Show Job Controls
Bid Cobra

DENTON IH 35E (0196-02-126)

Items: 468

County: DENTON
Length: 2.3820 MILES
Highway: IH 35E
District: DALLAS
Control Number: 0196-02-126
DBE Goal: 8.0%
Project: F 2025(346)
Guaranty: $100,000.00
Time: 1136 WORKING DAYS
Engineer's Estimate: $202,715,257.60
Date: 01/08/2025 (1 year ago)
Contract Number: 1253201
Type: INTERCHANGE IMPROVEMENT
Project ID: A00064403
Contract Type: Federal
Project Description: RECONSTRUCT GRADE SEPARATION AND EXISTING 4 CONTINUOUS TO 4 LANE CONTINUOUS FRONTAGE ROADS
Mail/Deliver Bids To: N/A
AMANDA MOSER
CHRISTOPHER ROCHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$202,715,257.60
$217,964,538.53
Over/Under Est: 7.52% $15,249,280.93
$221,370,118.20
Over/Under Est: 9.2% $18,654,860.60
Amt Left: 1.56% $3,405,579.67
$229,225,287.77
Over/Under Est: 13.08% $26,510,030.17
Amt Left: 5.17% $11,260,749.24
Delta: -3.55% -$7,855,169.57
$232,710,000.00
Over/Under Est: 14.8% $29,994,742.40
Amt Left: 6.77% $14,745,461.47
Delta: -1.52% -$3,484,712.23
Subcontractor Percentage Amount
MICA CORPORATION 9.25% $20,197,756.63
NORTH TEXAS CONTRACTING, INC. 8.75% $19,105,986.00
REYNOLDS ASPHALT & CONSTRUCTION COMPANY 8.03% $17,533,836.29
ROYAL REBAR INC 3.01% $6,572,459.18
OSCAR ORDUNO, INC. 2.12% $4,629,107.46
FGA CONSTRUCTION LLC 1.90% $4,148,728.39
WYLIE DRILLING & DRAINAGE, INC. 1.06% $2,314,553.73
MCRYAN HAULING, INC. 0.83% $1,812,339.24
LINDAMOOD, INC. 0.50% $1,091,770.63
STRIPE-A-ZONE, LLC 0.41% $895,251.92
SCOTT DERR PAINTING CO, LLC 0.32% $698,733.20
TEX OP CONSTRUCTION, LP 0.31% $676,897.79
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.19% $414,872.84
ACT SAW CUTTING & REMOVAL 0.15% $327,531.19
SYNERGY SIGNS & SERVICES LLC 0.13% $283,860.36
ANTIGO CONSTRUCTION, INC. 0.09% $196,518.71
STRUCTURAL TECHNOLOGIES, LLC 0.07% $152,847.89
BRENDA PRICE TRUCKING, INC. 0.05% $109,177.06
FORTSON CONTRACTING, INC. 0.05% $109,177.06
ASPS HOLDINGS, LLC DBA SUPERIOR PIPELINE SERVICES 0.04% $87,341.65
SOUTHEAST GRINDING AND GROOVING LLC 0.04% $87,341.65
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.04% $87,341.65
BROOKLYN SWEEPS, INCORPORATED 0.02% $43,670.83
BUYERS BARRICADES, INC. 0.01% $21,835.41
DALLAS LITE AND BARRICADE, INC. 0.01% $21,835.41
IMT CONSTRUCTION, LLC 0.00% $0.00
DURABLE SPECIALTIES, INC. 0.00% $0.00
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.00% $0.00
CIRCLE H BORING, LLC 0.00% $0.00
ASHTON SAWING AND DRILLING LLC 0.00% $0.00
ROYAL REBAR INC 0.00% $0.00
BREDA COMPANY, INC. 0.00% $0.00
COWBOY TRUCKING 0.00% $0.00
Total: 37.38% $81,620,772.17

Bid Items & Bid Tabulations

468 Total 0 of 468
DENTON  |  IH 35E  |  DALLAS  |  0196-02-126  |  01/08/2025  |  $202,715,257.60  |  F 2025(346)  |  INTERCHANGE IMPRV  |  1136 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SEMA CONSTRUCTION, INC.
