Bid Cobra

DENTON IH 35E (0196-02-128)

Items: 402

County: DENTON
Length: N/A
Highway: IH 35E
District: DALLAS
Control Number: 0196-02-128
DBE Goal: N/A
Project: F 2023(340)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $98,537,470.04
Date: 01/06/2023 (3 years ago)
Contract Number: N/A
Type: INTERCHANGE IMPROVEMENT
Mail/Deliver Bids To: N/A
TRAVIS CAMPBEL
CHRISTOPHER ROCHA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$98,537,470.04
$117,457,045.09
Over/Under Est: 19.2% $18,919,575.05
$121,096,015.68
Over/Under Est: 22.89% $22,558,545.64
Amt Left: 3.1% $3,638,970.59
Subcontractor Percentage Amount
MICA CORPORATION 9.95% $10,863,137.91
REYNOLDS ASPHALT & CONSTRUCTION COMPANY 7.48% $8,166,459.45
ANCORTEX, INC. 5.53% $6,037,502.78
WYLIE DRILLING & DRAINAGE, INC. 3.68% $4,017,723.37
LAUGHLEY BRIDGE & CONSTRUCTION, INC. 1.71% $1,866,931.24
DURABLE SPECIALTIES, INC. 1.36% $1,484,810.81
CHOCTAW ERECTORS, INC. 0.46% $502,215.42
TORO BRAVO CONSTRUCTION, LLC 0.45% $491,297.69
BREDA COMPANY, INC. 0.40% $436,709.06
KING GEORGE TRAFFIC SOLUTIONS LLC 0.39% $425,791.34
ELITE STRIPING, LLC 0.38% $414,873.61
A BROTHERS MILLING, LLC 0.24% $262,025.44
LINDAMOOD, INC. 0.23% $251,107.71
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.18% $196,519.08
ALLIANCE GEOTECHNICAL GROUP, INC. 0.15% $163,765.90
PRIMATE CONSTRUCTION, LP 0.14% $152,848.17
STRAIGHT LINE SAWING & SEALING, INC. 0.13% $141,930.45
J.H. PAINTING COMPANY 0.11% $120,094.99
SYNERGY SIGNS & SERVICES LLC 0.08% $87,341.81
BROOKLYN SWEEPS, INCORPORATED 0.06% $65,506.36
C. GREEN SCAPING, L.P. 0.06% $65,506.36
FORTSON CONTRACTING, INC. 0.04% $43,670.91
BUYERS BARRICADES, INC. 0.03% $32,753.18
NEXT GENERATION CONSTRUCTION & ENVIRONMENTAL, LLC 0.03% $32,753.18
TAYLOR LIGHTNING PROTECTION 0.03% $32,753.18
Total: 33.30% $36,356,029.40

Bid Items & Bid Tabulations

402 Total 0 of 402
DENTON  |  IH 35E  |  DALLAS  |  0196-02-128  |  01/06/2023  |  $98,537,470.04  |  F 2023(340)  |  INTERCHANGE IMPRV  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
SEMA CONSTRUCTION, INC.
WEBBER, LLC
PREPARING ROW
AC 72.000 $9,000.000 $83,090.000 $150,855.000
REMOVING CONC (PAV)
SY 42,530.000 $8.000 $14.110 $10.400
REMOVING CONC (RIPRAP)
SY 2,202.000 $7.000 $8.280 $4.800
REMOVING CONC (SIDEWALKS)
SY 2,597.000 $14.000 $6.060 $8.150
REMOVING CONC (DRIVEWAYS)
SY 6,083.000 $16.000 $8.620 $9.200
REMOVING CONC (CURB)
LF 4,211.000 $7.000 $2.810 $7.500
REMOVING CONC (CURB AND GUTTER)
LF 9,282.000 $7.000 $3.700 $8.000
REMOVING CONC (CTB)
LF 23,896.000 $11.000 $8.270 $15.100
REMOVING CONC (RETAINING WALLS)
SY 4,289.000 $32.000 $36.220 $30.750
REMOVING CONC (FLUME)
SY 985.000 $14.000 $11.780 $21.500
REMOVING STAB BASE AND ASPH PAV (2")
SY 37,135.000 $2.000 $1.840 $1.500
REMOVING STAB BASE AND ASPH PAV (6")
SY 1,881.000 $4.000 $7.350 $6.300
REMOVING STAB BASE & ASPH PAV (12")
SY 40,196.000 $7.000 $9.950 $8.850
REMOVING STAB BASE AND ASPH PAV (10")
SY 31,046.000 $5.000 $8.170 $7.300
REMOVING STAB BASE AND ASPH PAV(15")
SY 3,978.000 $9.000 $12.260 $10.700
EXCAVATION (ROADWAY)
CY 307,214.000 $9.000 $17.810 $9.550
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 17,639.000 $12.000 $13.180 $7.100
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 59,881.000 $20.000 $35.500 $27.500
COMPOST MANUF TOPSOIL (4")
SY 10,244.000 $1.300 $2.810 $5.850
BLOCK SODDING
SY 10,244.000 $3.900 $4.900 $3.550
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 23,126.000 $0.400 $0.320 $0.250
DRILL SEED (TEMP)(WARM OR COOL)
SY 23,126.000 $0.250 $0.300 $0.200
VEGETATIVE WATERING
MG 8,417.000 $7.500 $1.000 $17.800
IRRIGATION SYSTEM
LS 1.000 $27,500.000 $67,023.130 $103,513.510
LIME (HYDRATED LIME (SLURRY))
TON 154.000 $250.000 $1,596.860 $456.250
LIME TRT (EXST MATL) (12")
SY 72,874.000 $5.000 $4.020 $6.950
LIME TRT (EXST MATL)(8")
SY 74,329.000 $4.000 $3.690 $5.100
