|
|
PREPARING ROW
|
STA
|
24.850
|
$3,000.000
|
$8,300.000
|
$40,000.000
|
$55,136.350
|
$72,000.000
|
$70,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
1,835.000
|
$3.500
|
$5.000
|
$10.000
|
$7.450
|
$3.050
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
6,497.000
|
$8.000
|
$15.000
|
$7.500
|
$7.070
|
$5.900
|
$4.520
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
48,465.000
|
$15.000
|
$20.250
|
$15.000
|
$15.920
|
$15.100
|
$13.000
|
|
|
BACKFILL (TY A)
|
STA
|
9.590
|
$175.000
|
$1,680.000
|
$200.000
|
$623.710
|
$816.000
|
$1,000.000
|
|
|
BLADING
|
HR
|
50.000
|
$100.000
|
$103.000
|
$100.000
|
$133.640
|
$137.000
|
$312.420
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
30,823.000
|
$1.500
|
$1.890
|
$1.100
|
$1.420
|
$2.850
|
$2.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
30,823.000
|
$0.150
|
$0.400
|
$0.190
|
$0.240
|
$0.150
|
$0.150
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
7,706.000
|
$0.150
|
$0.500
|
$0.110
|
$0.320
|
$0.100
|
$0.090
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
SY
|
7,706.000
|
$0.150
|
$0.500
|
$0.110
|
$0.320
|
$0.100
|
$0.090
|
|
|
VEGETATIVE WATERING
|
MG
|
259.900
|
$20.000
|
$21.120
|
$15.000
|
$39.830
|
$42.750
|
$28.980
|
|
|
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS)
|
CY
|
6,933.000
|
$75.000
|
$65.000
|
$65.000
|
$70.430
|
$57.000
|
$70.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
189.000
|
$175.000
|
$235.000
|
$150.000
|
$205.670
|
$200.000
|
$185.000
|
|
|
LIME TRT (SUBGRADE)(6")
|
SY
|
26,344.000
|
$4.000
|
$4.350
|
$3.000
|
$3.120
|
$1.350
|
$3.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
4,713.000
|
$4.500
|
$3.450
|
$5.000
|
$5.500
|
$3.400
|
$3.300
|
|
|
AGGR(TY-PE GR-3 SAC-B)
|
CY
|
277.000
|
$140.000
|
$300.000
|
$150.000
|
$143.000
|
$294.000
|
$285.300
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
284.000
|
$150.000
|
$86.400
|
$130.000
|
$143.000
|
$85.500
|
$83.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
21,959.000
|
$4.000
|
$4.150
|
$3.500
|
$5.050
|
$4.100
|
$4.000
|
|
|
CEM STABIL BKFL
|
CY
|
208.300
|
$150.000
|
$197.000
|
$180.000
|
$162.810
|
$85.500
|
$55.000
|
|
|
CUT & RESTORING PAV
|
SY
|
26.000
|
$150.000
|
$169.000
|
$100.000
|
$75.000
|
$178.000
|
$130.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
27.600
|
$25.000
|
$105.000
|
$50.000
|
$150.000
|
$100.000
|
$125.000
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
2.000
|
$35,000.000
|
$11,000.000
|
$11,000.000
|
$10,526.320
|
$10,000.000
|
$32,000.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
3,810.000
|
$300.000
|
$325.000
|
$305.000
|
$253.920
|
$255.000
|
$398.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
519.000
|
$350.000
|
$450.000
|
$465.000
|
$402.220
|
$407.000
|
$565.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
660.000
|
$400.000
|
$508.000
|
$525.000
|
$472.920
|
$459.000
|
$650.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
80.000
|
$250.000
|
$216.000
|
$220.000
|
$216.000
|
$216.000
|
$225.000
|
|
|
CL C CONC (ABUT)
|
CY
|
55.600
|
$1,000.000
|
$960.000
|
$900.000
|
$1,500.000
|
$1,500.000
|
$1,250.000
|
|
|
CL C CONC (CAP)
|
CY
|
317.900
|
$1,000.000
|
$900.000
|
$800.000
|
$1,400.000
|
$1,800.000
|
$1,500.000
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
169.800
|
$1,000.000
|
$760.000
|
$870.000
|
$1,600.000
|
$1,300.000
|
$1,600.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
257.500
|
$1,200.000
|
$1,060.000
|
$900.000
|
$1,300.000
|
$1,400.000
|
$1,300.000
|
|
|
