DENTON IH 35E (0196-02-132)

Items: 233

County: DENTON
Length: N/A
Highway: IH 35E
District: DALLAS
Control Number: 0196-02-132
DBE Goal: N/A
Project: F 2022(043)
Guaranty: N/A
Time: 378 WORKING DAYS
Engineer's Estimate: $16,115,260.77
Date: 12/01/2022 (3 years ago)
Contract Number: N/A
Type: HIGHWAY OPERATIONS PROGRAM
Mail/Deliver Bids To: N/A
TRAVIS CAMPBELL
CHRISTOPHER ROCHA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$16,115,260.77
1
Awarded
$17,598,674.69
Over/Under Est: 9.21% $1,483,413.92
$19,429,297.72
Over/Under Est: 20.56% $3,314,036.95
Amt Left: 10.4% $1,830,623.03
$21,884,434.67
Over/Under Est: 35.8% $5,769,173.90
Amt Left: 24.35% $4,285,759.98
Delta: -12.64% -$2,455,136.95
$21,991,999.16
Over/Under Est: 36.47% $5,876,738.39
Amt Left: 24.96% $4,393,324.47
Delta: -0.49% -$107,564.49
Over/Under Est: 45.49% $7,330,716.67
Amt Left: 33.23% $5,847,302.75
Delta: -6.61% -$1,453,978.28
Subcontractor Percentage Amount
REYNOLDS ASPHALT & CONSTRUCTION COMPANY 11.44% $2,013,288.39
ROAD MAKER CONTRACTORS 8.01% $1,409,653.85
STRAIGHT LINE SAWING & SEALING, INC. 6.61% $1,163,272.40
MICA CORPORATION 5.33% $938,009.36
ROADWAY SPECIALTIES, INC. 3.30% $580,756.27
O. TREVINO CONSTRUCTION, LLC 2.86% $503,322.10
BARRICADES UNLIMITED 2.85% $501,562.23
FARR FOUNDATION, INC. 2.82% $496,282.63
J. H. ODEN CONTRACTING COMPANY 1.87% $329,095.22
TRP CONSTRUCTION GROUP, LLC 1.39% $244,621.58
CRANE MASTERS, INC. 0.55% $96,792.71
SOUTHERN CROSS CONTRACTORS, LLC 0.52% $91,513.11
TNT CRANE & RIGGING, INC. 0.45% $79,194.04
A BROTHERS MILLING, LLC 0.25% $43,996.69
ROYAL REBAR 0.20% $35,197.35
STRUCTURAL INTEGRITY GROUP LLC 0.17% $29,917.75
TEXOP CONSTRUCTION 0.14% $24,638.14
NORTH TEXAS CRANE SERVICE, INC. 0.08% $14,078.94
WEST TEXAS ROCK RESOURCES, LLC 0.04% $7,039.47
Total: 48.88% $8,602,232.23

Bid Items & Bid Tabulations

233 Total 0 of 233
DENTON  |  IH 35E  |  DALLAS  |  0196-02-132  |  12/01/2022  |  $16,115,260.77  |  F 2022(043)  |  HWY OPERATIONS PROGRAM  |  378 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
COPASA INC
SEMA CONSTRUCTION, INC.
ALTUS CONSTRUCTION LLC
JAGOE-PUBLIC COMPANY
RAGLE CONSTRUCTION, INC.