CEM TRT(PLNT MX) (CL L)(TYD)(GR1-2)(6")
SY 74,329.000 $30.000 $19.950 $24.900
PRIME COAT (MULTI OPTION)
GAL 14,042.000 $5.000 $6.950 $7.050
PLANE ASPH CONC PAV(0" TO 6")
SY 11,122.000 $4.000 $3.580 $2.750
CONC PVMT (CONT REINF - CRCP) (11")
SY 39,913.000 $81.000 $80.000 $102.000
CONC PVMT (CONT REINF - CRCP) (13")
SY 72,647.000 $95.000 $98.750 $112.000
STRUCT EXCAV (PIPE)
CY 122.000 $5.000 $162.960 $20.400
CEM STABIL BKFL
CY 3,459.000 $110.000 $194.610 $116.000
CUT & RESTORING PAV
SY 813.000 $122.000 $131.710 $231.000
TRENCH EXCAVATION PROTECTION
LF 19,539.000 $2.700 $5.570 $5.250
TEMPORARY SPL SHORING
SF 43,590.000 $25.000 $38.640 $25.300
DRILL SHAFT (18 IN)
LF 10.000 $100.000 $383.500 $355.000
DRILL SHAFT (36 IN)
LF 75.000 $230.000 $817.760 $756.000
DRILL SHAFT (42 IN)
LF 802.000 $277.000 $239.150 $241.000
DRILL SHAFT (48 IN)
LF 34,487.000 $300.000 $330.700 $300.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 82.500 $150.000 $368.710 $361.000
DRILL SHAFT (SIGN MTS) (30 IN)
LF 93.000 $685.000 $455.520 $446.000
DRILL SHAFT (SIGN MTS) (36 IN)
LF 86.000 $616.000 $426.920 $418.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 79.000 $646.000 $782.350 $767.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 101.000 $707.000 $823.210 $807.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 41.000 $580.000 $788.480 $773.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 400.000 $326.000 $317.000 $310.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 16.000 $462.000 $884.530 $866.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 96.000 $576.000 $1,070.640 $1,050.000
CL A CONC (MISC)
CY 8.860 $875.000 $1,263.920 $588.000
CL A CONC (FLUME)
CY 56.000 $885.000 $940.820 $624.000
CL C CONC (ABUT)(HPC)
CY 299.100 $1,300.000 $891.100 $1,010.000
CL C CONC (CAP)(HPC)
CY 324.800 $1,060.000 $1,196.200 $1,110.000
CL C CONC (COLUMN)(HPC)
CY 351.600 $1,100.000 $1,057.670 $1,360.000
CL C CONC (RAIL FOUNDATION)
CY 2,498.000 $475.000 $408.340 $556.000
CL C CONC (MISC)
CY 39.200 $1,500.000 $804.070 $831.000
CL C CONC (VEH DEFL WALL)
CY 16.600 $1,000.000 $776.020 $838.000
CL C CONC (PILASTER)
CY 15.960 $500.000 $2,385.160 $1,010.000
CL C CONC (TIE BEAM)
CY 866.000 $777.000 $644.040 $939.000
REINF CONC SLAB (HPC)
SF 62,266.000 $22.000 $22.320 $27.000
APPROACH SLAB (HPC)
CY 434.000 $625.000 $561.840 $598.000
RETAINING WALL (DRILL SHAFT) (FACIA)
SF 69,285.000 $65.000 $75.660 $92.000
RETAINING WALL (SPECIAL)
SF 5,250.000 $50.000 $96.360 $97.150
PRESTR CONC GIRDER (TX46)
LF 3,665.980 $178.000 $226.380 $200.000
OPAQUE SEALER FINISH
SF 22,018.000 $3.000 $0.430 $0.400
RIPRAP (CONC)(5 IN)
CY 1,933.000 $500.000 $529.390 $458.000
RIPRAP (CONC)(CL B)
CY 15.250 $456.000 $485.690 $588.000
RIPRAP (CONC)(FLUME)
CY 75.800 $555.000 $750.780 $673.000
RIPRAP (MOW STRIP)(4 IN)
CY 92.300 $420.000 $570.060 $467.000
ELASTOMERIC BEARING(EE4)
EA 19.000 $2,400.000 $1,788.200 $1,790.000
ELASTOMERIC BEARING (EF4)
EA 19.000 $2,400.000 $1,947.420 $1,920.000
STR STEEL (PLATE GIRDER)
LB 1,385,200.000 $2.250 $2.350 $2.400
STR STEEL (MISC NON - BRIDGE)
LB 2,776.000 $8.500 $11.540 $11.700
RAIL (TY SSTR)
LF 20,262.000 $65.000 $51.320 $53.250
RAIL (TY SSTR)(HPC)
LF 1,247.500 $60.000 $109.490 $61.750
RAIL (TY SSTR)(MOD)
LF 237.000 $175.000 $365.950 $296.000
RAIL (TY PR11)
LF 325.000 $115.000 $93.690 $131.000
RAIL (TY T222)(MOD)
LF 543.000 $95.000 $196.780 $303.000
ARMOR JOINT (SEALED)
LF 311.000 $172.000 $104.140 $109.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 539.000 $152.000 $156.450 $201.000
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 402.000 $150.000 $156.920 $219.000
RC PIPE (CL III)(24 IN)
LF 9,637.000 $85.000 $94.480 $95.000
RC PIPE (CL III)(36 IN)
LF 5,232.000 $145.000 $163.240 $153.000
RC PIPE (CL III)(48 IN)
LF 981.000 $208.000 $255.730 $238.000
RC PIPE (CL III)(60 IN)
