PREPARING ROW
|
STA
|
56.900
|
$5,000.000
|
$1,070.000
|
$12,331.390
|
$28,687.660
|
$844.500
|
$1,414.500
|
$14,500.000
|
$26,000.000
|
$60,000.000
|
$13,500.000
|
$5,450.000
|
$32,000.000
|
$12,500.000
|
$69,330.170
|
|
|
REMOVING CONC (PAV)
|
SY
|
492.000
|
$7.920
|
$29.200
|
$20.740
|
$10.000
|
$14.610
|
$19.200
|
$14.000
|
$40.000
|
$12.750
|
$20.000
|
$20.000
|
$21.000
|
$8.690
|
$40.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
465.000
|
$17.500
|
$5.250
|
$2.650
|
$3.000
|
$2.470
|
$3.600
|
$2.400
|
$8.000
|
$4.500
|
$5.000
|
$4.000
|
$17.000
|
$9.210
|
$10.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (4")
|
SY
|
758.000
|
$4.150
|
$7.000
|
$6.530
|
$3.000
|
$3.960
|
$7.100
|
$8.000
|
$7.000
|
$4.500
|
$20.000
|
$8.000
|
$11.000
|
$3.690
|
$15.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
15,787.000
|
$8.500
|
$5.200
|
$9.500
|
$7.000
|
$3.880
|
$8.900
|
$5.000
|
$7.250
|
$4.000
|
$15.000
|
$8.000
|
$5.110
|
$7.720
|
$15.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
14,968.000
|
$11.000
|
$11.000
|
$6.300
|
$5.000
|
$7.350
|
$8.700
|
$7.500
|
$17.010
|
$10.000
|
$15.000
|
$16.000
|
$6.550
|
$14.090
|
$15.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
22.200
|
$214.000
|
$560.000
|
$191.250
|
$250.000
|
$141.410
|
$490.400
|
$360.000
|
$770.000
|
$200.000
|
$275.000
|
$236.000
|
$3,000.000
|
$198.230
|
$362.160
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
34,029.000
|
$1.200
|
$0.600
|
$0.890
|
$1.600
|
$1.030
|
$1.660
|
$2.500
|
$2.200
|
$0.590
|
$0.600
|
$0.620
|
$5.500
|
$0.590
|
$2.470
|
|
|
BLOCK SODDING
|
SY
|
34,029.000
|
$3.000
|
$2.500
|
$2.490
|
$2.600
|
$2.490
|
$2.900
|
$2.900
|
$2.700
|
$4.500
|
$2.600
|
$2.600
|
$2.490
|
$2.490
|
$2.490
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
34,029.000
|
$0.240
|
$0.100
|
$0.080
|
$0.100
|
$0.080
|
$0.100
|
$0.110
|
$0.100
|
$0.080
|
$0.040
|
$0.090
|
$0.080
|
$0.080
|
$0.080
|
|
|
VEGETATIVE WATERING
|
MG
|
6,328.000
|
$2.500
|
$25.700
|
$17.000
|
$29.000
|
$17.000
|
$20.000
|
$12.500
|
$0.010
|
$0.010
|
$2.100
|
$26.000
|
$11.880
|
$17.000
|
$17.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
473.000
|
$185.500
|
$172.000
|
$175.500
|
$160.000
|
$181.190
|
$172.000
|
$150.000
|
$180.600
|
$170.000
|
$175.000
|
$175.000
|
$250.000
|
$172.000
|
$179.750
|
|
|
LIME TRT (EXST MATL)(10")
|
SY
|
20,864.000
|
$5.250
|
$3.850
|
$3.510
|
$4.200
|
$3.460
|
$3.500
|
$4.650
|
$4.420
|
$2.500
|
$4.000
|
$5.500
|
$9.000
|
$5.460
|
$5.240
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
8,934.000
|
$3.500
|
$4.150
|
$3.490
|
$4.000
|
$5.660
|
$3.500
|
$4.500
|
$4.810
|
$2.750
|
$3.900
|
$5.500
|
$9.000
|
$6.610
|
$5.300
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
359.000
|
$52.530
|
$78.000
|
$73.670
|
$72.000
|
$88.870
|
$79.000
|
$84.000
|
$88.370
|
$78.000
|
$105.000
|
$110.000
|
$120.550
|
$110.170
|
$114.310
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
8,732.000
|
$62.000
|
$69.250
|
$67.440
|
$52.000
|
$76.490
|
$81.000
|
$70.000
|
$75.000
|
$75.000
|
$68.000
|
$85.000
|
$100.000
|
$83.360
|
$78.220
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
19,619.000
|
$85.000
|
$77.500
|
$77.740
|
$58.000
|
$84.780
|
$88.000
|
$73.000
|
$86.000
|
$84.000
|
$75.000
|
$95.000
|
$94.000
|
$93.860
|
$81.750
|
|
|
CEM STABIL BKFL
|
CY
|
941.000
|
$250.000
|
$109.000
|
$126.390
|
$105.000
|
$92.220
|
$135.700
|
$110.000
|
$140.000
|
$78.000
|
$175.000
|
$140.000
|
$138.590
|
$130.620
|
$151.290
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,268.000
|
$2.500
|
$1.950
|
$1.620
|
$2.000
|
$0.190
|
$1.000
|
$7.000
|
$3.000
|
$1.000
|
$5.000
|
$1.000
|
$3.410
|
$2.900
|
$1.170
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
308.000
|
$95.000
|
$50.250
|
$90.360
|
$80.000
|
$80.000
|
