|
|
PREPARING ROW
|
STA
|
269.060
|
$1,500.000
|
$1,072.360
|
$1,700.000
|
$600.000
|
$1,521.360
|
$757.000
|
|
|
PREPARING ROW(TREE)(24" TO 36" DIA.)
|
EA
|
5.000
|
$1,700.000
|
$3,649.350
|
$1,100.000
|
$1,410.000
|
$1,802.000
|
$1,410.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
944.000
|
$30.000
|
$8.100
|
$15.000
|
$21.000
|
$13.770
|
$15.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,273.000
|
$13.500
|
$20.310
|
$15.000
|
$22.000
|
$11.360
|
$15.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
775.000
|
$18.000
|
$3.660
|
$7.500
|
$11.000
|
$2.800
|
$15.000
|
|
|
REMOV STAB BASE AND ASPH PAV (0"-12")
|
SY
|
1,065.000
|
$9.250
|
$8.340
|
$10.000
|
$22.500
|
$8.480
|
$32.910
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,893.000
|
$14.500
|
$9.000
|
$10.000
|
$90.000
|
$52.250
|
$20.360
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
269.060
|
$650.000
|
$465.000
|
$1,000.000
|
$530.000
|
$1,245.810
|
$340.740
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
9,932.000
|
$15.000
|
$17.000
|
$10.000
|
$18.000
|
$12.260
|
$20.460
|
|
|
BACKFILL (TY A OR B)
|
STA
|
280.830
|
$280.000
|
$185.000
|
$300.000
|
$185.000
|
$1,239.370
|
$405.390
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
269.060
|
$190.000
|
$190.000
|
$1,200.000
|
$325.000
|
$130.160
|
$340.740
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
174,230.000
|
$1.250
|
$0.790
|
$0.760
|
$0.680
|
$0.720
|
$0.790
|
|
|
BLOCK SODDING
|
SY
|
56,993.000
|
$3.500
|
$2.890
|
$2.790
|
$2.800
|
$2.970
|
$2.850
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
117,238.000
|
$1.000
|
$0.110
|
$0.130
|
$0.170
|
$0.180
|
$0.110
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
87,115.000
|
$0.150
|
$0.080
|
$0.080
|
$0.180
|
$0.190
|
$0.070
|
|
|
VEGETATIVE WATERING
|
MG
|
38,878.000
|
$10.000
|
$16.500
|
$0.100
|
$1.000
|
$15.900
|
$2.640
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
98,968.000
|
$12.500
|
$8.500
|
$9.000
|
$10.300
|
$9.620
|
$9.180
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
200.000
|
$25.000
|
$17.250
|
$25.000
|
$40.000
|
$35.080
|
$100.000
|
|
|
REWORK BS MATL (TY C)(9")(ORD COMP)
|
SY
|
98,968.000
|
$2.150
|
$3.200
|
$0.100
|
$1.500
|
$1.260
|
$2.460
|
|
|
CEMENT
|
TON
|
494.400
|
$140.000
|
$140.000
|
$200.000
|
$186.000
|
$228.760
|
$138.000
|
|
|
CEMENT TREAT (EXIST MATL) (6")
|
SY
|
98,968.000
|
$3.250
|
$1.700
|
$2.000
|
$2.350
|
$0.890
|
$2.460
|
|
|
EMULS ASPH (PRIME)(MS-2 OR SS-1)
|
GAL
|
19,799.000
|
$6.000
|
$3.710
|
$5.500
|
$7.000
|
$3.750
|
$5.090
|
|
|
ASPH (CRS-2P)
|
GAL
|
24,742.000
|
$4.250
|
$4.010
|
$3.950
|
$3.850
|
$3.490
|
$4.810
|
|
|
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
|
GAL
|
20,777.000
|
$4.250
|
$3.910
|
$3.950
|
$3.750
|
$3.340
|
$4.530
|
|
|
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
|
CY
|
948.000
|
$130.000
|
$187.680
|
$181.000
|
$180.000
|
$202.330
|
$134.750
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")
|
SY
|
1,000.000
|
$50.000
|
$28.480
|
$45.000
|
$41.000
|
$27.040
|
$87.000
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
84,495.000
|
$4.000
|
$0.730
|
$0.750
|
$3.000
|
$0.800
|
$4.250
|
|
|
CUT & RESTORING PAV
|
SY
|
210.000
|
$175.000
|
$357.370
|
$200.000
|
$90.000
|
$137.800
|
$150.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
253.000
|
$4.500
|
$13.380
|
$10.000
|
$12.000
|
$12.720
|
$20.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
19,057.300
|
$32.000
|
$7.000
|
$20.000
|
$27.000
|
$42.400
|
$40.380