LF 208.000 $300.000 $350.960 $343.000
RC PIPE (CL IV)(18 IN)
LF 11.000 $98.000 $116.050 $227.000
RC PIPE (CL IV)(24 IN)
LF 1,458.000 $130.000 $106.870 $101.000
RC PIPE (CL IV)(36 IN)
LF 703.000 $170.000 $211.270 $177.000
RC PIPE (CL IV)(48 IN)
LF 1,227.000 $350.000 $368.910 $342.000
RC PIPE (CL IV) (60 IN)
LF 311.000 $420.000 $550.600 $497.000
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 2.000 $16,900.000 $23,654.960 $23,950.000
INLET (COMPL)(PCU)(3FT)(NONE)
EA 12.000 $6,100.000 $4,969.530 $6,630.000
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 22.000 $9,600.000 $5,631.830 $8,010.000
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 12.000 $8,500.000 $5,753.160 $8,180.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 5.000 $6,750.000 $6,395.540 $8,790.000
INLET (COMPL)(PCU)(4FT)(LEFT)
EA 3.000 $10,000.000 $7,209.200 $9,720.000
INLET (COMPL)(PCU)(4FT)(RIGHT)
EA 8.000 $9,500.000 $7,795.650 $10,330.000
INLET (COMPL)(PCU)(4FT)(BOTH)
EA 1.000 $8,400.000 $7,259.930 $9,620.000
INLET (COMPL)(PCU)(6FT)(RIGHT)
EA 1.000 $10,000.000 $8,397.680 $10,570.000
INLET (COMPL)(PSL)(RC)(6FTX6FT)
EA 1.000 $9,500.000 $8,094.340 $9,890.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $5,750.000 $5,373.510 $5,640.000
INLET (COMPL)(PSL)(FG)(6FTX6FT-4FTX4FT)
EA 5.000 $11,000.000 $15,001.210 $18,670.000
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 33.000 $7,900.000 $4,966.040 $5,690.000
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 32.000 $8,300.000 $6,520.900 $7,550.000
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 3.000 $10,000.000 $6,297.730 $6,980.000
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
EA 7.000 $6,100.000 $6,575.830 $5,110.000
INLET (RAIL & GRATE) (TY II)
EA 8.000 $7,000.000 $3,979.630 $9,290.000
INL(CMP)(PAZD-CZ)(FG)(3FTX3FT-3FTX3FT)
EA 3.000 $6,800.000 $4,715.310 $6,580.000
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
EA 2.000 $8,500.000 $7,307.980 $10,530.000
ADJUSTING INLET (CAP)
EA 2.000 $3,500.000 $1,569.920 $3,590.000
REMOV STR (INLET)
EA 80.000 $750.000 $778.080 $855.000
REMOV STR (MANHOLE)
EA 4.000 $880.000 $1,058.540 $1,140.000
REMOV STR (WINGWALL)
EA 5.000 $1,800.000 $1,141.990 $857.000
REMOV STR (PIPE)
LF 13,804.000 $22.000 $17.120 $23.500
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $120,000.000 $291,810.740 $135,678.000
REMOVE STR (JUNCTION BOX)
EA 18.000 $1,300.000 $786.580 $1,140.000
REMOV STR (DRILL SHAFT)
EA 1.000 $1,000.000 $789.290 $4,980.000
REMOV STR (SLOTTED DRAIN INLET)
LF 604.000 $15.000 $14.250 $14.800
REMOVE STR (BARRIER GATE)
EA 13.000 $500.000 $1,012.390 $3,500.000
MOBILIZATION
LS 1.000 $8,047,992.070 $10,545,600.000 $10,861,601.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 36.000 $20,000.000 $46,225.740 $21,327.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 215.000 $32.000 $35.200 $25.500
ROCK FILTER DAMS (REMOVE)
LF 215.000 $12.000 $12.420 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,488.000 $20.000 $34.510 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 1,488.000 $8.000 $11.040 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,797.000 $3.000 $3.310 $2.400
TEMP SEDMT CONT FENCE (REMOVE)
LF 6,348.000 $0.800 $0.760 $0.550
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 435.000 $5.000 $7.180 $5.200
BIODEG EROSN CONT LOGS (REMOVE)
LF 435.000 $1.000 $1.380 $1.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 2,551.000 $8.000 $10.700 $7.750
CONSTRUCTING DETOURS
SY 12,162.000 $66.000 $111.970 $150.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 20,480.000 $37.000 $38.390 $89.500
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 4,030.000 $35.000 $48.890 $83.500
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 280.000 $60.000 $51.130 $106.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 28,430.000 $7.000 $6.190 $7.250
