PREPARING ROW
|
AC
|
72.000
|
$9,000.000
|
$83,090.000
|
$150,855.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
42,530.000
|
$8.000
|
$14.110
|
$10.400
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
2,202.000
|
$7.000
|
$8.280
|
$4.800
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
2,597.000
|
$14.000
|
$6.060
|
$8.150
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
6,083.000
|
$16.000
|
$8.620
|
$9.200
|
|
|
REMOVING CONC (CURB)
|
LF
|
4,211.000
|
$7.000
|
$2.810
|
$7.500
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
9,282.000
|
$7.000
|
$3.700
|
$8.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
23,896.000
|
$11.000
|
$8.270
|
$15.100
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
4,289.000
|
$32.000
|
$36.220
|
$30.750
|
|
|
REMOVING CONC (FLUME)
|
SY
|
985.000
|
$14.000
|
$11.780
|
$21.500
|
|
|
REMOVING STAB BASE AND ASPH PAV (2")
|
SY
|
37,135.000
|
$2.000
|
$1.840
|
$1.500
|
|
|
REMOVING STAB BASE AND ASPH PAV (6")
|
SY
|
1,881.000
|
$4.000
|
$7.350
|
$6.300
|
|
|
REMOVING STAB BASE & ASPH PAV (12")
|
SY
|
40,196.000
|
$7.000
|
$9.950
|
$8.850
|
|
|
REMOVING STAB BASE AND ASPH PAV (10")
|
SY
|
31,046.000
|
$5.000
|
$8.170
|
$7.300
|
|
|
REMOVING STAB BASE AND ASPH PAV(15")
|
SY
|
3,978.000
|
$9.000
|
$12.260
|
$10.700
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
307,214.000
|
$9.000
|
$17.810
|
$9.550
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
17,639.000
|
$12.000
|
$13.180
|
$7.100
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
59,881.000
|
$20.000
|
$35.500
|
$27.500
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
10,244.000
|
$1.300
|
$2.810
|
$5.850
|
|
|
BLOCK SODDING
|
SY
|
10,244.000
|
$3.900
|
$4.900
|
$3.550
|
|
|
DRILL SEEDING (PERM) (URBAN) (CLAY)
|
SY
|
23,126.000
|
$0.400
|
$0.320
|
$0.250
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
23,126.000
|
$0.250
|
$0.300
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
8,417.000
|
$7.500
|
$1.000
|
$17.800
|
|
|
IRRIGATION SYSTEM
|
LS
|
1.000
|
$27,500.000
|
$67,023.130
|
$103,513.510
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
154.000
|
$250.000
|
$1,596.860
|
$456.250
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
72,874.000
|
$5.000
|
$4.020
|
$6.950
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
74,329.000
|
$4.000
|
$3.690
|
$5.100
|
|
|
CEM TRT(PLNT MX) (CL L)(TYD)(GR1-2)(6")
|
SY
|
74,329.000
|
$30.000
|
$19.950
|
$24.900
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
14,042.000
|
$5.000
|
$6.950
|
$7.050
|
|
|
PLANE ASPH CONC PAV(0" TO 6")
|
SY
|
11,122.000
|
$4.000
|
$3.580
|
$2.750
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
39,913.000
|
$81.000
|
$80.000
|
$102.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
72,647.000
|
$95.000
|
$98.750
|
$112.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
122.000
|
$5.000
|
$162.960
|
$20.400
|
|
|
CEM STABIL BKFL
|
CY
|
3,459.000
|
$110.000
|
$194.610
|
$116.000
|
|
|
CUT & RESTORING PAV
|
SY
|
813.000
|
$122.000
|
$131.710
|
$231.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
19,539.000
|
$2.700
|
$5.570
|
$5.250
|
|
|
TEMPORARY SPL SHORING
|
SF
|
43,590.000
|
$25.000
|
$38.640
|
$25.300
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
10.000
|
$100.000
|
$383.500
|
$355.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
75.000
|
$230.000
|
$817.760
|
$756.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
802.000
|
$277.000
|
$239.150
|
$241.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
34,487.000
|
$300.000
|
$330.700
|
$300.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
82.500
|
$150.000
|
$368.710
|
$361.000
|
|
|
DRILL SHAFT (SIGN MTS) (30 IN)
|
LF
|
93.000
|
$685.000
|
$455.520
|
$446.000
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
86.000
|
$616.000
|
$426.920
|
$418.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
79.000
|
$646.000
|
$782.350
|
$767.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
101.000
|
$707.000
|
$823.210
|
$807.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
41.000
|
$580.000
|
$788.480
|
$773.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
400.000
|
$326.000
|
$317.000
|
$310.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
16.000
|
$462.000
|
$884.530
|
$866.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
96.000
|
$576.000
|
$1,070.640
|
$1,050.000
|
|
|
CL A CONC (MISC)
|
CY
|
8.860
|
$875.000
|
$1,263.920
