
|
|
TEMP TRAF SIGNALS
|
EA
|
2.000
|
$21,000.000
|
$7,000.000
|
$28,080.000
|
$28,600.000
|
$8,000.000
|
$5,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
40.000
|
$300.000
|
$265.000
|
$540.000
|
$709.130
|
$400.000
|
$700.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
96.000
|
$37.500
|
$52.000
|
$81.000
|
$141.830
|
$50.000
|
$70.000
|
|
Totals: |
$4,828,749.680
|
$4,526,012.960
|
$4,979,224.187
|
$5,075,637.749
|
$5,187,502.810
|
$5,518,284.502
|