DENTON IH0035W (6479-05-001)

Items: 31

County: DENTON
Length: 0.0100 MILES
Highway: IH0035W
District: DALLAS
Control Number: 6479-05-001
DBE Goal: N/A
Project: RMC - A00213803
Guaranty: $19,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $926,030.00
Date: 07/09/2025 (11 months ago)
Contract Number: 7251803
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00213803
Project Description: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
4777 E HWY 80, MESQUITE, TX 75150
AMANDA MILLER
WAYNE POWELL
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$926,030.00
$488,902.00
Over/Under Est: -47.2% -$437,128.00
Over/Under Est: -39.63% -$367,005.00
Amt Left: 14.34% $70,123.00
Over/Under Est: -39.12% -$362,288.00
Amt Left: 15.31% $74,840.00
Delta: -0.84% -$4,717.00
Over/Under Est: -36.72% -$340,055.00
Amt Left: 19.86% $97,073.00
Delta: -3.94% -$22,233.00
Over/Under Est: -30.91% -$286,208.00
Amt Left: 30.87% $150,920.00
Delta: -9.19% -$53,847.00
$775,005.00
Over/Under Est: -16.31% -$151,025.00
Amt Left: 58.52% $286,103.00
Delta: -21.13% -$135,183.00
Subcontractor Percentage Amount
ELITE CASTLE RESOURCES LLC 0.00% $0.00
SABER HIGHWAYS LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

31 Total 0 of 31
DENTON  |  IH0035W  |  DALLAS  |  6479-05-001  |  07/09/2025  |  $926,030.00  |  RMC - A00213803  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
SHORT-LINE CORPORATION
BK FIELD OPERATIONS LLC
FIREMAN EXCAVATING, INC.
MARCOM'S MOWING SERVICE, LLC
RHINO EQUITY, LLC
MOBILIZATION (CALLOUT)
EA 300.000 $500.000 $0.100 $1.000 $1.000 $1.000 $1.000 $750.000
TMA (STATIONARY)
DAY 200.000 $400.000 $0.100 $1.000 $1.000 $1.000 $1.000 $1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 5.000 $100.000 $1,000.000 $100.000 $100.000 $100.000 $100.000 $50.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 8,000.000 $30.000 $20.000 $36.500 $22.000 $20.000 $33.000 $13.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 15.000 $25.000 $50.000 $50.000 $150.000 $150.000 $30.000 $50.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 10.000 $50.000 $50.000 $100.000 $250.000 $150.000 $250.000 $300.000
REPLACE SHORT RADIUS SYS (TL-2)
EA 15.000 $100.000 $1.000 $100.000 $500.000 $50.000 $500.000 $1.000
REPLACE TIMBER POST W/O CONC FND
EA 100.000 $75.000 $750.000 $100.000 $125.000 $80.000 $1.000 $100.000
REPLACE STEEL POST W/O CONC FND
EA 25.000 $55.000 $750.000 $100.000 $150.000 $80.000 $60.000 $75.000
REALIGN POSTS
EA 1,000.000 $30.000 $10.000 $1.000 $1.000 $5.000 $1.000 $3.000
REPLACE TERMINAL ANCHOR POSTS
EA 5.000 $5.000 $1.000 $1.000 $1.000 $20.000 $1.000 $1.000
REM OBSOLETE GET & REPL W/ SGT
EA 10.000 $2,500.000 $3,000.000 $2,500.000 $4,000.000 $2,500.000 $6,000.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 80.000 $1,000.000 $650.000 $1,000.000 $1,232.000 $800.000 $1,100.000 $1,200.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,500.000 $35.000 $1.000 $20.000 $28.000 $45.000 $45.000 $36.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 450.000 $127.000 $50.000 $1.000 $80.000 $70.000 $1.000 $65.000
REPLACE BLOCKOUT
EA 500.000 $50.000 $1.000 $1.000 $6.000 $10.000 $10.000 $28.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $100.000 $100.000 $100.000 $50.000 $100.000 $150.000 $1.000
RESET SGT IMPACT HEAD
EA 10.000 $150.000 $100.000 $100.000 $100.000 $400.000 $150.000 $1.000
REPLACE SGT OBJECT MARKER
EA 15.000 $32.000 $1.000 $1.000 $1.000 $25.000 $100.000 $25.000
REPLACE SGT CABLE ANCHOR
EA 60.000 $75.000 $1.000 $1.000 $60.000 $50.000 $100.000 $25.000
REPLACE SGT CABLE ASSEMBLY
EA 30.000 $150.000 $1.000 $1.000 $65.000 $100.000 $100.000 $25.000
REPLACE SGT STRUT
EA 5.000 $75.000 $1.000 $1.000 $20.000 $200.000 $1,500.000 $1.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $750.000 $1.000 $1,000.000 $750.000 $1,200.000 $1,400.000 $1,000.000
REPLACE POSTS (TL-3)(BRIFEN)
EA 110.000 $350.000 $150.000 $150.000 $180.000 $200.000 $1.000 $350.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 200.000 $150.000 $450.000 $200.000 $210.000 $200.000 $1.000 $350.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $150.000 $100.000 $1.000 $1.000 $150.000 $500.000 $1.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $100.000 $1.000 $1.000 $1.000 $150.000 $1.000 $1.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 2.000 $1,500.000 $1.000 $500.000 $1.000 $1,500.000 $1.000 $500.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 5.000 $1,000.000 $1.000 $500.000 $800.000 $1,500.000 $1,500.000 $500.000
CHECK / RE-TENSION CABLE (TL-3)
EA 2.000 $1,000.000 $100.000 $100.000 $100.000 $2,000.000 $250.000 $1,000.000
CHECK / RE-TENSION CABLE (TL-4)
EA 10.000 $500.000 $100.000 $100.000 $100.000 $2,000.000 $500.000 $500.000
Totals: $926,030.000 $488,902.000 $559,025.000 $563,742.000 $585,975.000 $639,822.000 $775,005.000