Show Job Controls
Bid Cobra

DENTON IH0035 (6343-71-001)

Items: 34

County: DENTON
Length: N/A
Highway: IH0035
District: DALLAS
Control Number: 6343-71-001
DBE Goal: N/A
Project: RMC - 634371001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $747,426.12
Date: 12/03/2019 (6 years ago)
Contract Number: N/A
Type: FULL DEPTH CONCRETE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$747,426.12
$695,630.20
Over/Under Est: -6.93% -$51,795.92
Over/Under Est: -0.72% -$5,387.10
Amt Left: 6.67% $46,408.82
Over/Under Est: 101.84% $761,171.22
Amt Left: 116.87% $812,967.14
Delta: -103.30% -$766,558.32
Over/Under Est: 153.08% $1,144,134.38
Amt Left: 171.92% $1,195,930.30
Delta: -25.39% -$382,963.16

Bid Items & Bid Tabulations

34 Total 0 of 34
DENTON  |  IH0035  |  DALLAS  |  6343-71-001  |  12/03/2019  |  $747,426.12  |  RMC - 634371001  |  FULL DEPTH CONC REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
SILVER CREEK CONSTRUCTION, INC.
O. TREVINO CONSTRUCTION, LLC
SEMA CONSTRUCTION, INC.
REMOVING CONC (PAV)
SY 11.150 $33.470 $30.000 $50.000 $400.000 $1,500.000
REMOVING CONC (CURB)
LF 104.000 $10.850 $15.000 $15.000 $40.000 $60.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 13.960 $20.000 $50.000 $40.000 $300.000 $1,000.000
EXCAVATION (ROADWAY)
CY 20.050 $43.000 $100.000 $40.000 $250.000 $100.000
FL BS (CMP IN PLC)(TY D GR1-2)(8")
SY 51.780 $32.000 $75.000 $40.000 $150.000 $130.000
D-GR HMA TY-B PG64-22
TON 11.390 $115.000 $200.000 $220.000 $400.000 $550.000
CONC PVMT (CONT REINF-CRCP)(HES)(10")
SY 35.180 $165.000 $500.000 $320.000 $600.000 $2,855.000
FULL - DEPTH REPAIR CRCP (8")
SY 500.000 $225.000 $195.000 $226.250 $400.000 $400.000
FULL - DEPTH REPAIR CRCP (10")
SY 2,218.960 $238.000 $195.000 $202.000 $409.000 $410.000
MOBILIZATION (CALLOUT)
EA 4.000 $2,750.000 $1,500.000 $2,500.000 $5,000.000 $20,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $36.000 $7,000.000 $12,500.000 $25,000.000 $103,850.000
CONC CURB (MONO) (TY II)
LF 139.000 $36.000 $20.000 $8.000 $25.000 $50.000
DRIVEWAYS (CONC)
SY 477.280 $65.000 $100.000 $70.000 $140.000 $150.000
CURB RAMPS (TY 1)
EA 2.000 $1,400.000 $1,500.000 $2,500.000 $4,000.000 $4,000.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 135.000 $1.000 $3.000 $4.000 $3.000 $7.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 100.000 $1.000 $3.000 $4.000 $3.000 $7.000
REFL PAV MRK TY I (W)4"(BRK)(090MIL)
LF 130.000 $0.420 $5.000 $4.500 $8.000 $5.300
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 91.000 $1.050 $6.000 $5.500 $8.000 $10.500
REFL PAV MRK TY I (W)4"(SLD)(090MIL)
LF 1,526.000 $0.510 $4.000 $3.500 $8.000 $5.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 145.000 $0.850 $7.000 $6.500 $8.000 $8.000
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
EA 2.000 $197.000 $400.000 $350.000 $900.000 $450.000
REFL PAV MRK TY I (Y)4"(SLD)(090MIL)
LF 804.000 $0.510 $4.000 $3.500 $8.000 $5.300
PAVEMENT SEALER 4"
LF 1,404.000 $0.280 $2.000 $1.000 $8.000 $3.400
PAVEMENT SEALER 8"
LF 145.000 $0.590 $3.000 $2.000 $8.000 $4.000
PAVEMENT SEALER (DBL ARROW)
EA 2.000 $74.000 $100.000 $65.000 $900.000 $130.000
REFL PAV MRKR TY II-C-R
EA 18.000 $3.500 $50.000 $25.000 $100.000 $15.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,460.000 $0.830 $3.000 $2.000 $8.000 $4.000
ELIM EXT PAV MRK & MRKS (8")
LF 145.000 $1.350 $5.000 $4.000 $8.000 $5.000
PAV SURF PREP FOR MRK (4")
LF 1,404.000 $0.280 $3.000 $2.000 $8.000 $3.200
PAV SURF PREP FOR MRK (8")
LF 145.000 $0.310 $4.000 $3.000 $8.000 $3.600
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $49.000 $100.000 $55.000 $900.000 $63.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,000.000 $7,500.000 $3,500.000 $30,000.000 $2,100.000
TMA (STATIONARY)
DAY 102.000 $205.000 $50.000 $200.000 $300.000 $250.000
TMA (MOBILE OPERATION)
DAY 120.000 $75.000 $50.000 $200.000 $90.000 $690.000
Totals: $747,426.120 $695,630.200 $742,039.020 $1,508,597.340 $1,891,560.500