Show Job Controls
Bid Cobra

EASTLAND IH 20 (0007-06-084)

Items: 228

County: EASTLAND
Length: N/A
Highway: IH 20
District: BROWNWOOD
Control Number: 0007-06-084
DBE Goal: N/A
Project: STP 2017(368)HES
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $79,604,509.10
Date: 03/08/2017 (9 years ago)
Contract Number: N/A
Type: REALIGN EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (11)
E
Engineer's Estimate
$79,604,509.10
$76,238,256.10
Over/Under Est: -4.23% -$3,366,253.00
Over/Under Est: -2.16% -$1,716,253.52
Amt Left: 2.16% $1,649,999.48
Over/Under Est: 0.26% $203,912.34
Amt Left: 4.68% $3,570,165.34
Delta: -2.47% -$1,920,165.86
$79,922,115.35
Over/Under Est: 0.4% $317,606.25
Amt Left: 4.83% $3,683,859.25
Delta: -0.14% -$113,693.91
Over/Under Est: 5.42% $4,315,321.77
Amt Left: 10.08% $7,681,574.77
Delta: -5.00% -$3,997,715.52
$84,030,963.38
Over/Under Est: 5.56% $4,426,454.28
Amt Left: 10.22% $7,792,707.28
Delta: -0.13% -$111,132.51
$85,890,353.62
Over/Under Est: 7.9% $6,285,844.52
Amt Left: 12.66% $9,652,097.52
Delta: -2.21% -$1,859,390.24
$87,939,080.19
Over/Under Est: 10.47% $8,334,571.09
Amt Left: 15.35% $11,700,824.09
Delta: -2.39% -$2,048,726.57
Over/Under Est: 12.51% $9,961,825.89
Amt Left: 17.48% $13,328,078.89
Delta: -1.85% -$1,627,254.80
$90,000,000.00
Over/Under Est: 13.06% $10,395,490.90
Amt Left: 18.05% $13,761,743.90
Delta: -0.48% -$433,665.01
Over/Under Est: 14.93% $11,886,490.80
Amt Left: 20.01% $15,252,743.80
Delta: -1.66% -$1,490,999.90

Bid Items & Bid Tabulations

228 Total 0 of 228
EASTLAND  |  IH 20  |  BROWNWOOD  |  0007-06-084  |  03/08/2017  |  $79,604,509.10  |  STP 2017(368)HES  |  REALIGN EXIST ROADWAY  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACHRY CONSTRUCTION CORPORATION
SUNDT CONSTRUCTION, INC.
FLATIRON CONSTRUCTORS, INC.
A. L. HELMCAMP, INC.
JAY MILLS CONTRACTING, INCORPORATED
WEBBER, LLC
FLUOR ENTERPRISES, INC.
AMES CONSTRUCTION, INC.
MARIO SINACOLA & SONS EXCAVATING, INC.
FISHER SAND & GRAVEL CO.
THE LANE CONSTRUCTION CORPORATION
PREPARING ROW
AC 10.000 $2,500.000 $45,000.000 $900.000 $44,869.830 $25,000.000 $2,000.000 $50,000.000 $2,500.000 $10,400.000 $5,000.000 $15,000.000 $9,168.000
REMOVING CONC (PAV)
SY 12,778.000 $7.000 $9.000 $12.000 $8.590 $5.800 $4.000 $10.600 $7.240 $9.500 $7.000 $10.000 $7.700
REMOVING CONC (CTB)
LF 6,582.000 $11.000 $9.000 $15.000 $10.100 $10.000 $6.750 $16.700 $9.780 $17.000 $20.000 $10.000 $15.000
REMOVING CONC (FLUME)
SY 3,753.000 $13.000 $12.000 $5.000 $9.090 $10.000 $11.000 $4.800 $7.350 $10.000 $7.000 $10.000 $5.450
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 7,132.000 $5.000 $2.050 $3.000 $1.790 $4.000 $3.750 $2.150 $6.970 $4.000 $4.000 $5.000 $1.050
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 19,534.000 $5.000 $3.490 $3.000 $3.080 $5.000 $4.700 $3.800 $42.370 $8.000 $6.000 $5.000 $1.950
REMOVING STAB BASE & ASPH PAV (0-2")
SY 15,374.000 $3.000 $1.700 $0.100 $1.220 $1.000 $1.000 $1.350 $0.970 $2.500 $1.000 $2.000 $0.250
EXCAVATION (ROADWAY)
CY 1,646,603.000 $9.000 $7.800 $8.660 $8.000 $7.000 $10.750 $7.250 $5.900 $8.700 $8.500 $7.000 $9.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,098,670.000 $6.500 $5.300 $7.220 $6.400 $5.500 $4.050 $8.000 $7.250 $4.100 $7.000 $6.000 $9.000
FURNISHING AND PLACING TOPSOIL (6")
SY 283,379.000 $1.600 $1.400 $0.200 $1.620 $1.500 $1.250 $1.400 $1.360 $0.700 $0.500 $1.500 $3.200
DRILL SEEDING (TEMP) (WARM)
SY 195,252.000 $0.200 $0.050 $0.080 $0.060 $0.130 $0.070 $0.150 $0.080 $0.100 $0.080 $0.220 $0.120
DRILL SEEDING (TEMP) (COOL)
SY 195,233.000 $0.200 $0.060 $0.080 $0.060 $0.130 $0.070 $0.150 $0.090 $0.100 $0.090 $0.220 $0.130
DRILL SEEDING (PERM)(WARM OR COOL)
SY 283,379.000 $0.200 $0.140 $0.090 $0.100 $0.130 $0.120 $0.200 $0.090 $0.120 $0.100 $0.220 $0.170
VEGETATIVE WATERING
MG 58,484.100 $10.000 $4.000 $12.000 $35.910 $12.000 $15.000 $20.000 $20.290 $12.000 $20.000 $20.000 $10.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 237,659.000 $1.300 $0.580 $0.900 $0.770 $1.100 $0.730 $0.700 $0.870 $0.650 $1.000 $1.000 $0.670
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 21,840.000 $1.800 $0.580 $1.000 $0.870 $1.150 $0.730 $0.700 $0.970 $0.650 $1.000 $1.250 $0.670
PROOF ROLLING
HR 1,000.000 $44.000 $150.000 $53.000 $70.710 $60.000 $110.000 $67.000 $145.660 $185.000 $75.000 $100.000 $128.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 23,537.000 $40.000 $35.000 $17.000 $28.280 $34.000 $33.000 $25.800 $36.340 $32.500 $45.000 $31.000 $24.500
CM TRT(PT MX)(CL L)(TYD)(GR1-2)(FN POS)