PREPARING ROW
STA 112.000 $20,000.000 $15,500.000 $17,520.000 $11,985.500 $1,900.000 $20,500.000
REMOVING CONC (PAV)
SY 3,060.000 $6.330 $20.000 $38.000 $13.910 $48.500 $16.500
REMOVING CONC (RIPRAP)
SY 56.000 $9.950 $20.000 $12.000 $35.250 $31.500 $100.000
REMOVING CONC (CURB AND GUTTER)
LF 470.000 $2.500 $25.000 $3.500 $13.030 $36.000 $10.000
REMOVING CONC (CTB)
LF 3,860.000 $5.460 $25.000 $18.000 $19.110 $66.000 $40.000
REMOVE CONC (WINGWALL)
CY 3.000 $500.000 $2,000.000 $250.000 $794.360 $210.000 $450.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 400.000 $12.000 $12.000 $3.500 $13.230 $36.000 $7.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 132.000 $15.000 $17.690 $13.000 $16.310 $39.500 $21.000
REMOVING CONC (FLUME)
SY 46.000 $9.140 $89.000 $19.000 $49.580 $42.250 $49.000
REMOVING STAB BASE AND ASPH PAV (2")
SY 2,137.000 $2.270 $3.000 $11.500 $8.690 $18.250 $8.000
REMOVING STAB BASE AND ASPH PAV(4"-16")
SY 10,147.000 $4.260 $6.060 $11.800 $5.590 $36.250 $15.000
EXCAVATION (ROADWAY)
CY 2,685.000 $20.000 $12.000 $7.500 $12.770 $25.000 $75.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 8,007.000 $18.000 $16.000 $32.000 $32.110 $25.000 $40.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 3,206.000 $25.000 $20.000 $38.000 $36.930 $25.000 $80.000
EMBANKMENT (FINAL)(DENS CONT)(TY C3)
CY 540.000 $54.340 $20.000 $95.000 $38.310 $110.000 $120.000
COMPOST MANUF TOPSOIL (4")
SY 24,524.000 $1.480 $1.500 $3.500 $1.460 $4.000 $0.850
BLOCK SODDING
SY 24,524.000 $4.000 $5.000 $5.700 $5.890 $10.750 $5.200
DRILL SEED (TEMP)(WARM OR COOL)
SY 24,524.000 $0.120 $0.160 $0.250 $0.400 $0.750 $0.160
VEGETATIVE WATERING
MG 7,300.000 $3.920 $15.000 $3.000 $0.640 $5.000 $1.000
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 2,375.000 $1.170 $2.500 $2.000 $7.980 $5.200 $1.050
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 343.000 $48.500 $185.760 $125.000 $118.190 $240.000 $138.000
LIME TRT (EXST MATL)(10")
SY 3,627.000 $5.500 $7.750 $6.500 $6.320 $20.000 $16.000
LIME TRT (EXST MATL) (12")
SY 16,905.000 $6.000 $9.000 $5.600 $3.520 $20.000 $5.500
LIME (HYD, COM, OR QK(SLURRY))
TON 493.000 $275.000 $297.980 $265.000 $298.850 $265.000 $261.000
FLEX PAVEMNT STRUCT REPAIR (O" TO 12")
SY 1,500.000 $115.000 $175.000 $138.000 $207.760 $150.000 $137.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 3,195.000 $130.000 $95.000 $125.000 $210.920 $160.000 $102.000
FULL - DEPTH REPAIR CRCP (8")
SY 1,000.000 $300.000 $375.000 $160.000 $382.440 $250.000 $200.000
FULL - DEPTH REPAIR CPCD (8")
SY 1,000.000 $180.000 $350.000 $160.000 $384.540 $250.000 $200.000
CEM STABIL BKFL
CY 153.000 $141.630 $140.000 $175.000 $144.120 $300.000 $242.000
TRENCH EXCAVATION PROTECTION
LF 856.000 $7.910 $7.000 $11.000 $3.850 $3.100 $1.000
TEMPORARY SPL SHORING
SF 2,140.000 $30.000 $37.500 $57.000 $53.830 $38.250 $48.000
DRILL SHAFT (18 IN)
LF 160.000 $80.000 $287.780 $250.000 $638.580 $330.000 $286.000
DRILL SHAFT (36 IN)
LF 1,087.000 $290.000 $453.630 $760.000 $547.920 $810.000 $540.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 8.000 $201.230 $355.000 $380.000 $298.680 $390.000 $399.130
DRILL SHAFT (SIGN MTS) (30 IN)
LF 66.000 $341.000 $283.000 $300.000 $348.340 $310.000 $372.520
DRILL SHAFT (SIGN MTS) (36 IN)