|
$588.000
|
|
|
CL A CONC (FLUME)
|
CY
|
56.000
|
$885.000
|
$940.820
|
$624.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
299.100
|
$1,300.000
|
$891.100
|
$1,010.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
324.800
|
$1,060.000
|
$1,196.200
|
$1,110.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
351.600
|
$1,100.000
|
$1,057.670
|
$1,360.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
2,498.000
|
$475.000
|
$408.340
|
$556.000
|
|
|
CL C CONC (MISC)
|
CY
|
39.200
|
$1,500.000
|
$804.070
|
$831.000
|
|
|
CL C CONC (VEH DEFL WALL)
|
CY
|
16.600
|
$1,000.000
|
$776.020
|
$838.000
|
|
|
CL C CONC (PILASTER)
|
CY
|
15.960
|
$500.000
|
$2,385.160
|
$1,010.000
|
|
|
CL C CONC (TIE BEAM)
|
CY
|
866.000
|
$777.000
|
$644.040
|
$939.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
62,266.000
|
$22.000
|
$22.320
|
$27.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
434.000
|
$625.000
|
$561.840
|
$598.000
|
|
|
RETAINING WALL (DRILL SHAFT) (FACIA)
|
SF
|
69,285.000
|
$65.000
|
$75.660
|
$92.000
|
|
|
RETAINING WALL (SPECIAL)
|
SF
|
5,250.000
|
$50.000
|
$96.360
|
$97.150
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
3,665.980
|
$178.000
|
$226.380
|
$200.000
|
|
|
OPAQUE SEALER FINISH
|
SF
|
22,018.000
|
$3.000
|
$0.430
|
$0.400
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
1,933.000
|
$500.000
|
$529.390
|
$458.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
15.250
|
$456.000
|
$485.690
|
$588.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
75.800
|
$555.000
|
$750.780
|
$673.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
92.300
|
$420.000
|
$570.060
|
$467.000
|
|
|
ELASTOMERIC BEARING(EE4)
|
EA
|
19.000
|
$2,400.000
|
$1,788.200
|
$1,790.000
|
|
|
ELASTOMERIC BEARING (EF4)
|
EA
|
19.000
|
$2,400.000
|
$1,947.420
|
$1,920.000
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
1,385,200.000
|
$2.250
|
$2.350
|
$2.400
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
2,776.000
|
$8.500
|
$11.540
|
$11.700
|
|
|
RAIL (TY SSTR)
|
LF
|
20,262.000
|
$65.000
|
$51.320
|
$53.250
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
1,247.500
|
$60.000
|
$109.490
|
$61.750
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
237.000
|
$175.000
|
$365.950
|
$296.000
|
|
|
RAIL (TY PR11)
|
LF
|
325.000
|
$115.000
|
$93.690
|
$131.000
|
|
|
RAIL (TY T222)(MOD)
|
LF
|
543.000
|
$95.000
|
$196.780
|
$303.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
311.000
|
$172.000
|
$104.140
|
$109.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
539.000
|
$152.000
|
$156.450
|
$201.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
402.000
|
$150.000
|
$156.920
|
$219.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
9,637.000
|
$85.000
|
$94.480
|
$95.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
5,232.000
|
$145.000
|
$163.240
|
$153.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
981.000
|
$208.000
|
$255.730
|
$238.000
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
208.000
|
$300.000
|
$350.960
|
$343.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
11.000
|
$98.000
|
$116.050
|
$227.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
1,458.000
|
$130.000
|
$106.870
|
$101.000
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
703.000
|
$170.000
|
$211.270
|
$177.000
|
|
|
RC PIPE (CL IV)(48 IN)
|
LF
|
1,227.000
|
$350.000
|
$368.910
|
$342.000
|
|
|
RC PIPE (CL IV) (60 IN)
|
LF
|
311.000
|
$420.000
|
$550.600
|
$497.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
2.000
|
$16,900.000
|
$23,654.960
|
$23,950.000
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
12.000
|
$6,100.000
|
$4,969.530
|
$6,630.000
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
22.000
|
$9,600.000
|
$5,631.830
|
$8,010.000
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
12.000
|
$8,500.000
|
$5,753.160
|
$8,180.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
5.000
|
$6,750.000
|
$6,395.540
|
$8,790.000
|
|
|
INLET (COMPL)(PCU)(4FT)(LEFT)
|
EA
|
3.000
|
$10,000.000
|
$7,209.200
|
$9,720.000
|
|
|
INLET (COMPL)(PCU)(4FT)(RIGHT)
|
EA
|
8.000
|
$9,500.000
|
$7,795.650
|
$10,330.000
|
|
|
INLET (COMPL)(PCU)(4FT)(BOTH)
|
EA
|
1.000
|
$8,400.000
|
$7,259.930
|
$9,620.000
|
|
|
INLET (COMPL)(PCU)(6FT)(RIGHT)
|
EA
|
1.000
|
$10,000.000
|
$8,397.680
|
$10,570.000
|
|
|
INLET (COMPL)(PSL)(RC)(6FTX6FT)
|
EA
|
1.000
|
$9,500.000
|
$8,094.340
|