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
164.200
|
$500.000
|
$405.000
|
$500.000
|
$581.000
|
$477.000
|
$450.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
397.000
|
$400.000
|
$525.000
|
$600.000
|
$576.000
|
$530.000
|
$450.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(18 IN)
|
CY
|
647.200
|
$125.000
|
$158.000
|
$275.000
|
$311.000
|
$242.740
|
$240.260
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
44.000
|
$400.000
|
$212.470
|
$275.000
|
$347.300
|
$318.000
|
$450.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
45.000
|
$850.000
|
$412.680
|
$560.000
|
$558.100
|
$742.000
|
$750.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
8.000
|
$550.000
|
$616.290
|
$900.000
|
$1,024.000
|
$742.000
|
$600.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
68.000
|
$1,000.000
|
$891.900
|
$1,050.000
|
$681.000
|
$1,007.000
|
$1,000.000
|
|
|
CONC BOX CULV (9 FT X 9 FT)(EXTEND)
|
LF
|
57.000
|
$1,100.000
|
$966.980
|
$1,150.000
|
$780.300
|
$1,166.000
|
$1,500.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)(EXTEND)
|
LF
|
34.000
|
$1,015.000
|
$1,142.500
|
$1,250.000
|
$955.700
|
$1,378.000
|
$1,800.000
|
|
|
CONC BOX CULV (5 FT X 6.5 FT)(EXTEND)
|
LF
|
15.000
|
$1,000.000
|
$796.380
|
$1,025.000
|
$644.900
|
$901.000
|
$900.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,382.000
|
$62.500
|
$79.000
|
$55.000
|
$53.000
|
$47.700
|
$48.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
499.000
|
$76.000
|
$91.480
|
$66.000
|
$68.000
|
$97.520
|
$68.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
170.000
|
$105.000
|
$107.190
|
$99.000
|
$111.000
|
$132.500
|
$85.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
16.000
|
$120.000
|
$198.140
|
$333.000
|
$288.000
|
$169.600
|
$125.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
17.000
|
$185.000
|
$284.800
|
$444.000
|
$362.000
|
$212.000
|
$200.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
117.000
|
$80.000
|
$148.680
|
$69.000
|
$120.000
|
$116.600
|
$90.000
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
67.000
|
$165.000
|
$203.380
|
$150.000
|
$303.000
|
$196.100
|
$170.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$8,000.000
|
$9,043.850
|
$6,500.000
|
$4,224.000
|
$6,890.000
|
$8,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$13,500.000
|
$14,160.490
|
$10,000.000
|
$7,605.800
|
$10,600.000
|
$8,000.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
4.000
|
$26,000.000
|
$36,500.000
|
$31,500.000
|
$36,900.900
|
$38,160.000
|
$30,000.000
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
2.000
|
$32,400.000
|
$47,139.840
|
$45,000.000
|
$50,722.700
|
$50,880.000
|
$38,000.000
|
|
|
WINGWALL (PW - 2) (HW=12 FT)
|
EA
|
2.000
|
$33,400.000
|
$57,000.000
|
$50,000.000
|
$57,902.400
|
$59,360.000
|
$44,000.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
1.000
|
$13,800.000
|
$11,758.980
|
$8,000.000
|
$7,407.600
|
$7,950.000
|
$14,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
2.000
|
$26,000.000
|
$20,204.240
|
$17,000.000
|
$16,038.800
|
$16,960.000
|
$18,000.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
2.000
|
$30,000.000
|
$28,748.560
|
$22,000.000
|
$25,049.600
|
$25,440.000
|
$28,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 5 FT)(3:1)(C)
|
EA
|
1.000
|
$8,500.000
|
$6,791.430
|
$6,000.000
|
$5,771.600
|
$7,420.000
|
$8,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
4.000
|
$5,500.000
|
$7,155.270
|
$8,000.000
|
$3,687.000
|
$9,540.000
|
$9,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