WEBBER, LLC
SUNDT CONSTRUCTION, INC.
FLUOR HEAVY CIVIL, LLC
PREPARING ROW
STA 116.020 $149,112.220 $162,739.620 $190,484.390 $140,000.000 $200,577.480
REMOV CONC (PAV)
SY 104,348.000 $10.000 $10.240 $11.500 $11.000 $11.230
REMOV CONC (RIPRAP)
SY 6,469.000 $20.000 $14.270 $11.000 $27.000 $7.830
REMOV CONC (MEDIANS)
SY 2,309.000 $19.000 $16.000 $35.750 $26.000 $15.560
REMOV CONC (DRIVEWAYS)
SY 10,436.000 $18.000 $15.040 $21.400 $17.530 $14.240
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 7,239.000 $31.000 $12.730 $17.400 $26.000 $13.670
REMOV CONC (CURB & GUTTER)
LF 25,134.000 $22.750 $9.550 $5.250 $9.010 $7.640
REMOV CONC (RETAINING WALLS)
SY 3,933.000 $37.500 $46.950 $40.250 $66.850 $30.450
REMOV CONC (TRAFFIC BARRIER)
LF 20,240.000 $21.000 $9.240 $20.600 $29.000 $12.960
REMOV CONC (FLUME)
SY 83.000 $45.000 $16.690 $54.750 $87.000 $138.940
REMOV CONC (MISC)
SY 22,798.000 $34.500 $20.250 $12.500 $1.000 $0.820
RMV (8"-14") TRT/UNTRT BASE & ASPH PAV
SY 129,369.000 $12.000 $5.760 $10.700 $10.000 $10.440
EXCAV (ROADWAY)
CY 276,990.000 $22.000 $8.090 $18.300 $26.000 $19.210
EMBANK (FNL)(DC)(TY C1)
CY 264,248.000 $16.000 $21.200 $17.000 $16.000 $11.280
EMBANK (FNL)(DC)(TY C2)
CY 38,140.000 $42.000 $78.630 $67.250 $41.000 $67.270
COMPOST MANUF TOPSOIL (4")
SY 56,875.000 $2.000 $4.500 $3.350 $6.000 $3.420
BLOCK SODDING
SY 56,875.000 $6.250 $4.490 $4.150 $4.240 $4.230
DRILL SEED (TEMP_WARM_COOL)
SY 55,230.000 $0.400 $0.360 $0.250 $0.240 $0.230
VEGETATIVE WATERING
TGL 16,677.200 $15.000 $58.560 $32.750 $26.560 $0.010
IRRIGATION SYSTEM
LS 2.000 $54,000.000 $47,329.120 $155,082.000 $47,680.010 $47,570.590
LIME (COM OR QK)(SLURRY)
TON 8,059.000 $340.000 $321.500 $322.000 $380.000 $411.640
LIME TRT (EXIST MATL)(6")
SY 228.000 $1.850 $18.810 $38.250 $120.000 $31.270
LIME TRT (EXIST MATL)(12")
SY 322,256.000 $6.500 $5.940 $7.150 $10.000 $7.670
CEM TRT(PLNT MX)(CL L)(TYD)(GR1-2)(6")
SY 143,468.000 $20.000 $24.560 $20.400 $30.000 $24.430
D-GR HMA TY-B PG64-22 (LEVEL-UP)
TON 958.000 $130.000 $187.730 $190.000 $148.260 $194.090
SP MIXES SP-B PG64-22
TON 53,301.000 $135.000 $141.730 $144.000 $148.260 $145.040
SP MIXES SP-C PG70-22
TON 8,196.000 $147.000 $151.150 $153.000 $165.370 $158.450
SP MIXES SP-D PG64-22
TON 9,861.000 $145.000 $163.690 $166.000 $165.370 $169.190
TACK COAT
GAL 29,350.000 $4.780 $7.910 $8.000 $1.140 $8.070
STONE-MTRX-ASPH SMA-C SAC-A PG76-28
TON 7,639.000 $150.000 $220.020 $223.000 $193.890 $234.220
PLANE ASPH CONC PAV(0" TO 3")
SY 10,748.000 $2.500 $2.470 $3.700 $5.000 $3.780
CONC PVMT (CRCP) (8")
SY 582.000 $95.000 $107.370 $164.000 $150.000 $135.490
CONC PVMT (CRCP) (11")
