PREPARING ROW
|
STA
|
37.000
|
$2,000.000
|
$3,400.000
|
$950.000
|
$2,000.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
2,777.000
|
$7.250
|
$19.000
|
$3.000
|
$29.250
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
5.000
|
$250.000
|
$200.000
|
$1,200.000
|
$2,600.000
|
|
|
REMOVING CONC (COPING)
|
LF
|
60.000
|
$20.000
|
$88.000
|
$115.000
|
$56.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,144.000
|
$1.050
|
$11.000
|
$12.000
|
$14.250
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
2,785.000
|
$27.500
|
$11.350
|
$25.000
|
$11.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,435.000
|
$25.000
|
$19.500
|
$21.000
|
$23.750
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
4,902.000
|
$57.500
|
$37.000
|
$44.000
|
$19.500
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
25,370.000
|
$0.950
|
$1.400
|
$1.130
|
$1.300
|
|
|
BLOCK SODDING
|
SY
|
25,370.000
|
$4.750
|
$4.750
|
$4.370
|
$4.900
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
25,370.000
|
$0.150
|
$0.140
|
$0.170
|
$0.050
|
|
|
VEGETATIVE WATERING
|
MG
|
7,548.000
|
$3.000
|
$0.010
|
$13.500
|
$10.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
315.000
|
$180.000
|
$255.000
|
$365.000
|
$275.000
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
10,510.000
|
$4.000
|
$6.000
|
$17.000
|
$13.500
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
1,524.000
|
$6.750
|
$7.000
|
$8.500
|
$7.100
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
30.000
|
$450.000
|
$700.000
|
$700.000
|
$620.000
|
|
|
RIPRAP (STONE COMMON)(GROUT)(12 IN)
|
CY
|
90.000
|
$210.000
|
$300.000
|
$315.000
|
$320.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
20.000
|
$450.000
|
$750.000
|
$760.000
|
$920.000
|
|
|
RETROFIT RAIL (TY T1F)
|
LF
|
5.000
|
$50.000
|
$700.000
|
$600.000
|
$2,600.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
80.000
|
$160.000
|
$275.000
|
$275.000
|
$180.000
|
|
|
SET (TY I) (36 IN) (3: 1) (C)
|
EA
|
2.000
|
$3,000.000
|
$9,000.000
|
$7,200.000
|
$4,300.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$210,785.140
|
$270,000.000
|
$150,000.000
|
$275,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$15,000.000
|
$10,000.000
|
$20,000.000
|
$20,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
100.000
|
$17.500
|
$35.000
|
$33.310
|
$37.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
100.000
|
$8.000
|
$14.000
|
$8.660
|
$9.800
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,845.000
|
$2.500
|
$3.500
|
$3.340
|
$3.800
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,845.000
|
$0.500
|
$1.000
|
$0.920
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
330.000
|
$5.000
|
$5.000
|
$5.620
|
$6.300
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
330.000
|
$1.000
|
$1.000
|
$1.470
|
$1.700
|
|
|
PCTB FUR&INSTL(F-SHAPE OR SNGL SLP)TY1
|
LF
|
3,220.000
|
$25.000
|
$16.000
|
$19.000
|
$40.500
|
|
|
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
|
LF
|
3,220.000
|
$10.000
|
$13.000
|
$14.500
|
$13.500
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
4,210.000
|
$65.000
|
$140.000
|
$115.000
|
$150.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
2,095.000
|
$2.250
|
$3.000
|
$4.500
|
$2.900
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
220.000
|
$5.000
|
$28.750
|
$24.000
|
$27.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,000.000
|
$2,500.000
|
$2,125.000
|
$2,400.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,144.000
|
$2.500
|
$2.050
|
$1.750
|
$2.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$275.000
|
$275.000
|
$225.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$1,470.000
|
$275.000
|
$225.000
|
$250.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$700.000
|
$1,800.000
|
$800.000
|
$1,700.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$8,000.000
|
$9,000.000
|
$8,000.000
|
$5,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$675.000
|
$950.000
|
$812.000
|
$920.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$750.000
|
$1,100.000
|
$949.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,100.000
|
$1,800.000
|
