DENTON FM 428 (0817-01-025)

Items: 105

County: DENTON
Length: N/A
Highway: FM 428
District: DALLAS
Control Number: 0817-01-025
DBE Goal: N/A
Project: BR 2022(619)
Guaranty: N/A
Time: 522 WORKING DAYS
Engineer's Estimate: $5,694,055.14
Date: 06/01/2022 (4 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
TRAVIS CAMPBELL
CHRISTOPHER ROCHA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$5,694,055.14
$5,848,540.85
Over/Under Est: 2.71% $154,485.71
Over/Under Est: 5.78% $329,292.36
Amt Left: 2.99% $174,806.65
Over/Under Est: 6.64% $378,199.56
Amt Left: 3.83% $223,713.85
Delta: -0.81% -$48,907.20
Over/Under Est: 13.49% $768,268.42
Amt Left: 10.49% $613,782.71
Delta: -6.42% -$390,068.86
Over/Under Est: 13.8% $785,500.37
Amt Left: 10.79% $631,014.66
Delta: -0.27% -$17,231.95
Over/Under Est: 22.09% $1,257,549.01
Amt Left: 18.86% $1,103,063.30
Delta: -7.29% -$472,048.64
Over/Under Est: 32.69% $1,861,359.29
Amt Left: 29.18% $1,706,873.58
Delta: -8.69% -$603,810.28
Over/Under Est: 35.86% $2,041,775.86
Amt Left: 32.27% $1,887,290.15
Delta: -2.39% -$180,416.57
Subcontractor Percentage Amount
PEACHTREE CONSTRUCTION, LTD. 5.56% $363,297.63
STOIC CIVIL CONSTRUCTION, INC. 3.48% $227,387.73
MORRIS COUNTY CONTRACTORS, L.L.C. 2.92% $190,796.60
WYLIE DRILLING & DRAINAGE, INC. 2.22% $145,057.69
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 2.21% $144,404.27
BRENDA PRICE TRUCKING, INC. 1.86% $121,534.82
SYNERGY SIGNS & SERVICES LLC 1.16% $75,795.91
TEX OP CONSTRUCTION, LP 1.13% $73,835.67
TEXAS SWPPP SERVICES 0.91% $59,460.58
BARRICADES UNLIMITED 0.69% $45,085.50
STRIPE-A-ZONE, LLC 0.69% $45,085.50
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.69% $45,085.50
TEXAS TRAFFIC AND BARRICADE, LLC 0.46% $30,057.00
SUPERIOR TRAFFIC CONTROL, LLC 0.46% $30,057.00
TRP CONSTRUCTION GROUP, LLC 0.45% $29,403.59
HDZ CONSTRUCTION 0.30% $19,602.39
CIVIL TREE SOLUTIONS, LLC 0.24% $15,681.91
DFW REBAR, INC. 0.16% $10,454.61
SOUTHEAST GRINDING AND GROOVING LLC 0.15% $9,801.20
PENHALL COMPANY 0.13% $8,494.37
WEST TEXAS ROCK RESOURCES, LLC 0.09% $5,880.72
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.00% $0.00
TEXOP CONSTRUCTION 0.00% $0.00
ED BELL CONSTRUCTION COMPANY 0.00% $0.00
Total: 25.96% $1,696,260.19

Bid Items & Bid Tabulations

105 Total 0 of 105
DENTON  |  FM 428  |  DALLAS  |  0817-01-025  |  06/01/2022  |  $5,694,055.14  |  BR 2022(619)  |  REPLACE BRIDGE AND APPROACHES  |  522 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STATELINE CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
HODGES AND SON CONSTRUCTION COMPANY, INC.
INDUS ROAD & BRIDGE, INC.
SEMA CONSTRUCTION, INC.