LF 36.000 $400.000 $445.000 $470.000 $555.560 $490.000 $425.730
DRILL SHAFT (HIGH MAST POLE) (66 IN)
LF 45.000 $576.690 $1,017.000 $1,125.000 $1,007.680 $1,100.000 $851.470
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 168.000 $251.590 $198.000 $220.000 $491.710 $220.000 $319.300
CL B CONC (FLUME)
CY 15.200 $400.000 $1,500.000 $600.000 $1,532.590 $675.000 $870.000
CL C CONC (ABUT)(HPC)(EXTEND)
CY 49.800 $1,500.000 $3,096.180 $2,000.000 $3,192.890 $3,000.000 $1,400.000
CL C CONC (CAP)(HPC)
CY 70.100 $1,500.000 $3,056.460 $3,600.000 $2,554.310 $3,200.000 $1,900.000
CL C CONC (CAP)(HPC)(EXTEND)
CY 70.400 $2,000.000 $2,844.880 $1,950.000 $3,192.890 $3,900.000 $1,300.000
CL C CONC (COLUMN)(HPC)
CY 39.900 $1,500.000 $2,455.690 $2,000.000 $2,298.880 $3,500.000 $1,700.000
CL C CONC (RAIL FOUNDATION)
CY 712.000 $500.000 $667.170 $625.000 $556.110 $790.000 $530.000
REINF CONC SLAB (EXTEND SLAB)(HPC)
SF 19,856.000 $30.000 $34.290 $40.000 $51.090 $49.750 $41.000
APPROACH SLAB (EXTEND) (HPC)
CY 70.000 $600.000 $1,700.000 $900.000 $1,450.010 $1,600.000 $762.000
RETAINING WALL (MSE)
SF 865.000 $90.000 $145.300 $135.000 $107.870 $110.000 $110.000
RETAINING WALL (CAST - IN - PLACE)
SF 221.000 $150.000 $135.530 $130.000 $319.290 $170.000 $140.000
PRESTR CONC GIRDER (TX28)
LF 1,024.930 $220.000 $255.320 $270.000 $387.470 $680.000 $250.000
PRESTR CONC GIRDER (TX34)
LF 442.330 $225.000 $286.990 $266.000 $469.270 $460.000 $242.000
PRESTR CONC GIRDER (TX54)
LF 759.980 $225.000 $277.200 $283.000 $445.590 $730.000 $400.000
RIPRAP (CONC)(4 IN)
CY 370.000 $500.000 $625.000 $560.000 $565.540 $950.000 $660.000
RIPRAP (CONC)(5 IN)
CY 8.000 $1,100.000 $750.000 $600.000 $572.790 $860.000 $880.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 6.000 $200.000 $650.000 $272.000 $256.230 $820.000 $342.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 204.000 $123.780 $300.000 $165.000 $176.110 $260.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 110.000 $500.000 $750.000 $600.000 $543.720 $1,300.000 $770.000
CLEANING EXISTING JOINTS
LF 272.000 $24.190 $31.500 $20.000 $25.540 $11.500 $18.000
RAIL (TY T551)
LF 59.000 $49.900 $56.300 $145.000 $319.290 $200.000 $170.000
RAIL (TY T552)
LF 605.000 $50.000 $56.070 $145.000 $108.600 $200.000 $120.000
RAIL (TY SSTR)
LF 3,240.000 $65.000 $51.630 $75.000 $109.180 $74.000 $78.000
RAIL (TY SSTR)(HPC)
LF 1,202.400 $45.000 $70.740 $132.000 $128.850 $110.000 $86.000
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 1,797.000 $75.000 $50.630 $82.000 $120.100 $79.000 $80.000
RETROFIT RAIL (TY SSTR)(HPC)
LF 294.700 $102.770 $70.740 $184.000 $308.110 $320.000 $240.000
ARMOR JOINT
LF 260.000 $100.000 $105.000 $116.000 $144.110 $130.000 $120.000
HEADER TYPE EXPANSION JOINT
LF 272.000 $143.410 $260.000 $190.000 $508.310 $130.000 $115.000
JOINT SEALANT
LF 272.000 $15.440 $37.500 $22.000 $20.430 $16.500 $20.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 41.000 $112.180 $225.000 $240.000 $192.770 $310.000 $250.000
RC PIPE (CL III)(18 IN)
LF 323.000 $129.000 $66.740 $136.000 $100.150 $100.000 $112.000
RC PIPE (CL III)(24 IN)
LF 485.000 $135.000 $87.210 $160.000 $127.600 $130.000 $144.000
INLET (COMPL)(PCU)(3FT)(NONE)