$9,890.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$5,750.000
|
$5,373.510
|
$5,640.000
|
|
|
INLET (COMPL)(PSL)(FG)(6FTX6FT-4FTX4FT)
|
EA
|
5.000
|
$11,000.000
|
$15,001.210
|
$18,670.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
33.000
|
$7,900.000
|
$4,966.040
|
$5,690.000
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
32.000
|
$8,300.000
|
$6,520.900
|
$7,550.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
3.000
|
$10,000.000
|
$6,297.730
|
$6,980.000
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
7.000
|
$6,100.000
|
$6,575.830
|
$5,110.000
|
|
|
INLET (RAIL & GRATE) (TY II)
|
EA
|
8.000
|
$7,000.000
|
$3,979.630
|
$9,290.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
3.000
|
$6,800.000
|
$4,715.310
|
$6,580.000
|
|
|
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$8,500.000
|
$7,307.980
|
$10,530.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
2.000
|
$3,500.000
|
$1,569.920
|
$3,590.000
|
|
|
REMOV STR (INLET)
|
EA
|
80.000
|
$750.000
|
$778.080
|
$855.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
4.000
|
$880.000
|
$1,058.540
|
$1,140.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
5.000
|
$1,800.000
|
$1,141.990
|
$857.000
|
|
|
REMOV STR (PIPE)
|
LF
|
13,804.000
|
$22.000
|
$17.120
|
$23.500
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$120,000.000
|
$291,810.740
|
$135,678.000
|
|
|
REMOVE STR (JUNCTION BOX)
|
EA
|
18.000
|
$1,300.000
|
$786.580
|
$1,140.000
|
|
|
REMOV STR (DRILL SHAFT)
|
EA
|
1.000
|
$1,000.000
|
$789.290
|
$4,980.000
|
|
|
REMOV STR (SLOTTED DRAIN INLET)
|
LF
|
604.000
|
$15.000
|
$14.250
|
$14.800
|
|
|
REMOVE STR (BARRIER GATE)
|
EA
|
13.000
|
$500.000
|
$1,012.390
|
$3,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$8,047,992.070
|
$10,545,600.000
|
$10,861,601.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
36.000
|
$20,000.000
|
$46,225.740
|
$21,327.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
215.000
|
$32.000
|
$35.200
|
$25.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
215.000
|
$12.000
|
$12.420
|
$9.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,488.000
|
$20.000
|
$34.510
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,488.000
|
$8.000
|
$11.040
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,797.000
|
$3.000
|
$3.310
|
$2.400
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,348.000
|
$0.800
|
$0.760
|
$0.550
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
435.000
|
$5.000
|
$7.180
|
$5.200
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
435.000
|
$1.000
|
$1.380
|
$1.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
2,551.000
|
$8.000
|
$10.700
|
$7.750
|
|
|
CONSTRUCTING DETOURS
|
SY
|
12,162.000
|
$66.000
|
$111.970
|
$150.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
20,480.000
|
$37.000
|
$38.390
|
$89.500
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
4,030.000
|
$35.000
|
$48.890
|
$83.500
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
280.000
|
$60.000
|
$51.130
|
$106.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
28,430.000
|
$7.000
|
$6.190
|
$7.250
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
6,080.000
|
$7.000
|
$6.040
|
$6.200
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
280.000
|
$11.000
|
$10.150
|
$25.300
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
20,300.000
|
$10.000
|
$11.680
|
$9.200
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
4,040.000
|
$10.000
|
$12.200
|
$7.700
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
280.000
|
$15.000
|
$12.920
|
$15.500
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
10,139.000
|
$85.000
|
$71.290
|
$84.750
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
318.000
|
$200.000
|
$195.070
|
$205.000
|
|
|
PERM CTB (TRAN SSCB TO SSTR) (MOD)
|
LF
|
90.000
|
$280.000
|
$484.330
|
$202.000
|
|
|
PERM CTB (SSCB)(TY 1)(MOD)
|
LF
|
2,399.000
|
$330.000
|
$580.050
|
$68.750
|
|
|
PERM CTB (SSCB)(TY 3)(MOD)
|
LF
|
217.000
|
$685.000
|
$204.110
|
$401.000
|
|
|
COLORED TEXTURED CONC (8")
|
SY
|
944.200
|
$108.000
|
$79.380
|
$88.000
|
|
|
COLORED TEXTURED CONC (5")
|
SY
|
210.150
|
$85.500
|
$65.810
|
$75.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
7,255.000
|
$5.000
|
$4.720
|
$6.350
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
2,660.000
|
$25.000
|
$16.070
|
$25.000
|
|
|
CONC CURB (DOWEL)
|
LF
|
2,047.000
|
$12.000
|
$9.070
|
$10.700
|
|
|
DRIVEWAYS (CONC)
|
SY
|
2,086.000
|