$83.200
|
$102.000
|
$100.750
|
$60.000
|
$73.500
|
$110.000
|
$98.650
|
$81.390
|
$100.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
7,831.000
|
$330.000
|
$169.000
|
$166.640
|
$188.000
|
$210.000
|
$192.500
|
$190.000
|
$200.000
|
$165.000
|
$190.000
|
$220.000
|
$178.210
|
$290.920
|
$215.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
2,515.000
|
$550.000
|
$220.000
|
$224.980
|
$230.000
|
$230.000
|
$220.100
|
$320.000
|
$235.000
|
$200.000
|
$265.000
|
$320.000
|
$209.560
|
$346.500
|
$245.000
|
|
|
DRILL SHAFT (SIGN MTS) (30 IN)
|
LF
|
104.000
|
$280.000
|
$200.000
|
$200.000
|
$246.000
|
$246.000
|
$248.500
|
$215.000
|
$260.000
|
$212.050
|
$309.420
|
$400.000
|
$283.000
|
$200.000
|
$246.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
14.000
|
$350.000
|
$300.000
|
$300.000
|
$455.000
|
$455.000
|
$459.600
|
$315.000
|
$480.000
|
$318.080
|
$415.020
|
$460.000
|
$358.500
|
$300.000
|
$455.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
66.000
|
$390.000
|
$360.000
|
$360.000
|
$420.000
|
$419.000
|
$423.200
|
$375.000
|
$455.000
|
$381.700
|
$542.410
|
$450.000
|
$409.500
|
$360.000
|
$419.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
51.000
|
$476.000
|
$420.000
|
$420.000
|
$441.000
|
$441.000
|
$668.200
|
$435.000
|
$465.000
|
$445.310
|
$655.620
|
$445.000
|
$468.600
|
$420.000
|
$441.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
231.700
|
$988.000
|
$739.000
|
$1,152.970
|
$810.000
|
$991.520
|
$685.000
|
$760.000
|
$1,100.000
|
$800.000
|
$750.000
|
$950.000
|
$950.000
|
$1,300.000
|
$1,000.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
1,576.700
|
$1,000.000
|
$654.000
|
$924.080
|
$935.000
|
$708.690
|
$860.000
|
$820.000
|
$950.000
|
$850.000
|
$780.000
|
$1,250.000
|
$800.710
|
$1,700.000
|
$1,100.000
|
|
|
CL C CONC (CAP)(HPC)(EXTEND)
|
CY
|
13.500
|
$2,012.000
|
$1,460.000
|
$1,564.060
|
$1,500.000
|
$2,752.140
|
$1,564.300
|
$1,750.000
|
$1,773.430
|
$1,775.000
|
$1,450.000
|
$3,000.000
|
$1,605.060
|
$2,500.000
|
$2,700.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
14.900
|
$900.000
|
$850.000
|
$724.960
|
$730.000
|
$757.680
|
$795.000
|
$936.000
|
$1,082.540
|
$975.000
|
$950.000
|
$1,100.000
|
$990.380
|
$1,400.000
|
$1,100.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
1,680.100
|
$1,400.000
|
$707.000
|
$779.160
|
$740.000
|
$832.470
|
$650.000
|
$850.000
|
$950.000
|
$650.000
|
$800.000
|
$1,100.000
|
$855.000
|
$1,500.000
|
$1,200.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
340,465.000
|
$18.000
|
$15.300
|
$14.940
|
$16.000
|
$15.690
|
$18.700
|
$15.500
|
$17.300
|
$16.500
|
$15.000
|
$17.150
|
$20.000
|
$17.870
|
$14.280
|
|
|
APPROACH SLAB (HPC)
|
CY
|
255.000
|
$425.000
|
$429.000
|
$417.920
|
$460.000
|
$590.950
|
$450.000
|
$460.000
|
$525.000
|
$450.000
|
$500.000
|
$465.000
|
$609.710
|
$500.420
|
$653.960
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
605.090
|
$134.000
|
$142.000
|
$135.760
|
$140.000
|
$144.360
|
$175.000
|
$156.000
|
$143.000
|
$123.000
|
$175.000
|
$150.000
|
$135.240
|
$149.900
|
$160.000
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
29,778.080
|
$153.000
|
$146.000
|
$141.750
|
$155.000
|
$153.140
|
$170.000
|
$159.000
|
$150.000
|
$123.000
|
$175.000
|
$161.000
|
$147.310
|
$160.290
|
$175.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
788.000
|
$439.000
|
$416.000
|
$533.370
|
$190.000
|
$479.670
|
$375.000
|
$490.000
|
$470.000
|
$415.000
|
$450.000
|
$447.000
|
$227.850
|
$415.160
|
$433.950
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
66.000
|
$500.000
|
$416.000
|
$562.610
|
$484.000
|
$591.430
|
$755.300
|
$525.000
|
$590.000
|
$445.000
|
$550.000
|
$550.000
|
$405.060
|
$474.550
|
$462.070
|
|
|
ELASTOMERIC BEARING (EE6)
|
EA
|
15.000
|
$2,570.000
