DENTON IH 35E (0196-02-131)

Items: 85

County: DENTON
Length: N/A
Highway: IH 35E
District: DALLAS
Control Number: 0196-02-131
DBE Goal: N/A
Project: F 2022(771)
Guaranty: N/A
Time: 71 WORKING DAYS
Engineer's Estimate: $2,318,635.59
Date: 06/29/2022 (3 years ago)
Contract Number: N/A
Type: CONSTRUCT RAMPS
Mail/Deliver Bids To: N/A
JAMES CAMPBELL
CHRISTOPHER ROCHA
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,318,635.59
$2,796,046.88
Over/Under Est: 20.59% $477,411.29
Over/Under Est: 20.96% $486,017.12
Amt Left: 0.31% $8,605.83
$3,142,166.10
Over/Under Est: 35.52% $823,530.51
Amt Left: 12.38% $346,119.22
Delta: -12.03% -$337,513.39

Bid Items & Bid Tabulations

85 Total 0 of 85
DENTON  |  IH 35E  |  DALLAS  |  0196-02-131  |  06/29/2022  |  $2,318,635.59  |  F 2022(771)  |  CONSTRUCT RAMPS  |  71 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
EUROVIA ATLANTIC COAST LLC
JAGOE-PUBLIC COMPANY
PREPARING ROW
STA 37.000 $2,000.000 $3,400.000 $950.000 $2,000.000
REMOVING CONC (CTB)
LF 2,777.000 $7.250 $19.000 $3.000 $29.250
REMOVING CONC (RETAINING WALLS)
SY 5.000 $250.000 $200.000 $1,200.000 $2,600.000
REMOVING CONC (COPING)
LF 60.000 $20.000 $88.000 $115.000 $56.000
REMOVING CONCRETE(MOW STRIP)
LF 1,144.000 $1.050 $11.000 $12.000 $14.250
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 2,785.000 $27.500 $11.350 $25.000 $11.000
EXCAVATION (ROADWAY)
CY 2,435.000 $25.000 $19.500 $21.000 $23.750
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,902.000 $57.500 $37.000 $44.000 $19.500
COMPOST MANUF TOPSOIL (4")
SY 25,370.000 $0.950 $1.400 $1.130 $1.300
BLOCK SODDING
SY 25,370.000 $4.750 $4.750 $4.370 $4.900
DRILL SEED (TEMP)(WARM OR COOL)
SY 25,370.000 $0.150 $0.140 $0.170 $0.050
VEGETATIVE WATERING
MG 7,548.000 $3.000 $0.010 $13.500 $10.000
LIME (HYDRATED LIME (SLURRY))
TON 315.000 $180.000 $255.000 $365.000 $275.000
LIME TRT (EXST MATL) (12")
SY 10,510.000 $4.000 $6.000 $17.000 $13.500
PLANE ASPH CONC PAV (2")
SY 1,524.000 $6.750 $7.000 $8.500 $7.100
RIPRAP (CONC)(4 IN)
CY 30.000 $450.000 $700.000 $700.000 $620.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 90.000 $210.000 $300.000 $315.000 $320.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $450.000 $750.000 $760.000 $920.000
RETROFIT RAIL (TY T1F)
LF 5.000 $50.000 $700.000 $600.000 $2,600.000
RC PIPE (CL III)(36 IN)
LF 80.000 $160.000 $275.000 $275.000 $180.000
SET (TY I) (36 IN) (3: 1) (C)
EA 2.000 $3,000.000 $9,000.000 $7,200.000 $4,300.000
MOBILIZATION
LS 1.000 $210,785.140 $270,000.000 $150,000.000 $275,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $15,000.000 $10,000.000 $20,000.000 $20,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 100.000 $17.500 $35.000 $33.310 $37.500
CONSTRUCTION EXITS (REMOVE)
SY 100.000 $8.000 $14.000 $8.660 $9.800
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,845.000 $2.500 $3.500 $3.340 $3.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,845.000 $0.500 $1.000 $0.920 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 330.000 $5.000 $5.000 $5.620 $6.300
BIODEG EROSN CONT LOGS (REMOVE)
LF 330.000 $1.000 $1.000 $1.470 $1.700
PCTB FUR&INSTL(F-SHAPE OR SNGL SLP)TY1
LF 3,220.000 $25.000 $16.000 $19.000 $40.500
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
LF 3,220.000 $10.000 $13.000 $14.500 $13.500
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 4,210.000 $65.000 $140.000 $115.000 $150.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 2,095.000 $2.250 $3.000 $4.500 $2.900
MTL W-BEAM GD FEN (TIM POST)
LF 220.000 $5.000 $28.750 $24.000 $27.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $2,500.000 $2,125.000 $2,400.000
REMOVE METAL BEAM GUARD FENCE