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 6,080.000 $7.000 $6.040 $6.200
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 280.000 $11.000 $10.150 $25.300
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 20,300.000 $10.000 $11.680 $9.200
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 4,040.000 $10.000 $12.200 $7.700
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 280.000 $15.000 $12.920 $15.500
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 10,139.000 $85.000 $71.290 $84.750
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 318.000 $200.000 $195.070 $205.000
PERM CTB (TRAN SSCB TO SSTR) (MOD)
LF 90.000 $280.000 $484.330 $202.000
PERM CTB (SSCB)(TY 1)(MOD)
LF 2,399.000 $330.000 $580.050 $68.750
PERM CTB (SSCB)(TY 3)(MOD)
LF 217.000 $685.000 $204.110 $401.000
COLORED TEXTURED CONC (8")
SY 944.200 $108.000 $79.380 $88.000
COLORED TEXTURED CONC (5")
SY 210.150 $85.500 $65.810 $75.000
CONC CURB (MONO) (TY II)
LF 7,255.000 $5.000 $4.720 $6.350
CONC CURB & GUTTER (TY II)
LF 2,660.000 $25.000 $16.070 $25.000
CONC CURB (DOWEL)
LF 2,047.000 $12.000 $9.070 $10.700
DRIVEWAYS (CONC)
SY 2,086.000 $80.000 $87.470 $70.250
DRIVEWAYS (ACP)
SY 566.000 $49.000 $96.330 $103.000
CONC SIDEWALKS (4")
SY 3,936.000 $60.000 $51.330 $50.000
CURB RAMPS (TY 1)
EA 4.000 $2,340.000 $1,296.330 $2,750.000
CURB RAMPS (TY 2)
EA 19.000 $2,380.000 $1,296.330 $2,750.000
CURB RAMPS (TY 7)
EA 51.000 $2,260.000 $1,503.740 $2,450.000
CURB RAMPS (TY 21)
EA 2.000 $2,960.000 $2,022.270 $3,230.000
CURB RAMPS (TY 22)
EA 3.000 $3,670.000 $2,022.270 $3,300.000
CONC SIDEWALKS (8")
SY 583.000 $75.000 $80.890 $63.000
CONC SIDEWALK (SPECIAL)(RETAINING WALL)
SF 1,416.000 $95.000 $54.050 $65.500
CONC MEDIAN
SY 142.000 $72.000 $56.780 $80.750
MTL W-BEAM GD FEN (TIM POST)
LF 800.000 $25.000 $20.220 $21.100
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,000.000 $1,840.780 $1,920.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,380.000 $1,037.060 $1,080.000
REMOVE METAL BEAM GUARD FENCE
LF 1,536.000 $3.000 $2.590 $2.700
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,000.000 $2,903.770 $3,020.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 21.000 $1,400.000 $1,168.460 $1,080.000
CRASH CUSH ATTEN (REMOVE)
EA 17.000 $1,000.000 $934.770 $918.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 4.000 $25,000.000 $24,059.610 $28,890.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 1.000 $42,000.000 $58,028.140 $51,600.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 10.000 $7,750.000 $7,062.650 $7,650.000
RELOCATE EXISTING MAILBOX
EA 4.000 $513.000 $523.260 $492.000
REMOVE RD IL ASM (SHOE-BASE)
EA 9.000 $738.000 $664.680 $651.000
REMOVE RD IL ASM (TRANS-BASE)
EA 29.000 $500.000 $664.680 $651.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 12.000 $1,690.000 $2,101.400 $2,060.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 16.000 $1,603.000 $2,193.430 $2,150.000
IN RD IL (TY SA) 30S-8 (250W EQ) LED
EA 6.000 $4,000.000 $4,754.990 $4,650.000
IN RD IL (TY SA) 40S-12 (250W EQ) LED
EA 1.000 $5,205.000 $5,164.020 $5,060.000
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 38.000 $5,686.000 $4,874.630 $4,770.000
IN RD IL (TY SA) 50T-12-12(400W EQ)LED
EA 2.000 $8,600.000 $6,417.700 $6,280.000
TEMP RD IL (RD IL ASM)
EA 21.000 $10,209.000 $10,097.960 $9,890.000
CONDT (PVC) (SCH 40) (1")
LF 281.000 $12.000 $27.660 $27.100
CONDT (PVC) (SCH 40) (2")
LF 14,434.000 $17.000 $27.030 $26.500
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,415.000 $28.000 $54.860 $53.750
CONDT (PVC) (SCH 40) (2") (STL ENCSE)
LF 882.000 $25.000 $119.230 $117.000
CONDT (PVC) (SCH 40) (3")
LF 7,780.000 $24.000 $25.700 $25.200
CONDT (PVC) (SCH 40) (3") (BORE)
LF 13,610.000 $45.000 $38.600 $37.750
CONDT (PVC) (SCH 40) (4")
LF 150.000 $25.000 $56.450 $55.250