SY 118,515.000 $105.000 $100.260 $104.000 $110.000 $132.010
CONC PVMT (CRCP) (13")
SY 140,818.000 $112.000 $111.910 $112.000 $115.000 $134.290
CONC PVMT (CPCD) (10")
SY 9,761.000 $115.000 $114.160 $96.000 $95.000 $131.750
CONC PVMT (CRCP)(HES) (11")
SY 1,684.000 $115.000 $123.990 $155.000 $180.000 $137.630
CONC PAV (JOINT REINF) (10")
SY 1,377.000 $115.000 $114.770 $123.000 $132.000 $131.750
CEM STABIL BKFL
CY 1,369.000 $256.000 $164.110 $205.000 $300.000 $185.620
CEMENT STAB BACKFILL (INLET OR MH)
CY 2,613.000 $220.000 $150.000 $156.000 $330.000 $170.000
TRENCH EXCAVATION PROTECTION
LF 28,521.000 $7.500 $1.000 $5.000 $1.000 $5.440
TEMPORARY SPL SHORING
SF 89,768.000 $45.000 $45.470 $33.250 $46.000 $54.670
SOIL NAIL ANCHORS
LF 48,940.000 $40.000 $33.510 $17.800 $33.870 $33.400
DRILL SHAFT (18 IN)
LF 286.000 $240.000 $474.950 $411.000 $415.270 $414.180
DRILL SHAFT (30 IN)
LF 66.000 $280.000 $182.800 $185.000 $260.000 $165.320
DRILL SHAFT (36 IN)
LF 8,243.000 $260.000 $198.990 $228.000 $264.000 $227.780
DRILL SHAFT (42 IN)
LF 2,658.000 $420.000 $242.110 $273.000 $310.000 $259.440
DRILL SHAFT (48 IN)
LF 1,205.000 $503.000 $349.220 $379.000 $480.000 $377.580
DRILL SHAFT (60 IN)
LF 156.000 $650.000 $485.740 $534.000 $760.000 $524.340
DRILL SHAFT (SIGN MTS) (12 IN)
LF 7.000 $130.000 $208.010 $180.000 $181.820 $188.890
DRILL SHAFT (SIGN MTS) (24 IN)
LF 184.000 $360.000 $403.300 $349.000 $352.530 $358.590
DRILL SHAFT (SIGN MTS) (30 IN)
LF 64.000 $410.000 $480.730 $416.000 $420.200 $430.370
DRILL SHAFT (SIGN MTS) (36 IN)
LF 184.000 $451.000 $505.000 $437.000 $441.410 $453.940
DRILL SHAFT (SIGN MTS) (42 IN)
LF 30.000 $777.000 $960.300 $831.000 $839.390 $855.600
DRILL SHAFT (SIGN MTS) (48 IN)
LF 142.000 $835.000 $961.460 $832.000 $840.400 $862.320
DRILL SHAFT (SIGN MTS) (54 IN)
LF 64.000 $876.000 $880.570 $762.000 $769.700 $799.080
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 250.000 $875.000 $961.460 $832.000 $840.650 $872.420
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 12.000 $400.000 $696.930 $690.000 $697.170 $712.170
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 14.000 $510.000 $755.510 $748.000 $755.770 $771.680
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 220.000 $650.000 $813.080 $805.000 $813.370 $837.310
CL A CONC (MISC)
CY 14.700 $3,200.000 $675.000 $1,340.000 $4,154.000 $4,298.820
CL B CONC (FLUME)
CY 94.000 $1,275.000 $573.600 $565.000 $1,310.000 $1,064.440
CL C CONC (ABUT)(HPC)
CY 620.600 $1,300.000 $1,013.380 $1,430.000 $1,150.000 $1,388.110
CL C CONC (CAP)(HPC)
CY 2,168.100 $1,800.000 $1,173.060 $1,170.000 $1,500.000 $1,372.850
CL C CONC (COLUMN)
CY 795.830 $1,500.000 $739.960 $565.000 $807.000 $234.570