LF 1,144.000 $2.500 $2.050 $1.750 $2.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $275.000 $275.000 $225.000 $250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $1,470.000 $275.000 $225.000 $250.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $700.000 $1,800.000 $800.000 $1,700.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 3.000 $8,000.000 $9,000.000 $8,000.000 $5,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $675.000 $950.000 $812.000 $920.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $750.000 $1,100.000 $949.000 $1,100.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,100.000 $1,800.000 $1,528.000 $1,700.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $2,200.000 $7,500.000 $4,995.000 $5,600.000
REMOVE SM RD SN SUP&AM
EA 1.000 $90.000 $175.000 $150.000 $170.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 14,350.000 $0.250 $1.150 $1.000 $1.100
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 240.000 $1.000 $5.000 $5.000 $5.600
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 4,160.000 $0.250 $1.850 $1.550 $1.800
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 500.000 $0.750 $1.850 $1.550 $1.800
REFL PAV MRK TY I (W)4"(SLD)(100MIL)
LF 4,330.000 $0.750 $0.550 $0.470 $0.550
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,000.000 $0.750 $1.200 $1.000 $1.100
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 305.000 $3.000 $4.500 $3.850 $4.300
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
LF 95.000 $3.000 $5.250 $5.250 $5.900
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 215.000 $6.000 $7.000 $6.950 $7.800
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 6.000 $175.000 $265.000 $225.000 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $160.000 $300.000 $250.000 $280.000
REFL PAV MRK TY I (Y)4"(SLD)(100MIL)
LF 5,565.000 $0.500 $0.550 $0.470 $0.550
REFL PAV MRK TY II (W) 4" (DOT)
LF 500.000 $0.500 $2.500 $2.000 $2.300
REFL PAV MRK TY II (W) 4" (SLD)
LF 4,330.000 $0.500 $0.300 $0.250 $0.300
REFL PAV MRK TY II (W) 8" (SLD)
LF 1,000.000 $0.300 $1.200 $0.990 $1.100
REFL PAV MRK TY II (W) 12" (SLD)
LF 305.000 $1.500 $3.500 $3.000 $3.400
REFL PAV MRK TY II (W) 18" (SLD)
LF 95.000 $2.500 $11.750 $10.000 $11.250
REFL PAV MRK TY II (W) 24" (SLD)
LF 215.000 $2.500 $4.750 $4.000 $4.500
REFL PAV MRK TY II (W) (ARROW)
EA 6.000 $60.000 $120.000 $100.000 $110.000
REFL PAV MRK TY II (W) (WORD)
EA 4.000 $75.000 $175.000 $150.000 $170.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 5,565.000 $0.150 $0.250 $0.200 $0.230
REFL PAV MRKR TY II-C-R
EA 74.000 $3.500 $12.000 $10.000 $11.250
ELIM EXT PAV MRK & MRKS (4")
LF 15,652.000 $0.500 $0.950 $0.800 $0.900
ELIM EXT PAV MRK & MRKS (12")
LF 146.000 $1.750 $1.900 $1.600 $1.800
ELIM EXT PAV MRK & MRKS (24")
LF 547.000 $3.250 $3.750 $3.200 $3.600
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $75.000 $60.000 $50.000 $56.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 2.000 $75.000 $90.000 $75.000 $85.000
PAV SURF PREP FOR MRK (4")
LF 18,745.000 $0.050 $0.030 $0.020 $0.020
PAV SURF PREP FOR MRK (8")
LF 1,000.000 $0.150 $0.090 $0.070 $0.080
PAV SURF PREP FOR MRK (12")
LF 305.000 $0.500 $0.300 $0.260 $0.300
PAV SURF PREP FOR MRK (18")
LF 95.000 $0.500 $0.400 $0.340 $0.400
PAV SURF PREP FOR MRK (24")
LF 215.000 $0.500 $0.550 $0.470 $0.550
PAV SURF PREP FOR MRK (ARROW)
EA 6.000 $10.000 $13.250 $11.250 $12.750
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $25.000 $15.500 $13.000 $14.750
PAV SURF PREP FOR MRK (RPM)
EA 74.000 $0.250 $0.750 $0.640 $0.700
SP MIXES SP-B PG64-22
TON 4,430.000 $115.000 $125.000 $124.000 $150.000
SP MIXES SP-D SAC-A PG76-22
TON 1,235.000 $145.000 $150.000 $165.000 $165.000
TACK COAT
GAL 1,315.000 $5.000 $4.750 $6.500 $3.000
RE PM W/RET REQ TY I (W)4"(BRK)
LF 11,330.000 $0.200 $0.850 $0.700 $0.800
RE PM W/RET REQ TY II (W)4"(BRK)
LF 11,330.000 $0.400 $0.600 $0.500 $0.550
Totals: $2,318,635.590 $2,796,046.880 $2,804,652.710 $3,142,166.100