CL C CONC (COLUMN)(MASS)
|
CY
|
114.900
|
$1,200.000
|
$960.000
|
$1,100.000
|
$1,400.000
|
$1,650.000
|
$1,500.000
|
|
|
REINF CONC SLAB
|
SF
|
115,794.000
|
$18.000
|
$16.000
|
$15.550
|
$16.490
|
$19.700
|
$13.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
8,145.000
|
$150.000
|
$150.000
|
$140.000
|
$118.070
|
$160.000
|
$120.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
1,732.500
|
$175.000
|
$153.000
|
$140.000
|
$126.580
|
$167.000
|
$124.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
311.800
|
$400.000
|
$520.000
|
$430.000
|
$451.890
|
$487.000
|
$450.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
4.600
|
$400.000
|
$690.000
|
$560.000
|
$747.000
|
$710.000
|
$800.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,244.000
|
$150.000
|
$280.000
|
$165.000
|
$99.740
|
$177.000
|
$225.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
91.000
|
$450.000
|
$1,270.000
|
$500.000
|
$452.170
|
$488.000
|
$430.000
|
|
|
ELASTOMERIC BEARING (EE5)
|
EA
|
5.000
|
$2,000.000
|
$2,790.000
|
$2,400.000
|
$1,916.960
|
$2,170.000
|
$3,300.000
|
|
|
ELASTOMERIC BEARING (E9)
|
EA
|
5.000
|
$2,000.000
|
$4,380.000
|
$2,800.000
|
$2,859.960
|
$2,170.000
|
$4,200.000
|
|
|
ELASTOMERIC BEARING (F9)
|
EA
|
5.000
|
$2,000.000
|
$4,380.000
|
$2,800.000
|
$2,859.960
|
$2,170.000
|
$4,300.000
|
|
|
SLIDING ELASTOMERIC BEARING (ES 5)
|
EA
|
5.000
|
$3,000.000
|
$2,700.000
|
$3,000.000
|
$2,335.960
|
$2,170.000
|
$4,300.000
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
2,129,000.000
|
$1.750
|
$1.400
|
$1.800
|
$1.440
|
$1.550
|
$2.050
|
|
|
RAIL (TY SSTR)
|
LF
|
5,558.000
|
$80.000
|
$43.300
|
$67.000
|
$44.260
|
$51.000
|
$32.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
285.000
|
$100.000
|
$139.000
|
$120.000
|
$128.750
|
$150.000
|
$120.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
82.000
|
$110.000
|
$140.000
|
$120.000
|
$128.980
|
$150.000
|
$120.000
|
|
|
CONC BOX CULV(5'X 6.5')
|
LF
|
20.000
|
$650.000
|
$1,160.000
|
$1,300.000
|
$1,400.000
|
$2,130.000
|
$1,240.540
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
114.000
|
$60.000
|
$93.600
|
$120.000
|
$70.000
|
$107.000
|
$106.670
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
2.000
|
$10,000.000
|
$5,100.000
|
$12,000.000
|
$15,600.000
|
$13,050.000
|
$13,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$1,460.000
|
$1,800.000
|
$1,500.000
|
$1,480.000
|
$1,600.000
|
|
|
PIPE (PVC) (SCH 80) (4 IN)
|
LF
|
1,448.800
|
$25.000
|
$13.000
|
$35.000
|
$14.030
|
$15.600
|
$5.000
|
|
|
REMOV STR (SMALL)
|
EA
|
1.000
|
$1,000.000
|
$2,880.000
|
$1,000.000
|
$1,282.370
|
$3,560.000
|
$5,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,446,000.000
|
$1,400,000.000
|
$1,100,000.000
|
$1,719,609.250
|
$1,790,000.000
|
$1,684,225.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
30.000
|
$4,000.000
|
$1,780.000
|
$1,000.000
|
$31,500.000
|
$1,660.000
|
$3,200.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
100.000
|
$30.000
|
$34.900
|
$30.000
|
$35.230
|
$25.000
|
$25.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
100.000
|
$10.000
|
$8.450
|
$10.000
|
$12.900
|
$8.000
|
$8.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
111.000
|
$25.000
|
$25.500
|
$20.000
|
$39.900
|
$16.000
|
$16.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
111.000
|
$7.000
|
$6.200
|
$2.500
|
$9.720
|
$2.000
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,380.000
|
$3.000
|
$2.550
|
$2.000
|
$2.500
|
$1.800
|
$1.800
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,380.000