EA 1.000 $5,706.060 $7,052.500 $8,000.000 $8,536.690 $7,000.000 $6,200.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 2.000 $7,000.000 $6,524.640 $9,500.000 $9,980.790 $8,800.000 $7,700.000
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 7.000 $7,640.060 $10,000.000 $7,000.000 $10,119.830 $10,300.000 $7,200.000
INLET (COMPL)(ARMOR CURB SLOT)
EA 1.000 $3,500.000 $5,737.630 $4,800.000 $6,616.960 $15,500.000 $7,700.000
REMOV STR (INLET)
EA 7.000 $603.980 $1,500.000 $900.000 $688.430 $980.000 $765.000
REMOV STR (PIPE)
LF 602.000 $16.810 $30.000 $19.000 $23.990 $23.500 $25.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $300,000.000 $150,000.000 $750,000.000 $81,270.200 $950,000.000 $1,350,000.000
REMOV STR (APPROACH SLAB)
EA 5.000 $2,000.000 $7,000.000 $1,500.000 $11,993.230 $3,900.000 $1,700.000
MOBILIZATION
LS 1.000 $1,400,000.000 $1,850,000.000 $1,942,000.000 $2,107,307.300 $2,000,000.000 $2,300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $35,000.000 $27,871.670 $50,000.000 $25,543.120 $40,000.000 $147,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 300.000 $30.660 $35.000 $48.000 $38.820 $75.000 $25.500
ROCK FILTER DAMS (REMOVE)
LF 300.000 $8.390 $9.000 $19.400 $12.780 $18.250 $7.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,132.000 $22.870 $44.530 $27.000 $30.700 $35.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 2,132.000 $6.620 $11.430 $17.300 $9.680 $10.000 $7.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,519.000 $2.450 $3.250 $2.250 $3.920 $5.500 $2.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,519.000 $0.590 $0.500 $0.850 $0.930 $1.200 $0.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 1,771.000 $3.030 $5.000 $3.600 $7.230 $5.400 $2.850
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,771.000 $0.740 $1.000 $1.000 $1.740 $1.200 $0.650
CONSTRUCTING DETOURS (TY 1)
SY 737.000 $100.000 $125.000 $118.000 $145.550 $150.000 $120.000
CONSTRUCTING DETOURS (TY 2)
SY 2,824.000 $110.000 $145.000 $165.000 $146.550 $190.000 $120.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 20,010.000 $45.000 $60.000 $36.000 $83.070 $27.250 $40.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 520.000 $34.190 $65.000 $54.000 $56.230 $43.750 $42.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $34.720 $65.000 $62.000 $56.230 $43.750 $42.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 37,620.000 $11.000 $8.000 $6.000 $22.760 $19.750 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 520.000 $6.850 $8.000 $6.500 $22.760 $5.500 $7.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $7.450 $8.000 $22.000 $22.760 $5.500 $7.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 20,010.000 $8.000 $11.620 $12.000 $22.310 $11.000 $9.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 520.000 $8.400 $11.620 $13.000 $22.310 $16.500 $9.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $10.140 $11.620 $15.500 $22.310 $16.500 $9.000
PCTB(FUR & INST)(F-SHP TO LOW PROF)TY T
LF 10.000 $291.310 $200.000 $180.000 $1,277.160 $220.000 $400.000
PORT CTB(MOVE)(F-SHAPE)(TY T)
LF 10.000 $7.760 $100.000 $25.000 $319.290 $110.000 $75.000
PORT CTB(REMOVE)(F-SHAPE)(TY T)
LF 10.000 $1,500.000 $100.000 $30.000 $194.370 $110.000 $95.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 2,713.000 $90.000 $79.530 $87.000 $93.690 $78.000 $102.000