$80.000
|
$87.470
|
$70.250
|
|
|
DRIVEWAYS (ACP)
|
SY
|
566.000
|
$49.000
|
$96.330
|
$103.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
3,936.000
|
$60.000
|
$51.330
|
$50.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
4.000
|
$2,340.000
|
$1,296.330
|
$2,750.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
19.000
|
$2,380.000
|
$1,296.330
|
$2,750.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
51.000
|
$2,260.000
|
$1,503.740
|
$2,450.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
2.000
|
$2,960.000
|
$2,022.270
|
$3,230.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
3.000
|
$3,670.000
|
$2,022.270
|
$3,300.000
|
|
|
CONC SIDEWALKS (8")
|
SY
|
583.000
|
$75.000
|
$80.890
|
$63.000
|
|
|
CONC SIDEWALK (SPECIAL)(RETAINING WALL)
|
SF
|
1,416.000
|
$95.000
|
$54.050
|
$65.500
|
|
|
CONC MEDIAN
|
SY
|
142.000
|
$72.000
|
$56.780
|
$80.750
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
800.000
|
$25.000
|
$20.220
|
$21.100
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,000.000
|
$1,840.780
|
$1,920.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,380.000
|
$1,037.060
|
$1,080.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,536.000
|
$3.000
|
$2.590
|
$2.700
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,000.000
|
$2,903.770
|
$3,020.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
21.000
|
$1,400.000
|
$1,168.460
|
$1,080.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
17.000
|
$1,000.000
|
$934.770
|
$918.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
4.000
|
$25,000.000
|
$24,059.610
|
$28,890.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$42,000.000
|
$58,028.140
|
$51,600.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
10.000
|
$7,750.000
|
$7,062.650
|
$7,650.000
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
4.000
|
$513.000
|
$523.260
|
$492.000
|
|
|
REMOVE RD IL ASM (SHOE-BASE)
|
EA
|
9.000
|
$738.000
|
$664.680
|
$651.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
29.000
|
$500.000
|
$664.680
|
$651.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
12.000
|
$1,690.000
|
$2,101.400
|
$2,060.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
16.000
|
$1,603.000
|
$2,193.430
|
$2,150.000
|
|
|
IN RD IL (TY SA) 30S-8 (250W EQ) LED
|
EA
|
6.000
|
$4,000.000
|
$4,754.990
|
$4,650.000
|
|
|
IN RD IL (TY SA) 40S-12 (250W EQ) LED
|
EA
|
1.000
|
$5,205.000
|
$5,164.020
|
$5,060.000
|
|
|
IN RD IL (TY SA) 50T-12 (400W EQ) LED
|
EA
|
38.000
|
$5,686.000
|
$4,874.630
|
$4,770.000
|
|
|
IN RD IL (TY SA) 50T-12-12(400W EQ)LED
|
EA
|
2.000
|
$8,600.000
|
$6,417.700
|
$6,280.000
|
|
|
TEMP RD IL (RD IL ASM)
|
EA
|
21.000
|
$10,209.000
|
$10,097.960
|
$9,890.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
281.000
|
$12.000
|
$27.660
|
$27.100
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
14,434.000
|
$17.000
|
$27.030
|
$26.500
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,415.000
|
$28.000
|
$54.860
|
$53.750
|
|
|
CONDT (PVC) (SCH 40) (2") (STL ENCSE)
|
LF
|
882.000
|
$25.000
|
$119.230
|
$117.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
7,780.000
|
$24.000
|
$25.700
|
$25.200
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
13,610.000
|
$45.000
|
$38.600
|
$37.750
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
150.000
|
$25.000
|
$56.450
|
$55.250
|
|
|
CONDT (PVC) (SCH 80) (1 1/4")
|
LF
|
2,560.000
|
$10.000
|
$17.540
|
$17.200
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
2,470.000
|
$25.000
|
$36.100
|
$35.250
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
2,450.000
|
$31.000
|
$54.300
|
$53.250
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
1,290.000
|
$63.000
|
$101.240
|
$99.000
|
|
|
CONDT (RM) (1")
|
LF
|
1,235.000
|
$44.000
|
$73.320
|
$71.750
|
|
|
CONDT (RM) (1 1/4")
|
LF
|
310.000
|
$32.000
|
$75.980
|
$74.500
|
|
|
CONDT (RM) (2")
|
LF
|
1,055.000
|
$29.000
|
$52.870
|
$51.750
|
|
|
ELEC CONDR (NO.14) INSULATED
|
LF
|
510.000
|
$1.100
|
$2.450
|
$2.400
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
1,355.000
|
$2.000
|
$2.450
|
$2.400
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
4,310.000
|
$2.000
|
$2.760
|
$2.700
|
|
|
ELEC CONDR (NO.10) BARE
|
LF
|
281.000
|
$1.300
|
$2.560
|
$2.500
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
562.000
|
$1.500
|
$2.710
|
$2.650
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
17,175.000
|
$3.000
|
$2.810
|
$2.750