CONDT (PVC) (SCH 80) (1 1/4")
LF 2,560.000 $10.000 $17.540 $17.200
CONDT (PVC) (SCH 80) (2")
LF 2,470.000 $25.000 $36.100 $35.250
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,450.000 $31.000 $54.300 $53.250
CONDT (PVC) (SCH 80) (4") (BORE)
LF 1,290.000 $63.000 $101.240 $99.000
CONDT (RM) (1")
LF 1,235.000 $44.000 $73.320 $71.750
CONDT (RM) (1 1/4")
LF 310.000 $32.000 $75.980 $74.500
CONDT (RM) (2")
LF 1,055.000 $29.000 $52.870 $51.750
ELEC CONDR (NO.14) INSULATED
LF 510.000 $1.100 $2.450 $2.400
ELEC CONDR (NO.12) BARE
LF 1,355.000 $2.000 $2.450 $2.400
ELEC CONDR (NO.12) INSULATED
LF 4,310.000 $2.000 $2.760 $2.700
ELEC CONDR (NO.10) BARE
LF 281.000 $1.300 $2.560 $2.500
ELEC CONDR (NO.10) INSULATED
LF 562.000 $1.500 $2.710 $2.650
ELEC CONDR (NO.8) BARE
LF 17,175.000 $3.000 $2.810 $2.750
ELEC CONDR (NO.8) INSULATED
LF 55,290.000 $3.000 $3.170 $3.100
ELEC CONDR (NO.6) BARE
LF 3,538.000 $4.000 $5.730 $5.600
ELEC CONDR (NO.6) INSULATED
LF 8,798.000 $4.000 $3.580 $3.500
ELEC CONDR (NO.4) BARE
LF 1,170.000 $4.000 $3.780 $3.700
ELEC CONDR (NO.4) INSULATED
LF 4,425.000 $4.000 $3.940 $3.950
ELEC CONDR (NO.2) BARE
LF 732.000 $2.600 $5.730 $5.600
ELEC CONDR (NO.2) INSULATED
LF 3,182.000 $3.400 $6.190 $6.050
GROUND BOX TY A (122311)
EA 14.000 $900.000 $1,671.910 $1,640.000
GROUND BOX TY A (122311)W/APRON
EA 38.000 $1,735.000 $2,663.820 $2,610.000
GROUND BOX TY D (162922)
EA 11.000 $1,125.000 $1,794.630 $1,760.000
GROUND BOX TY D (162922)W/APRON
EA 16.000 $2,002.000 $3,507.440 $3,430.000
REMOVE GROUND BOX
EA 10.000 $300.000 $664.680 $651.000
TIMBER POLE (CL 2) 40 FT
EA 33.000 $1,900.000 $2,893.900 $2,830.000
RELOCATE ELECTRICAL SERVICES
EA 1.000 $4,783.000 $20,258.280 $19,830.000
REMOVE ELECTRICAL SERVICES
EA 6.000 $574.000 $993.950 $973.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
EA 2.000 $7,445.000 $14,172.930 $13,870.000
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
EA 4.000 $5,143.000 $18,278.580 $17,890.000
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 3.000 $8,005.000 $17,537.210 $17,170.000
ELEC SRV TY D 120/240 100(NS)SS(E)OC(U)
EA 1.000 $10,200.000 $13,528.710 $13,240.000
ELC SRV TY C 240/480 060 (NS)SS(E)GC(U)
EA 1.000 $10,000.000 $15,890.860 $15,560.000
ALUMINUM SIGNS (TY A)
SF 30.500 $51.000 $51.070 $50.000
ALUMINUM SIGNS (TY G)
SF 75.000 $31.000 $63.320 $62.000
ALUMINUM SIGNS (TY O)
SF 2,913.500 $30.000 $36.460 $35.750
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 36.000 $729.000 $1,170.460 $1,150.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 25.000 $924.000 $1,340.010 $1,310.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $1,160.000 $1,617.820 $1,590.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000 $952.000 $2,015.120 $1,980.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $1,168.000 $1,616.790 $1,580.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $1,361.000 $2,036.560 $2,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 1.000 $1,400.000 $2,308.250 $2,260.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 2.000 $3,527.000 $3,967.930 $3,890.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $4,052.000 $5,070.990 $4,970.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 4.000 $6,843.000 $5,959.560 $5,840.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $796.000 $1,709.740 $1,680.000
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 7.000 $379.000 $471.860 $462.000
RELOCATE LRSA
EA 1.000 $8,351.000 $5,877.850 $5,760.000
REMOVE LRSA
EA 4.000 $940.000 $1,323.670 $1,300.000
INS OH SN SUP(15 FT CANT)
EA 1.000 $15,600.000 $22,469.630 $22,020.000
INS OH SN SUP(15 FT CANT)(SPAN ONLY)
EA 1.000 $15,600.000 $15,881.950 $20,120.000
INS OH SN SUP(20 FT CANT)
EA 3.000 $41,355.000 $32,626.940 $31,980.000
INS OH SN SUP(30 FT CANT)
EA 3.000 $28,260.000 $36,119.950 $35,400.000
INS OH SN SUP(35 FT CANT)