|
$1,160.000
|
$1,157.000
|
$1,500.000
|
$2,857.980
|
$2,200.000
|
$1,400.000
|
$2,561.690
|
$2,000.000
|
$1,450.000
|
$1,430.000
|
$1,424.790
|
$2,154.040
|
$1,487.920
|
|
|
ELASTOMERIC BEARING (EE7)
|
EA
|
4.000
|
$2,180.000
|
$1,200.000
|
$1,200.000
|
$1,500.000
|
$2,882.200
|
$2,300.000
|
$1,440.000
|
$2,606.840
|
$2,000.000
|
$1,500.000
|
$1,475.000
|
$1,702.110
|
$1,970.360
|
$1,534.390
|
|
|
ELASTOMERIC BEARING (F7)
|
EA
|
19.000
|
$2,500.000
|
$2,550.000
|
$2,554.050
|
$2,850.000
|
$4,395.980
|
$3,700.000
|
$2,900.000
|
$4,381.100
|
$2,000.000
|
$2,900.000
|
$2,830.000
|
$2,818.320
|
$3,567.300
|
$2,883.540
|
|
|
SLIDING ELASTOMERIC BEARING (ES 6)
|
EA
|
4.000
|
$2,570.000
|
$2,010.000
|
$2,013.000
|
$2,325.000
|
$3,957.750
|
$3,100.000
|
$2,300.000
|
$3,460.490
|
$2,000.000
|
$2,500.000
|
$2,290.000
|
$2,515.110
|
$3,045.110
|
$2,347.390
|
|
|
ELASTOMERIC BEARING(EE4)
|
EA
|
15.000
|
$1,200.000
|
$1,030.000
|
$1,028.000
|
$1,350.000
|
$2,683.110
|
$2,100.000
|
$1,300.000
|
$2,426.240
|
$2,000.000
|
$1,300.000
|
$1,300.000
|
$1,295.790
|
$1,933.930
|
$1,164.130
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
5,186,700.000
|
$2.000
|
$1.750
|
$1.790
|
$1.800
|
$1.900
|
$1.860
|
$1.980
|
$1.730
|
$1.750
|
$2.000
|
$1.760
|
$1.840
|
$1.813
|
$1.860
|
|
|
RAIL (TY SSTR)
|
LF
|
3,800.000
|
$39.000
|
$40.000
|
$46.560
|
$35.000
|
$45.010
|
$45.300
|
$69.000
|
$58.500
|
$55.000
|
$40.000
|
$45.000
|
$48.870
|
$53.070
|
$52.920
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
12,601.900
|
$48.000
|
$44.500
|
$50.150
|
$40.000
|
$53.570
|
$54.000
|
$61.000
|
$61.500
|
$55.000
|
$50.000
|
$54.000
|
$57.780
|
$57.690
|
$52.830
|
|
|
RAIL (CLF-RO)
|
LF
|
1,423.900
|
$100.000
|
$121.000
|
$121.000
|
$100.000
|
$240.000
|
$82.800
|
$147.000
|
$132.000
|
$121.000
|
$150.000
|
$121.000
|
$121.000
|
$110.990
|
$85.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
944.000
|
$115.000
|
$108.000
|
$121.320
|
$143.000
|
$130.730
|
$125.800
|
$114.000
|
$138.080
|
$105.000
|
$80.000
|
$130.000
|
$167.440
|
$112.700
|
$146.180
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
310.000
|
$125.000
|
$109.000
|
$123.370
|
$143.000
|
$130.730
|
$125.800
|
$115.000
|
$138.080
|
$105.000
|
$80.000
|
$130.000
|
$149.480
|
$125.080
|
$146.180
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,339.000
|
$68.500
|
$69.250
|
$56.000
|
$75.000
|
$73.850
|
$86.100
|
$75.000
|
$85.000
|
$65.000
|
$75.000
|
$100.000
|
$78.600
|
$71.310
|
$113.400
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
6.000
|
$117.870
|
$307.000
|
$120.000
|
$462.000
|
$403.290
|
$964.500
|
$200.000
|
$330.000
|
$200.000
|
$400.000
|
$600.000
|
$229.380
|
$95.930
|
$484.010
|
|
|
INLET (COMPL)(PSL)(RG)(3FTX3FT)
|
EA
|
2.000
|
$2,500.000
|
$4,020.000
|
$3,300.000
|
$3,800.000
|
$3,657.400
|
$4,212.600
|
$3,400.000
|
$4,100.000
|
$4,350.000
|
$4,500.000
|
$5,000.000
|
$3,512.940
|
$2,500.000
|
$3,886.250
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
6.000
|
$5,800.000
|
$5,020.000
|
$4,250.000
|
$4,600.000
|
$4,582.610
|
$5,030.600
|
$4,400.000
|
$5,100.000
|
$5,250.000
|
$5,750.000
|
$5,800.000
|
$4,455.080
|
$4,835.970
|
$4,374.640
|
|
|
REMOV STR (INLET)
|
EA
|
4.000
|
$700.000
|
$571.000
|
$500.000
|
$900.000
|
$587.560
|
$634.500
|
$550.000
|
$915.000
|
$450.000
|
$500.000
|
$600.000
|
$1,864.820
|
$594.600
|
$418.820
|
|
|
REMOV STR (PIPE)
|
LF
|
487.000
|
$15.500
|
$14.200
|
$8.000
|
$17.000
|
$14.190
|
$13.700
|
$16.000
|
$15.500
|
$13.500
|
$20.000
|
$20.000
|
$35.030
|
$14.360
|
$14.610
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$4,720,000.000
|
$3,016,884.000
|
$2,661,673.140
|
$3,000,000.000
|
$3,540,000.000
|
$3,680,000.000
|
$3,700,000.000
|
$2,825,000.000
|
$3,600,000.000
|
$3,377,551.000
|
$4,250,000.000
|
$3,900,000.000