|
$2.000
|
$0.500
|
$1.000
|
$0.790
|
$0.750
|
$0.750
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
930.000
|
$60.000
|
$80.100
|
$73.000
|
$64.500
|
$73.750
|
$65.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
472.000
|
$30.000
|
$77.600
|
$51.000
|
$58.000
|
$41.000
|
$30.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
157.000
|
$30.000
|
$90.000
|
$38.000
|
$35.000
|
$64.500
|
$53.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
975.000
|
$20.000
|
$20.500
|
$21.000
|
$20.000
|
$20.000
|
$17.950
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,900.000
|
$1,530.000
|
$1,900.000
|
$1,487.000
|
$1,490.000
|
$1,825.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
425.000
|
$2.000
|
$2.050
|
$2.000
|
$2.000
|
$2.000
|
$1.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$175.000
|
$154.000
|
$150.000
|
$150.000
|
$150.000
|
$125.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,800.000
|
$2,840.000
|
$2,900.000
|
$2,767.000
|
$2,770.000
|
$2,450.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$20,000.000
|
$25,500.000
|
$27,000.000
|
$29,700.000
|
$24,850.000
|
$36,000.000
|
|
|
WIRE FENCE (TY A)
|
LF
|
360.000
|
$20.000
|
$30.000
|
$12.000
|
$8.000
|
$15.000
|
$27.000
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
8.000
|
$4,000.000
|
$4,270.000
|
$4,400.000
|
$4,265.000
|
$4,270.000
|
$4,265.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
3,006.000
|
$10.000
|
$6.050
|
$6.200
|
$6.050
|
$6.050
|
$6.050
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
173.000
|
$25.000
|
$11.350
|
$12.000
|
$11.370
|
$11.400
|
$11.370
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
3,021.000
|
$1.350
|
$1.150
|
$1.200
|
$1.130
|
$1.150
|
$1.130
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
3,634.000
|
$1.450
|
$1.200
|
$1.300
|
$1.220
|
$1.200
|
$1.220
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
8.000
|
$1,200.000
|
$910.000
|
$950.000
|
$912.000
|
$912.000
|
$912.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
17.800
|
$25.000
|
$26.100
|
$27.000
|
$30.000
|
$26.100
|
$26.120
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$600.000
|
$530.000
|
$460.000
|
$520.500
|
$521.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$600.000
|
$610.000
|
$600.000
|
$598.630
|
$599.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$650.000
|
$690.000
|
$620.000
|
$671.180
|
$671.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$800.000
|
$880.000
|
$800.000
|
$860.200
|
$860.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$900.000
|
$920.000
|
$920.000
|
$895.820
|
$896.000
|
$1,250.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
4.000
|
$800.000
|
$930.000
|
$900.000
|
$901.950
|
$902.000
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
18.000
|
$450.000
|
$420.000
|
$340.000
|
$408.860
|
$409.000
|
$350.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
2.000
|
$400.000
|
$480.000
|
$370.000
|
$469.480
|
$469.000
|
$400.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
29.000
|
$75.000
|
$88.100
|
$100.000
|
$85.930
|
$86.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
65.000
|
$20.000
|
$13.350
|
$20.000
|
$13.000
|
$13.000
|
$18.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
22.000
|
$20.000
|
$17.400
|
$28.000
|
$16.950
|
$17.000
|
$22.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
4.000
|
$60.000
|
$64.100
|
$65.000
|
$62.500
|
$62.500
|
$85.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
360.000
|
$0.350
|
$2.000
|
$0.900
|
$0.850
|
$0.750
|