EA 1.000 $43,300.000 $31,983.480 $31,350.000
INS OH SN SUP(40 FT BAL TEE)
EA 1.000 $34,000.000 $82,698.490 $81,100.000
INS OH SN SUP(40 FT CANT)
EA 2.000 $56,971.000 $43,514.500 $42,650.000
INS OH SN SUP(40 FT BRDG)
EA 1.000 $30,000.000 $45,945.300 $45,030.000
INS OH SN SUP(50 FT BRDG)
EA 1.000 $53,715.000 $97,027.990 $101,900.000
INS OH SN SUP(75 FT BRDG)
EA 1.000 $81,652.000 $61,832.370 $60,600.000
INS OH SN SUP(80 FT BRDG)
EA 1.000 $89,580.000 $85,205.900 $83,500.000
INS OH SN SUP(150 FT BRDG)
EA 1.000 $263,098.000 $165,902.540 $162,600.000
RELOCATE EXISTING OVERHD SIGN SUP
EA 5.000 $13,400.000 $18,430.210 $18,060.000
REMOVE OVERHD SIGN SUP
EA 15.000 $10,800.000 $9,866.210 $9,670.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 107.000 $16.000 $20.740 $21.600
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 177.000 $24.000 $21.000 $21.900
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 256.000 $22.000 $20.740 $21.600
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 10.000 $24.000 $25.930 $27.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 6.000 $50.000 $25.930 $27.000
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 90,244.000 $1.150 $0.780 $0.750
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 1,450.000 $2.000 $0.830 $0.800
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 77,331.000 $1.000 $0.780 $0.750
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 1,584.000 $2.500 $1.130 $1.100
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 644.000 $10.000 $4.130 $4.000
WK ZN PAV MRK REMOV (Y)4"(DOT)
LF 390.000 $2.500 $1.130 $1.100
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 87,365.000 $1.000 $0.780 $0.750
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 710.000 $3.000 $1.030 $1.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 9,885.000 $2.000 $1.030 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,098.000 $6.000 $2.490 $2.400
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,390.000 $9.000 $6.350 $6.150
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 2.000 $220.000 $370.410 $359.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 355.000 $5.000 $2.580 $2.500
PAVEMENT SEALER 4"
LF 63,271.000 $1.000 $0.170 $0.150
PAVEMENT SEALER 6"
LF 9,396.000 $1.000 $0.210 $0.200
PAVEMENT SEALER 8"
LF 8,315.000 $1.000 $0.230 $0.200
PAVEMENT SEALER 12"
LF 2,453.000 $2.000 $0.460 $0.450
PAVEMENT SEALER 24"
LF 1,390.000 $3.000 $0.830 $0.800
PAVEMENT SEALER (ARROW)
EA 30.000 $39.000 $41.270 $40.000
PAVEMENT SEALER (WORD)
EA 36.000 $45.000 $48.490 $47.000
PAVEMENT SEALER (DBL ARROW)
EA 6.000 $45.000 $56.750 $55.000
PAVEMENT SEALER (UTURN ARROW)
EA 6.000 $53.000 $77.380 $75.000
PAVEMENT SEALER (LNDP ARROW)
EA 6.000 $58.000 $77.380 $75.000
PAVEMENT SEALER (YLD TRI)
EA 25.000 $7.000 $5.160 $5.000
PAVEMENT SEALER (NUMBER)
EA 2.000 $5.000 $25.800 $25.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 5,158.000 $1.000 $0.880 $0.850
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 42,825.000 $1.000 $0.660 $0.650
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 12,481.000 $1.000 $0.920 $0.900
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 30,935.000 $1.000 $0.670 $0.650
PREFAB PAV MRK TY C (W) (ARROW)
EA 30.000 $310.000 $180.560 $175.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 6.000 $619.000 $283.740 $275.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 6.000 $740.000 $438.500 $425.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 7.000 $563.000 $562.310 $545.000
PREFAB PAV MRK TY C (W) (WORD)
EA 36.000 $373.000 $320.880 $311.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 25.000 $29.000 $43.330 $42.000
REFL PAV MRKR TY I-A
EA 52.000 $5.000 $4.130 $4.000
REFL PAV MRKR TY I-C
EA 201.000 $6.000 $4.130 $4.000
REFL PAV MRKR TY II-C-R
EA 1,204.000 $6.000 $4.130 $4.000
