Show Job Controls
Bid Cobra

DENTON FM 407 (1310-01-043)

Items: 65

County: DENTON
Length: N/A
Highway: FM 407
District: DALLAS
Control Number: 1310-01-043
DBE Goal: N/A
Project: F 2022(414)
Guaranty: N/A
Time: 156 WORKING DAYS
Engineer's Estimate: $1,609,333.80
Date: 03/04/2022 (4 years ago)
Contract Number: N/A
Type: REALIGNMENT OF EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$1,609,333.80
$1,884,000.00
Over/Under Est: 17.07% $274,666.20
Over/Under Est: 23% $370,175.86
Amt Left: 5.07% $95,509.66
Over/Under Est: 25.51% $410,498.59
Amt Left: 7.21% $135,832.39
Delta: -2.04% -$40,322.73
Over/Under Est: 30.81% $495,832.08
Amt Left: 11.74% $221,165.88
Delta: -4.22% -$85,333.49
$2,115,783.18
Over/Under Est: 31.47% $506,449.38
Amt Left: 12.3% $231,783.18
Delta: -0.50% -$10,617.30

Bid Items & Bid Tabulations

65 Total 0 of 65
DENTON  |  FM 407  |  DALLAS  |  1310-01-043  |  03/04/2022  |  $1,609,333.80  |  F 2022(414)  |  REALIGNMENT OF EXIST ROADWAY  |  156 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ED BELL CONSTRUCTION COMPANY
EUROVIA ATLANTIC COAST LLC
A. K. GILLIS & SONS, LLC
D. L. LENNON INCORPORATED - CONTRACTOR
JAGOE-PUBLIC COMPANY
PREPARING ROW
STA 15.750 $9,000.000 $10,500.000 $1,150.000 $350.000 $4,094.000 $6,500.000
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 54.000 $220.000 $550.000 $495.000 $500.000 $800.000 $640.000
PREP ROW (TREE) (18"-36" DIA.)
EA 16.000 $600.000 $825.000 $1,240.000 $750.000 $1,500.000 $1,100.000
REMOVING CONC (PAV)
SY 794.000 $18.000 $20.000 $16.000 $25.000 $55.000 $33.000
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 4,983.000 $15.000 $6.000 $13.000 $10.110 $8.500 $6.000
EXCAVATION (ROADWAY)
CY 12,629.000 $12.000 $20.000 $14.500 $12.490 $12.000 $20.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 489.000 $18.000 $20.000 $55.000 $28.660 $9.000 $30.000
COMPOST MANUF TOPSOIL (4")
SY 20,756.000 $1.500 $0.650 $2.000 $0.580 $0.580 $0.750
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 20,756.000 $0.250 $0.150 $0.110 $0.440 $0.440 $0.130
DRILL SEED (TEMP)(WARM OR COOL)
SY 2,400.000 $0.220 $0.390 $0.390 $0.100 $0.100 $0.450
VEGETATIVE WATERING
MG 3,448.800 $16.000 $2.100 $1.000 $2.980 $1.000 $30.000
FL BS (CMP IN PLC)(TYB GR1-2)(FNAL POS)
CY 39.000 $50.000 $95.000 $180.000 $366.080 $55.000 $240.000
FL BS (CMP IN PLC)(TY D GR1-2)(8")
SY 867.000 $15.000 $24.000 $37.000 $24.020 $18.000 $28.000
FL BS (CMP IN PLC)(TY D GR1-2)(12")
SY 7,137.000 $17.000 $24.000 $20.500 $23.740 $36.000 $30.000
LIME (HYD, COM, OR QK(SLURRY))
TON 100.000 $170.000 $210.000 $235.000 $188.000 $250.000 $215.000
LIME TRT (EXST MATL)(8")
SY 7,451.000 $6.000 $8.000 $13.500 $2.370 $5.000 $9.000
PRIME COAT(MC-30 OR AE-P)
GAL 1,416.000 $3.400 $7.000 $6.000 $9.360 $8.000 $2.500
CONC PVMT (CONT REINF - CRCP) (9")
SY 448.000 $100.000 $151.000 $131.000 $154.880 $150.000 $140.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 15.000 $200.000 $420.000 $315.000 $253.680 $309.000 $470.000
RC PIPE (CL III)(18 IN)
LF 217.000 $65.000 $60.000 $53.000 $48.000 $65.000 $64.000
RC PIPE (CL III)(24 IN)
LF 163.000 $80.000 $80.000 $74.000 $65.000 $75.000 $93.000
RC PIPE (CL III)(30 IN)
LF 36.000 $100.000 $100.000 $100.000 $90.000 $98.000 $140.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 7.000 $1,200.000 $1,000.000 $1,050.000 $700.000 $1,200.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $1,000.000 $2,000.000 $1,275.000 $1,200.000 $1,500.000 $1,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,000.000 $2,000.000 $1,275.000 $1,200.000 $1,600.000 $1,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $3,500.000 $2,500.000 $2,300.000 $2,500.000 $3,500.000 $2,700.000
REMOV STR (SET)
EA 10.000 $300.000 $400.000 $250.000 $200.000 $350.000 $290.000