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
55,290.000
|
$3.000
|
$3.170
|
$3.100
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
3,538.000
|
$4.000
|
$5.730
|
$5.600
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
8,798.000
|
$4.000
|
$3.580
|
$3.500
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
1,170.000
|
$4.000
|
$3.780
|
$3.700
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
4,425.000
|
$4.000
|
$3.940
|
$3.950
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
732.000
|
$2.600
|
$5.730
|
$5.600
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
3,182.000
|
$3.400
|
$6.190
|
$6.050
|
|
|
GROUND BOX TY A (122311)
|
EA
|
14.000
|
$900.000
|
$1,671.910
|
$1,640.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
38.000
|
$1,735.000
|
$2,663.820
|
$2,610.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
11.000
|
$1,125.000
|
$1,794.630
|
$1,760.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
16.000
|
$2,002.000
|
$3,507.440
|
$3,430.000
|
|
|
REMOVE GROUND BOX
|
EA
|
10.000
|
$300.000
|
$664.680
|
$651.000
|
|
|
TIMBER POLE (CL 2) 40 FT
|
EA
|
33.000
|
$1,900.000
|
$2,893.900
|
$2,830.000
|
|
|
RELOCATE ELECTRICAL SERVICES
|
EA
|
1.000
|
$4,783.000
|
$20,258.280
|
$19,830.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
6.000
|
$574.000
|
$993.950
|
$973.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
|
EA
|
2.000
|
$7,445.000
|
$14,172.930
|
$13,870.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
|
EA
|
4.000
|
$5,143.000
|
$18,278.580
|
$17,890.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
|
EA
|
3.000
|
$8,005.000
|
$17,537.210
|
$17,170.000
|
|
|
ELEC SRV TY D 120/240 100(NS)SS(E)OC(U)
|
EA
|
1.000
|
$10,200.000
|
$13,528.710
|
$13,240.000
|
|
|
ELC SRV TY C 240/480 060 (NS)SS(E)GC(U)
|
EA
|
1.000
|
$10,000.000
|
$15,890.860
|
$15,560.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
30.500
|
$51.000
|
$51.070
|
$50.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
75.000
|
$31.000
|
$63.320
|
$62.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
2,913.500
|
$30.000
|
$36.460
|
$35.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
36.000
|
$729.000
|
$1,170.460
|
$1,150.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
25.000
|
$924.000
|
$1,340.010
|
$1,310.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
4.000
|
$1,160.000
|
$1,617.820
|
$1,590.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
2.000
|
$952.000
|
$2,015.120
|
$1,980.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$1,168.000
|
$1,616.790
|
$1,580.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,361.000
|
$2,036.560
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,400.000
|
$2,308.250
|
$2,260.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
2.000
|
$3,527.000
|
$3,967.930
|
$3,890.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$4,052.000
|
$5,070.990
|
$4,970.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
4.000
|
$6,843.000
|
$5,959.560
|
$5,840.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$796.000
|
$1,709.740
|
$1,680.000
|
|
|
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
|
EA
|
7.000
|
$379.000
|
$471.860
|
$462.000
|
|
|
RELOCATE LRSA
|
EA
|
1.000
|
$8,351.000
|
$5,877.850
|
$5,760.000
|
|
|
REMOVE LRSA
|
EA
|
4.000
|
$940.000
|
$1,323.670
|
$1,300.000
|
|
|
INS OH SN SUP(15 FT CANT)
|
EA
|
1.000
|
$15,600.000
|
$22,469.630
|
$22,020.000
|
|
|
INS OH SN SUP(15 FT CANT)(SPAN ONLY)
|
EA
|
1.000
|
$15,600.000
|
$15,881.950
|
$20,120.000
|
|
|
INS OH SN SUP(20 FT CANT)
|
EA
|
3.000
|
$41,355.000
|
$32,626.940
|
$31,980.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
3.000
|
$28,260.000
|
$36,119.950
|
$35,400.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
1.000
|
$43,300.000
|
$31,983.480
|
$31,350.000
|
|
|
INS OH SN SUP(40 FT BAL TEE)
|
EA
|
1.000
|
$34,000.000
|
$82,698.490
|
$81,100.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
2.000
|
$56,971.000
|
$43,514.500
|
$42,650.000
|
|
|
INS OH SN SUP(40 FT BRDG)
|
EA
|
1.000
|
$30,000.000
|
$45,945.300
|
$45,030.000
|
|
|
INS OH SN SUP(50 FT BRDG)
|
EA
|
1.000
|
$53,715.000
|
$97,027.990
|
$101,900.000
|
|
|
INS OH SN SUP(75 FT BRDG)
|
EA
|
1.000
|
$81,652.000
|
$61,832.370
|
$60,600.000
|
|
|
INS OH SN SUP(80 FT BRDG)
|
EA
|
1.000
|
$89,580.000
|
$85,205.900
|
$83,500.000
|
|
|
INS OH SN SUP(150 FT BRDG)
|
EA
|
1.000
|
$263,098.000
|
$165,902.540
|
$162,600.000
|
|
|