70.000
|
$750.000
|
$951.120
|
$675.000
|
$1,340.000
|
$901.000
|
$675.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
8.000
|
$1,000.000
|
$1,082.050
|
$725.000
|
$1,140.000
|
$954.000
|
$750.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
4.000
|
$1,500.000
|
$926.690
|
$800.000
|
$1,366.000
|
$1,007.000
|
$850.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
24.000
|
$1,000.000
|
$1,284.320
|
$1,000.000
|
$1,704.000
|
$1,060.000
|
$1,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$1,800.000
|
$1,607.660
|
$1,050.000
|
$2,340.000
|
$2,120.000
|
$1,300.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,100.000
|
$2,260.100
|
$2,500.000
|
$4,106.000
|
$2,650.000
|
$3,500.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
8.000
|
$2,100.000
|
$1,990.230
|
$2,500.000
|
$2,594.000
|
$3,180.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,750.000
|
$1,907.540
|
$2,750.000
|
$3,200.000
|
$3,710.000
|
$3,700.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
19.000
|
$3,600.000
|
$1,514.500
|
$1,500.000
|
$2,000.000
|
$2,120.000
|
$1,500.000
|
|
|
REMOV STR (SET)
|
EA
|
4.000
|
$350.000
|
$466.530
|
$250.000
|
$550.000
|
$583.000
|
$300.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
42.000
|
$1,300.000
|
$620.550
|
$1,200.000
|
$1,500.000
|
$1,590.000
|
$1,000.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
21.000
|
$1,000.000
|
$620.550
|
$700.000
|
$1,500.000
|
$1,590.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
433.000
|
$15.000
|
$15.860
|
$23.000
|
$25.000
|
$26.500
|
$15.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
47.000
|
$80.000
|
$125.540
|
$66.000
|
$200.000
|
$212.000
|
$85.000
|
|
|
REMOV STR (SMALL)
|
EA
|
46.000
|
$500.000
|
$372.430
|
$110.000
|
$1,500.000
|
$1,590.000
|
$2,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$969,620.000
|
$675,000.000
|
$712,000.000
|
$885,000.000
|
$385,000.000
|
$1,175,240.150
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$12,000.000
|
$3,500.000
|
$21,000.000
|
$27,500.000
|
$2,738.080
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,420.000
|
$28.000
|
$25.040
|
$25.850
|
$22.860
|
$24.230
|
$27.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
500.000
|
$70.000
|
$69.340
|
$29.150
|
$49.000
|
$51.940
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,920.000
|
$8.000
|
$9.520
|
$13.750
|
$8.600
|
$9.120
|
$6.750
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
780.000
|
$21.000
|
$20.670
|
$22.000
|
$23.180
|
$24.570
|
$20.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
780.000
|
$7.250
|
$7.680
|
$11.000
|
$6.840
|
$7.250
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,000.000
|
$2.000
|
$2.780
|
$1.540
|
$2.000
|
$2.120
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,000.000
|
$0.550
|
$0.520
|
$0.110
|
$0.480
|
$0.510
|
$0.400
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
5,000.000
|
$3.500
|
$3.570
|
$3.250
|
$3.260
|
$3.460
|
$4.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
5,000.000
|
$0.750
|
$0.520
|
$1.100
|
$0.690
|
$0.730
|
$1.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
21.000
|
$4,200.000
|
$4,400.000
|
$1,000.000
|
$3,700.000
|
$3,400.000
|
$5,000.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
1,200.000
|
$36.000
|
$22.500
|
$15.000
|
$50.000
|
$50.880
|
$98.490
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
9,600.000
|
$20.000
|
$10.000
|
$5.000
|
$14.000
|
$10.600
|
$37.330
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
1,200.000
|
$10.000
|
$11.000