CY 40,939.000 $40.000 $70.000 $56.000 $61.520 $56.000 $60.000 $50.000 $84.900 $73.500 $70.000 $75.000 $55.000
PRIME COAT (MC-30)
GAL 13,408.000 $3.900 $4.400 $4.400 $4.400 $4.800 $4.500 $4.650 $3.000 $4.600 $4.450 $5.000 $4.600
AGGR(TY-B GR-4 SAC-B)
CY 490.000 $82.500 $112.000 $100.000 $100.000 $120.000 $128.000 $141.000 $96.120 $105.000 $100.000 $200.000 $125.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 2,573.000 $2.800 $8.000 $8.000 $8.000 $5.000 $5.800 $4.200 $2.750 $8.500 $8.000 $3.500 $5.700
ASPH (CRS-1P, CRS-2P, OR AC-15P)
GAL 23,570.000 $2.800 $3.500 $3.500 $3.500 $5.000 $5.800 $6.250 $2.500 $3.750 $3.500 $8.000 $5.700
D-GR HMA TY-C PG70-22
TON 28,380.300 $72.000 $87.950 $87.950 $87.950 $89.000 $84.000 $88.000 $85.250 $92.000 $88.000 $95.000 $93.000
D-GR HMA TY-D PG70-22
TON 12,218.100 $80.000 $89.250 $89.250 $89.250 $81.000 $90.000 $92.000 $85.000 $94.000 $90.000 $95.000 $93.000
PLANE ASPH CONC PAV(0" TO 8")
SY 119,569.000 $2.000 $4.150 $2.000 $1.760 $3.500 $2.600 $2.400 $1.290 $3.600 $3.500 $3.750 $1.500
CONC PVMT (CONT REINF - CRCP) (13")
SY 248,770.400 $40.000 $50.000 $47.000 $46.590 $61.000 $57.000 $49.000 $68.800 $61.000 $51.200 $70.000 $56.200
CEM STABIL BKFL
CY 692.000 $75.000 $85.000 $180.000 $153.080 $160.000 $105.000 $47.000 $155.000 $230.000 $150.000 $175.000 $165.000
FLOWABLE BACKFILL
CY 913.000 $155.000 $200.000 $130.000 $153.080 $160.000 $115.000 $133.000 $180.000 $205.000 $150.000 $165.000 $165.000
TRENCH EXCAVATION PROTECTION
LF 16,779.000 $3.000 $0.600 $0.100 $1.990 $5.000 $1.350 $0.050 $3.780 $19.000 $25.000 $10.000 $1.200
SOIL NAIL ANCHORS
LF 90,825.000 $13.500 $17.000 $11.000 $14.900 $22.000 $12.000 $10.200 $9.760 $25.000 $10.000 $22.000 $11.000
ROCK NAIL ANCHORS
LF 48,843.000 $17.000 $22.000 $14.000 $14.290 $22.000 $16.000 $13.000 $13.150 $25.000 $13.500 $22.000 $15.000
DRILL SHAFT (18 IN)
LF 160.000 $74.000 $63.600 $77.000 $65.480 $70.000 $70.000 $74.750 $65.320 $52.000 $80.000 $100.000 $172.000
DRILL SHAFT (24 IN)
LF 42.000 $105.000 $125.000 $127.000 $132.430 $185.000 $205.000 $136.000 $141.160 $141.000 $130.000 $150.000 $133.000
DRILL SHAFT (36 IN)
LF 677.000 $152.000 $134.160 $144.000 $119.520 $205.000 $250.000 $129.000 $135.020 $215.000 $200.000 $200.000 $159.000
DRILL SHAFT (42 IN)
LF 284.000 $225.000 $220.930 $220.000 $150.730 $280.000 $590.000 $201.000 $263.060 $240.000 $315.000 $475.000 $230.000
DRILL SHAFT (48 IN)
LF 156.000 $239.000 $200.930 $210.000 $201.410 $360.000 $465.000 $209.000 $217.360 $375.000 $340.000 $500.000 $350.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 7.000 $120.000 $100.000 $100.000 $107.110 $120.000 $110.000 $110.000 $117.760 $130.000 $110.000 $125.000 $108.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 160.000 $600.000 $530.000 $540.000 $613.030 $630.000 $852.500 $631.000 $614.050 $655.000 $610.000 $650.000 $720.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 192.000 $185.000 $185.000 $190.000 $154.150 $205.000 $550.000 $159.000 $163.830 $166.000 $155.000 $175.000 $180.000
CL A CONC (FLUME)
CY 359.000 $580.000 $675.000 $435.000 $662.940 $480.000 $625.000 $392.000 $653.000 $825.000 $1,100.000 $550.000 $470.000
CL C CONC (ABUT)(HPC)
CY 101.100 $862.000 $1,000.000 $750.000 $604.600 $1,000.000 $955.000 $1,230.000 $917.370 $900.000 $1,100.000 $1,050.000 $880.000
CL C CONC (CAP)(HPC)
CY 226.300 $831.000 $1,175.000 $700.000 $811.270 $1,000.000 $1,800.000 $983.000 $1,132.670 $1,200.000 $1,400.000 $850.000 $1,140.000
CL C CONC (COLUMN)(HPC)
CY 87.600 $785.000 $1,160.000 $710.000 $842.350 $1,000.000 $1,260.000 $1,150.000 $1,267.870 $855.000 $950.000 $750.000 $1,460.000
CL C CONC (RAIL FOUNDATION)
CY 633.000 $356.000 $350.000 $325.000 $327.810 $410.000 $630.000 $476.000 $477.000 $460.000 $550.000 $450.000 $360.000
REINF CONC SLAB (HPC)
SF 28,761.000 $17.000 $21.000 $12.000 $14.790 $16.000 $19.000 $18.100 $16.530 $25.000 $21.000 $35.000 $19.000
APPROACH SLAB (HPC)
CY 101.080 $382.000 $560.000 $600.000 $508.510 $500.000 $460.000 $578.000 $1,154.400 $920.000 $550.000 $1,100.000 $660.000
RETAINING WALL (MSE)
SF 17,574.800 $47.500 $55.000 $45.000 $44.480 $52.000 $51.000 $42.500 $52.370 $62.000 $52.000 $55.000 $44.000
RETAINING WALL (SOIL NAIL)(FACIA)
SF 63,424.000 $38.000 $31.000 $35.000 $32.470 $36.000 $44.000 $43.010 $43.270 $34.000 $40.000 $50.000 $45.000
PRESTR CONC GIRDER (TX54)
LF 2,716.750 $120.000 $130.000 $120.000 $127.140 $135.000 $150.000 $134.000 $169.940 $160.000 $150.000 $125.000 $154.000
PRESTR CONC GIRDER (TX62)
LF 1,100.970 $141.000 $170.000 $150.000 $129.410 $135.000 $155.000 $176.000 $190.540 $200.000 $150.000 $165.000 $152.000