RELOCATE EXISTING OVERHD SIGN SUP
|
EA
|
5.000
|
$13,400.000
|
$18,430.210
|
$18,060.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
15.000
|
$10,800.000
|
$9,866.210
|
$9,670.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
107.000
|
$16.000
|
$20.740
|
$21.600
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
177.000
|
$24.000
|
$21.000
|
$21.900
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
256.000
|
$22.000
|
$20.740
|
$21.600
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
10.000
|
$24.000
|
$25.930
|
$27.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
6.000
|
$50.000
|
$25.930
|
$27.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
90,244.000
|
$1.150
|
$0.780
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
1,450.000
|
$2.000
|
$0.830
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
77,331.000
|
$1.000
|
$0.780
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,584.000
|
$2.500
|
$1.130
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
644.000
|
$10.000
|
$4.130
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
390.000
|
$2.500
|
$1.130
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
87,365.000
|
$1.000
|
$0.780
|
$0.750
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
710.000
|
$3.000
|
$1.030
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
9,885.000
|
$2.000
|
$1.030
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,098.000
|
$6.000
|
$2.490
|
$2.400
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,390.000
|
$9.000
|
$6.350
|
$6.150
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
2.000
|
$220.000
|
$370.410
|
$359.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
355.000
|
$5.000
|
$2.580
|
$2.500
|
|
|
PAVEMENT SEALER 4"
|
LF
|
63,271.000
|
$1.000
|
$0.170
|
$0.150
|
|
|
PAVEMENT SEALER 6"
|
LF
|
9,396.000
|
$1.000
|
$0.210
|
$0.200
|
|
|
PAVEMENT SEALER 8"
|
LF
|
8,315.000
|
$1.000
|
$0.230
|
$0.200
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,453.000
|
$2.000
|
$0.460
|
$0.450
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,390.000
|
$3.000
|
$0.830
|
$0.800
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
30.000
|
$39.000
|
$41.270
|
$40.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
36.000
|
$45.000
|
$48.490
|
$47.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
6.000
|
$45.000
|
$56.750
|
$55.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
6.000
|
$53.000
|
$77.380
|
$75.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
6.000
|
$58.000
|
$77.380
|
$75.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
25.000
|
$7.000
|
$5.160
|
$5.000
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
2.000
|
$5.000
|
$25.800
|
$25.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
5,158.000
|
$1.000
|
$0.880
|
$0.850
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
42,825.000
|
$1.000
|
$0.660
|
$0.650
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
12,481.000
|
$1.000
|
$0.920
|
$0.900
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
30,935.000
|
$1.000
|
$0.670
|
$0.650
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
30.000
|
$310.000
|
$180.560
|
$175.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
6.000
|
$619.000
|
$283.740
|
$275.000
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
6.000
|
$740.000
|
$438.500
|
$425.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
7.000
|
$563.000
|
$562.310
|
$545.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
36.000
|
$373.000
|
$320.880
|
$311.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
25.000
|
$29.000
|
$43.330
|
$42.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
52.000
|
$5.000
|
$4.130
|
$4.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
201.000
|
$6.000
|
$4.130
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,204.000
|
$6.000
|
$4.130
|
$4.000
|
|
REFL PAV MRKR TY II-C-C
|
EA
|
143.000
|
$4.000
|
$6.190
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
43,373.000
|
$0.500
|
$0.610
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
48,530.000
|
$0.700
|
$0.690
|
$0.650
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
5,570.000
|
$1.000
|
$0.740
|
$0.700
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
79,630.000
|
$0.100
|
$0.180
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
12,485.000
|
$0.100
|
$0.230
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
9,965.000
|
$0.150
|
$0.300