PERM CTB (F-SHAPE) (TY 1)
LF 120.000 $49.000 $58.540 $100.000 $82.770 $200.000 $165.000
CONC CURB (MONO) (TY II)
LF 2,019.000 $2.760 $4.000 $8.500 $15.770 $12.500 $9.000
CONC CURB & GUTTER (TY I)
LF 155.000 $30.000 $32.000 $37.000 $45.650 $47.250 $39.000
CONC CURB & GUTTER (TY II)
LF 1,440.000 $47.000 $22.000 $28.000 $43.510 $47.250 $37.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 3,972.000 $0.160 $1.000 $1.650 $1.280 $1.800 $1.900
RUMBLE STRIPS (SHOULDER) CONCRETE
LF 935.000 $1.480 $4.000 $6.500 $1.920 $7.200 $3.800
MTL W-BEAM GD FEN (STEEL POST)
LF 1,275.000 $21.000 $25.000 $26.200 $39.920 $30.240 $27.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $1,654.500 $2,155.000 $2,500.000 $2,585.140 $2,300.000 $2,100.000
REMOVE METAL BEAM GUARD FENCE
LF 2,117.000 $3.360 $1.000 $1.200 $2.780 $2.800 $2.500
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,462.990 $2,700.000 $2,900.000 $3,871.960 $3,100.000 $2,775.000
GUARDRAIL END TREATMENT (REMOVE)
EA 7.000 $250.000 $185.000 $200.000 $316.990 $270.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 35.000 $2,000.000 $1,300.000 $1,150.000 $1,513.150 $2,200.000 $1,000.000
CRASH CUSH ATTEN (REMOVE)
EA 20.000 $758.000 $600.000 $870.000 $1,281.830 $1,600.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 1.000 $27,000.000 $19,025.000 $21,000.000 $33,498.370 $23,400.000 $21,300.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 18.000 $8,500.000 $7,550.000 $7,000.000 $4,946.820 $9,300.000 $7,850.000
CHAIN LINK FENCE (INSTALL) (6')
LF 27.000 $20.760 $70.000 $120.000 $40.780 $47.000 $30.000
RELOCATE RD IL ASM (BRIDGE MOUNT)
EA 3.000 $750.000 $2,800.000 $3,200.000 $766.290 $3,100.000 $2,622.520
RELOCATE RD IL ASM (TRANS-BASE)
EA 14.000 $2,126.760 $2,685.000 $3,000.000 $1,915.730 $3,000.000 $3,687.910
IN RD IL AM (TY SA) 40B-8 (250W) S
EA 1.000 $2,500.000 $5,205.000 $5,700.000 $8,940.090 $5,800.000 $5,428.100
REPLACE LUMINAIRE W/LED (400W EQ)
EA 19.000 $566.320 $875.000 $960.000 $1,053.650 $970.000 $726.940
IN RD IL (TY SP) 48S-12 (400W EQ) LED
EA 1.000 $3,200.000 $5,870.000 $6,500.000 $7,637.390 $6,500.000 $7,135.290
REPLC LED HI MST IL(6 FIXT)(SYM)(TY S)
EA 1.000 $24,000.000 $17,000.000 $18,500.000 $12,771.560 $18,900.000 $7,343.890
CONDT (PVC) (SCH 40) (2")
LF 4,430.000 $10.850 $21.750 $24.000 $12.200 $24.250 $13.840
CONDT (PVC) (SCH 40) (2") (BORE)
LF 195.000 $24.420 $66.100 $71.000 $38.000 $74.000 $26.610
CONDT (PVC) (SCH 40) (3")
LF 495.000 $18.000 $35.150 $38.000 $21.840 $39.000 $16.500
CONDT (PVC) (SCH 40) (3") (BORE)
LF 780.000 $12.190 $32.250 $35.000 $47.250 $35.750 $31.930
CONDT (RM) (1")
LF 330.000 $19.380 $44.500 $48.000 $44.700 $49.500 $47.900
CONDT (RM) (2")
LF 40.000 $54.830 $70.100 $76.000 $57.470 $78.000 $58.540
ELEC CONDR (NO.8) BARE
LF 5,535.000 $1.160 $2.100 $2.400 $1.980 $2.300 $1.600
ELEC CONDR (NO.8) INSULATED
LF 11,285.000 $1.240 $2.310 $2.500 $2.080 $2.600 $1.760
ELEC CONDR (NO.6) BARE
LF 1,460.000 $2.000 $2.410 $2.650 $2.550 $2.700 $1.920
ELEC CONDR (NO.6) INSULATED
LF 900.000 $2.000 $2.750 $3.000 $3.000 $3.100 $2.240
ELEC CONDR (NO.2) INSULATED
LF 2,920.000 $2.070 $4.300 $4.700 $4.530 $4.800 $6.390
GROUND BOX TY A (122311)
EA 1.000 $597.890 $1,230.000 $1,320.000 $1,274.600 $1,400.000 $1,011.120