CL C CONC (COLUMN)(HPC)
CY 1,459.800 $1,600.000 $1,088.600 $1,570.000 $1,375.000 $1,524.400
CL C CONC (FOOTING)(HPC)
CY 19.200 $1,400.000 $946.740 $2,160.000 $1,725.000 $1,448.150
CL C CONC (RAIL FOUNDATION)
CY 31.000 $512.000 $1,001.850 $595.000 $840.000 $631.800
CL F CONC (COLUMN)(HPC)
CY 60.600 $1,400.000 $4,404.830 $2,270.000 $1,700.000 $2,019.570
CL H CONC (PT CAP)(HPC)(MASS)
CY 322.400 $650.000 $1,395.270 $2,260.000 $2,100.000 $2,147.990
CL C CONC (PILASTER)
CY 85.100 $2,400.000 $1,589.850 $1,040.000 $1,792.000 $2,264.770
REINF CONC SLAB (HPC)
SF 267,795.000 $26.000 $22.470 $24.400 $26.000 $26.030
APPROACH SLAB (HPC)
CY 1,619.000 $725.000 $600.700 $534.000 $870.000 $727.150
RETAINING WALL (MSE)
SF 78,294.000 $90.000 $78.650 $68.500 $112.000 $107.990
RETAINING WALL (CAST-IN-PLACE)
SF 2,813.000 $108.000 $79.840 $120.000 $130.000 $146.880
RETAINING WALL (DRILL SHAFT) (FASCIA)
SF 5,977.000 $71.000 $98.930 $102.000 $130.000 $163.940
RETAINING WALL (SOIL NAIL) (FASCIA)
SF 29,298.000 $110.000 $92.660 $132.000 $100.000 $128.720
RETAINING WALL (SPECIAL)
SF 8,350.000 $100.000 $97.570 $10.300 $100.000 $3.010
RETAIN WALL (CAST IN PLACE) (SPECIAL)
SF 3,344.900 $115.000 $89.030 $89.250 $110.000 $168.840
PRESTR CONC GIRDER (TX46)
LF 20,849.070 $195.000 $209.800 $369.000 $255.000 $271.070
PRESTR CONC GIRDER (TX54)
LF 14,336.020 $210.000 $205.600 $193.000 $270.000 $282.610
PT FOR CAP
EA 2.000 $5,000.000 $84,857.930 $130,300.000 $120,000.000 $83,024.010
OPAQUE SEALER FINISH
SF 900,577.000 $1.750 $0.370 $0.450 $0.520 $0.390
RIPRAP (CONC)(4 IN)
CY 1,251.000 $600.000 $549.840 $505.000 $690.000 $789.100
RIPRAP (CONC)(CL B)
CY 8.750 $700.000 $717.770 $615.000 $1,000.000 $1,320.150
RIPRAP (MOW STRIP)(4 IN)
CY 233.000 $612.000 $587.820 $579.000 $1,050.000 $786.490
RAIL (TY SSTR)
LF 16,755.000 $51.000 $70.360 $66.250 $70.000 $66.590
RAIL (TY SSTR)(HPC)
LF 2,042.000 $77.000 $98.080 $81.000 $80.000 $92.540
RAIL (TY C221)(HPC)
LF 641.000 $120.000 $180.820 $133.000 $260.000 $90.520
RAIL (TY PR11)
LF 1,131.000 $140.000 $89.430 $132.000 $97.910 $139.900
RAIL (HANDRAIL)(TY F)
LF 420.000 $240.000 $111.300 $153.000 $170.000 $162.060
RAIL (TY SSTR)(MOD)
LF 1,197.200 $366.000 $241.030 $399.000 $390.000 $412.930
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 1,269.000 $178.000 $169.680 $230.000 $305.000 $265.510
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 355.000 $154.000 $172.560 $222.000 $305.000 $261.040
CONC BOX CULV (4 FT X 4 FT)
LF 138.000 $524.000 $400.000 $415.000 $740.000 $394.540
RC PIPE (CL III)(12 IN)
LF 19.000 $120.000 $150.000 $82.000 $178.390 $240.000
RC PIPE (CL III)(18 IN)
LF 1,990.000 $99.000 $150.000 $85.000 $155.650 $112.000