RIPRAP (CONC)(5 IN)
CY 601.000 $433.000 $352.000 $360.000 $424.370 $450.000 $510.000 $463.000 $418.000 $375.000 $750.000 $450.000 $510.000
RIPRAP (CONC)(6 IN)
CY 4.500 $485.000 $830.000 $640.000 $507.610 $1,600.000 $580.000 $674.000 $500.000 $830.000 $1,000.000 $600.000 $960.000
RIPRAP (CONC) (CL A )
CY 21.300 $690.000 $1,000.000 $625.000 $500.000 $800.000 $765.000 $494.000 $423.000 $600.000 $1,000.000 $575.000 $770.000
RIPRAP (CONC)(CL B)
CY 3.000 $407.000 $1,000.000 $640.000 $507.610 $1,600.000 $650.000 $919.000 $500.000 $900.000 $1,500.000 $600.000 $960.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 1,328.000 $122.000 $100.000 $55.000 $61.880 $130.000 $75.000 $119.000 $109.020 $78.000 $165.000 $200.000 $91.000
RIPRAP (MOW STRIP)(5 IN)
CY 200.500 $470.000 $610.000 $340.000 $561.420 $530.000 $550.000 $458.000 $553.000 $380.000 $750.000 $525.000 $560.000
RAIL (TY SSTR)
LF 15,020.600 $40.000 $44.000 $38.000 $52.920 $50.000 $41.500 $57.500 $50.640 $69.000 $55.000 $50.000 $55.000
RAIL (TY SSTR)(HPC)
LF 1,777.300 $33.000 $44.000 $30.000 $58.200 $65.000 $50.000 $57.750 $63.640 $73.500 $60.000 $65.000 $53.000
RAIL (TY PR1)
LF 2,970.000 $88.000 $60.000 $50.000 $66.350 $85.000 $77.000 $83.500 $95.080 $106.000 $74.000 $65.000 $68.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 208.000 $90.000 $93.000 $68.000 $81.470 $85.000 $90.000 $79.000 $91.880 $130.000 $110.000 $50.000 $86.000
CONC BOX CULV (4 FT X 2 FT)
LF 118.000 $175.000 $260.100 $160.000 $130.570 $280.000 $180.000 $178.000 $300.000 $360.000 $370.000 $450.000 $210.000
CONC BOX CULV (5 FT X 2 FT)
LF 2,374.000 $270.000 $372.300 $430.000 $309.570 $440.000 $375.000 $280.000 $380.000 $910.000 $530.000 $450.000 $400.000
CONC BOX CULV (5 FT X 4 FT)
LF 445.000 $262.000 $311.100 $460.000 $252.080 $350.000 $280.000 $243.000 $640.000 $505.000 $440.000 $550.000 $290.000
CONC BOX CULV (6 FT X 3 FT)
LF 494.000 $304.000 $382.500 $420.000 $288.570 $400.000 $310.000 $274.000 $410.000 $730.000 $438.000 $675.000 $410.000
CONC BOX CULV (5 FT X 5 FT)-(MOD)
LF 555.000 $550.000 $566.100 $485.000 $601.030 $650.000 $600.000 $1,120.000 $620.000 $710.000 $1,015.000 $1,100.000 $810.000
RC PIPE (CL III)(18 IN)
LF 90.000 $60.000 $75.480 $100.000 $42.630 $55.000 $58.000 $76.000 $74.000 $1,925.000 $116.000 $125.000 $55.000
RC PIPE (CL III)(24 IN)
LF 14,705.000 $75.000 $98.940 $75.000 $73.260 $65.000 $72.000 $97.500 $97.000 $133.000 $114.000 $150.000 $100.000
RC PIPE (CL III)(36 IN)
LF 3,111.000 $115.000 $105.060 $87.000 $95.500 $95.000 $95.000 $111.000 $103.000 $170.000 $138.000 $140.000 $137.000
RC PIPE (CL IV)(24 IN)
LF 839.000 $96.000 $76.500 $84.000 $107.480 $80.000 $82.000 $103.000 $75.000 $145.000 $152.000 $150.000 $107.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $3,750.000 $1,836.000 $2,600.000 $2,272.470 $5,000.000 $2,300.000 $3,600.000 $1,800.000 $6,300.000 $5,500.000 $4,000.000 $4,300.000
INLET (COMPL)(TY MSE1)
EA 3.000 $6,200.000 $2,810.100 $2,200.000 $2,265.180 $5,000.000 $8,300.000 $2,440.000 $2,755.000 $3,600.000 $5,000.000 $4,500.000 $2,700.000
INLET (COMPL)(TY MSE2)
EA 1.000 $5,100.000 $4,105.500 $3,300.000 $3,071.470 $5,000.000 $7,400.000 $1,970.000 $4,025.000 $3,600.000 $6,100.000 $5,000.000 $3,400.000
MANH(COMPL)(TY 1 )
EA 7.000 $4,225.000 $4,284.000 $4,500.000 $3,596.520 $5,000.000 $4,350.000 $4,070.000 $4,200.000 $6,200.000 $10,000.000 $5,500.000 $4,300.000
INLET(COMPL)(DROP)(TY 1)(1 GRATE)
EA 6.000 $3,310.000 $3,468.000 $3,900.000 $3,426.240 $5,000.000 $3,600.000 $4,880.000 $3,400.000 $6,100.000 $6,000.000 $5,250.000 $4,900.000
JCT BOX (COMPL)(SPL2)
EA 1.000 $11,000.000 $5,661.000 $4,300.000 $4,115.470 $5,000.000 $5,800.000 $8,100.000 $5,550.000 $7,500.000 $5,900.000 $6,500.000 $5,300.000
MANH (COMPL)(TY 1-C)
EA 3.000 $3,750.000 $2,499.000 $3,100.000 $2,675.920 $5,000.000 $3,200.000 $4,490.000 $2,450.000 $5,000.000 $5,500.000 $4,500.000 $3,100.000
INLET (COMPL)(DROP)(TY 1-C)
EA 3.000 $3,500.000 $3,315.000 $2,800.000 $2,592.240 $5,000.000 $2,800.000 $3,820.000 $3,250.000 $5,500.000 $5,600.000 $4,500.000 $4,200.000
RGI-SPL
EA 102.000 $5,900.000 $6,410.700 $6,700.000 $4,155.310 $5,000.000 $6,900.000 $6,020.000 $6,285.000 $6,400.000 $12,000.000 $4,500.000 $7,600.000
INLET UNDER RAIL (CIP)(COMPL)
EA 12.000 $5,900.000 $6,987.000 $7,300.000 $5,388.960 $6,000.000 $8,350.000 $3,610.000 $6,850.000 $10,500.000 $9,150.000 $6,000.000 $10,200.000
WINGWALL (PW - 1) (HW=4 FT)
