PREPARING ROW
|
STA
|
32.100
|
$1,500.000
|
$800.000
|
$1,750.000
|
$3,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
867.000
|
$16.000
|
$15.000
|
$11.550
|
$54.000
|
|
|
REMOVING STAB BASE & ASPH PAV(14")
|
SY
|
715.000
|
$5.000
|
$20.000
|
$13.000
|
$25.000
|
|
|
REMOV STAB BASE AND ASPH PAV (0"-12")
|
SY
|
1,128.000
|
$5.500
|
$15.000
|
$8.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,368.000
|
$9.500
|
$46.000
|
$15.750
|
$50.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
3,182.000
|
$15.000
|
$39.000
|
$42.000
|
$50.000
|
|
|
BACKFILL (TY B)
|
STA
|
32.100
|
$150.000
|
$450.000
|
$210.000
|
$500.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
17,775.000
|
$1.050
|
$1.130
|
$1.100
|
$2.800
|
|
|
BLOCK SODDING
|
SY
|
2,660.000
|
$3.000
|
$4.660
|
$5.500
|
$5.200
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
15,115.000
|
$0.500
|
$0.280
|
$0.410
|
$0.230
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
8,888.000
|
$0.500
|
$0.360
|
$0.100
|
$0.220
|
|
|
VEGETATIVE WATERING
|
MG
|
3,967.000
|
$2.000
|
$1.000
|
$3.150
|
$5.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
3,864.000
|
$19.000
|
$34.000
|
$52.500
|
$42.250
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
64.400
|
$250.000
|
$350.000
|
$315.000
|
$380.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
3,449.000
|
$4.000
|
$21.000
|
$11.550
|
$27.500
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
773.000
|
$4.500
|
$6.500
|
$21.000
|
$11.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
450.000
|
$90.000
|
$150.000
|
$132.000
|
$140.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
8,888.000
|
$2.000
|
$5.000
|
$2.500
|
$4.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
302.000
|
$25.000
|
$35.000
|
$133.330
|
$42.500
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
8.400
|
$500.000
|
$835.000
|
$1,050.000
|
$790.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
60.900
|
$300.000
|
$330.000
|
$225.000
|
$330.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
56.300
|
$400.000
|
$620.000
|
$840.000
|
$650.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
90.000
|
$500.000
|
$700.000
|
$850.000
|
$850.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
413.000
|
$65.000
|
$58.500
|
$73.500
|
$71.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
407.000
|
$85.000
|
$82.000
|
$94.500
|
$100.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
143.000
|
$120.000
|
$123.000
|
$189.000
|
$150.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
68.000
|
$211.000
|
$265.000
|
$210.000
|
$320.000
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
60.000
|
$350.000
|
$415.000
|
$630.000
|
$500.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$6,000.000
|
$5,000.000
|
$9,450.000
|
$6,100.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 60 IN)
|
EA
|
2.000
|
$16,000.000
|
$26,400.000
|
$25,200.000
|
$32,100.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$2,200.000
|
$18,600.000
|
$17,850.000
|
$22,600.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$890.000
|
$1,075.000
|
$1,155.000
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,500.000
|
$1,800.000
|
$1,470.000
|
$2,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$2,300.000
|
$3,745.000
|
$6,300.000
|
$4,500.000
|
|
|
SET (TY II) (48 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$9,000.000
|
$8,600.000
|
$10,500.000
|
$10,400.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
10.000
|
$1,300.000
|
$1,800.000
|
$525.000
|
$2,200.000
|
|
|
REMOV STR (SET)
|
EA
|
48.000
|
$450.000
|
$150.000
|
$315.000
|
$180.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,600.000
|
$800.000
|
$4,200.000
|
$970.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,001.000
|
$20.000
|
$8.000
|
$21.000
|
$9.700
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$130,000.000
|
$200,000.000
|
$210,000.000
|
$260,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$11,500.000
|
$14,850.000
|
$31,500.000
|
$19,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
165.000
|
$32.000
|
$43.190
|
$42.000
|
$31.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
165.000
|
$10.000
|
$13.940
|
$22.000
|
$11.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