RC PIPE (CL III)(24 IN)
LF 21,244.000 $120.000 $170.000 $96.000 $200.000 $105.000
RC PIPE (CL III)(30 IN)
LF 2,642.000 $123.000 $200.000 $127.000 $220.000 $142.000
RC PIPE (CL III)(36 IN)
LF 2,501.000 $163.000 $230.000 $169.000 $250.000 $177.000
RC PIPE (CL III)(42 IN)
LF 3,906.000 $199.000 $325.000 $216.000 $270.800 $240.000
RC PIPE (CL III)(48 IN)
LF 2,511.000 $227.000 $300.000 $310.000 $328.440 $340.000
RC PIPE (CL IV)(18 IN)
LF 136.500 $135.000 $220.000 $90.000 $421.010 $141.000
RC PIPE (CL IV)(24 IN)
LF 2,646.520 $121.000 $265.000 $112.000 $211.320 $121.000
RC PIPE (CL IV)(30 IN)
LF 631.200 $191.000 $275.000 $141.000 $224.650 $160.000
RC PIPE (CL IV)(36 IN)
LF 1,020.000 $213.000 $290.000 $184.000 $255.000 $221.000
RC PIPE (CL IV)(42 IN)
LF 1,094.700 $371.000 $350.000 $251.000 $309.000 $268.000
RC PIPE (CL IV)(48 IN)
LF 406.000 $400.000 $445.000 $396.000 $550.000 $374.000
MANH (COMPL)(PRM)(48IN)
EA 14.000 $7,500.000 $8,000.000 $9,000.000 $11,000.000 $6,901.480
MANH (COMPL)(PRM)(60IN)
EA 20.000 $8,000.000 $9,000.000 $9,100.000 $11,039.710 $7,782.990
MANH (COMPL)(PRM)(72IN)
EA 27.000 $9,000.000 $11,000.000 $9,200.000 $16,000.000 $10,743.550
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 2.000 $6,500.000 $7,000.000 $7,800.000 $10,900.000 $8,256.330
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 30.000 $10,000.000 $12,000.000 $9,800.000 $11,010.000 $11,175.690
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 15.000 $9,800.000 $14,000.000 $16,000.000 $12,743.000 $12,663.940
JCTBOX(COMPL)(PJB)(8FTX8FT)
EA 1.000 $21,000.000 $25,000.000 $31,000.000 $31,500.000 $20,061.500
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 3.000 $7,700.000 $7,000.000 $8,500.000 $10,000.000 $9,425.200
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 10.000 $7,700.000 $7,000.000 $8,500.000 $10,000.000 $9,425.250
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 10.000 $10,000.000 $9,000.000 $9,500.000 $10,000.000 $10,077.170
INLET (COMPL)(PCO)(4FT)(NONE)
EA 5.000 $10,000.000 $8,500.000 $9,500.000 $10,000.000 $9,683.890
INLET (COMPL)(PCO)(6FT)(RIGHT)
EA 1.000 $11,200.000 $12,000.000 $14,500.000 $15,000.000 $12,549.300
INLET (COMPL)(PCO)(6FT)(BOTH)
EA 1.000 $15,000.000 $15,000.000 $14,500.000 $15,000.000 $13,200.510
INLET (COMPL)(PCU)(3FT)(NONE)
EA 4.000 $7,000.000 $7,000.000 $8,000.000 $13,800.000 $8,486.960
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 6.000 $6,350.000 $8,000.000 $9,300.000 $11,000.000 $9,402.320
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 3.000 $7,700.000 $8,000.000 $9,700.000 $11,007.000 $9,417.290
