Show Job Controls
Bid Cobra

EASTLAND US 183 (0127-01-037)

Items: 42

County: EASTLAND
Length: N/A
Highway: US 183
District: BROWNWOOD
Control Number: 0127-01-037
DBE Goal: N/A
Project: F 2022(288)
Guaranty: N/A
Time: 73 WORKING DAYS
Engineer's Estimate: $2,966,327.40
Date: 01/06/2022 (4 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$2,966,327.40
$2,839,911.02
Over/Under Est: -4.26% -$126,416.38
Over/Under Est: -3.96% -$117,375.53
Amt Left: 0.32% $9,040.85
$2,850,240.41
Over/Under Est: -3.91% -$116,086.99
Amt Left: 0.36% $10,329.39
Delta: -0.05% -$1,288.54
Over/Under Est: -3.76% -$111,602.85
Amt Left: 0.52% $14,813.53
Delta: -0.16% -$4,484.14
$3,011,079.30
Over/Under Est: 1.51% $44,751.90
Amt Left: 6.03% $171,168.28
Delta: -5.48% -$156,354.75

Bid Items & Bid Tabulations

42 Total 0 of 42
EASTLAND  |  US 183  |  BROWNWOOD  |  0127-01-037  |  01/06/2022  |  $2,966,327.40  |  F 2022(288)  |  PREVENT MAINT  |  73 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DUININCK, INC.
BIG CREEK CONSTRUCTION, LTD.
A. L. HELMCAMP, INC.
NORTHEASTERN PAVERS, LLC
RK HALL, LLC
REMOVING CONC (DRIVEWAYS)
SY 656.000 $25.000 $25.000 $20.000 $34.000 $35.000 $24.870
EXCAVATION (ROADWAY)
CY 1,425.000 $25.000 $25.500 $25.000 $34.000 $40.000 $13.840
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 500.000 $30.000 $41.500 $25.000 $15.000 $45.000 $15.970
BROADCAST SEED (TEMP) (WARM)
SY 2,764.000 $1.000 $0.600 $0.600 $0.650 $1.000 $0.660
BROADCAST SEED (TEMP) (COOL)
SY 2,764.000 $1.000 $0.610 $0.610 $0.650 $1.000 $0.670
VEGETATIVE WATERING
MG 2.500 $100.000 $26.500 $50.000 $25.000 $3,000.000 $735.600
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,000.000 $65.000 $92.000 $50.000 $75.000 $70.000 $148.190
PLANE CONC PAV(0" TO 1-1/2")
SY 2,053.000 $5.000 $7.000 $1.750 $3.500 $3.000 $8.210
PLANE ASPH CONC PAV (1.5")
SY 4,016.000 $5.000 $3.600 $2.000 $3.500 $3.000 $3.150
PLANE ASPH CONC PAV (1")
SY 3,701.000 $2.500 $3.900 $2.000 $3.500 $2.000 $3.430
MOBILIZATION
LS 1.000 $269,274.400 $200,000.000 $284,000.000 $175,000.000 $250,000.000 $159,969.600
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $8,000.000 $17,500.000 $3,000.000 $10,000.000 $5,000.000 $15,500.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 108.000 $5.000 $6.900 $6.860 $7.350 $10.000 $7.550
BIODEG EROSN CONT LOGS (REMOVE)
LF 108.000 $1.000 $2.000 $2.000 $2.150 $2.500 $2.200
TURNOUTS (ACP)
SY 26.000 $80.000 $60.000 $45.000 $50.000 $75.000 $348.250
RUMBLE STRIPS (SHOULDER)
LF 90,439.000 $0.500 $0.060 $0.300 $0.180 $0.180 $0.050
RUMBLE STRIPS (CENTERLINE)
LF 46,219.000 $0.500 $0.100 $0.300 $0.180 $0.180 $0.050
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 2.000 $500.000 $1,200.000 $2,500.000 $428.000 $1,400.000 $522.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $500.000 $1,200.000 $1,200.000 $642.000 $1,400.000 $1,215.500
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $500.000 $1,800.000 $1,200.000 $856.000 $2,100.000 $1,458.600
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $500.000 $2,600.000 $1,500.000 $1,177.000 $3,000.000 $1,663.200
REMOVE SM RD SN SUP&AM
EA 5.000 $100.000 $755.000 $100.000 $123.000 $875.000 $175.930
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 4,558.000 $0.250 $0.600 $1.000 $0.800 $1.000 $3.540
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 450.000 $1.000 $0.850 $0.900 $0.910 $1.350 $0.940
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 55.000 $1.000 $1.500 $1.800 $1.610 $1.650 $1.650
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 642.000 $2.500 $1.000 $0.800 $1.070 $0.860 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 210.000 $5.000 $6.000 $12.000 $6.420 $6.000 $6.600
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 5,395.000 $0.500 $0.340 $0.360 $0.360 $0.400 $0.370
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 84,006.000 $0.500 $0.330 $0.360 $0.350 $0.370 $0.360
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,518.000 $0.500 $0.340 $0.340 $0.360 $0.400 $0.370
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 64,243.000 $0.500 $0.330 $0.340 $0.350 $0.370 $0.360
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $125.000 $225.000 $330.000 $241.000 $220.000 $247.500
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 8.000 $500.000 $350.000 $700.000 $375.000 $450.000 $385.000
PREFAB PAV MRK TY C (W) (WORD)
EA 2.000 $500.000 $250.000 $385.000 $268.000 $295.000 $275.000
REFL PAV MRKR TY I-C
EA 230.000 $5.000 $4.500 $4.700 $4.850 $3.500 $4.950
REFL PAV MRKR TY II-A-A
EA 1,211.000 $5.000 $4.500 $4.700 $4.850 $3.500 $4.950
TACK COAT
GAL 360.000 $2.000 $2.900 $5.000 $6.000 $0.010 $11.220
D-GR HMA TY-B PG64-22
TON 1,017.000 $95.000 $110.000 $85.000 $115.000 $85.000 $111.890
SP MIXES SP-D SAC-B PG76-22
TON 22,025.000 $95.000 $91.000 $93.000 $94.000 $98.000 $97.220
BONDING COURSE
GAL 35,500.000 $3.000 $2.900 $3.750 $3.500 $0.010 $4.000
TMA (STATIONARY)
DAY 35.000 $200.000 $400.000 $150.000 $215.000 $0.010 $374.470
TMA (MOBILE OPERATION)
HR 96.000 $50.000 $90.500 $70.000 $65.000 $0.010 $48.400
Totals: $2,966,327.400 $2,839,911.020 $2,848,951.870 $2,850,240.410 $2,854,724.550 $3,011,079.300