253.000
|
$18.000
|
$39.010
|
$10.500
|
$30.250
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
253.000
|
$7.000
|
$11.360
|
$5.250
|
$9.700
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
242.000
|
$2.500
|
$8.220
|
$5.250
|
$3.600
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
242.000
|
$0.550
|
$3.810
|
$0.500
|
$0.900
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
643.000
|
$4.600
|
$5.640
|
$6.000
|
$4.800
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
643.000
|
$1.300
|
$2.120
|
$1.500
|
$1.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
276.000
|
$160.000
|
$121.000
|
$150.000
|
$130.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
371.000
|
$43.700
|
$70.000
|
$60.000
|
$120.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
515.000
|
$41.800
|
$70.000
|
$60.000
|
$100.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
833.000
|
$77.000
|
$113.000
|
$150.000
|
$160.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
4,370.000
|
$0.250
|
$0.900
|
$1.000
|
$1.200
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
2,185.000
|
$0.200
|
$1.350
|
$2.000
|
$1.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
330.000
|
$36.000
|
$36.000
|
$40.000
|
$43.750
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
250.000
|
$2.800
|
$3.000
|
$3.000
|
$3.600
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,000.000
|
$2,775.000
|
$3,100.000
|
$3,400.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$245.000
|
$225.000
|
$250.000
|
$270.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
2.000
|
$270.000
|
$260.000
|
$320.000
|
$320.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
28.500
|
$40.000
|
$40.000
|
$63.000
|
$48.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
13.000
|
$630.000
|
$657.000
|
$800.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$900.000
|
$715.000
|
$900.000
|
$870.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,000.000
|
$905.000
|
$1,300.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$1,450.000
|
$1,135.000
|
$1,500.000
|
$1,400.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
16.000
|
$20.000
|
$25.000
|
$35.000
|
$30.250
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
7.000
|
$60.000
|
$68.000
|
$100.000
|
$84.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
10,580.000
|
$0.400
|
$0.400
|
$1.100
|
$0.550
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
40.000
|
$5.500
|
$8.000
|
$6.600
|
$11.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
7,775.000
|
$0.260
|
$0.400
|
$1.100
|
$0.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
265.000
|
$1.190
|
$3.500
|
$6.000
|
$6.300
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$140.000
|
$150.000
|
$154.000
|
$210.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
6.000
|
$155.000
|
$185.000
|
$176.000
|
$260.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
2.000
|
$660.000
|
$650.000
|
$770.000
|
$910.000
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
1,255.000
|
$0.420
|
$0.990
|
$1.100
|
$1.400
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
110.000
|
$3.000
|
$5.000
|
$6.600
|
$7.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
10,580.000
|
$0.420
|
$0.500
|
$0.770
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
7,775.000
|
$0.450
|
$0.500
|
$0.770
|
$0.700
|
|
REFL PAV MRKR TY I-C
|
EA
|
32.000
|
$4.000
|
$5.000
|
$5.500
|
$7.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
195.000
|
$4.500
|
$5.000
|
$5.500
|
$7.000
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$4,000.000
|
$4,280.000
|
$10,500.000
|
$5,200.000
|
|
|
SPOT MOWING
|
AC
|
3.000
|
$100.000
|
$1,200.000
|
$630.000
|
$91.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
1,466.000
|
$113.270
|
$156.000
|
$126.000
|
$175.000
|
|
|
TACK COAT
|
GAL
|
1,244.000
|
$3.000
|
$4.000
|
$3.200
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$7,300.000
|
$14,000.000
|
$5,000.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
90.000
|
$120.000
|
$315.000
|
$157.500
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$180.000
|
$700.000
|
$735.000
|
$300.000
|
|
Totals: |
$1,421,532.370
|
$2,095,541.430
|
$2,323,162.360
|
$2,674,521.760
|