EA 2.000 $9,500.000 $4,299.300 $8,000.000 $5,062.790 $7,000.000 $7,400.000 $14,050.000 $4,215.000 $9,700.000 $8,500.000 $10,000.000 $8,600.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $11,250.000 $8,874.000 $19,000.000 $9,784.830 $8,000.000 $11,400.000 $19,500.000 $8,700.000 $6,900.000 $13,000.000 $12,500.000 $14,700.000
WINGWALL (SW - 0) (HW=3 FT)
EA 2.000 $4,850.000 $2,040.000 $3,500.000 $2,518.770 $6,000.000 $4,000.000 $10,800.000 $2,000.000 $4,400.000 $6,000.000 $13,500.000 $4,400.000
SET (TY I) (36 IN) (3: 1) (C)
EA 1.000 $1,700.000 $4,284.000 $7,000.000 $2,116.560 $3,000.000 $2,150.000 $3,210.000 $4,200.000 $8,200.000 $5,500.000 $1,000.000 $7,400.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1) (C)
EA 3.000 $6,500.000 $6,120.000 $4,200.000 $3,146.100 $5,000.000 $5,900.000 $4,390.000 $6,000.000 $10,500.000 $7,750.000 $2,200.000 $4,500.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
EA 2.000 $8,000.000 $8,160.000 $13,000.000 $5,923.590 $8,000.000 $12,500.000 $6,050.000 $8,000.000 $17,000.000 $16,600.000 $2,500.000 $10,900.000
SET (TY I)(S= 5 FT)(HW= 7 FT)(3:1) (C)
EA 2.000 $17,400.000 $11,347.500 $11,000.000 $6,602.100 $9,000.000 $24,250.000 $6,320.000 $11,125.000 $21,000.000 $21,250.000 $3,000.000 $14,500.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $12,000.000 $7,650.000 $7,000.000 $8,386.610 $10,000.000 $12,000.000 $9,020.000 $7,500.000 $16,000.000 $18,000.000 $3,500.000 $9,600.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000 $1,000.000 $1,173.000 $1,000.000 $1,734.560 $900.000 $725.000 $1,260.000 $1,150.000 $1,700.000 $2,100.000 $1,000.000 $1,640.000
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 1.000 $800.000 $1,173.000 $1,000.000 $1,734.560 $900.000 $725.000 $2,120.000 $1,150.000 $1,800.000 $2,100.000 $1,000.000 $1,640.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,055.000 $1,224.000 $1,000.000 $1,734.700 $900.000 $775.000 $2,110.000 $1,200.000 $1,900.000 $2,100.000 $1,000.000 $1,770.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 2.000 $1,355.000 $1,224.000 $1,000.000 $1,734.700 $900.000 $775.000 $2,110.000 $1,200.000 $1,850.000 $2,100.000 $1,000.000 $1,740.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 7.000 $1,100.000 $1,275.000 $1,100.000 $1,734.550 $900.000 $925.000 $1,380.000 $1,250.000 $2,100.000 $2,000.000 $1,050.000 $1,920.000
ADJUSTING INLET (CAP)
EA 1.000 $1,270.000 $1,326.000 $1,800.000 $1,251.060 $1,500.000 $1,500.000 $3,250.000 $1,300.000 $3,800.000 $4,250.000 $3,000.000 $1,340.000
REMOV STR (INLET)
EA 6.000 $760.000 $714.000 $1,000.000 $378.560 $500.000 $925.000 $2,890.000 $700.000 $800.000 $500.000 $2,000.000 $730.000
REMOV STR (SET)
EA 11.000 $330.000 $510.000 $185.000 $155.400 $500.000 $400.000 $1,910.000 $500.000 $400.000 $350.000 $2,000.000 $1,100.000
REMOV STR (WINGWALL)
EA 14.000 $1,260.000 $2,040.000 $650.000 $895.020 $1,000.000 $1,750.000 $3,080.000 $2,000.000 $1,400.000 $1,500.000 $2,150.000 $1,760.000
REMOV STR (PIPE)
LF 2,487.000 $19.000 $20.400 $15.000 $9.960 $20.000 $13.000 $26.300 $20.000 $35.000 $20.000 $25.000 $10.500
REMOV STR (BOX CULVERT)
LF 651.000 $51.000 $64.260 $25.000 $16.220 $35.000 $42.000 $79.250 $63.000 $55.000 $40.000 $110.000 $34.000
REMOV STR (SMALL FENCE)
LF 420.000 $4.000 $6.000 $1.500 $1.240 $5.000 $2.500 $5.200 $8.420 $1.000 $5.000 $10.000 $5.600
REMOVE STR (BARRIER GATE)
EA 2.000 $3,000.000 $750.000 $300.000 $163.930 $2,500.000 $1,800.000 $2,610.000 $841.690 $650.000 $1,100.000 $350.000 $590.000
MOBILIZATION
LS 1.000 $10,780,006.670 $6,308,673.830 $7,275,000.000 $7,893,052.880 $6,650,000.000 $8,200,000.000 $8,165,000.000 $8,220,186.210 $8,415,000.000 $8,910,000.000 $7,284,003.220 $10,050,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 42.000 $4,000.000 $17,200.000 $7,000.000 $10,575.780 $8,000.000 $24,000.000 $30,000.000 $9,581.150 $13,200.000 $20,000.000 $30,000.000 $6,300.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 8,998.000 $28.000 $14.500 $18.000 $21.650 $27.000 $24.000 $20.900 $22.500 $20.000 $25.000 $30.000 $20.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 470.000 $47.000 $27.500 $45.000 $61.860 $68.000 $75.000 $70.500 $125.900 $40.000 $125.000 $40.000 $68.000
ROCK FILTER DAMS (REMOVE)
LF 9,468.000 $9.000 $6.500 $2.000 $11.340 $8.000 $5.250 $4.900 $11.160 $7.000 $10.000 $10.000 $4.750
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,412.000 $20.000 $9.000 $16.000 $24.740 $15.000 $27.000 $24.800 $40.490 $10.000 $15.000 $13.000 $24.000
CONSTRUCTION EXITS (REMOVE)
SY 1,412.000 $9.000 $4.000 $4.750 $12.370 $3.000 $7.750 $6.650 $10.200 $5.000 $5.350 $8.500 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 35,389.000 $2.500 $1.300 $1.650 $1.800 $3.500 $2.250 $2.100 $1.560 $3.500 $1.600 $1.500 $2.050