|
$4,080,000.000
|
$3,965,541.110
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
20.000
|
$7,000.000
|
$4,480.000
|
$3,681.020
|
$10,000.000
|
$2,843.330
|
$9,630.000
|
$22,000.000
|
$8,000.000
|
$50,000.000
|
$21,000.000
|
$6,000.000
|
$12,406.020
|
$1,000.000
|
$3,343.450
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
522.000
|
$28.000
|
$20.600
|
$20.600
|
$57.000
|
$20.600
|
$26.300
|
$29.000
|
$31.000
|
$20.600
|
$278.500
|
$22.000
|
$20.600
|
$20.600
|
$20.600
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
522.000
|
$7.000
|
$6.800
|
$6.790
|
$6.000
|
$6.790
|
$6.900
|
$11.000
|
$10.000
|
$6.790
|
$12.500
|
$7.500
|
$6.790
|
$6.790
|
$6.790
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
246.000
|
$21.400
|
$16.700
|
$16.740
|
$17.000
|
$16.740
|
$22.700
|
$21.000
|
$28.000
|
$16.740
|
$22.000
|
$18.000
|
$16.740
|
$16.740
|
$16.740
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
246.000
|
$9.400
|
$5.900
|
$5.920
|
$6.000
|
$5.920
|
$6.000
|
$6.000
|
$11.000
|
$5.920
|
$10.000
|
$6.500
|
$5.920
|
$5.920
|
$5.920
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,712.000
|
$2.500
|
$1.750
|
$1.750
|
$1.750
|
$1.750
|
$3.100
|
$2.500
|
$2.500
|
$1.750
|
$2.000
|
$1.850
|
$1.750
|
$1.750
|
$1.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,712.000
|
$0.600
|
$0.300
|
$0.290
|
$0.300
|
$0.290
|
$0.300
|
$0.450
|
$0.700
|
$0.290
|
$0.100
|
$0.300
|
$0.290
|
$0.290
|
$0.290
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
605.000
|
$5.750
|
$6.100
|
$6.100
|
$6.000
|
$6.100
|
$11.600
|
$4.600
|
$6.500
|
$6.100
|
$3.500
|
$6.500
|
$6.100
|
$6.100
|
$6.100
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
605.000
|
$1.050
|
$0.300
|
$0.320
|
$0.350
|
$0.320
|
$0.300
|
$0.650
|
$1.250
|
$0.320
|
$1.000
|
$0.350
|
$0.320
|
$0.320
|
$0.320
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
4,110.000
|
$23.500
|
$24.200
|
$14.970
|
$6.000
|
$8.750
|
$7.500
|
$15.500
|
$12.500
|
$25.000
|
$7.000
|
$30.000
|
$6.690
|
$37.000
|
$21.220
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
4,170.000
|
$5.000
|
$7.050
|
$4.900
|
$5.000
|
$5.320
|
$5.000
|
$9.500
|
$6.000
|
$8.000
|
$7.000
|
$6.250
|
$3.070
|
$6.000
|
$6.500
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
3,027.000
|
$61.000
|
$57.500
|
$57.090
|
$65.000
|
$65.220
|
$58.100
|
$73.000
|
$83.000
|
$55.000
|
$65.000
|
$65.750
|
$90.000
|
$59.000
|
$64.020
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
285.000
|
$260.000
|
$150.000
|
$165.900
|
$128.000
|
$180.020
|
$172.100
|
$196.000
|
$185.000
|
$1.000
|
$315.000
|
$188.000
|
$250.000
|
$160.000
|
$200.930
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
950.000
|
$25.500
|
$22.300
|
$22.250
|
$23.000
|
$25.000
|
$33.300
|
$24.000
|
$24.000
|
$24.000
|
$25.750
|
$22.500
|
$22.250
|
$24.000
|
$22.250
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,830.000
|
$1,600.000
|
$1,600.000
|
$1,600.000
|
$1,900.000
|
$2,234.500
|
$1,700.000
|
$1,900.000
|
$1,700.000
|
$2,250.000
|
$1,650.000
|
$1,600.000
|
$1,700.000
|
$1,600.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,150.000
|
$979.000
|
$979.000
|
$980.000
|
$1,100.000
|
$1,318.100
|
$1,050.000
|
$1,100.000
|
$1,000.000
|
$1,100.000
|
$1,000.000
|
$979.000
|
$1,000.000
|
$979.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
300.000
|
$2.570
|
$1.750
|
$1.750
|
$2.000
|
$3.000
|
$2.500
|
$1.850
|
$2.000
|
$3.000
|
$5.000
|
$5.000
|
$1.750
|
$3.000
|
$1.750
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$242.000
|
$175.000
|
$175.000
|
$175.000
|
$250.000
|
$150.600
|
$185.000
|
$185.000
|
$125.000
|
$312.000
|
$300.000
|
$175.000
|
$125.000
|
$175.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$2,570.000
|
$2,400.000
|
$2,395.000
|
$2,400.000
|
$2,795.000
|
$2,862.100