|
$6.000
|
$15.000
|
$16.960
|
$37.330
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,293.000
|
$30.000
|
$15.000
|
$40.000
|
$42.000
|
$100.880
|
$44.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,675.000
|
$32.000
|
$35.000
|
$40.000
|
$37.000
|
$48.760
|
$41.370
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
893.000
|
$80.000
|
$66.000
|
$100.000
|
$125.000
|
$70.140
|
$110.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
49,496.000
|
$0.200
|
$0.100
|
$0.120
|
$0.290
|
$0.130
|
$0.100
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
24,748.000
|
$0.200
|
$0.100
|
$0.120
|
$0.290
|
$0.130
|
$0.100
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
4,080.000
|
$40.000
|
$19.190
|
$22.000
|
$18.500
|
$21.200
|
$20.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
260.000
|
$55.000
|
$67.770
|
$51.150
|
$52.000
|
$49.290
|
$46.500
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,685.000
|
$5.000
|
$2.090
|
$2.150
|
$2.000
|
$2.070
|
$1.950
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
36.000
|
$2,650.000
|
$2,502.410
|
$2,722.500
|
$2,330.000
|
$2,623.500
|
$2,475.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
9.000
|
$650.000
|
$208.530
|
$220.000
|
$225.000
|
$212.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
32.000
|
$1,300.000
|
$2,189.610
|
$1,575.000
|
$1,200.000
|
$842.700
|
$1,350.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$800.000
|
$834.140
|
$840.000
|
$600.000
|
$530.000
|
$750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$8,500.000
|
$8,237.110
|
$11,550.000
|
$7,200.000
|
$7,711.000
|
$7,600.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
25.000
|
$205.000
|
$240.860
|
$247.500
|
$188.000
|
$281.910
|
$231.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
10.000
|
$550.000
|
$495.270
|
$660.000
|
$591.000
|
$705.430
|
$475.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
22.000
|
$50.000
|
$27.340
|
$30.800
|
$23.000
|
$27.300
|
$60.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
41.000
|
$475.000
|
$500.480
|
$522.500
|
$504.000
|
$439.900
|
$480.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$600.000
|
$646.460
|
$720.500
|
$604.000
|
$625.400
|
$620.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$750.000
|
$782.010
|
$731.500
|
$732.000
|
$779.100
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$800.000
|
$907.130
|
$891.000
|
$922.000
|
$1,054.700
|
$870.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
2.000
|
$845.000
|
$927.980
|
$1,039.500
|
$1,044.000
|
$1,033.500
|
$890.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$1,000.000
|
$938.410
|
$1,056.000
|
$888.000
|
$948.700
|
$900.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$80.000
|
$83.410
|
$93.500
|
$65.000
|
$100.700
|
$80.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
30.000
|
$60.000
|
$60.480
|
$50.600
|
$58.000
|
$111.830
|
$58.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
58,804.000
|
$0.500
|
$0.150
|
$0.320
|
$0.140
|
$0.280
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
1,000.000
|
$6.000
|
$0.290
|
$0.530
|
$0.280
|
$1.060
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
180.000
|
$3.000
|
$1.040
|
$3.180
|
$1.000
|
$4.240
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
190.000
|
$4.000
|
$2.090
|
$5.300
|
$2.000
|
$7.420
|
$2.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
9.000
|
$50.000
|
$52.130
|
$127.200
|
$50.000
|
$106.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
7.000
|
$50.000
|
$78.200
|