REMOV STR (PIPE)
LF 391.000 $15.000 $15.000 $12.000 $15.000 $7.000 $14.000
REMOV STR (CATTLE GUARD)
EA 1.000 $2,200.000 $1,000.000 $3,114.040 $1,500.000 $1,500.000 $2,400.000
MOBILIZATION
LS 1.000 $150,000.000 $179,254.770 $140,000.000 $276,771.000 $144,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $5,000.000 $10,500.000 $15,000.000 $15,000.000 $7,550.000 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 30.000 $30.000 $27.500 $31.030 $40.000 $40.000 $36.000
ROCK FILTER DAMS (REMOVE)
LF 30.000 $10.000 $12.500 $9.270 $10.000 $10.000 $10.750
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 200.000 $20.000 $22.000 $23.880 $30.000 $30.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 200.000 $10.000 $10.000 $6.630 $10.000 $10.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 235.000 $2.000 $2.000 $5.850 $4.000 $4.000 $10.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 235.000 $0.500 $0.150 $1.870 $1.000 $1.000 $3.500
CONSTRUCTING DETOURS
SY 3,353.000 $75.000 $75.000 $133.000 $130.740 $159.700 $110.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,120.000 $40.000 $25.000 $38.000 $84.000 $99.000 $44.250
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $50.000 $50.000 $38.000 $82.000 $99.000 $44.250
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,080.000 $9.000 $5.000 $10.000 $21.000 $15.000 $15.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $15.000 $10.000 $10.000 $21.000 $15.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,120.000 $10.000 $10.000 $15.000 $21.000 $25.000 $17.500
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $15.000 $20.000 $15.000 $21.000 $25.000 $17.500
DRIVEWAYS (ACP)
SY 249.000 $30.000 $75.000 $75.000 $52.320 $28.600 $75.000
DRIVEWAYS (CONC) (HES)
SY 158.000 $70.000 $150.000 $145.000 $100.000 $145.000 $140.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $500.000 $874.500 $950.000 $950.000 $950.000 $920.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 3.000 $600.000 $935.000 $1,000.000 $100.000 $1,000.000 $990.000
INSTL OM ASSM (OM-2X)(WC)GND
EA 2.000 $65.000 $220.000 $60.000 $60.000 $150.000 $120.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 7,455.000 $1.200 $1.100 $0.750 $0.750 $0.750 $1.200
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 8,944.000 $1.200 $1.100 $0.750 $0.750 $0.750 $1.200
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 85.000 $8.000 $13.200 $6.550 $6.550 $6.550 $14.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 2,727.000 $0.950 $1.650 $0.990 $0.990 $0.990 $1.700
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 2,527.000 $0.950 $1.650 $0.990 $0.990 $0.990 $1.700
REFL PAV MRKR TY II-A-A
EA 19.000 $3.000 $7.700 $4.000 $4.000 $4.000 $8.100
ELIM EXT PAV MRK & MRKS (4")
LF 2,742.000 $0.500 $1.100 $0.500 $0.500 $1.500 $1.200
FULL - WIDTH MOWING
CYC 2.000 $2,000.000 $1,000.000 $3,700.000 $3,500.000 $150.000 $4,000.000
LITTER REMOVAL
CYC 2.000 $2,500.000 $1,000.000 $4,000.000 $3,500.000 $1,500.000 $2,000.000
SP MIXES SP-B PG64-22
TON 105.000 $100.000 $275.000 $255.000 $103.800 $103.800 $150.000
SP MIXES SP-C SAC-B PG64-22
TON 1,296.000 $110.000 $123.200 $111.000 $123.000 $123.000 $110.000
SP MIXES SP-D PG64-22 (LEVEL-UP)
TON 8.000 $90.000 $495.000 $405.000 $152.000 $152.000 $175.000
TACK COAT
GAL 294.000 $5.000 $6.000 $5.000 $7.500 $7.500 $2.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $10,000.000 $17,000.000 $15,000.000 $15,000.000 $15,000.000
TMA (STATIONARY)
DAY 80.000 $200.000 $160.000 $225.000 $150.000 $150.000 $175.000
TMA (MOBILE OPERATION)
HR 60.000 $100.000 $75.000 $55.000 $150.000 $115.000 $50.000
Totals: $1,609,333.800 $1,884,000.000 $1,979,509.660 $2,019,832.394 $2,105,165.880 $2,115,783.180