DENTON BS 121H (0364-03-099)

Items: 34

County: DENTON
Length: N/A
Highway: BS 121H
District: DALLAS
Control Number: 0364-03-099
DBE Goal: N/A
Project: NH 1702(578)
Guaranty: N/A
Time: 252 WORKING DAYS
Engineer's Estimate: $1,993,865.00
Date: 07/12/2017 (8 years ago)
Contract Number: N/A
Type: LANDSCAPE TREATMENT OF MEDIANS AND RIGHT OF WAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,993,865.00
$1,895,000.00
Over/Under Est: -4.96% -$98,865.00
$1,945,000.00
Over/Under Est: -2.45% -$48,865.00
Amt Left: 2.64% $50,000.00
$2,012,090.40
Over/Under Est: 0.91% $18,225.40
Amt Left: 6.18% $117,090.40
Delta: -3.45% -$67,090.40
Over/Under Est: 27.59% $550,135.00
Amt Left: 34.25% $649,000.00
Delta: -26.44% -$531,909.60

Bid Items & Bid Tabulations

34 Total 0 of 34
DENTON  |  BS 121H  |  DALLAS  |  0364-03-099  |  07/12/2017  |  $1,993,865.00  |  NH 1702(578)  |  LANDSCAPE TREATMENT OF MEDIANS AND R...  |  252 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
APEX LANDSCAPE & IRRIGATION, LLC
AALC, INC.
C. GREEN SCAPING, L.P.
LONE STAR CIVIL CONSTRUCTION, INC.
REMOVING CONC (SIDEWALKS)
SY 1,320.000 $15.000 $13.000 $20.000 $14.000 $16.000
EXCAVATION (SPECIAL)
CY 1,941.000 $20.000 $10.000 $74.000 $26.000 $50.000
SPEC EXCAV WORK (ORIGINAL)
CY 730.000 $15.000 $13.000 $20.000 $26.000 $50.000
FURNISHING AND PLACING TOPSOIL (3")
SY 5,162.000 $2.000 $2.000 $4.500 $7.200 $4.000
GENERAL USE COMPOST
CY 120.000 $40.000 $38.500 $40.000 $54.000 $35.000
IRRIGATION SYSTEM
LS 1.000 $360,000.000 $499,830.700 $262,335.000 $308,000.000 $350,000.000
PLANT MATERIAL (1-GAL)
EA 1,336.000 $7.000 $3.500 $2.000 $8.000 $12.000
PLANT MATERIAL (3-GAL)
EA 573.000 $15.000 $14.000 $7.000 $16.000 $23.000
PLANT MATERIAL (5-GAL)
EA 6,356.000 $25.000 $14.000 $9.000 $14.000 $28.000
PLANT MATERIAL (15-GAL)
EA 84.000 $140.000 $80.000 $90.000 $110.000 $210.000
MULCH
CY 200.000 $40.000 $37.500 $40.500 $52.000 $35.000
LANDSCAPE EDGE
LF 9,316.000 $15.000 $15.000 $25.000 $15.000 $15.000
PLANT BED PREPARATION
SY 7,596.000 $3.000 $2.000 $1.000 $13.000 $3.000
PLANT MATERIAL (15 GAL) (TREE)
EA 2.000 $140.000 $80.000 $90.000 $110.000 $210.000
PLANT MATERIAL (30 GAL) (TREE)
EA 91.000 $320.000 $120.000 $175.000 $380.000 $400.000
PLANT MATERIAL (45 GAL) (TREE)
EA 33.000 $461.000 $200.000 $225.000 $480.000 $450.000
PLANT MATERIAL (1 GAL) (SHRUB)
EA 2,177.000 $5.000 $3.500 $2.000 $8.000 $12.000
PLANT MATERIAL (3 GAL) (SHRUB)
EA 1,385.000 $15.000 $14.000 $7.000 $16.000 $22.000
PLANT BED PREP (TYPE I)
SY 5,162.000 $4.000 $2.000 $1.000 $13.000 $1.500
LANDSCAPE EDGE (TYPE I)
LF 4,926.000 $35.000 $15.000 $25.000 $16.000 $16.000
PLANT MAINTENANCE
MO 12.000 $3,700.000 $2,250.000 $5,500.000 $3,400.000 $3,000.000
IRRIGATION SYSTEM OPER AND MAINT
MO 12.000 $1,300.000 $1,500.000 $1,578.000 $3,000.000 $1,500.000
MOBILIZATION
LS 1.000 $90,000.000 $177,500.000 $150,000.000 $100,000.000 $249,252.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $8,000.000 $6,250.000 $6,000.000 $2,200.000 $52,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,200.000 $2.100 $0.010 $0.100 $2.600 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,200.000 $0.450 $0.010 $0.100 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 800.000 $4.500 $0.010 $0.100 $3.750 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 800.000 $1.250 $0.010 $0.100 $1.250 $1.000
COLORED TEXTURED CONC (4")
SY 1,186.000 $85.000 $105.800 $83.000 $81.000 $100.000
CONDT (PVC) (SCH 40) (6") (BORE)
LF 1,903.000 $35.000 $25.000 $43.000 $34.000 $35.000
ELC SRV TY D 120/240 060(NS)AL(N)PS(U)
EA 7.000 $4,000.000 $10,720.000 $3,000.000 $9,800.000 $4,400.000
LANDSCAPE AMENITY (TY 1)
EA 2.000 $45,000.000 $30,000.000 $40,000.000 $17,064.000 $36,000.000
LOOSE AGGR FOR GROUNDCOVER (TYPE I)
CY 1,163.000 $180.000 $88.500 $275.000 $122.000 $95.000
LOOSE AGGR FOR GROUNDCOVER (TYPE II)
CY 943.000 $180.000 $239.500 $80.000 $370.000 $90.000
Totals: $1,993,865.000 $1,895,000.000 $1,945,000.000 $2,012,090.400 $2,544,000.000