$159.000
|
$75.000
|
$143.100
|
$75.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
167,944.000
|
$0.350
|
$0.150
|
$0.320
|
$0.140
|
$0.280
|
$0.140
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,860.000
|
$4.500
|
$3.390
|
$3.500
|
$3.250
|
$4.930
|
$3.250
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
17,490.000
|
$1.000
|
$0.630
|
$0.800
|
$0.600
|
$1.110
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
216.000
|
$10.000
|
$10.430
|
$8.480
|
$10.000
|
$8.320
|
$10.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
70,560.000
|
$1.000
|
$0.630
|
$0.800
|
$0.600
|
$1.110
|
$0.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,400.000
|
$1.200
|
$1.230
|
$2.000
|
$1.250
|
$2.970
|
$2.250
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,000.000
|
$1.000
|
$0.730
|
$1.060
|
$0.700
|
$1.270
|
$0.700
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
180.000
|
$3.750
|
$4.170
|
$3.710
|
$4.000
|
$3.180
|
$4.000
|
|
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
|
LF
|
80.000
|
$10.000
|
$10.430
|
$5.300
|
$10.000
|
$5.300
|
$10.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
190.000
|
$8.000
|
$8.340
|
$6.890
|
$8.000
|
$6.360
|
$8.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
9.000
|
$132.000
|
$156.400
|
$148.400
|
$150.000
|
$132.500
|
$150.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
7.000
|
$150.000
|
$208.530
|
$159.000
|
$200.000
|
$153.700
|
$200.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
150.000
|
$6.000
|
$8.340
|
$6.890
|
$8.000
|
$6.360
|
$8.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
56,804.000
|
$0.450
|
$0.360
|
$0.480
|
$0.350
|
$0.420
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,620.000
|
$0.550
|
$0.360
|
$1.060
|
$0.350
|
$0.480
|
$0.350
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
50,854.000
|
$0.450
|
$0.360
|
$0.480
|
$0.350
|
$0.420
|
$0.350
|
|
REFL PAV MRKR TY I-C
|
EA
|
80.000
|
$4.000
|
$5.470
|
$3.500
|
$5.250
|
$4.510
|
$5.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,291.000
|
$4.500
|
$3.390
|
$3.500
|
$3.250
|
$4.510
|
$3.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
109,140.000
|
$0.400
|
$0.520
|
$0.510
|
$0.500
|
$0.370
|
$2.100
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,000.000
|
$0.240
|
$0.310
|
$1.060
|
$0.300
|
$1.060
|
$0.300
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$5,000.000
|
$4,170.690
|
$8,000.000
|
$4,500.000
|
$9,116.000
|
$8,000.000
|
|
|
REMOVE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$1,300.000
|
$729.870
|
$1,500.000
|
$1,000.000
|
$477.000
|
$2,000.000
|
|
|
STRIP MOWING
|
AC
|
39.210
|
$120.000
|
$41.710
|
$220.000
|
$195.000
|
$371.000
|
$100.000
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
15,827.000
|
$85.000
|
$74.000
|
$81.000
|
$90.000
|
$81.380
|
$80.940
|
|
|
FLOATING TURBIDITY BARRIER(FUR & INST)
|
LF
|
500.000
|
$40.000
|
$63.760
|
$55.000
|
$65.000
|
$64.820
|
$26.000
|
|
|
FLOATING TURBIDITY BARRIER (REMOVE)
|
LF
|
500.000
|
$10.000
|
$23.270
|
$5.500
|
$25.000
|
$23.660
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$12,500.000
|
$7,600.000
|
$17,500.000
|
$16,500.000
|
$50,085.000
|
$17,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
354.000
|
$140.000
|
$240.000
|
$157.500
|
$300.000
|
$157.940
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
2,268.000
|
$72.000
|
$83.780
|
$52.500
|
$95.000
|
$185.500
|
$100.000
|
|
Totals: |
$10,958,188.350
|
$8,828,849.781
|
$9,269,302.820
|
$10,374,441.640
|
$10,545,222.379
|
$10,858,993.588
|