GROUND BOX TY A (122311)W/APRON
EA 10.000 $1,066.040 $2,040.000 $2,220.000 $1,551.740 $2,300.000 $1,170.770
ALUMINUM SIGNS (TY A)
SF 54.000 $29.490 $32.850 $35.000 $52.380 $36.000 $35.000
ALUMINUM SIGNS (TY O)
SF 655.000 $39.150 $35.400 $37.000 $54.920 $38.750 $36.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 1,133.000 $27.450 $47.950 $51.000 $57.470 $52.000 $36.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 13.000 $519.160 $1,050.000 $1,120.000 $977.840 $1,100.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $702.840 $1,180.000 $1,250.000 $1,124.920 $1,300.000 $850.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 1.000 $657.850 $1,190.000 $1,300.000 $1,224.360 $1,300.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 1.000 $891.000 $2,870.000 $3,100.000 $1,551.740 $3,100.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $977.070 $1,795.000 $1,950.000 $1,711.390 $2,000.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,056.750 $2,025.000 $2,200.000 $1,960.430 $2,200.000 $1,700.000
IN SM RD SN SUP&AM TYS80(1)SB(U-BM)
EA 3.000 $450.000 $1,800.000 $1,950.000 $2,921.490 $2,000.000 $1,700.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $1,886.520 $3,935.000 $4,100.000 $3,665.440 $4,300.000 $3,430.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 3.000 $2,620.000 $7,550.000 $7,800.000 $7,360.980 $8,200.000 $9,608.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 13.000 $275.800 $1,485.000 $1,600.000 $1,198.320 $1,600.000 $575.000
RELOCATE SM RD SN SUP&AM(RAIL MOUNT)
EA 1.000 $2,330.000 $7,550.000 $7,800.000 $12,132.980 $8,200.000 $9,394.000
RELOCATE LRSA
EA 1.000 $2,996.620 $4,070.000 $4,200.000 $5,300.200 $4,400.000 $6,500.000
INS OH SN SUP(75 FT BRDG)
EA 1.000 $55,000.000 $43,100.000 $44,000.000 $108,558.260 $47,100.000 $110,000.000
INS OH SN SUP(135 FT COMB)
EA 1.000 $300,000.000 $113,800.000 $116,000.000 $357,603.660 $124,300.000 $1,000,000.000
REMOVE OVERHD SIGN SUP
EA 3.000 $10,000.000 $7,700.000 $7,900.000 $12,324.550 $8,400.000 $10,000.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 6.000 $900.000 $960.000 $1,000.000 $1,858.260 $1,000.000 $5,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 40.000 $25.110 $36.000 $38.000 $38.690 $36.250 $32.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 51.000 $24.160 $36.000 $38.000 $18.220 $16.750 $32.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 22.000 $25.000 $125.000 $132.000 $115.350 $160.000 $110.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 11.000 $25.000 $125.000 $132.000 $181.040 $160.000 $110.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 8.000 $25.000 $125.000 $132.000 $96.270 $220.000 $110.000
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 240.000 $10.000 $5.000 $6.200 $5.100 $6.600 $6.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 4,782.000 $1.010 $1.500 $1.900 $1.390 $1.900 $1.750
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 41,636.000 $1.030 $1.250 $1.000 $1.390 $1.000 $0.950
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 45.000 $9.110 $7.000 $27.000 $7.660 $27.250 $25.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 30,195.000 $1.410 $1.250 $0.950 $1.390 $1.000 $0.900