TEMP SEDMT CONT FENCE (REMOVE)
LF 35,389.000 $0.700 $0.100 $0.500 $0.770 $1.250 $0.500 $0.350 $0.440 $0.750 $0.440 $0.300 $0.360
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 12,063.000 $7.800 $3.750 $4.600 $6.190 $6.000 $4.250 $3.900 $4.410 $6.000 $4.450 $5.000 $3.800
BIODEG EROSN CONT LOGS (REMOVE)
LF 12,063.000 $1.200 $0.250 $0.300 $1.030 $1.000 $0.500 $0.400 $0.310 $0.750 $0.300 $0.800 $0.410
CONSTRUCTING DETOURS
SY 44,365.000 $59.500 $88.860 $81.000 $83.980 $85.000 $82.000 $83.750 $65.580 $90.500 $90.000 $85.000 $75.000
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 17,220.000 $8.500 $3.000 $7.300 $4.320 $12.000 $11.500 $6.350 $6.840 $8.000 $12.000 $10.000 $5.500
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 44,986.000 $5.000 $3.000 $5.300 $2.300 $11.000 $9.250 $6.350 $6.920 $5.000 $10.000 $4.000 $5.000
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 17,220.000 $5.000 $3.000 $6.250 $3.650 $12.000 $11.250 $6.350 $6.920 $7.000 $10.000 $5.000 $7.250
PERM CTB (SGL SLOPE) (TY 1) (54 )
LF 31,013.000 $81.000 $60.000 $55.000 $95.140 $72.000 $79.000 $87.500 $95.000 $109.000 $90.000 $90.000 $74.000
PERM CTB (SGL SLOPE) (TY 3) (54 )
LF 64.000 $260.000 $325.000 $180.000 $196.930 $480.000 $260.000 $150.000 $175.000 $355.000 $350.000 $200.000 $450.000
PERM CTB (SGL SLOPE) (TY 4) (54 )
LF 430.000 $81.000 $130.000 $140.000 $228.210 $210.000 $170.000 $105.000 $205.000 $219.000 $500.000 $175.000 $240.000
RUMBLE STRIPS (SHOULDER)
LF 47,216.000 $0.200 $0.080 $0.900 $0.310 $0.180 $0.050 $1.050 $2.000 $0.200 $0.290 $1.000 $0.300
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 17.000 $1,650.000 $1,375.000 $1,700.000 $1,515.310 $2,600.000 $2,200.000 $1,180.000 $500.000 $1,200.000 $1,500.000 $1,500.000 $1,490.000
REMOVE METAL BEAM GUARD FENCE
LF 3,845.000 $3.000 $1.000 $2.030 $5.100 $6.000 $2.500 $0.850 $2.750 $1.000 $2.250 $1.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 17.000 $2,260.000 $1,750.000 $2,436.550 $2,117.350 $2,600.000 $2,750.000 $1,830.000 $1,850.000 $1,900.000 $1,400.000 $2,000.000 $2,100.000
CRASH CUSH ATTEN (INSTL)
EA 15.000 $12,000.000 $8,500.000 $10,000.000 $11,156.460 $13,000.000 $15,750.000 $8,880.000 $3,000.000 $12,000.000 $9,000.000 $10,000.000 $11,100.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 18.000 $1,850.000 $1,500.000 $1,000.000 $1,326.530 $1,800.000 $2,800.000 $1,570.000 $887.500 $4,700.000 $1,500.000 $1,500.000 $1,320.000
CRASH CUSH ATTEN (REMOVE)
EA 12.000 $900.000 $500.000 $425.000 $612.250 $1,000.000 $2,500.000 $522.000 $887.500 $530.000 $1,000.000 $750.000 $610.000
WIRE FENCE (TY C)
LF 1,000.000 $11.000 $6.500 $10.000 $16.330 $8.000 $5.000 $6.800 $25.000 $11.000 $15.000 $10.000 $16.000
GATE (TY 1)
EA 2.000 $960.000 $350.000 $1,250.000 $1,020.410 $1,500.000 $2,000.000 $1,670.000 $500.000 $1,100.000 $1,000.000 $1,000.000 $1,020.000
PIPE UNDERDRAINS (TY 8) (6")
LF 3,000.000 $27.000 $16.000 $30.000 $15.480 $31.000 $24.000 $20.300 $14.430 $23.000 $45.000 $25.000 $43.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 20.000 $1,925.000 $1,900.000 $2,500.000 $2,277.430 $2,400.000 $3,025.000 $2,340.000 $2,101.570 $2,400.000 $2,300.000 $2,500.000 $2,700.000
REMOVE RD IL ASM (TRANS-BASE)
EA 4.000 $680.000 $500.000 $700.000 $911.420 $1,000.000 $550.000 $938.000 $2,101.570 $950.000 $900.000 $1,000.000 $1,070.000
IN RD IL (TY SA) 30B-8 (250W EQ) LED
EA 1.000 $2,750.000 $2,900.000 $2,900.000 $2,142.860 $2,200.000 $3,300.000 $2,200.000 $2,446.500 $2,250.000 $2,150.000 $2,300.000 $2,500.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 4.000 $3,000.000 $2,700.000 $2,600.000 $2,618.310 $2,700.000 $4,125.000 $2,690.000 $2,446.500 $2,700.000 $2,600.000 $2,800.000 $3,100.000
IN RD IL (TY SP) 48S-12-12(400W EQ)LED
EA 43.000 $7,600.000 $4,300.000 $4,300.000 $4,026.950 $4,200.000 $6,050.000 $4,140.000 $2,446.500 $4,200.000 $4,000.000 $4,300.000 $4,700.000
CONDT (PVC) (SCH 40) (2")
LF 20,231.000 $9.000 $6.000 $7.500 $7.620 $8.000 $7.700 $7.850 $6.650 $8.000 $7.590 $8.000 $8.900
CONDT (PVC) (SCH 80) (2") (BORE)
LF 315.000 $24.000 $30.000 $30.000 $32.980 $34.000 $49.500 $34.000 $15.690 $35.000 $32.810 $35.000 $39.000
ELEC CONDR (NO.12) BARE
LF 950.000 $1.200 $0.700 $0.710 $0.930 $1.000 $0.990 $0.950 $0.880 $1.000 $0.930 $1.000 $1.100
ELEC CONDR (NO.12) INSULATED
LF 2,850.000 $1.200 $0.750 $0.750 $0.930 $1.000 $1.100 $0.950 $1.000 $1.000 $0.930 $1.000 $1.100
ELEC CONDR (NO.8) BARE