|
$2,500.000
|
$2,600.000
|
$2,350.000
|
$3,000.000
|
$2,400.000
|
$2,395.000
|
$2,350.000
|
$2,395.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$244.000
|
$175.000
|
$175.000
|
$175.000
|
$250.000
|
$150.600
|
$182.000
|
$185.000
|
$250.000
|
$300.000
|
$300.000
|
$175.000
|
$250.000
|
$175.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$751.440
|
$700.000
|
$700.000
|
$700.000
|
$850.000
|
$957.600
|
$715.000
|
$570.000
|
$750.000
|
$750.000
|
$525.000
|
$700.000
|
$750.000
|
$700.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,200.000
|
$8,000.000
|
$8,000.000
|
$8,000.000
|
$10,000.000
|
$7,072.110
|
$7,500.000
|
$8,400.000
|
$7,700.000
|
$9,500.000
|
$7,000.000
|
$8,000.000
|
$7,700.000
|
$8,000.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
4.000
|
$1,215.000
|
$1,300.000
|
$1,575.000
|
$1,630.000
|
$1,630.000
|
$1,646.500
|
$1,350.000
|
$1,720.000
|
$1,378.360
|
$1,071.200
|
$1,650.000
|
$1,663.100
|
$1,300.000
|
$1,630.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
389.000
|
$9.250
|
$9.000
|
$9.160
|
$17.500
|
$17.500
|
$17.700
|
$9.500
|
$18.500
|
$9.540
|
$11.480
|
$18.000
|
$17.860
|
$9.000
|
$17.500
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
51.000
|
$22.750
|
$23.000
|
$21.550
|
$41.050
|
$41.050
|
$41.500
|
$24.000
|
$43.500
|
$24.390
|
$24.850
|
$41.500
|
$41.880
|
$23.000
|
$41.050
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
57.000
|
$9.950
|
$13.000
|
$11.900
|
$23.650
|
$23.650
|
$23.900
|
$13.500
|
$25.000
|
$13.780
|
$19.660
|
$24.000
|
$24.130
|
$13.000
|
$23.650
|
|
|
CONDT (RM) (1")
|
LF
|
232.000
|
$20.950
|
$20.000
|
$41.500
|
$33.700
|
$33.700
|
$34.000
|
$21.000
|
$36.000
|
$21.210
|
$25.760
|
$34.000
|
$34.380
|
$20.000
|
$33.700
|
|
|
CONDT (RM) (2")
|
LF
|
266.000
|
$35.400
|
$30.000
|
$52.000
|
$36.700
|
$36.700
|
$37.100
|
$32.000
|
$39.000
|
$31.810
|
$40.970
|
$37.000
|
$37.450
|
$30.000
|
$36.700
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
232.000
|
$1.000
|
$0.950
|
$0.670
|
$1.450
|
$1.450
|
$1.500
|
$1.000
|
$1.550
|
$1.010
|
$1.380
|
$1.500
|
$1.480
|
$0.950
|
$1.450
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
464.000
|
$1.150
|
$1.000
|
$0.820
|
$1.500
|
$1.500
|
$1.500
|
$1.100
|
$1.600
|
$1.060
|
$1.450
|
$1.550
|
$1.530
|
$1.000
|
$1.500
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
706.000
|
$1.250
|
$1.100
|
$1.040
|
$2.000
|
$2.050
|
$2.100
|
$1.150
|
$2.200
|
$1.170
|
$1.840
|
$2.100
|
$2.090
|
$1.100
|
$2.050
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
1,412.000
|
$1.500
|
$1.250
|
$1.450
|
$2.000
|
$2.050
|
$2.100
|
$1.300
|
$2.200
|
$1.330
|
$1.730
|
$2.100
|
$2.090
|
$1.250
|
$2.050
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
2.000
|
$987.000
|
$950.000
|
$1,160.500
|
$1,405.000
|
$1,405.000
|
$1,419.200
|
$1,000.000
|
$1,500.000
|
$1,007.260
|
$987.070
|
$1,425.000
|
$1,433.530
|
$950.000
|
$1,405.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$1,157.000
|
$1,100.000
|
$1,203.300
|
$1,490.000
|
$1,490.000
|
$1,505.100
|
$1,200.000
|
$1,600.000
|
$1,166.300
|
$1,087.530
|
$1,525.000
|
$1,520.250
|
$1,100.000
|
$1,490.000
|
|
|
ELC SRV TY A 120/240 060(NS)SS(E)GC(O)
|
EA
|
1.000
|
$6,200.000
|
$4,200.000
|
$6,210.000
|
$7,425.000
|
$7,425.000
|
$7,500.000
|
$4,500.000
|
$7,800.000
|
$4,453.140
|
$6,892.860
|
$7,550.000
|
$7,575.760
|
$4,200.000
|
$7,425.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
|
EA
|
1.000
|
$6,931.000
|
$5,200.000
|
$6,477.500
|
$7,665.000
|
$7,665.000
|
$7,742.400
|
$5,350.000
|
$8,100.000
|
$5,513.420
|
$6,415.760
|
$7,750.000
|
$7,820.630
|
$5,200.000
|
$7,665.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
1,503.250
|
$25.000
|
$26.000
|
$26.000
|
$27.000
|
$24.000
|
$27.400
|
$27.000
|
$29.000
|
$27.570
|
$29.950
|
$27.500