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,453.000
|
$0.350
|
$0.410
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,390.000
|
$1.000
|
$0.830
|
$0.800
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
36.000
|
$20.000
|
$28.890
|
$28.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
6.000
|
$17.000
|
$36.110
|
$35.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
6.000
|
$35.000
|
$41.270
|
$40.000
|
|
|
PAV SURF PREP FOR MRK (NUMBER)
|
EA
|
2.000
|
$76.000
|
$67.070
|
$65.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
35.000
|
$30.000
|
$30.950
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
25.000
|
$20.000
|
$12.380
|
$12.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$6,907.000
|
$7,878.960
|
$7,710.000
|
|
|
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
|
EA
|
1.000
|
$38,000.000
|
$49,185.990
|
$48,150.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
4.000
|
$75,550.000
|
$135,235.930
|
$132,400.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
16.000
|
$558.000
|
$923.390
|
$904.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
6.000
|
$568.000
|
$923.390
|
$904.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
20.000
|
$575.000
|
$923.390
|
$904.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
2.000
|
$546.000
|
$923.390
|
$904.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
20.000
|
$549.000
|
$923.390
|
$904.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$548.000
|
$923.390
|
$904.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
12.000
|
$1,285.000
|
$1,712.820
|
$1,680.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
20.000
|
$201.000
|
$435.620
|
$426.000
|
|
|
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
|
EA
|
2.000
|
$270.000
|
$476.530
|
$466.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
1,250.000
|
$4.000
|
$5.880
|
$5.750
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
3,245.000
|
$5.000
|
$8.230
|
$8.050
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
2,425.000
|
$8.000
|
$10.580
|
$10.400
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
5,225.000
|
$3.000
|
$3.530
|
$3.450
|
|
|
INS TRF SIG PL AM (S)1 ARM(20')
|
EA
|
2.000
|
$5,500.000
|
$20,354.420
|
$19,930.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
1.000
|
$15,430.000
|
$24,956.010
|
$24,430.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
3.000
|
$41,895.000
|
$45,745.020
|
$44,780.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(32-32')
|
EA
|
1.000
|
$12,000.000
|
$26,111.530
|
$25,560.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(60-40')LUM
|
EA
|
1.000
|
$55,000.000
|
$55,924.790
|
$54,700.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
7.000
|
$4,731.000
|
$5,409.440
|
$5,300.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
12.000
|
$1,204.000
|
$1,748.610
|
$1,710.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
2.000
|
$4,245.000
|
$6,467.800
|
$6,330.000
|
|
|
REMOVAL OF CONDUIT
|
LF
|
10,044.000
|
$2.000
|
$4.040
|
$2.100
|
|
|
REMOVAL OF TIMBER POLES
|
EA
|
33.000
|
$756.000
|
$664.680
|
$651.000
|
|
|
INSTL DOWN GUY W/GUARD
|
EA
|
5.000
|
$1,325.000
|
$1,704.640
|
$1,670.000
|
|
|
REMOVE DOWN GUY W/GUARD
|
EA
|
5.000
|
$1,095.000
|
$21,382.100
|
$651.000
|
|
|
ANTI - GRAFFITI COATING(PERMNENT-TY II)
|
SF
|
11,669.000
|
$3.590
|
$0.800
|
$0.750
|
|
|
NO. OF WORKING DAYS
|
$/D
|
15,000.000
|
$936.000
|
$800.000
|
$832.000
|
|
|
LANDSCAPE AMENITY (TY 1)
|
EA
|
11.000
|
$9,600.000
|
$21,356.370
|
$20,910.000
|
|
|
LANDSCAPE AMENITY (INTERPRETIVE SIGN)
|
EA
|
2.000
|
$3,500.000
|
$14,365.250
|
$14,070.000
|
|
|
LANDSCAPE AMENITY (INTERPRETIVE SIGN)
|
EA
|
2.000
|
$3,500.000
|
$14,365.250
|
$14,070.000
|
|
|
AMENITY (TY 1) (DOUBLE-BANNER POLES)
|
EA
|
11.000
|
$9,600.000
|
$21,551.600
|
$20,910.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
39,742.000
|
$100.000
|
$102.290
|
$104.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
1,328.000
|
$135.000
|
$123.150
|
$125.000
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
4,939.000
|
$135.000
|
$131.090
|
$133.000
|
|
|
SP MIXES SP-D PG64-22
|
TON
|
5,001.000
|
$130.000
|
$139.040
|
$141.000
|
|
|
TACK COAT
|
GAL
|
3,263.000
|
$3.000
|
$8.940
|
$9.050
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
5,563.000
|
$157.000
|
$203.590
|
$207.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
1,125.000
|
$157.000
|
$230.410
|
$234.000
|
|
|
PRESTRESSED GROUND ANCHORS