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 385.000 $2.050 $2.000 $1.300 $1.400 $1.400 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,534.000 $1.000 $1.100 $1.600 $1.510 $1.600 $1.500
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 702.000 $2.530 $3.000 $2.700 $4.280 $2.700 $2.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,325.000 $3.160 $2.750 $3.300 $4.280 $3.300 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 250.000 $6.480 $6.500 $8.500 $7.370 $8.700 $8.000
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 17.000 $55.680 $75.000 $52.000 $38.310 $55.000 $50.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 959.000 $0.920 $1.100 $1.600 $1.510 $1.600 $1.500
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 173.000 $6.000 $6.500 $9.500 $7.370 $9.800 $9.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 30,796.000 $0.100 $0.200 $0.180 $0.600 $0.160 $0.150
REFL PAV MRK TY II (W) 6" (BRK)
LF 10,730.000 $0.250 $0.350 $0.250 $0.700 $0.240 $0.220
REFL PAV MRK TY II (W) 6" (DOT)
LF 385.000 $1.510 $0.850 $0.550 $0.700 $0.550 $0.500
REFL PAV MRK TY II (W) 8" (SLD)
LF 7,534.000 $0.320 $0.650 $0.450 $0.770 $0.450 $0.400
REFL PAV MRK TY II (W) 12" (LNDP)
LF 702.000 $1.500 $2.000 $1.050 $0.970 $1.100 $1.000
REFL PAV MRK TY II (W) 12" (SLD)
LF 1,325.000 $1.650 $1.000 $1.050 $0.970 $1.100 $1.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 250.000 $2.790 $3.500 $2.500 $4.410 $2.600 $2.400
REFL PAV MRK TY II (W) 18" (YLD TRI)
EA 17.000 $55.000 $20.000 $10.250 $6.390 $11.000 $10.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 22,544.000 $0.100 $0.200 $0.180 $0.600 $0.160 $0.150
REFL PAV MRK TY II (Y) 8" (SLD)
LF 959.000 $0.350 $0.650 $0.550 $0.770 $0.550 $0.500
REFL PAV MRK TY II (Y) 24" (SLD)
LF 173.000 $2.500 $3.500 $3.150 $0.420 $3.300 $3.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 30,796.000 $0.460 $0.520 $0.800 $1.260 $0.800 $0.750
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 10,730.000 $1.000 $0.750 $1.300 $1.400 $1.400 $1.250
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 22,544.000 $0.460 $0.520 $0.800 $1.260 $0.800 $0.750
PREFAB PAV MRK TY C (W) (ARROW)
EA 13.000 $216.290 $235.000 $260.000 $238.830 $270.000 $250.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 2.000 $350.000 $525.000 $335.000 $415.080 $360.000 $325.000
PREFAB PAV MRK TY C (W) (WORD)
EA 14.000 $283.760 $315.000 $370.000 $411.240 $380.000 $350.000
REFL PAV MRKR TY II-C-R
EA 1,176.000 $3.740 $5.000 $4.400 $4.850 $4.400 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 58,947.000 $0.710 $0.450 $0.700 $0.570 $0.700 $0.650
ELIM EXT PAV MRK & MRKS (8")
LF 6,796.000 $0.970 $0.830 $0.800 $0.660 $0.800 $0.750
ELIM EXT PAV MRK & MRKS (12")
LF 354.000 $2.210 $1.500 $2.600 $0.830 $2.700 $2.500
PAV SURF PREP FOR MRK (4")
LF 53,340.000 $0.160 $0.120 $0.180 $0.170 $0.170 $0.160
PAV SURF PREP FOR MRK (6")
LF 11,115.000 $0.080 $0.250 $0.180 $0.190 $0.170 $0.160
PAV SURF PREP FOR MRK (8")
LF 8,493.000 $0.150 $0.250 $0.250 $0.240 $0.220 $0.200
PAV SURF PREP FOR MRK (12")
LF 2,009.000 $0.450 $1.000 $0.800 $0.320 $0.800 $0.750
PAV SURF PREP FOR MRK (24")
LF 423.000 $0.910 $2.000 $2.200 $0.380 $2.200 $2.000
PAV SURF PREP FOR MRK (ARROW)
EA 13.000 $17.490 $40.000 $36.000 $22.990 $38.250 $35.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $32.280 $55.000 $58.000 $29.370 $60.000 $55.000