|
$25.430
|
$26.000
|
$27.100
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
4.950
|
$19.500
|
$17.000
|
$17.000
|
$160.000
|
$40.000
|
$161.600
|
$18.000
|
$170.000
|
$18.020
|
$55.380
|
$162.000
|
$25.000
|
$17.000
|
$160.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$557.000
|
$550.000
|
$550.000
|
$955.000
|
$540.000
|
$611.400
|
$570.000
|
$1,050.000
|
$583.150
|
$430.310
|
$560.000
|
$530.000
|
$550.000
|
$955.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$648.680
|
$630.000
|
$630.000
|
$970.000
|
$575.000
|
$646.000
|
$650.000
|
$1,100.000
|
$667.970
|
$443.810
|
$600.000
|
$560.000
|
$630.000
|
$970.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$810.900
|
$685.000
|
$685.000
|
$1,120.000
|
$745.000
|
$830.600
|
$710.000
|
$1,200.000
|
$726.290
|
$602.870
|
$775.000
|
$720.000
|
$685.000
|
$1,120.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$880.000
|
$1,050.000
|
$1,050.000
|
$1,420.000
|
$975.000
|
$980.600
|
$1,100.000
|
$1,500.000
|
$1,113.290
|
$798.620
|
$1,025.000
|
$850.000
|
$1,050.000
|
$1,420.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SB(P)
|
EA
|
1.000
|
$1,212.000
|
$900.000
|
$900.000
|
$2,495.000
|
$1,700.000
|
$1,730.400
|
$1,000.000
|
$2,650.000
|
$954.250
|
$1,363.220
|
$1,750.000
|
$1,500.000
|
$900.000
|
$2,495.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
3.000
|
$2,198.100
|
$1,800.000
|
$1,800.000
|
$2,925.000
|
$1,800.000
|
$2,954.600
|
$1,900.000
|
$3,100.000
|
$1,908.490
|
$2,058.420
|
$1,850.000
|
$1,824.410
|
$1,800.000
|
$2,925.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
5.000
|
$3,100.000
|
$2,500.000
|
$2,500.000
|
$5,100.000
|
$3,300.000
|
$5,151.500
|
$2,600.000
|
$5,400.000
|
$2,650.680
|
$4,811.560
|
$3,400.000
|
$1,836.670
|
$2,500.000
|
$5,100.000
|
|
|
INS OH SN SUP(25 FT CANT)
|
EA
|
1.000
|
$18,330.000
|
$13,500.000
|
$13,500.000
|
$18,365.000
|
$18,365.000
|
$18,550.500
|
$14,000.000
|
$19,500.000
|
$14,313.680
|
$17,030.100
|
$19,000.000
|
$18,737.880
|
$13,500.000
|
$18,365.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
2.000
|
$22,500.000
|
$23,000.000
|
$23,000.000
|
$51,610.000
|
$51,610.000
|
$52,131.300
|
$24,000.000
|
$53,000.000
|
$24,386.270
|
$44,499.890
|
$53,000.000
|
$52,657.890
|
$23,000.000
|
$51,610.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
3.000
|
$25,100.000
|
$24,000.000
|
$24,000.000
|
$27,110.000
|
$27,110.000
|
$27,383.800
|
$25,000.000
|
$29,000.000
|
$25,446.540
|
$24,926.250
|
$27,385.000
|
$27,660.440
|
$24,000.000
|
$27,110.000
|
|
|
INS OH SN SUP(95 FT BRDG)
|
EA
|
1.000
|
$45,000.000
|
$54,000.000
|
$54,000.000
|
$42,175.000
|
$42,175.000
|
$42,601.000
|
$56,000.000
|
$45,000.000
|
$57,254.710
|
$47,293.170
|
$50,000.000
|
$43,031.320
|
$54,000.000
|
$42,175.000
|
|
|
INS OH SN SUP(105 FT BRDG)
|
EA
|
1.000
|
$47,000.000
|
$56,000.000
|
$56,000.000
|
$50,125.000
|
$50,125.000
|
$50,631.300
|
$58,000.000
|
$53,000.000
|
$59,375.260
|
$56,101.810
|
$55,000.000
|
$51,142.740
|
$56,000.000
|
$50,125.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
47.000
|
$20.160
|
$23.000
|
$22.000
|
$23.000
|
$15.000
|
$23.400
|
$23.000
|
$23.100
|
$23.330
|
$25.000
|
$20.000
|
$19.660
|
$22.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
46.000
|
$26.000
|
$20.000
|
$23.000
|
$20.000
|
$15.000
|
$26.100
|
$24.000
|
$24.150
|
$24.390
|
$27.500
|
$20.000
|
$20.000
|
$23.000
|
$15.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
103.000
|
$20.000
|
$23.000
|
$21.000
|
$23.000
|
$15.000
|
$23.400
|
$22.000
|
$22.050
|
$22.270
|
$25.000
|
$20.000
|
$19.940
|
$21.000
|
$15.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
1,020.000
|
$0.890
|
$0.750
|
$0.750
|
$1.000
|
$0.800
|
$3.100
|
$0.820
|
$0.830
|
$0.800
|
$0.830
|
$0.750
|
$3.000
|
$1.000
|
$1.400