NEW WORLD CONTRACTING, LLC
MCMAHON CONTRACTING AND CONSTRUCTION, LLC
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
PREPARING ROW
STA 22.000 $7,000.000 $2,000.000 $5,250.000 $4,500.000 $6,000.000 $29,430.000 $9,500.000 $8,606.580 $5,000.000
REMOVING CONC (RIPRAP)
SY 119.000 $12.000 $20.000 $63.000 $15.000 $60.000 $9.500 $19.000 $29.470 $30.000
REMOVING CONCRETE(MOW STRIP)
LF 420.000 $9.000 $15.000 $6.300 $8.000 $25.000 $2.200 $18.000 $6.910 $10.000
REMOV STAB BASE & ASPH PAV (8"-20")
SY 3,585.000 $7.000 $15.000 $7.350 $15.000 $14.000 $8.500 $16.000 $17.280 $20.000
REMOVING STAB BASE AND ASPH PAV (4")
SY 207.000 $15.000 $17.000 $7.350 $15.000 $38.000 $8.500 $19.000 $9.600 $15.000
REMOV STAB BASE AND ASPH PAV (10"-18")
SY 1,997.000 $6.500 $12.500 $7.350 $20.000 $12.000 $8.500 $8.500 $17.280 $20.000
EXCAVATION (ROADWAY)
CY 2,889.000 $18.000 $14.000 $21.000 $15.000 $28.000 $7.000 $28.000 $32.250 $20.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 21,679.000 $15.000 $13.500 $21.000 $15.000 $38.000 $24.000 $30.000 $18.000 $25.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 761.000 $22.500 $18.000 $31.500 $15.000 $57.000 $48.000 $33.000 $37.930 $25.000
COMPOST MANUF TOPSOIL (4")
SY 20,373.000 $2.200 $2.000 $1.500 $2.000 $3.000 $3.300 $4.500 $6.940 $2.000
BLOCK SODDING
SY 20,373.000 $3.500 $4.000 $4.000 $6.000 $4.000 $5.500 $5.500 $5.880 $6.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 20,373.000 $0.200 $0.750 $0.100 $0.600 $0.200 $0.150 $0.650 $0.370 $0.750
VEGETATIVE WATERING
MG 3,789.000 $20.000 $5.000 $1.000 $1.000 $15.000 $5.000 $25.000 $30.000 $16.000
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
SY 4,981.000 $20.000 $35.000 $18.000 $20.000 $17.000 $12.000 $16.000 $19.860 $12.000
FL BS (CMP IN PLC)(TY D GR1-2)(8")
SY 2,937.000 $16.000 $35.000 $24.000 $25.000 $23.000 $15.000 $18.000 $26.060 $12.000
LIME (HYDRATED LIME (SLURRY))
TON 49.000 $200.000 $380.000 $250.000 $225.000 $250.000 $215.000 $526.000 $288.000 $600.000
LIME TRT (SUBGRADE)(8")
SY 2,937.000 $5.000 $16.500 $10.000 $15.000 $8.000 $7.500 $76.000 $11.700 $30.000
CEMENT
TON 29.000 $170.000 $400.000 $550.000 $250.000 $225.000 $255.000 $503.000 $281.680 $500.000
CEMENT TREAT (NEW BASE) (6")
SY 5,094.000 $4.000 $8.000 $3.000 $15.000 $6.000 $4.800 $34.000 $28.270 $25.000
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 1,584.000 $12.500 $11.000 $8.860 $8.000 $8.000 $7.000 $10.000 $7.440 $12.000
ASPH (CRS-2P)
GAL 3,960.000 $8.500 $14.000 $7.090 $8.000 $7.000 $7.200 $10.650 $8.100 $10.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 3,326.000 $10.000 $14.000 $8.930 $10.000 $9.000 $9.000 $10.500 $10.200 $10.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 75.000 $630.000 $280.000 $682.500 $700.000 $750.000 $687.000 $865.000 $780.000 $900.000
CEM STABIL BKFL
CY 305.600 $175.000 $225.000 $300.000 $200.000 $200.000 $160.000 $280.000 $206.200 $350.000
TEMPORARY SPL SHORING
SF 5,153.000 $35.000 $42.000 $25.000 $30.000 $20.000 $35.000 $37.000 $42.000 $50.000
DRILL SHAFT (18 IN)
LF 220.000 $130.000 $150.000 $125.000 $90.000 $157.000 $90.000 $218.000 $172.410 $400.000
DRILL SHAFT (36 IN)
LF 1,236.000 $240.000 $250.000 $225.000 $215.000 $282.000 $240.000 $308.000 $355.270 $600.000
CL C CONC (ABUT)(HPC)