$0.850
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
420.000
|
$0.350
|
$2.000
|
$0.900
|
$0.850
|
$0.750
|
$0.850
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
42,106.000
|
$0.300
|
$0.500
|
$0.480
|
$0.450
|
$0.650
|
$0.450
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,948.000
|
$0.350
|
$1.500
|
$2.000
|
$2.000
|
$1.400
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
240.000
|
$0.350
|
$2.000
|
$0.480
|
$0.450
|
$0.750
|
$0.450
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
42,454.000
|
$0.300
|
$0.500
|
$0.480
|
$0.450
|
$0.650
|
$0.450
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
460.000
|
$1.200
|
$1.000
|
$1.000
|
$1.500
|
$2.000
|
$1.080
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,919.000
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$2.000
|
$0.830
|
|
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
|
LF
|
210.000
|
$0.800
|
$1.500
|
$0.450
|
$0.420
|
$1.000
|
$0.420
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
974.000
|
$0.750
|
$2.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
180.000
|
$0.750
|
$0.650
|
$1.000
|
$1.000
|
$1.500
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
18,742.000
|
$0.750
|
$0.500
|
$0.530
|
$0.500
|
$0.350
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
12.000
|
$0.750
|
$0.650
|
$3.100
|
$3.000
|
$5.000
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
19,544.000
|
$0.750
|
$0.500
|
$0.530
|
$0.500
|
$0.350
|
$0.500
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
24.000
|
$12.000
|
$20.000
|
$15.000
|
$14.000
|
$12.000
|
$14.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$200.000
|
$250.000
|
$220.000
|
$210.000
|
$211.000
|
$210.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$200.000
|
$500.000
|
$570.000
|
$550.000
|
$478.000
|
$550.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
67.000
|
$3.750
|
$5.000
|
$5.200
|
$5.000
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
305.000
|
$5.000
|
$5.000
|
$4.800
|
$4.500
|
$5.000
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,820.000
|
$0.400
|
$1.500
|
$1.000
|
$0.500
|
$1.200
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
176.000
|
$3.000
|
$7.500
|
$3.000
|
$3.000
|
$4.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
|
EA
|
4.000
|
$20.000
|
$50.000
|
$16.000
|
$30.000
|
$33.000
|
$30.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(3 CONDR)
|
LF
|
1,204.000
|
$3.000
|
$1.750
|
$1.800
|
$1.740
|
$1.750
|
$1.740
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$5,000.000
|
$4,330.000
|
$4,500.000
|
$4,336.000
|
$4,340.000
|
$4,336.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
6,172.000
|
$90.000
|
$89.000
|
$80.000
|
$94.500
|
$82.750
|
$80.300
|
|
|
D-GR HMA TY-D SAC-B PG70-22
|
TON
|
6,456.000
|
$105.000
|
$98.000
|
$93.000
|
$92.500
|
$93.000
|
$90.330
|
|
|
TACK COAT
|
GAL
|
2,170.000
|
$4.000
|
$3.450
|
$3.000
|
$4.000
|
$3.400
|
$3.300
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
4.000
|
$5,000.000
|
$6,600.000
|
$7,000.000
|
$6,000.000
|
$6,000.000
|
$6,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$10,000.000
|
$8,800.000
|
$10,000.000
|
$2,056.750
|
$17,990.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
30.000
|
$500.000
|
$117.000
|
$270.000
|
$435.530
|
$293.000
|
$265.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$500.000
|
$104.000
|
$270.000
|
$891.330
|
$729.000
|
$830.000
|
|
Totals: |
$16,094,405.200
|
$15,556,720.888
|
$15,986,277.770
|
$17,247,836.022
|
$17,945,642.575
|
$18,359,656.568
|