|
LF
|
68,587.000
|
$45.000
|
$56.370
|
$38.000
|
|
|
INSTALL CIRCUIT BREAKER
|
EA
|
1.000
|
$173.000
|
$511.290
|
$501.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$8,000.000
|
$12,522.550
|
$7,650.000
|
|
|
ITS COM CBL (ETHERNET)
|
LF
|
45.000
|
$4.000
|
$69.690
|
$68.000
|
|
|
ITS COM CBL (UNDRGRND)(19 AWG/6 PR)
|
LF
|
295.000
|
$3.000
|
$29.650
|
$28.900
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
|
LF
|
1,075.000
|
$4.000
|
$14.320
|
$14.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(48 FIBER)
|
LF
|
13,000.000
|
$4.000
|
$3.730
|
$3.650
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(72 FIBER)
|
LF
|
6,600.000
|
$6.000
|
$4.600
|
$4.500
|
|
|
FO CBL (48 SMF)(ADSS)(AERIAL)
|
LF
|
7,440.000
|
$10.000
|
$4.750
|
$4.650
|
|
|
FO CBL (72 SMF)(ADSS)(AERIAL)
|
LF
|
6,880.000
|
$9.350
|
$5.520
|
$5.400
|
|
|
FO SPLICE ENCLOSURE (TYPE 1)
|
EA
|
20.000
|
$3,000.000
|
$2,418.400
|
$2,370.000
|
|
|
FIBER OPTIC FUSION SPLICE
|
EA
|
1,078.000
|
$66.000
|
$76.690
|
$75.000
|
|
|
REMOVE FIBER OPTIC CABLE
|
LF
|
18,076.000
|
$1.300
|
$5.010
|
$4.900
|
|
|
RELOCATE EXISTING COMMUNICATION CABINET
|
EA
|
7.000
|
$9,073.000
|
$10,588.790
|
$10,350.000
|
|
|
COMMUNICATION CABINET FOUNDATION
|
EA
|
6.000
|
$2,000.000
|
$15,103.480
|
$14,790.000
|
|
|
CCTV MOUNT (POLE)
|
EA
|
1.000
|
$500.000
|
$1,533.870
|
$1,500.000
|
|
|
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
|
EA
|
1.000
|
$1,250.000
|
$5,348.080
|
$5,240.000
|
|
|
RELOCATE CCTV FIELD EQUIPMENT
|
EA
|
3.000
|
$5,460.000
|
$7,275.640
|
$7,120.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
2,475.000
|
$34.000
|
$31.440
|
$30.750
|
|
|
ITS MULTI-DUCT CND (PVC-40)(BORE)
|
LF
|
3,635.000
|
$56.000
|
$42.140
|
$41.250
|
|
|
FIBER OPTIC CABLE ROAD MARKER
|
EA
|
10.000
|
$441.000
|
$255.650
|
$250.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
920.000
|
$2.000
|
$9.100
|
$8.900
|
|
|
GROUND BOX (PREPARE)
|
EA
|
8.000
|
$276.000
|
$1,268.000
|
$1,240.000
|
|
|
SYSTEM INTEGRATION
|
LS
|
1.000
|
$13,410.000
|
$71,856.550
|
$70,300.000
|
|
|
REMOVE OVERHEAD SIGN PANELS
|
EA
|
3.000
|
$2,300.000
|
$1,181.080
|
$1,160.000
|
|
|
ITS POLE (40 FT)(90 MPH)
|
EA
|
1.000
|
$17,000.000
|
$12,449.890
|
$12,190.000
|
|
|
ITS POLE (60 FT)(REL)
|
EA
|
3.000
|
$5,210.000
|
$18,894.170
|
$18,500.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 1)
|
EA
|
1.000
|
$5,019.000
|
$7,675.470
|
$7,510.000
|
|
|
REMOVE EXISTING COMMUNICATION CABINET
|
EA
|
6.000
|
$1,000.000
|
$3,962.490
|
$3,880.000
|
|
|
TMA (STATIONARY)
|
DAY
|
430.000
|
$130.000
|
$154.380
|
$348.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
476.000
|
$60.000
|
$61.850
|
$79.500
|
|
|
ITS GND BOX(PCAST) TY 1 (243660)
|
EA
|
4.000
|
$4,000.000
|
$4,816.340
|
$4,710.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
|
EA
|
10.000
|
$5,146.000
|
$5,920.730
|
$5,800.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
|
EA
|
9.000
|
$13,217.000
|
$7,914.750
|
$7,750.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366060)
|
EA
|
3.000
|
$7,000.000
|
$7,270.530
|
$7,120.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
|
EA
|
7.000
|
$7,601.000
|
$8,380.030
|
$8,200.000
|
|
|
REMOVE ITS GROUND BOX
|
EA
|
8.000
|
$1,000.000
|
$884.530
|
$866.000
|
|
|
INST LRG GRND MNT AND OVRHD SIGN(STATE)
|
SF
|
2,358.500
|
$15.000
|
$41.930
|
$41.000
|
|
|
ITS RVSD (DC & WWA) (RELOCATE)
|
EA
|
3.000
|
$6,500.000
|
$7,802.270
|
$7,640.000
|
|
|
VIVDS TEMPORARY
|
EA
|
2.000
|
$23,367.000
|
$42,334.730
|
$41,440.000
|
|
|
VIVDS CABLING
|
LF
|
6,415.000
|
$6.000
|
$7.160
|
$7.000
|
|
|
VIVDS PROSR SYS (INSTALL ONLY)
|
EA
|
2.000
|
$598.000
|
$1,763.950
|
$1,730.000
|
|
|
VIVDS CAM ASSY (INSTALL ONLY)
|
EA
|
6.000
|
$558.000
|
$2,939.910
|
$2,880.000
|
|
|
VIVDS CABLING (INSTALL ONLY)
|
LF
|
2,580.000
|
$2.000
|
$3.580
|
$3.500
|
|
|
REMOVE AND RELOCATE SLDMS SYSTEM
|
EA
|
1.000
|
$10,000.000
|
$67,418.560
|
$66,000.000
|
|
|
VAB REMOVE
|
EA
|
1.000
|
$6,500.000
|
$21,494.590
|
$21,040.000
|
|
|
VAB FURNISH AND INSTALL
|
EA
|
1.000
|
$7,600.000
|
$1,179,543.630
|
$1,154,600.000
|
|
|
DECORATIVE ILL ASSEMBLY (PILASTER)
|
EA
|
12.000
|
$4,100.000
|
$13,630.960
|
$13,340.000
|
|
|
LINEAR ILLUMINATION ASSEMBLY (MURAL)
|
LF
|
304.000
|
$240.000
|
$1,648.400
|
$1,610.000
|
|
|
RMV AND RLCAT AUTO BARRIER GATE ASSM
|
EA
|
11.000
|
$5,000.000
|
$11,260.450
|
$10,420.000
|
|
Totals: |
$98,537,470.045
|
$117,457,045.147
|
$121,096,015.690
|