LF 2,968.000 $1.000 $0.950 $1.000 $1.040 $1.100 $1.380 $1.050 $0.880 $1.000 $1.030 $1.100 $1.200
ELEC CONDR (NO.8) INSULATED
LF 8,739.000 $1.200 $1.000 $1.000 $1.140 $1.200 $1.490 $1.150 $1.000 $1.250 $1.130 $1.200 $1.350
ELEC CONDR (NO.6) BARE
LF 11,589.000 $1.400 $1.000 $1.000 $1.170 $1.200 $1.870 $1.200 $1.130 $1.250 $1.160 $1.250 $1.350
ELEC CONDR (NO.6) INSULATED
LF 25,469.000 $1.500 $1.150 $1.200 $1.280 $1.300 $1.980 $1.300 $1.260 $1.350 $1.270 $1.350 $1.500
ELEC CONDR (NO.4) BARE
LF 6,695.000 $1.750 $1.300 $1.300 $1.430 $1.500 $3.300 $1.450 $1.130 $1.600 $1.420 $1.500 $1.700
ELEC CONDR (NO.4) INSULATED
LF 13,340.000 $2.000 $1.400 $1.400 $1.510 $1.600 $3.580 $1.550 $1.260 $1.600 $1.500 $1.600 $1.750
GROUND BOX TY A (122311)W/APRON
EA 19.000 $830.000 $750.000 $765.000 $798.220 $850.000 $1,237.500 $821.000 $786.220 $830.000 $790.000 $850.000 $930.000
GROUND BOX TY D (162922)W/APRON
EA 6.000 $925.000 $850.000 $900.000 $897.900 $930.000 $1,705.000 $924.000 $786.220 $940.000 $890.000 $950.000 $1,050.000
REMOVE GROUND BOX
EA 23.000 $230.000 $185.000 $1,700.000 $1,740.860 $1,800.000 $220.000 $1,790.000 $180.040 $1,800.000 $1,730.000 $1,800.000 $2,000.000
RELOCATE ELECTRICAL SERVICES
EA 5.000 $1,825.000 $1,500.000 $2,700.000 $2,715.740 $2,800.000 $3,498.000 $2,790.000 $5,000.000 $2,800.000 $2,700.000 $2,900.000 $3,200.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $650.000 $400.000 $400.000 $810.150 $850.000 $660.000 $834.000 $2,500.000 $850.000 $800.000 $850.000 $950.000
ALUMINUM SIGNS (TY A)
SF 14.000 $27.000 $25.000 $25.000 $39.910 $42.000 $25.300 $26.100 $33.950 $19.000 $40.000 $42.000 $40.000
ALUMINUM SIGNS (TY G)
SF 157.000 $24.000 $25.000 $26.000 $26.200 $27.000 $24.200 $26.100 $21.810 $28.000 $27.000 $28.000 $26.000
ALUMINUM SIGNS (TY O)
SF 170.000 $33.000 $25.000 $25.000 $27.380 $28.000 $23.100 $26.100 $21.690 $29.000 $27.000 $30.000 $28.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 17.000 $480.000 $485.000 $490.000 $514.090 $530.000 $753.500 $507.000 $348.230 $370.000 $510.000 $550.000 $520.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 20.000 $550.000 $585.000 $600.000 $614.170 $640.000 $863.500 $611.000 $462.690 $435.000 $610.000 $650.000 $620.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $675.000 $730.000 $750.000 $751.560 $800.000 $990.000 $762.000 $559.780 $610.000 $745.000 $800.000 $760.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $880.000 $830.000 $850.000 $905.920 $950.000 $1,182.500 $867.000 $750.000 $855.000 $900.000 $950.000 $910.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,625.000 $1,205.000 $1,200.000 $1,262.560 $1,300.000 $2,200.000 $1,260.000 $910.530 $1,400.000 $1,250.000 $1,300.000 $1,270.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 3.000 $1,980.000 $1,715.000 $1,750.000 $1,432.790 $1,500.000 $3,520.000 $1,790.000 $1,653.130 $1,600.000 $1,425.000 $1,500.000 $1,440.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 15.000 $3,540.000 $3,845.000 $3,900.000 $2,296.750 $2,400.000 $3,190.000 $4,020.000 $1,500.000 $1,800.000 $2,300.000 $2,400.000 $2,300.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 6.000 $425.000 $380.000 $380.000 $546.300 $600.000 $825.000 $397.000 $500.000 $370.000 $540.000 $550.000 $550.000
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000 $400.000 $445.000 $450.000 $709.210 $750.000 $825.000 $465.000 $500.000 $320.000 $700.000 $750.000 $710.000
REMOVE SM RD SN SUP&AM
EA 58.000 $100.000 $50.000 $100.000 $101.270 $110.000 $60.000 $52.250 $250.000 $40.000 $100.000 $100.000 $102.000
INSTALL LRSS (STRUCT STEEL)
LB 989.000 $5.000 $6.000 $6.000 $7.750 $8.000 $6.950 $7.950 $7.500 $8.000 $8.000 $8.000 $7.800
RELOCATE LRSA
EA 1.000 $3,350.000 $1,425.000 $1,450.000 $2,317.260 $3,000.000 $6,600.000 $2,380.000 $2,600.000 $2,400.000 $2,300.000 $2,500.000 $2,300.000
REMOVE LRSA
EA 4.000 $805.000 $475.000 $1,000.000 $1,012.690 $1,100.000 $1,650.000 $1,040.000 $580.000 $1,100.000 $1,000.000 $1,000.000 $1,020.000
INS OH SN SUP(25 FT CANT)
EA 1.000 $19,500.000 $17,500.000 $17,800.000 $16,018.380 $17,000.000 $19,800.000 $16,480.000 $12,500.000 $17,000.000 $16,000.000 $17,000.000 $16,100.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 25.000 $80.000 $65.000 $111.680 $127.550 $80.000 $137.500 $68.000 $50.000 $144.000 $30.000 $70.000 $16.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 14.000 $18.200 $15.000 $15.230 $25.510 $20.000 $27.500 $15.700 $50.000 $34.000 $30.000 $16.000 $1.800
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 222.000 $37.000 $17.500 $15.230 $25.510 $25.000 $27.500 $18.300 $50.000 $40.000 $30.000 $19.000 $2.250
