DIMMIT US 83 (0037-05-062)

Items: 48

County: DIMMIT
Length: N/A
Highway: US 83
District: LAREDO
Control Number: 0037-05-062
DBE Goal: N/A
Project: C 37-5-62
Guaranty: N/A
Time: 110 WORKING DAYS
Engineer's Estimate: $2,659,260.91
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
DENNICE GARZA
ANGEL MARTINEZ
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,659,260.91
1
$2,887,281.00
Over/Under Est: 8.57% $228,020.09
Over/Under Est: 12.96% $344,616.09
Amt Left: 4.04% $116,596.00
Subcontractor Percentage Amount
D&G ENERGY CORPORATION 15.27% $471,522.45
DEPENDABLE FENCE 0.64% $19,762.57
R&T CONSTRUCTION 0.00% $0.00
Total: 15.91% $491,285.02

Bid Items & Bid Tabulations

48 Total 0 of 48
DIMMIT  |  US 83  |  LAREDO  |  0037-05-062  |  06/27/2023  |  $2,659,260.91  |  C 37-5-62  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  110 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
DELGADO'S CONTRACTORS, LLC
PREPARING ROW
STA 46.500 $4,165.000 $2,500.000 $1,500.000
REMOVING CONC (PAV)
SY 38.000 $40.890 $50.000 $50.000
REMOVING CONC (DRIVEWAYS)
SY 2,804.000 $22.690 $25.000 $25.000
REMOVING CONC (CURB AND GUTTER)
LF 418.000 $22.630 $20.000 $12.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 2,333.000 $18.210 $6.000 $12.000
FURNISHING AND PLACING TOPSOIL
CY 946.000 $23.310 $35.000 $25.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 23,832.000 $0.460 $0.550 $1.000
DRILL SEEDING (TEMP) (WARM)
SY 11,920.000 $0.350 $0.550 $1.000
DRILL SEEDING (TEMP) (COOL)
SY 11,920.000 $0.350 $0.550 $1.000
VEGETATIVE WATERING
MG 4.960 $112.540 $200.000 $250.000
PRIME COAT (MC-30)
GAL 1,158.000 $9.430 $6.000 $10.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 320.000 $287.770 $280.500 $350.000
BRIDGE SIDEWALK
SF 4,176.000 $57.500 $80.000 $30.000
RIPRAP (CONC)(CL B)
CY 14.000 $814.650 $685.000 $700.000
RIPRAP (MOW STRIP)(4 IN)
CY 31.000 $550.000 $715.000 $700.000
MOBILIZATION
LS 1.000 $218,070.700 $250,000.000 $325,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $8,000.000 $17,500.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 30.000 $38.290 $80.000 $200.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $30.740 $50.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,600.000 $4.260 $10.000 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,600.000 $1.570 $6.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 24.000 $7.090 $50.000 $25.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 24.000 $2.850 $15.000 $2.000
CONC CURB & GUTTER (TY II)
LF 5,430.000 $48.820 $64.680 $55.000
CONCRETE GUTTER (MODIFIED)
LF 3,359.000 $50.000 $64.680 $55.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 1,940.000 $150.000 $127.400 $215.000
CONC SIDEWALKS (5")
SY 3,861.000 $117.000 $98.280 $105.000
CURB RAMPS (TY 2)
EA 13.000 $2,300.000 $4,368.000 $4,000.000
CURB RAMPS (TY 7)
EA 5.000 $2,350.000 $4,368.000 $4,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $33.730 $35.310 $40.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,500.000 $1,578.500 $1,800.000
REMOVE METAL BEAM GUARD FENCE
LF 269.000 $4.500 $3.300 $5.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $311.740 $275.000 $250.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $204.290 $275.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,359.630 $3,663.000 $4,000.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 4.000 $625.000 $330.000 $650.000
REPLACE LUMINAIRE W/LED (250W EQ)
EA 1.000 $721.290 $874.500 $600.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 40.000 $4,565.000 $4,676.250 $5,000.000
CONDT (PVC) (SCH 40) (2")
LF 6,200.000 $9.300 $12.900 $20.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,310.000 $28.120 $43.000 $50.000
ELEC CONDR (NO.8) BARE
LF 8,510.000 $2.080 $1.500 $5.000
ELEC CONDR (NO.8) INSULATED
LF 17,260.000 $2.160 $1.660 $5.000
GROUND BOX TY C (162911)W/APRON
EA 3.000 $1,663.130 $1,505.000 $2,000.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 1.000 $9,500.000 $5,912.500 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $850.000 $376.250 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $600.000 $268.750 $1,000.000
D-GR HMA TY-C PG64-22
TON 50.000 $100.000 $350.000 $300.000
TMA (STATIONARY)
DAY 110.000 $302.000 $300.000 $500.000
Totals: $2,659,260.908 $2,887,281.000 $3,003,877.000