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
5,384.000
|
$0.400
|
$0.750
|
$0.750
|
$1.000
|
$0.800
|
$1.000
|
$0.820
|
$0.830
|
$0.800
|
$0.830
|
$0.750
|
$1.000
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
655.000
|
$1.350
|
$1.150
|
$1.150
|
$1.150
|
$1.220
|
$3.600
|
$1.250
|
$1.280
|
$1.220
|
$1.270
|
$1.150
|
$3.500
|
$2.000
|
$1.850
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
5,729.000
|
$0.850
|
$0.750
|
$0.750
|
$1.000
|
$0.800
|
$1.000
|
$0.820
|
$0.830
|
$0.800
|
$0.830
|
$0.750
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,782.000
|
$0.300
|
$0.800
|
$0.780
|
$0.850
|
$0.830
|
$1.100
|
$0.850
|
$0.870
|
$0.830
|
$0.860
|
$0.780
|
$1.050
|
$0.850
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
242.000
|
$2.900
|
$2.850
|
$2.850
|
$2.850
|
$3.030
|
$2.200
|
$3.100
|
$3.170
|
$3.030
|
$3.150
|
$2.850
|
$2.150
|
$3.500
|
$2.390
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$139.330
|
$190.000
|
$190.000
|
$190.000
|
$201.890
|
$204.100
|
$206.000
|
$212.000
|
$201.890
|
$209.960
|
$190.000
|
$200.000
|
$133.000
|
$100.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$164.540
|
$190.000
|
$190.000
|
$190.000
|
$201.890
|
$204.100
|
$206.000
|
$212.000
|
$201.890
|
$209.960
|
$190.000
|
$200.000
|
$160.000
|
$135.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
28,703.000
|
$0.190
|
$0.150
|
$0.140
|
$0.150
|
$0.150
|
$0.100
|
$0.160
|
$0.160
|
$0.150
|
$0.150
|
$0.140
|
$0.140
|
$0.140
|
$0.120
|
|
|
PAVEMENT SEALER 6"
|
LF
|
1,694.000
|
$0.150
|
$0.150
|
$0.160
|
$0.200
|
$0.170
|
$0.200
|
$0.180
|
$0.180
|
$0.170
|
$0.180
|
$0.160
|
$0.180
|
$0.200
|
$0.300
|
|
|
PAVEMENT SEALER 8"
|
LF
|
4,782.000
|
$0.400
|
$0.200
|
$0.200
|
$0.200
|
$0.210
|
$0.300
|
$0.220
|
$0.220
|
$0.210
|
$0.220
|
$0.200
|
$0.280
|
$0.300
|
$0.350
|
|
|
PAVEMENT SEALER 12"
|
LF
|
242.000
|
$1.150
|
$1.000
|
$1.000
|
$1.000
|
$1.060
|
$0.800
|
$1.100
|
$1.110
|
$1.060
|
$1.110
|
$1.000
|
$168.340
|
$1.350
|
$1.000
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
2.000
|
$26.580
|
$70.000
|
$70.000
|
$70.000
|
$74.380
|
$51.000
|
$77.000
|
$78.000
|
$74.380
|
$77.360
|
$70.000
|
$50.000
|
$55.000
|
$40.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
2.000
|
$37.500
|
$70.000
|
$70.000
|
$70.000
|
$74.380
|
$51.000
|
$77.000
|
$78.000
|
$74.380
|
$77.360
|
$70.000
|
$50.000
|
$55.000
|
$45.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
170.000
|
$0.790
|
$0.400
|
$0.380
|
$0.500
|
$0.400
|
$0.500
|
$0.420
|
$0.420
|
$0.400
|
$0.420
|
$0.380
|
$0.500
|
$1.000
|
$0.480
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
13,263.000
|
$0.400
|
$0.350
|
$0.340
|
$0.500
|
$0.360
|
$0.500
|
$0.380
|
$0.380
|
$0.360
|
$0.380
|
$0.340
|
$0.490
|
$0.500
|
$0.440
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,694.000
|
$0.600
|
$0.500
|
$0.500
|
$1.000
|
$0.530
|
$0.700
|
$0.540
|
$0.560
|
$0.530
|
$0.550
|
$0.500
|
$0.670
|
$1.000
|
$0.650
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
15,270.000
|
$0.380
|
$0.350
|
$0.340
|
$0.500
|
$0.360
|
$0.500
|
$0.380
|
$0.380
|
$0.360
|
$0.380
|
$0.340
|
$0.490
|
$0.500
|
$0.440
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
328.000
|
$3.600
|
$3.450
|
$3.450
|
$4.000
|
$3.670
|
$5.100
|
$3.750
|
$3.840
|
$3.670
|
$3.810
|
$3.450
|
$5.000
|
$4.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,711.000
|
$0.400
|
$0.300
|
$0.280
|
$0.550
|
$0.300
|
$0.500
|
$0.320
|
$0.310
|
$0.300
|
$0.310
|
$0.280
|
$0.500
|
$0.550
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
28,703.000
|
$0.050
|
$0.300
|
$0.320
|
$0.350
|
$0.340
|
$0.100
|
$0.350
|
$0.360
|
$0.340
|
$0.350
|
$0.320
|
$0.020
|
$0.070
|
$0.120
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,694.000
|
$0.100
|
$0.300
|
$0.280
|
$0.300
|
$0.300
|
$0.100
|