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 11.000 $21.000 $15.000 $15.230 $25.510 $20.000 $27.500 $15.700 $50.000 $34.000 $30.000 $16.000 $1.800
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 52.000 $30.500 $14.500 $15.230 $127.550 $25.000 $137.500 $15.200 $50.000 $33.000 $30.000 $15.000 $2.250
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 32.000 $78.000 $70.000 $111.680 $127.550 $90.000 $137.500 $73.000 $50.000 $160.000 $30.000 $75.000 $16.500
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 1.000 $75.000 $60.000 $111.680 $127.550 $80.000 $137.500 $62.750 $50.000 $135.000 $30.000 $65.000 $18.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 16.000 $30.000 $13.500 $30.460 $40.820 $40.000 $44.000 $14.100 $50.000 $31.000 $30.000 $15.000 $6.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 1.000 $40.000 $24.000 $30.460 $40.820 $30.000 $44.000 $25.100 $50.000 $54.000 $30.000 $25.000 $6.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 6,459.000 $0.300 $0.300 $0.300 $0.310 $0.360 $0.330 $0.300 $0.300 $0.400 $0.300 $0.350 $0.300
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 37,866.000 $0.200 $0.300 $0.300 $0.310 $0.330 $0.330 $0.300 $0.300 $0.350 $0.250 $0.350 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 4,242.000 $0.450 $0.670 $0.650 $0.680 $0.620 $0.740 $0.700 $0.600 $0.700 $0.650 $0.750 $0.680
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 28.000 $2.000 $8.000 $8.000 $8.160 $6.500 $8.800 $8.350 $8.000 $6.500 $5.050 $9.000 $8.100
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 34,197.000 $0.200 $0.300 $0.300 $0.310 $0.330 $0.330 $0.300 $0.300 $0.350 $0.250 $0.350 $0.300
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 132.000 $4.000 $2.500 $2.500 $2.550 $4.000 $2.750 $2.600 $2.500 $4.000 $5.050 $2.750 $2.550
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 1,248.000 $4.100 $2.500 $2.500 $2.550 $4.000 $2.750 $2.600 $2.500 $4.000 $5.050 $2.750 $2.550
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 10,547.000 $0.650 $0.670 $0.950 $0.680 $1.000 $0.740 $0.700 $0.670 $1.000 $1.260 $0.750 $0.680
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 52,918.000 $0.600 $0.630 $0.600 $0.640 $1.000 $0.690 $0.650 $0.630 $1.000 $0.860 $0.700 $0.640
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 5,124.000 $1.300 $1.440 $1.450 $1.470 $1.300 $1.580 $1.500 $1.440 $1.300 $0.510 $1.500 $1.450
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 53,831.000 $0.600 $0.630 $0.600 $0.640 $1.000 $0.690 $0.650 $0.630 $1.000 $0.860 $0.700 $0.640
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 64.000 $0.700 $1.000 $1.000 $1.020 $1.500 $1.100 $1.050 $1.000 $1.400 $5.050 $1.500 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,204.000 $0.900 $0.730 $0.750 $0.740 $1.000 $0.800 $0.750 $0.730 $1.050 $1.360 $1.000 $0.740
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 489.000 $2.000 $2.400 $2.400 $2.450 $2.000 $2.640 $2.500 $2.400 $2.050 $4.040 $2.750 $2.450
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 600.000 $2.600 $2.400 $2.400 $2.450 $4.000 $2.640 $2.500 $2.400 $4.000 $4.040 $2.750 $2.450
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 23.000 $5.600 $8.000 $8.000 $8.160 $7.500 $8.800 $8.350 $8.000 $7.000 $10.100 $8.500 $8.100
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
LF 10,221.000 $1.000 $0.550 $0.550 $0.560 $1.000 $0.610 $0.550 $0.550 $1.000 $0.660 $0.650 $0.560
PAVEMENT SEALER 4"
LF 117,171.000 $0.200 $0.120 $0.100 $0.120 $0.210 $0.130 $0.150 $0.120 $0.250 $0.150 $0.150 $0.120
PAVEMENT SEALER 8"
LF 3,721.000 $0.400 $0.400 $0.410 $0.410 $0.320 $0.440 $0.400 $0.400 $0.350 $0.400 $0.450 $0.410
PAVEMENT SEALER 12"
LF 742.000 $1.000 $1.440 $0.690 $1.470 $0.700 $1.580 $1.500 $1.440 $0.750 $0.660 $1.550 $1.450
PAVEMENT SEALER 24"
LF 23.000 $2.000 $3.440 $3.500 $3.510 $1.500 $3.780 $3.600 $3.440 $1.400 $3.030 $3.750 $3.500
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
LF 21,667.000 $0.600 $0.680 $0.700 $0.690 $0.400 $0.750 $0.700 $0.680 $0.450 $0.660 $0.750 $0.690
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 11,016.000 $0.450 $0.360 $0.370 $0.370 $0.500 $0.400 $0.400 $0.360 $0.500 $0.450 $0.450 $0.370
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 92,839.000 $0.350 $0.360 $0.400 $0.370 $0.420 $0.400 $0.400 $0.360 $0.450 $0.400 $0.450 $0.370
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 5,611.000 $0.350 $0.360 $0.370 $0.370 $0.470 $0.400 $0.400 $0.360 $0.500 $0.450 $0.450 $0.370