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 4.000 $7,000.000 $10,000.000 $10,200.000 $11,040.000 $9,424.850
INLET (COMPL)(PCU)(4FT)(NONE)
EA 1.000 $10,500.000 $9,000.000 $9,300.000 $13,800.000 $9,455.670
INLET (COMPL)(PCU)(4FT)(LEFT)
EA 17.000 $7,250.000 $9,000.000 $10,500.000 $10,000.000 $9,784.200
INLET (COMPL)(PCU)(4FT)(RIGHT)
EA 11.000 $8,300.000 $9,000.000 $11,000.000 $11,000.000 $10,262.850
INLET (COMPL)(PCU)(4FT)(BOTH)
EA 6.000 $8,600.000 $11,000.000 $11,500.000 $11,000.000 $10,247.340
INLET (COMPL)(PCU)(5FT)(NONE)
EA 2.000 $10,000.000 $10,000.000 $10,300.000 $12,020.000 $11,326.790
INLET (COMPL)(PCU)(5FT)(LEFT)
EA 3.000 $11,000.000 $11,000.000 $11,500.000 $14,000.000 $10,692.190
INLET (COMPL)(PCU)(5FT)(RIGHT)
EA 7.000 $10,000.000 $11,000.000 $13,500.000 $11,850.000 $11,745.360
INLET (COMPL)(PCU)(5FT)(BOTH)
EA 4.000 $10,000.000 $13,000.000 $12,000.000 $17,500.000 $11,179.050
INLET (COMPL)(PCU)(6FT)(LEFT)
EA 3.000 $13,500.000 $15,000.000 $13,000.000 $13,140.000 $12,661.980
INLET (COMPL)(PCU)(6FT)(RIGHT)
EA 7.000 $8,400.000 $15,000.000 $13,000.000 $13,000.000 $12,645.130
INLET (COMPL)(PCU)(6FT)(BOTH)
EA 4.000 $12,500.000 $17,000.000 $15,000.000 $13,570.000 $13,088.550
INLET (COMPL)(PMBD)(6FT)
EA 2.000 $6,600.000 $14,000.000 $16,500.000 $18,400.000 $15,718.610
INLET (COMPL)(PSL)(RH)(4FTX4FT)
EA 3.000 $8,250.000 $7,000.000 $9,000.000 $9,189.000 $8,896.310
INLET (COMPL)(PSL)(RC)(4FTX4FT)
EA 2.000 $12,500.000 $7,000.000 $8,900.000 $13,000.000 $9,244.210
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 5.000 $6,000.000 $8,000.000 $8,500.000 $13,500.000 $8,219.350
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
EA 46.000 $7,800.000 $10,000.000 $10,000.000 $14,000.000 $10,049.870
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 71.000 $8,100.000 $13,000.000 $10,200.000 $14,300.000 $9,591.180
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 3.000 $7,000.000 $14,000.000 $17,000.000 $15,000.000 $10,516.230
JCT BOX (COMPL)(SPL)
EA 5.000 $73,600.000 $50,000.000 $62,000.000 $64,000.000 $74,761.890
INLET (COMPL)(RWI)(TY I)
EA 61.000 $12,000.000 $19,000.000 $20,000.000 $25,000.000 $18,874.870
HEADWALL (CH - FW - 0) (DIA= 48 IN)
EA 3.000 $11,000.000 $20,000.000 $33,740.000 $14,000.000 $14,838.210
SET (TY I) (24 IN) (4: 1) (C)
EA 2.000 $10,000.000 $2,500.000 $3,500.000 $11,500.000 $3,267.280
SET (TY I)(S= 3 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $15,000.000 $10,000.000 $6,000.430 $10,800.000 $5,962.620
SET (TY II) (21 IN) (CMP) (6: 1) (P)
EA 1.000 $2,200.000 $2,000.000 $3,500.000 $8,000.000 $3,691.810
GRATE & FRAME
EA 47.000 $5,900.000 $3,277.680 $11,210.000 $3,800.000 $7,332.710
JACK BOR OR TUN PIPE(42 IN)(RC)(CL III)