$0.320
|
$0.310
|
$0.300
|
$0.310
|
$0.280
|
$0.020
|
$0.120
|
$0.180
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,782.000
|
$0.150
|
$0.300
|
$0.280
|
$0.300
|
$0.300
|
$0.100
|
$0.320
|
$0.310
|
$0.300
|
$0.310
|
$0.280
|
$0.080
|
$0.150
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
242.000
|
$0.680
|
$0.400
|
$0.400
|
$0.400
|
$0.430
|
$0.300
|
$0.450
|
$0.440
|
$0.430
|
$0.440
|
$0.400
|
$0.310
|
$0.500
|
$0.750
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
2.000
|
$21.400
|
$50.000
|
$50.000
|
$50.000
|
$53.130
|
$30.600
|
$54.000
|
$56.000
|
$53.130
|
$55.260
|
$50.000
|
$30.000
|
$50.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$32.200
|
$50.000
|
$50.000
|
$50.000
|
$53.130
|
$30.600
|
$54.000
|
$56.000
|
$53.130
|
$55.260
|
$50.000
|
$30.000
|
$50.000
|
$35.000
|
|
|
SPOT MOWING
|
AC
|
20.000
|
$197.800
|
$300.000
|
$250.000
|
$169.000
|
$325.000
|
$408.200
|
$550.000
|
$160.000
|
$325.000
|
$400.000
|
$425.000
|
$890.560
|
$206.320
|
$325.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
11,000.000
|
$528.000
|
$416.000
|
$416.000
|
$416.000
|
$416.000
|
$468.000
|
$480.000
|
$528.000
|
$498.000
|
$528.000
|
$416.000
|
$468.000
|
$416.000
|
$528.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
6,557.700
|
$80.000
|
$57.000
|
$68.230
|
$57.000
|
$57.000
|
$74.100
|
$63.000
|
$61.000
|
$77.350
|
$60.000
|
$57.000
|
$86.000
|
$73.250
|
$57.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,730.000
|
$17,210.000
|
$7,500.000
|
$15,000.000
|
$9,772.000
|
$1,786.100
|
$15,400.000
|
$8,100.000
|
$20,000.000
|
$15,000.000
|
$10,000.000
|
$8,000.000
|
$12,000.000
|
$17,320.000
|
|
|
ITS SYSTEM SUPPORT EQUIPMENT
|
LS
|
1.000
|
$71,220.000
|
$30,000.000
|
$65,750.000
|
$98,150.000
|
$98,150.000
|
$99,141.400
|
$31,200.000
|
$100,000.000
|
$31,808.170
|
$93,100.800
|
$100,000.000
|
$100,142.840
|
$30,000.000
|
$98,150.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
1.000
|
$5,134.000
|
$6,000.000
|
$7,275.000
|
$9,875.000
|
$9,875.000
|
$9,974.800
|
$6,400.000
|
$10,500.000
|
$6,361.630
|
$7,849.660
|
$10,000.000
|
$10,075.500
|
$6,000.000
|
$9,875.000
|
|
|
ITS RADIO (SNGL)(5 GHZ)-C-P
|
EA
|
1.000
|
$2,400.000
|
$5,000.000
|
$3,415.000
|
$7,890.000
|
$7,890.000
|
$7,969.700
|
$5,400.000
|
$8,200.000
|
$5,301.360
|
$5,020.030
|
$8,000.000
|
$8,050.200
|
$5,000.000
|
$7,890.000
|
|
|
ITS POLE (60 FT)(90 MPH)
|
EA
|
1.000
|
$13,781.000
|
$16,500.000
|
$15,625.000
|
$18,885.000
|
$18,885.000
|
$19,075.800
|
$17,200.000
|
$20,000.000
|
$17,494.500
|
$17,351.880
|
$19,500.000
|
$19,268.440
|
$16,500.000
|
$18,885.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)
|
EA
|
1.000
|
$6,245.000
|
$4,200.000
|
$5,150.000
|
$5,150.000
|
$5,150.000
|
$5,202.000
|
$4,500.000
|
$5,500.000
|
$4,453.140
|
$5,605.860
|
$5,250.000
|
$5,254.570
|
$4,200.000
|
$5,150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
161.000
|
$200.000
|
$280.000
|
$171.570
|
$500.000
|
$109.390
|
$150.000
|
$165.000
|
$130.000
|
$200.000
|
$150.000
|
$290.000
|
$254.600
|
$158.490
|
$162.380
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
4.000
|
$120.000
|
$697.000
|
$469.220
|
$2,100.000
|
$500.210
|
$695.000
|
$505.000
|
$1,285.000
|
$615.000
|
$1,000.000
|
$800.000
|
$613.240
|
$128.470
|
$752.340
|
|
|
ITS RVSD (DATA COLLECT & WWA) SYS
|
EA
|
1.000
|
$9,975.000
|
$9,000.000
|
$8,755.500
|
$14,075.000
|
$14,075.230
|
$14,217.200
|
$9,500.000
|
$15,000.000
|
$9,542.450
|
$9,178.520
|
$14,250.000
|
$14,360.780
|
$9,000.000
|
$14,075.000
|
|
Totals: |
$46,908,124.715
|
$36,943,838.160
|
$37,972,149.870
|
$39,500,045.454
|
$39,976,000.005
|
$41,955,441.350
|
$42,460,336.590
|
$42,539,349.831
|
$42,841,364.226
|
$42,870,353.948
|
$43,154,479.355
|
$44,555,607.085
|
$45,600,100.287
|
$47,115,719.547
|