CY 115.800 $1,200.000 $1,400.000 $1,500.000 $1,400.000 $1,000.000 $1,100.000 $583.000 $1,686.250 $1,500.000
CL C CONC (CAP)(HPC)
CY 61.600 $1,600.000 $1,800.000 $1,500.000 $1,400.000 $1,200.000 $1,300.000 $530.000 $2,077.530 $1,500.000
CL C CONC (COLUMN)(HPC)
CY 31.400 $2,000.000 $2,000.000 $2,000.000 $1,400.000 $1,100.000 $1,300.000 $679.000 $2,596.170 $1,500.000
CL C CONC (RAIL FOUNDATION)
CY 6.000 $700.000 $1,500.000 $1,300.000 $600.000 $600.000 $720.000 $727.000 $1,902.000 $700.000
REINF CONC SLAB (HPC)
SF 17,890.000 $24.000 $23.250 $30.000 $24.000 $22.000 $23.000 $15.000 $43.640 $30.000
APPROACH SLAB (HPC)
CY 169.600 $600.000 $600.000 $800.000 $800.000 $790.000 $625.000 $1,255.000 $731.820 $650.000
PRESTR CONC GIRDER (TX28)
LF 972.900 $230.000 $260.000 $210.000 $250.000 $180.000 $190.000 $299.000 $242.350 $600.000
PRESTR CONC GIRDER (TX34)
LF 1,774.400 $190.000 $290.000 $210.000 $255.000 $220.000 $194.000 $280.000 $256.800 $275.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 2,024.000 $165.000 $140.000 $120.030 $145.000 $125.000 $125.000 $117.000 $172.000 $150.000
RIPRAP (MOW STRIP)(4 IN)
CY 77.000 $650.000 $500.000 $600.000 $600.000 $650.000 $600.000 $115.000 $817.390 $600.000
RAIL (TY T221)(HPC)
LF 46.000 $150.000 $300.000 $315.000 $130.000 $180.000 $160.000 $289.000 $126.090 $150.000
RAIL (TY T223)(HPC)
LF 906.000 $150.000 $160.000 $150.000 $140.000 $180.000 $140.000 $315.000 $124.620 $150.000
SEALED EXPANSION JOINT (4 IN) (SEJ - B)
LF 180.000 $150.000 $150.000 $200.000 $150.000 $130.000 $120.000 $39.000 $122.530 $500.000
CONC BOX CULV (3 FT X 2 FT)
LF 50.000 $400.000 $400.000 $250.000 $350.000 $340.000 $260.000 $435.000 $371.610 $600.000
RC PIPE (CL III)(24 IN)
LF 114.000 $100.000 $75.000 $85.000 $80.000 $167.000 $100.000 $151.000 $147.560 $150.000
SET (TY I)(S=3 FT)(HW=2FT)(6:1)(P)
EA 2.000 $4,000.000 $14,600.000 $10,000.000 $2,000.000 $4,000.000 $7,900.000 $1,850.000 $8,727.180 $5,000.000
REMOV STR (PIPE)
LF 40.000 $25.000 $25.000 $15.000 $15.000 $50.000 $29.000 $33.000 $18.380 $50.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $35,000.000 $25,000.000 $25,000.000 $100,000.000 $40,000.000 $296,000.000 $51,000.000 $30,089.070 $50,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $60,000.000 $85,000.000 $75,000.000 $150,000.000 $74,000.000 $328,100.000 $54,000.000 $54,420.110 $100,000.000
MOBILIZATION
LS 1.000 $491,932.290 $480,000.000 $580,000.000 $530,000.000 $625,736.960 $647,500.000 $510,000.000 $920,640.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $12,000.000 $2,500.000 $21,000.000 $7,000.000 $10,000.000 $7,000.000 $2,500.000 $3,829.490 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 156.000 $35.000 $40.000 $30.000 $1.000 $40.000 $38.000 $46.000 $54.180 $50.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 70.000 $45.000 $50.000 $36.000 $1.000 $110.000 $59.000 $73.000 $114.000 $100.000
ROCK FILTER DAMS (REMOVE)
LF 226.000 $10.000 $10.000 $15.000 $1.000 $14.000 $15.000 $28.000 $36.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 977.000 $27.000 $18.000 $22.500 $1.000 $35.000 $32.000 $30.000 $53.100 $50.000
CONSTRUCTION EXITS (REMOVE)