REFL PAV MRKR TY II-C-C
EA 143.000 $4.000 $6.190 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 43,373.000 $0.500 $0.610 $0.600
ELIM EXT PAV MRK & MRKS (6")
LF 48,530.000 $0.700 $0.690 $0.650
ELIM EXT PAV MRK & MRKS (8")
LF 5,570.000 $1.000 $0.740 $0.700
PAV SURF PREP FOR MRK (4")
LF 79,630.000 $0.100 $0.180 $0.150
PAV SURF PREP FOR MRK (6")
LF 12,485.000 $0.100 $0.230 $0.200
PAV SURF PREP FOR MRK (8")
LF 9,965.000 $0.150 $0.300 $0.300
PAV SURF PREP FOR MRK (12")
LF 2,453.000 $0.350 $0.410 $0.400
PAV SURF PREP FOR MRK (24")
LF 1,390.000 $1.000 $0.830 $0.800
PAV SURF PREP FOR MRK (ARROW)
EA 36.000 $20.000 $28.890 $28.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 6.000 $17.000 $36.110 $35.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 6.000 $35.000 $41.270 $40.000
PAV SURF PREP FOR MRK (NUMBER)
EA 2.000 $76.000 $67.070 $65.000
PAV SURF PREP FOR MRK (WORD)
EA 35.000 $30.000 $30.950 $30.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 25.000 $20.000 $12.380 $12.000
REMOVING TRAFFIC SIGNALS
EA 2.000 $6,907.000 $7,878.960 $7,710.000
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 1.000 $38,000.000 $49,185.990 $48,150.000
TEMP TRAF SIGNALS
EA 4.000 $75,550.000 $135,235.930 $132,400.000
VEH SIG SEC (12")LED(GRN)
EA 16.000 $558.000 $923.390 $904.000
VEH SIG SEC (12")LED(GRN ARW)
EA 6.000 $568.000 $923.390 $904.000
VEH SIG SEC (12")LED(YEL)
EA 20.000 $575.000 $923.390 $904.000
VEH SIG SEC (12")LED(YEL ARW)
EA 2.000 $546.000 $923.390 $904.000
VEH SIG SEC (12")LED(RED)
EA 20.000 $549.000 $923.390 $904.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $548.000 $923.390 $904.000
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $1,285.000 $1,712.820 $1,680.000
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 20.000 $201.000 $435.620 $426.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 2.000 $270.000 $476.530 $466.000
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 1,250.000 $4.000 $5.880 $5.750
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
LF 3,245.000 $5.000 $8.230 $8.050
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 2,425.000 $8.000 $10.580 $10.400
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 5,225.000 $3.000 $3.530 $3.450
INS TRF SIG PL AM (S)1 ARM(20')
EA 2.000 $5,500.000 $20,354.420 $19,930.000
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 1.000 $15,430.000 $24,956.010 $24,430.000
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 3.000 $41,895.000 $45,745.020 $44,780.000
INS TRF SIG PL AM(S)2 ARM(32-32')
EA 1.000 $12,000.000 $26,111.530 $25,560.000
INS TRF SIG PL AM(S)2 ARM(60-40')LUM
EA 1.000 $55,000.000 $55,924.790 $54,700.000
PED POLE ASSEMBLY
EA 7.000 $4,731.000 $5,409.440 $5,300.000
PED DETECT PUSH BUTTON (APS)
EA 12.000 $1,204.000 $1,748.610 $1,710.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $4,245.000 $6,467.800 $6,330.000
REMOVAL OF CONDUIT
LF 10,044.000 $2.000 $4.040 $2.100
REMOVAL OF TIMBER POLES
EA 33.000 $756.000 $664.680 $651.000
INSTL DOWN GUY W/GUARD
EA 5.000 $1,325.000 $1,704.640 $1,670.000
REMOVE DOWN GUY W/GUARD
EA 5.000 $1,095.000 $21,382.100 $651.000
ANTI - GRAFFITI COATING(PERMNENT-TY II)
SF 11,669.000 $3.590 $0.800 $0.750
NO. OF WORKING DAYS
$/D 15,000.000 $936.000 $800.000 $832.000
LANDSCAPE AMENITY (TY 1)
EA 11.000 $9,600.000 $21,356.370 $20,910.000
LANDSCAPE AMENITY (INTERPRETIVE SIGN)
EA 2.000 $3,500.000 $14,365.250 $14,070.000
LANDSCAPE AMENITY (INTERPRETIVE SIGN)
EA 2.000 $3,500.000 $14,365.250 $14,070.000
AMENITY (TY 1) (DOUBLE-BANNER POLES)
EA 11.000 $9,600.000 $21,551.600 $20,910.000
SP MIXES SP-B PG64-22
TON 39,742.000 $100.000 $102.290 $104.000
SP MIXES SP-C PG64-22
TON 1,328.000 $135.000 $123.150 $125.000
SP MIXES SP-C PG70-22
TON 4,939.000 $135.000 $131.090 $133.000
SP MIXES SP-D PG64-22
TON 5,001.000 $130.000 $139.040 $141.000
