Show Job Controls
Bid Cobra

DICKENS COUNTY ROAD 384 (0925-15-016)

Items: 34

County: DICKENS
Length: 0.0000 MILES
Highway: COUNTY ROAD 384
District: CHILDRESS
Control Number: 0925-15-016
DBE Goal: 0.0%
Project: BR 2B24(453)
Guaranty: $44,000.00
Time: 112 WORKING DAYS
Engineer's Estimate: $1,094,124.97
Date: 12/03/2025 (6 months ago)
Contract Number: 12253221
Type: BRIDGE REPLACEMENT
Project ID: A00207372
Contract Type: Federal
Project Description: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
JARED GROVES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,094,124.97
1
Awarded
$1,016,530.80
Over/Under Est: -7.09% -$77,594.17
Over/Under Est: 1.66% $18,176.64
Amt Left: 9.42% $95,770.81
Over/Under Est: 2.76% $30,172.43
Amt Left: 10.6% $107,766.60
Delta: -1.08% -$11,995.79
Over/Under Est: 20.72% $226,661.79
Amt Left: 29.93% $304,255.96
Delta: -17.48% -$196,489.36
$1,386,916.00
Over/Under Est: 26.76% $292,791.03
Amt Left: 36.44% $370,385.20
Delta: -5.01% -$66,129.24

Bid Items & Bid Tabulations

34 Total 0 of 34
DICKENS  |  COUNTY ROAD 384  |  CHILDRESS  |  0925-15-016  |  12/03/2025  |  $1,094,124.97  |  BR 2B24(453)  |  BRIDGE REPL  |  112 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STX CIVIL
TEXAS STEEL INDUSTRIAL PLACING, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
COPPELL CONSTRUCTION CO., INC.
EARTH BUILDERS, L.P.
PREP ROW (TREE REMOVE) (12"-24" DIA)
EA 6.000 $1,490.000 $1,800.000 $2,000.000 $3,000.000 $1,800.000 $2,000.000
PREP ROW (TREE REMOVE) (24"-36" DIA)
EA 2.000 $2,000.000 $3,100.000 $3,000.000 $6,000.000 $1,900.000 $3,500.000
EXCAV (ROADWAY)
CY 138.000 $24.000 $20.000 $30.000 $30.000 $43.000 $25.000
EXCAV (CHANNEL)
CY 462.000 $25.000 $25.000 $30.000 $25.000 $44.000 $25.000
EMBANK (FNL)(OC)(TY B)
CY 376.000 $59.000 $50.000 $40.000 $30.000 $52.000 $25.000
BLADING
HR 10.000 $224.000 $100.000 $125.000 $60.000 $175.000 $125.000
BROADCAST SEED (PERM_RURAL_SAND)
AC 0.440 $2.300 $810.000 $6,343.000 $7,000.000 $6,343.000 $6,800.000
BROADCAST SEED (TEMP_WARM_COOL)
AC 0.440 $2.300 $810.000 $5,836.000 $3,400.000 $5,836.000 $6,800.000
VEGETATIVE WATERING
TGL 36.400 $11.640 $50.000 $1.000 $1.000 $50.000 $50.000
PROOF ROLLING
HR 6.000 $130.000 $120.000 $125.000 $20.000 $75.000 $125.000
FL BS (CMP IN PLC)(TY A GR 3) (6")
SY 1,366.000 $40.000 $35.000 $30.000 $42.000 $45.000 $38.000
CEM STABIL BKFL
CY 57.000 $300.000 $250.000 $275.000 $275.000 $430.000 $600.000
DRILL SHAFT (24 IN)
LF 525.000 $284.210 $230.000 $236.000 $170.000 $225.000 $350.000
CL C CONC (ABUT)
CY 21.600 $1,510.000 $1,150.000 $1,400.000 $2,000.000 $2,300.000 $2,400.000
CL C CONC (CAP)
CY 16.000 $1,850.000 $1,250.000 $2,250.000 $2,400.000 $1,400.000 $2,400.000
CL C CONC (COLUMN)
CY 7.000 $2,250.000 $1,750.000 $2,250.000 $2,500.000 $2,900.000 $2,400.000
REINF CONC SLAB (SLAB BEAM)
SF 4,176.000 $35.000 $25.000 $24.000 $28.000 $42.000 $41.000
PRESTR CONC SLAB BEAM (4SB15)
LF 1,028.000 $160.000 $300.000 $299.260 $320.000 $280.000 $330.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 210.000 $204.000 $225.000 $180.000 $250.000 $335.000 $320.000
RAIL (TY T223)
LF 284.000 $380.000 $180.000 $175.000 $180.000 $200.000 $200.000
ARMOR JOINT (SEALED)
LF 64.000 $250.000 $180.000 $135.000 $200.000 $195.000 $250.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $20,000.000 $55,000.000 $75,000.000 $50,000.000 $80,000.000 $50,000.000
MOBILIZATION
LS 1.000 $105,050.000 $77,500.000 $111,130.170 $100,000.000 $105,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $1,000.000 $1,200.000 $1,000.000 $2,000.000 $10,000.000 $3,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 174.000 $7.500 $10.000 $10.000 $5.000 $8.500 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 174.000 $3.000 $2.000 $2.000 $5.000 $2.000 $2.000
MTL W-BEAM GD FEN (STEEL POST)
LF 400.000 $35.000 $40.000 $35.000 $30.000 $26.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,422.000 $2,500.000 $3,250.000 $2,000.000 $1,950.000 $2,300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $4,000.000 $3,600.000 $3,600.000 $3,200.000 $3,150.000 $4,200.000
WIRE FENCE (TY C)
LF 1,250.000 $32.000 $10.000 $30.000 $20.000 $45.000 $20.000
GATE (TY 1)
EA 1.000 $3,200.000 $250.000 $1,500.000 $3,500.000 $2,500.000 $1,500.000
WIRE FENCE (WATER GAP)
LF 70.000 $200.000 $20.000 $60.000 $60.000 $50.000 $120.000
WIRE FENCE (REMOVE)
LF 1,320.000 $25.000 $1.000 $5.000 $5.000 $1.000 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
EA 18.000 $34.000 $40.000 $50.000 $25.000 $25.000 $50.000
Totals: $1,094,124.970 $1,016,530.800 $1,112,301.610 $1,124,297.400 $1,320,786.760 $1,386,916.000