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 32,630.000 $0.350 $0.360 $0.400 $0.370 $0.420 $0.400 $0.400 $0.360 $0.450 $0.400 $0.450 $0.370
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $204.000 $200.000 $200.000 $204.080 $300.000 $220.000 $209.000 $200.000 $300.000 $303.000 $225.000 $200.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $486.000 $444.000 $450.000 $453.060 $630.000 $488.400 $464.000 $444.000 $640.000 $404.000 $475.000 $450.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $263.000 $240.000 $250.000 $244.900 $400.000 $264.000 $251.000 $240.000 $400.000 $303.000 $250.000 $240.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 49.000 $32.000 $44.000 $45.000 $44.900 $70.000 $48.400 $46.000 $44.000 $71.000 $65.650 $48.000 $45.000
REFL PAV MRKR TY II-A-A
EA 499.000 $3.000 $4.000 $4.000 $4.080 $4.000 $4.400 $4.200 $4.000 $3.600 $5.050 $4.250 $4.050
REFL PAV MRKR TY II-C-R
EA 884.000 $3.400 $4.000 $4.000 $4.080 $4.000 $4.400 $4.200 $4.000 $3.600 $5.050 $4.250 $4.050
ELIM EXT PAV MRK & MRKS (4")
LF 53,139.000 $0.400 $0.430 $1.000 $0.440 $1.300 $0.540 $0.450 $0.430 $0.400 $0.350 $0.450 $0.440
PAV SURF PREP FOR MRK (4")
LF 118,717.000 $1.000 $0.120 $0.110 $0.120 $0.110 $0.130 $0.150 $0.120 $0.150 $0.150 $0.150 $0.120
PAV SURF PREP FOR MRK (8")
LF 3,721.000 $1.000 $0.250 $0.250 $0.260 $0.210 $0.280 $0.200 $0.250 $0.250 $0.450 $0.250 $0.250
PAV SURF PREP FOR MRK (12")
LF 742.000 $1.000 $1.500 $1.500 $1.530 $0.950 $1.650 $1.550 $1.500 $1.000 $1.000 $1.650 $1.500
PAV SURF PREP FOR MRK (24")
LF 23.000 $1.000 $3.000 $1.250 $3.060 $1.260 $3.300 $3.150 $3.000 $1.300 $2.020 $3.250 $3.050
REMOV RDSD FLSH BCN AM (SOLAR PWRD)
EA 3.000 $890.000 $700.000 $700.000 $1,012.690 $1,500.000 $852.500 $1,040.000 $997.500 $1,100.000 $1,000.000 $1,000.000 $1,190.000
REMOVAL OF CONTROL CABINET(GRND MNT)
EA 1.000 $1,040.000 $900.000 $900.000 $1,012.690 $1,100.000 $852.500 $1,040.000 $997.500 $1,100.000 $1,000.000 $1,000.000 $1,190.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 80,998.800 $0.750 $0.790 $0.700 $0.710 $0.800 $0.760 $0.700 $0.690 $0.700 $0.800 $0.750 $1.050
NO. OF WORKING DAYS
$/D 783.000 $1,094.000 $914.000 $914.000 $914.000 $1,094.000 $1,094.000 $1,094.000 $1,094.000 $970.000 $1,070.000 $1,094.000 $974.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 88,889.000 $1.500 $1.450 $0.100 $1.880 $1.250 $1.750 $2.500 $1.880 $2.100 $0.730 $1.750 $1.200
BARRIER GATE
EA 5.000 $16,000.000 $11,000.000 $14,000.000 $11,989.800 $23,000.000 $17,000.000 $7,420.000 $11,750.000 $9,200.000 $16,750.000 $3,000.000 $11,900.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 400.000 $100.000 $75.000 $80.000 $137.500 $125.000 $100.000 $73.500 $150.000 $90.000 $250.000 $150.000 $53.000
RELOCATE ITS RADIO
EA 6.000 $2,000.000 $3,845.000 $3,900.000 $1,362.950 $1,400.000 $6,171.000 $1,400.000 $1,342.500 $1,420.000 $1,350.000 $1,500.000 $1,600.000
ITS POLE (50 FT)(REL)
EA 3.000 $2,200.000 $2,500.000 $2,500.000 $2,638.230 $2,800.000 $5,912.500 $2,710.000 $2,598.660 $2,700.000 $2,625.000 $3,000.000 $3,100.000
ITS POLE MNT CAB (TY 2)(CONF 1)(INS)
EA 3.000 $6,000.000 $10,000.000 $10,000.000 $4,664.200 $4,800.000 $7,397.500 $4,800.000 $4,594.240 $4,800.000 $4,650.000 $5,000.000 $5,500.000
ITS POLE MNT CAB (TY 3)(CONF 1)(INS)
EA 3.000 $5,000.000 $11,200.000 $11,400.000 $5,930.610 $6,200.000 $7,755.000 $6,100.000 $5,841.650 $6,200.000 $5,900.000 $6,000.000 $6,900.000
REPLC LED HI MST IL(6 FIXT)(SYM)(TY S)
EA 1.000 $8,000.000 $11,500.000 $11,700.000 $8,906.800 $9,200.000 $15,246.000 $9,160.000 $8,773.200 $9,300.000 $8,900.000 $9,000.000 $10,400.000
REPLC LED HI MST IL(6 FIXT)(ASYM)(TY A)
EA 4.000 $8,000.000 $12,100.000 $12,300.000 $10,069.650 $11,000.000 $17,303.000 $10,360.000 $9,918.600 $10,500.000 $10,000.000 $10,000.000 $11,800.000
REMOVE HIGH MAST LIGHTING (150 FT)
EA 1.000 $12,000.000 $5,500.000 $6,600.000 $7,001.780 $7,200.000 $7,986.000 $7,200.000 $6,896.750 $7,300.000 $9,000.000 $7,500.000 $8,200.000
RELOCATE HIGH MAST LIGHTING (150 FT)
EA 5.000 $12,500.000 $21,300.000 $22,800.000 $11,641.740 $12,000.000 $19,250.000 $11,980.000 $11,467.110 $12,200.000 $13,000.000 $12,500.000 $13,600.000
ITS GND BOX (POLY) TY 2 (366036)W/APRN
EA 3.000 $6,000.000 $5,100.000 $5,200.000 $4,879.140 $5,000.000 $5,307.500 $5,020.000 $4,805.950 $5,100.000 $5,000.000 $5,000.000 $5,700.000
Totals: $79,604,509.100 $76,238,256.112 $77,888,255.590 $79,808,421.491 $79,922,115.350 $83,919,830.878 $84,030,963.385 $85,890,353.669 $87,939,080.190 $89,566,334.990 $90,000,000.000 $91,490,999.900