TACK COAT
GAL 3,263.000 $3.000 $8.940 $9.050
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 5,563.000 $157.000 $203.590 $207.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 1,125.000 $157.000 $230.410 $234.000
PRESTRESSED GROUND ANCHORS
LF 68,587.000 $45.000 $56.370 $38.000
INSTALL CIRCUIT BREAKER
EA 1.000 $173.000 $511.290 $501.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $8,000.000 $12,522.550 $7,650.000
ITS COM CBL (ETHERNET)
LF 45.000 $4.000 $69.690 $68.000
ITS COM CBL (UNDRGRND)(19 AWG/6 PR)
LF 295.000 $3.000 $29.650 $28.900
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 1,075.000 $4.000 $14.320 $14.000
FIBER OPTIC CBL (SNGLE-MODE)(48 FIBER)
LF 13,000.000 $4.000 $3.730 $3.650
FIBER OPTIC CBL (SNGLE-MODE)(72 FIBER)
LF 6,600.000 $6.000 $4.600 $4.500
FO CBL (48 SMF)(ADSS)(AERIAL)
LF 7,440.000 $10.000 $4.750 $4.650
FO CBL (72 SMF)(ADSS)(AERIAL)
LF 6,880.000 $9.350 $5.520 $5.400
FO SPLICE ENCLOSURE (TYPE 1)
EA 20.000 $3,000.000 $2,418.400 $2,370.000
FIBER OPTIC FUSION SPLICE
EA 1,078.000 $66.000 $76.690 $75.000
REMOVE FIBER OPTIC CABLE
LF 18,076.000 $1.300 $5.010 $4.900
RELOCATE EXISTING COMMUNICATION CABINET
EA 7.000 $9,073.000 $10,588.790 $10,350.000
COMMUNICATION CABINET FOUNDATION
EA 6.000 $2,000.000 $15,103.480 $14,790.000
CCTV MOUNT (POLE)
EA 1.000 $500.000 $1,533.870 $1,500.000
CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)
EA 1.000 $1,250.000 $5,348.080 $5,240.000
RELOCATE CCTV FIELD EQUIPMENT
EA 3.000 $5,460.000 $7,275.640 $7,120.000
ITS MULTI-DUCT CND (PVC-40)
LF 2,475.000 $34.000 $31.440 $30.750
ITS MULTI-DUCT CND (PVC-40)(BORE)
LF 3,635.000 $56.000 $42.140 $41.250
FIBER OPTIC CABLE ROAD MARKER
EA 10.000 $441.000 $255.650 $250.000
CONDUIT (PREPARE)
LF 920.000 $2.000 $9.100 $8.900
GROUND BOX (PREPARE)
EA 8.000 $276.000 $1,268.000 $1,240.000
SYSTEM INTEGRATION
LS 1.000 $13,410.000 $71,856.550 $70,300.000
REMOVE OVERHEAD SIGN PANELS
EA 3.000 $2,300.000 $1,181.080 $1,160.000
ITS POLE (40 FT)(90 MPH)
EA 1.000 $17,000.000 $12,449.890 $12,190.000
ITS POLE (60 FT)(REL)
EA 3.000 $5,210.000 $18,894.170 $18,500.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 1.000 $5,019.000 $7,675.470 $7,510.000
REMOVE EXISTING COMMUNICATION CABINET
EA 6.000 $1,000.000 $3,962.490 $3,880.000
TMA (STATIONARY)
DAY 430.000 $130.000 $154.380 $348.000
TMA (MOBILE OPERATION)
HR 476.000 $60.000 $61.850 $79.500
ITS GND BOX(PCAST) TY 1 (243660)
EA 4.000 $4,000.000 $4,816.340 $4,710.000
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
EA 10.000 $5,146.000 $5,920.730 $5,800.000
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 9.000 $13,217.000 $7,914.750 $7,750.000
ITS GND BOX(PCAST) TY 2 (366060)
EA 3.000 $7,000.000 $7,270.530 $7,120.000
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
EA 7.000 $7,601.000 $8,380.030 $8,200.000
REMOVE ITS GROUND BOX
EA 8.000 $1,000.000 $884.530 $866.000
INST LRG GRND MNT AND OVRHD SIGN(STATE)
SF 2,358.500 $15.000 $41.930 $41.000
ITS RVSD (DC & WWA) (RELOCATE)
EA 3.000 $6,500.000 $7,802.270 $7,640.000
VIVDS TEMPORARY
EA 2.000 $23,367.000 $42,334.730 $41,440.000
VIVDS CABLING
LF 6,415.000 $6.000 $7.160 $7.000
VIVDS PROSR SYS (INSTALL ONLY)
EA 2.000 $598.000 $1,763.950 $1,730.000
VIVDS CAM ASSY (INSTALL ONLY)
EA 6.000 $558.000 $2,939.910 $2,880.000
VIVDS CABLING (INSTALL ONLY)
LF 2,580.000 $2.000 $3.580 $3.500
REMOVE AND RELOCATE SLDMS SYSTEM
EA 1.000 $10,000.000 $67,418.560 $66,000.000
VAB REMOVE
EA 1.000 $6,500.000 $21,494.590 $21,040.000
VAB FURNISH AND INSTALL
EA 1.000 $7,600.000 $1,179,543.630 $1,154,600.000
DECORATIVE ILL ASSEMBLY (PILASTER)
EA 12.000 $4,100.000 $13,630.960 $13,340.000
LINEAR ILLUMINATION ASSEMBLY (MURAL)
LF 304.000 $240.000 $1,648.400 $1,610.000
RMV AND RLCAT AUTO BARRIER GATE ASSM
EA 11.000 $5,000.000 $11,260.450 $10,420.000
Totals: $98,537,470.045 $117,457,045.147 $121,096,015.690