SY 977.000 $8.000 $1.000 $12.000 $1.000 $8.000 $12.000 $18.000 $36.000 $30.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,130.000 $3.000 $4.000 $2.000 $1.000 $4.000 $3.200 $5.300 $3.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,130.000 $0.550 $1.500 $0.200 $1.000 $0.900 $1.000 $1.750 $1.380 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 99.000 $6.000 $22.000 $5.000 $5.000 $8.000 $5.500 $6.650 $9.900 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 99.000 $2.500 $10.000 $1.000 $1.000 $3.000 $1.000 $2.000 $5.400 $2.000
CONSTRUCTING DETOURS
SY 1,939.000 $90.000 $55.000 $75.000 $75.000 $94.000 $51.000 $69.000 $133.610 $150.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 14.000 $5,000.000 $5,000.000 $3,500.000 $3,000.000 $6,000.000 $3,400.000 $5,450.000 $4,089.600 $4,000.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 2,100.000 $60.000 $75.000 $25.000 $80.000 $57.000 $28.000 $114.000 $55.830 $75.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,710.000 $10.000 $21.000 $10.000 $10.000 $9.000 $4.000 $6.000 $7.410 $5.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 2,100.000 $15.000 $25.000 $15.000 $20.000 $13.000 $11.000 $9.000 $13.210 $75.000
DRIVEWAYS (ACP)
SY 262.000 $60.000 $38.000 $55.000 $80.000 $130.000 $28.000 $47.000 $45.190 $65.000
DRIVEWAYS (BASE)
SY 95.000 $30.000 $70.000 $40.000 $50.000 $120.000 $17.000 $21.000 $34.620 $25.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 2,144.000 $0.750 $1.750 $1.310 $4.000 $1.000 $2.200 $4.200 $1.500 $0.250
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 1,101.000 $0.750 $1.750 $1.310 $5.000 $1.000 $2.200 $4.200 $1.500 $0.250
MTL W-BEAM GD FEN (TIM POST)
LF 737.500 $30.000 $31.000 $24.150 $26.000 $25.000 $26.000 $27.000 $30.960 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 7.000 $2,200.000 $2,500.000 $2,833.550 $1,800.000 $2,200.000 $1,700.000 $2,300.000 $2,678.400 $2,500.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $1,200.000 $2,000.000 $971.250 $1,200.000 $1,000.000 $1,000.000 $1,800.000 $1,140.000 $1,600.000
SHORT RADIUS
LF 37.000 $40.000 $75.000 $36.750 $30.000 $40.000 $36.000 $83.000 $72.000 $90.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,230.000 $2,200.000 $1,433.250 $1,400.000 $1,500.000 $1,400.000 $2,240.000 $1,500.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 1,312.500 $3.500 $8.000 $1.840 $2.000 $2.000 $2.100 $11.000 $3.600 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $3,400.000 $3,800.000 $3,148.950 $3,200.000 $3,200.000 $3,100.000 $4,250.000 $3,900.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $300.000 $250.000 $236.250 $500.000 $300.000 $255.000 $795.000 $360.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 7.000 $1,500.000 $3,500.000 $1,500.000 $3,000.000 $1,300.000 $1,100.000 $3,420.000 $1,200.000 $9,000.000
CRASH CUSH ATTEN (REMOVE)
EA 9.000 $900.000 $1,800.000 $750.000 $1,000.000 $600.000 $910.000 $1,500.000 $960.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 9.000 $9,500.000 $12,000.000 $9,000.000 $10,000.000 $10,000.000 $8,300.000 $13,610.000 $11,160.000 $1,500.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000 $300.000 $500.000 $343.350 $500.000 $400.000 $440.000 $650.000 $360.000 $600.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $400.000 $700.000 $373.800 $500.000 $400.000 $490.000 $375.000 $396.000 $600.