PAV SURF PREP FOR MRK (WORD)
EA 14.000 $31.570 $45.000 $47.000 $31.930 $49.250 $45.000
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 17.000 $3.950 $25.000 $5.250 $6.390 $5.500 $5.000
FULL - WIDTH MOWING
CYC 6.000 $4,068.760 $3,704.180 $2,000.000 $5,322.630 $4,000.000 $1,250.000
LITTER REMOVAL
CYC 18.000 $1,955.900 $1,850.000 $3,500.000 $2,590.170 $2,500.000 $1,250.000
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
CYC 78.000 $1,500.000 $619.980 $2,400.000 $3,369.780 $2,000.000 $1,250.000
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
CYC 36.000 $1,980.000 $100.000 $2,400.000 $2,531.210 $3,000.000 $1,250.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 18.000 $3,500.000 $2,042.320 $2,650.000 $3,660.860 $2,500.000 $1,250.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
CYC 18.000 $2,400.000 $4,800.000 $2,650.000 $1,988.440 $4,000.000 $1,250.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 10.000 $1,500.000 $3,072.730 $5,700.000 $3,531.920 $3,500.000 $2,500.000
TREE REMOVAL (12" - 18" DIA)
EA 20.000 $100.000 $482.730 $775.000 $1,465.840 $1,100.000 $800.000
REPAIR (REACT)
EA 18.000 $5,000.000 $7,550.000 $8,000.000 $2,809.710 $10,900.000 $1,900.000
BRIDGE JOINT REPAIR (ARMOR)
LF 29.000 $600.000 $510.000 $132.000 $459.350 $270.000 $610.000
SP MIXES SP-B PG64-22
TON 7,728.000 $125.000 $115.100 $119.000 $156.130 $180.000 $115.960
SP MIXES SP-C PG70-22
TON 1,564.000 $145.000 $136.200 $142.000 $189.020 $170.000 $137.210
SP MIXES SP-C SAC-B PG70-22
TON 179.000 $140.000 $136.200 $142.000 $189.020 $240.000 $137.210
TACK COAT
GAL 2,115.000 $4.400 $8.000 $8.250 $4.150 $10.250 $8.060
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 1,749.000 $215.000 $222.300 $230.000 $245.210 $170.000 $223.960
PATCHING MILLED CONCRETE RUMBLE STRIPS
LF 1,736.000 $8.000 $45.000 $26.000 $7.480 $21.750 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $11,000.000 $6,883.230 $13,400.000 $13,572.360 $30,000.000 $22,000.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 3.000 $2,330.000 $2,515.000 $2,900.000 $4,533.900 $2,800.000 $2,767.260
FIBER OPTIC FUSION SPLICE
EA 168.000 $31.250 $63.000 $68.000 $83.020 $70.000 $85.150
RELOCATE FIBER OPTIC CABLE
LF 1,950.000 $13.940 $3.900 $4.250 $12.770 $4.300 $5.960
ITS MULTI-DUCT CND (PVC-40)
LF 165.000 $4.200 $43.400 $48.000 $57.470 $48.250 $36.190
ITS MULTI-DUCT CND (PVC-40)(BORE)
LF 260.000 $10.000 $41.200 $45.000 $108.560 $45.750 $44.700
CONDUIT (PREPARE)
LF 2,075.000 $3.020 $3.000 $3.250 $7.660 $3.300 $1.060
GROUND BOX (PREPARE)
EA 5.000 $292.920 $155.000 $800.000 $638.580 $820.000 $372.520
TMA (STATIONARY)
DAY 378.000 $200.000 $93.430 $175.000 $255.430 $250.000 $315.000
TMA (MOBILE OPERATION)
DAY 567.000 $250.000 $154.070 $580.000 $383.150 $500.000 $725.000
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
EA 4.000 $3,630.000 $5,335.000 $6,000.000 $9,578.670 $5,900.000 $7,450.330
REMOVE ITS GROUND BOX
EA 4.000 $1,180.000 $1,055.000 $1,200.000 $1,596.440 $1,200.000 $957.900
RELOCATE HIGH MAST LIGHTING ASSEMBLY
EA 1.000 $12,690.000 $22,050.000 $25,000.000 $44,700.460 $24,500.000 $30,865.640
Totals: $16,115,260.769 $17,598,674.737 $19,429,297.720 $21,884,434.720 $21,991,999.160 $23,445,977.440