Show Job Controls
Bid Cobra

DENTON FM 424 (0815-03-015)

Items: 60

County: DENTON
Length: N/A
Highway: FM 424
District: DALLAS
Control Number: 0815-03-015
DBE Goal: N/A
Project: C 815-3-15
Guaranty: N/A
Time: 116 WORKING DAYS
Engineer's Estimate: $1,827,904.81
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
AMANDA MILLER
CHRISTOPHER ROCHA
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,827,904.81
$2,064,269.71
Over/Under Est: 12.93% $236,364.90
Over/Under Est: 17.54% $320,543.45
Amt Left: 4.08% $84,178.55
Over/Under Est: 17.97% $328,544.88
Amt Left: 4.47% $92,179.98
Delta: -0.37% -$8,001.43
$2,531,180.54
Over/Under Est: 38.47% $703,275.73
Amt Left: 22.62% $466,910.83
Delta: -17.38% -$374,730.85

Bid Items & Bid Tabulations

60 Total 0 of 60
DENTON  |  FM 424  |  DALLAS  |  0815-03-015  |  05/04/2023  |  $1,827,904.81  |  C 815-3-15  |  REHAB EXIST ROADWAY  |  116 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ED BELL CONSTRUCTION COMPANY
TEXAS MATERIALS GROUP, INC.
EUROVIA ATLANTIC COAST LLC
JAGOE-PUBLIC COMPANY
PREPARING ROW
STA 48.000 $1,300.000 $1,500.000 $4,000.000 $850.000 $2,000.000
REMOVING CONC (DRIVEWAYS)
SY 543.000 $12.000 $21.000 $30.000 $26.000 $20.000
REMOV STAB BASE AND ASPH PAV (0"-12")
SY 1,821.000 $2.650 $21.000 $8.250 $11.000 $40.000
EXCAVATION (ROADWAY)
CY 832.000 $16.000 $3.000 $20.000 $100.000 $50.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,197.000 $30.000 $31.500 $29.000 $75.000 $65.000
BACKFILL (TY A OR B)
STA 81.700 $220.000 $200.000 $375.000 $420.000 $180.000
BLADING
STA 48.000 $160.000 $200.000 $160.000 $190.000 $1,600.000
COMPOST MANUF TOPSOIL (4")
SY 38,195.000 $1.400 $0.700 $1.500 $1.240 $3.200
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 38,195.000 $0.230 $0.200 $0.360 $0.360 $0.230
DRILL SEED (TEMP)(WARM OR COOL)
SY 12,732.000 $0.250 $0.400 $0.360 $0.360 $0.150
VEGETATIVE WATERING
MG 7,576.000 $7.000 $1.000 $0.010 $1.000 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 200.000 $130.000 $150.000 $220.000 $200.000 $125.000
TEMPORARY SPL SHORING
SF 455.000 $36.000 $70.000 $60.000 $40.000 $57.000
RIPRAP (STONE COMMON)(GROUT)(18 IN)
CY 31.000 $180.000 $525.000 $600.000 $450.000 $290.000
RC PIPE (CL III)(18 IN)
LF 246.000 $75.000 $120.000 $70.000 $58.000 $115.000
RC PIPE (CL III)(24 IN)
LF 210.000 $90.000 $125.000 $95.000 $80.000 $140.000
RC PIPE (CL III)(60 IN)
LF 38.000 $375.000 $1,000.000 $630.000 $425.000 $700.000
HEADWALL (CH - PW - 0) (DIA= 60 IN)
EA 2.000 $26,400.000 $27,500.000 $27,000.000 $18,000.000 $25,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 22.000 $900.000 $1,000.000 $1,500.000 $1,250.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $1,600.000 $1,500.000 $1,800.000 $1,555.000 $2,200.000
CLEAN EXIST CULVERTS
EA 2.000 $2,600.000 $750.000 $5,400.000 $2,500.000 $3,900.000
REMOV STR (SET)
EA 28.000 $370.000 $400.000 $140.000 $120.000 $410.000
REMOV STR (WINGWALL)
EA 2.000 $1,500.000 $6,000.000 $900.000 $750.000 $1,600.000
REMOV STR (PIPE)
LF 456.000 $22.000 $20.000 $12.000 $10.000 $100.000
MOBILIZATION
LS 1.000 $166,100.000 $206,400.000 $210,000.000 $200,000.000 $250,000.540
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $22,000.000 $31,500.000 $10,000.000 $28,000.000 $41,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 130.000 $35.000 $60.500 $175.000 $43.530 $58.000
ROCK FILTER DAMS (REMOVE)
LF 130.000 $17.000 $30.250 $45.000 $14.600 $17.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 105.000 $30.000 $26.400 $60.000 $46.420 $38.000
CONSTRUCTION EXITS (REMOVE)
SY 105.000 $8.500 $13.200 $20.000 $12.590 $13.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 44.000 $3.300 $3.300 $23.250 $23.060 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 44.000 $0.900 $1.100 $6.500 $6.460 $1.200
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 605.000 $5.780 $4.400 $6.000 $5.880 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 605.000 $1.700 $1.100 $2.500 $2.430 $1.200
DRIVEWAYS (ACP)
SY 871.000 $60.000 $75.000 $85.000 $85.000 $57.000
DRIVEWAYS (CONC) (HES)
SY 543.000 $130.000 $157.500 $162.000 $145.000 $150.000
RUMBLE STRIPS (SHOULDER)
LF 15,516.000 $0.250 $0.330 $0.200 $0.440 $0.300
RUMBLE STRIPS (CENTERLINE)
LF 7,758.000 $0.250 $0.330 $0.200 $0.440 $0.300
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 10.000 $550.000 $302.500 $300.000 $280.000 $320.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $800.000 $687.500 $650.000 $710.000 $725.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $960.000 $863.500 $900.000 $850.000 $915.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $1,200.000 $1,023.000 $1,100.000 $900.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,300.000 $1,133.000 $1,250.000 $1,300.000 $1,200.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 4.000 $130.000 $55.000 $60.000 $60.000 $60.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 408.000 $0.230 $5.000 $1.000 $2.000 $2.800
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 450.000 $2.000 $1.320 $1.200 $1.500 $2.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,710.000 $1.050 $0.990 $0.900 $1.150 $1.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 135.000 $7.000 $7.700 $7.000 $8.500 $8.100
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 10.000 $135.000 $130.900 $119.000 $175.000 $170.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 11.000 $150.000 $136.400 $124.000 $225.000 $190.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 470.000 $5.000 $2.750 $2.500 $4.250 $5.200
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 15,711.000 $0.570 $0.640 $0.580 $0.780 $1.200
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 17,970.000 $0.800 $0.640 $0.580 $0.780 $1.200
REFL PAV MRKR TY II-A-A
EA 450.000 $4.000 $3.840 $3.490 $5.000 $5.800
SP MIXES SP-B PG64-22
TON 2,348.000 $110.000 $125.000 $135.000 $135.000 $120.000
SP MIXES SP-C SAC-B PG64-22
TON 4,027.000 $125.000 $140.000 $137.000 $132.000 $125.000
TACK COAT
GAL 2,663.000 $3.500 $1.750 $4.250 $2.850 $1.750
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $7,500.000 $7,000.000 $17,500.000 $25,000.000
TMA (STATIONARY)
DAY 25.000 $300.000 $150.000 $1,490.000 $330.000 $500.000
TMA (MOBILE OPERATION)
HR 35.000 $110.000 $75.000 $110.000 $100.000 $150.000
Totals: $1,827,904.810 $2,064,269.710 $2,148,448.260 $2,156,449.690 $2,531,180.540