$1,528.000
|
$1,700.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$2,200.000
|
$7,500.000
|
$4,995.000
|
$5,600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$90.000
|
$175.000
|
$150.000
|
$170.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
14,350.000
|
$0.250
|
$1.150
|
$1.000
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
240.000
|
$1.000
|
$5.000
|
$5.000
|
$5.600
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
4,160.000
|
$0.250
|
$1.850
|
$1.550
|
$1.800
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
500.000
|
$0.750
|
$1.850
|
$1.550
|
$1.800
|
|
REFL PAV MRK TY I (W)4"(SLD)(100MIL)
|
LF
|
4,330.000
|
$0.750
|
$0.550
|
$0.470
|
$0.550
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,000.000
|
$0.750
|
$1.200
|
$1.000
|
$1.100
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
305.000
|
$3.000
|
$4.500
|
$3.850
|
$4.300
|
|
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
|
LF
|
95.000
|
$3.000
|
$5.250
|
$5.250
|
$5.900
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
215.000
|
$6.000
|
$7.000
|
$6.950
|
$7.800
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
6.000
|
$175.000
|
$265.000
|
$225.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$160.000
|
$300.000
|
$250.000
|
$280.000
|
|
REFL PAV MRK TY I (Y)4"(SLD)(100MIL)
|
LF
|
5,565.000
|
$0.500
|
$0.550
|
$0.470
|
$0.550
|
|
REFL PAV MRK TY II (W) 4" (DOT)
|
LF
|
500.000
|
$0.500
|
$2.500
|
$2.000
|
$2.300
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
4,330.000
|
$0.500
|
$0.300
|
$0.250
|
$0.300
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
1,000.000
|
$0.300
|
$1.200
|
$0.990
|
$1.100
|
|
REFL PAV MRK TY II (W) 12" (SLD)
|
LF
|
305.000
|
$1.500
|
$3.500
|
$3.000
|
$3.400
|
|
REFL PAV MRK TY II (W) 18" (SLD)
|
LF
|
95.000
|
$2.500
|
$11.750
|
$10.000
|
$11.250
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
215.000
|
$2.500
|
$4.750
|
$4.000
|
$4.500
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
6.000
|
$60.000
|
$120.000
|
$100.000
|
$110.000
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
4.000
|
$75.000
|
$175.000
|
$150.000
|
$170.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
5,565.000
|
$0.150
|
$0.250
|
$0.200
|
$0.230
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
74.000
|
$3.500
|
$12.000
|
$10.000
|
$11.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
15,652.000
|
$0.500
|
$0.950
|
$0.800
|
$0.900
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
146.000
|
$1.750
|
$1.900
|
$1.600
|
$1.800
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
547.000
|
$3.250
|
$3.750
|
$3.200
|
$3.600
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$75.000
|
$60.000
|
$50.000
|
$56.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$75.000
|
$90.000
|
$75.000
|
$85.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
18,745.000
|
$0.050
|
$0.030
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,000.000
|
$0.150
|
$0.090
|
$0.070
|
$0.080
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
305.000
|
$0.500
|
$0.300
|
$0.260
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (18")
|
LF
|
95.000
|
$0.500
|
$0.400
|
$0.340
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
215.000
|
$0.500
|
$0.550
|
$0.470
|
$0.550
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
6.000
|
$10.000
|
$13.250
|
$11.250
|
$12.750
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
4.000
|
$25.000
|
$15.500
|
$13.000
|
$14.750
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
74.000
|
$0.250
|
$0.750
|
$0.640
|
$0.700
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
4,430.000
|
$115.000
|
$125.000
|
$124.000
|
$150.000
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
1,235.000
|
$145.000
|
$150.000
|
$165.000
|
$165.000
|
|
|
TACK COAT
|
GAL
|
1,315.000
|
$5.000
|
$4.750
|
$6.500
|
$3.000
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)
|
LF
|
11,330.000
|
$0.200
|
$0.850
|
$0.700
|
$0.800
|
|
|
RE PM W/RET REQ TY II (W)4"(BRK)
|
LF
|
11,330.000
|
$0.400
|
$0.600
|
$0.500
|
$0.550
|
|
Totals: |
$2,318,635.590
|
$2,796,046.880
|
$2,804,652.710
|
$3,142,166.100
|