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $600.000 $1,000.000 $815.850 $500.000 $800.000 $920.000 $850.000 $900.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 10.000 $750.000 $800.000 $856.800 $1,000.000 $1,100.000 $730.000 $870.000 $960.000 $1,200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $30.000 $25.000 $15.750 $20.000 $67.000 $20.000 $23.000 $78.000 $70.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 8.000 $25.000 $25.000 $19.950 $20.000 $80.000 $20.000 $29.000 $36.000 $85.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 9.000 $32.000 $35.000 $26.250 $30.000 $96.000 $28.000 $11.000 $36.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 6.000 $90.000 $55.000 $126.000 $50.000 $200.000 $122.000 $73.000 $144.000 $200.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 78.000 $6.500 $10.000 $5.250 $10.000 $7.000 $6.500 $8.000 $6.000 $6.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 10,207.000 $1.200 $1.650 $1.420 $1.000 $1.500 $1.400 $2.000 $1.620 $2.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 20.000 $12.500 $25.000 $18.900 $20.000 $9.000 $9.000 $11.000 $21.600 $20.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 11,467.000 $1.200 $1.700 $1.420 $1.000 $1.500 $1.400 $1.750 $1.620 $1.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 5,528.000 $1.450 $0.800 $0.580 $0.800 $0.500 $0.500 $1.000 $0.660 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 510.000 $0.750 $1.500 $1.050 $1.200 $0.700 $0.700 $1.000 $1.200 $1.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,115.000 $0.750 $1.000 $0.680 $0.750 $0.600 $0.550 $1.000 $0.780 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 4,887.000 $1.000 $0.900 $0.580 $0.750 $0.500 $0.500 $1.000 $0.660 $1.000
REFL PAV MRKR TY II-A-A
EA 160.000 $5.000 $10.000 $6.040 $5.000 $9.000 $9.000 $11.000 $6.900 $6.500
ELIM EXT PAV MRK & MRKS (4")
LF 10,058.000 $0.650 $0.900 $0.820 $0.750 $0.600 $0.570 $1.000 $0.940 $1.250
PAV SURF PREP FOR MRK (4")
LF 11,530.000 $0.500 $0.750 $0.050 $0.250 $0.030 $0.030 $1.000 $0.060 $0.050
PAV SURF PREP FOR MRK (6")
LF 510.000 $0.250 $5.000 $0.110 $0.500 $0.030 $0.030 $1.000 $0.060 $0.100
FULL - WIDTH MOWING
CYC 4.000 $2,000.000 $1,000.000 $1,200.000 $1,500.000 $3,600.000 $630.000 $4,500.000 $3,120.000 $38.000
SP MIXES SP-C SAC-B PG64-22
TON 1,273.000 $160.000 $175.000 $150.000 $175.000 $150.000 $150.000 $215.000 $165.900 $225.000
TACK COAT
GAL 475.000 $4.500 $4.000 $8.000 $8.000 $9.000 $8.500 $6.000 $9.600 $2.000
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 876.000 $2.750 $8.250 $2.000 $1.000 $6.000 $5.500 $5.000 $4.580 $5.000
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 876.000 $0.800 $3.500 $0.200 $1.000 $2.000 $1.500 $2.000 $1.380 $2.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $12,000.000 $8,000.000 $17,500.000 $60,000.000 $40,000.000 $12,000.000 $24,000.000 $15,600.000 $2,500.000
TMA (STATIONARY)
DAY 742.000 $160.000 $125.000 $157.500 $180.000 $185.000 $170.000 $180.000 $219.600 $220.000
TMA (MOBILE OPERATION)
DAY 14.000 $200.000 $500.000 $735.000 $180.000 $1,000.000 $550.000 $180.000 $1,200.000 $250.000
Totals: $5,694,055.140 $5,848,540.850 $6,023,347.505 $6,072,254.700 $6,462,323.560 $6,479,555.510 $6,951,604.150 $7,555,414.453 $7,735,831.000