LF 163.000 $950.000 $1,715.000 $1,660.000 $1,300.000 $1,550.120
JACK BOR OR TUN PIPE(48 IN)(RC)(CL III)
LF 385.000 $1,000.000 $1,750.000 $1,980.000 $1,500.000 $1,689.630
ADJUSTING MANHOLES & INLETS
EA 6.000 $5,500.000 $7,500.000 $5,000.000 $2,900.000 $6,099.120
CLEAN EXIST CULVERTS
EA 8.000 $2,500.000 $5,575.340 $7,000.000 $8,400.000 $3,661.690
REMOV STR (BOX CULVERT)
EA 4.000 $17,000.000 $400.000 $4,600.000 $8,600.000 $22,337.710
REMOV STR (INLET)
EA 192.000 $1,000.000 $1,500.000 $1,000.000 $734.000 $623.930
REMOV STR (MANHOLE)
EA 5.000 $925.000 $2,000.000 $1,000.000 $1,102.000 $1,365.980
REMOV STR (SET)
EA 23.000 $405.000 $1,500.000 $800.000 $600.000 $589.190
REMOV STR (WINGWALL)
EA 2.000 $1,250.000 $3,500.000 $5,000.000 $1,400.000 $1,894.290
REMOV STR (PIPE)
LF 25,357.000 $17.500 $50.000 $30.000 $32.000 $17.730
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 5.000 $170,000.000 $149,464.430 $181,200.000 $320,000.000 $206,938.360
REMOVE STR (RAIL)
LF 7,912.000 $40.000 $19.870 $11.800 $32.000 $11.960
MOBILIZATION
LS 1.000 $17,300,000.000 $21,360,524.770 $22,100,000.000 $21,572,000.000 $23,271,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 46.000 $100,000.000 $273,686.480 $187,994.530 $100,000.000 $98,595.800
PORTABLE CHANGEABLE MESSAGE SIGN
EA 9.000 $15,000.000 $20,437.840 $19,330.000 $28,500.000 $26,699.020
TMA (STATIONARY)
DAY 534.000 $225.000 $224.540 $845.000 $580.000 $168.210
TMA (MOBILE OPERATION)
HR 2,112.000 $93.000 $105.890 $84.500 $125.000 $68.380
TMA (MOBILE OPERATION)
DAY 10.000 $300.000 $997.620 $845.000 $1,250.000 $683.820
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $35.000 $35.710 $53.000 $54.290 $54.160
ROCK FILTER DAMS (REMOVE)
LF 80.000 $16.000 $36.790 $16.100 $16.480 $16.440
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,310.000 $31.000 $24.260 $38.000 $53.000 $38.870
CONSTRUCTION EXITS (REMOVE)
SY 2,310.000 $11.000 $19.230 $12.100 $4.500 $12.340
TEMP SEDMT CONT FENCE (INSTALL)
LF 18,367.000 $3.900 $3.420 $4.050 $4.140 $4.130
TEMP SEDMT CONT FENCE (REMOVE)
LF 18,367.000 $1.150 $1.080 $1.200 $1.210 $1.200
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 4,738.000 $4.500 $4.850 $6.100 $6.220 $6.200
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,738.000 $2.500 $1.040 $1.450 $1.470 $1.470
CONSTRUCTING DETOURS
SY 39,137.400 $118.000 $136.970 $175.000 $136.000 $156.230
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 29,070.000 $65.000 $62.080 $46.500 $30.000 $31.530
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 6,760.000 $60.000 $47.620 $60.000 $72.000 $31.300
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 360.000 $61.000 $68.780 $95.750 $72.000 $38.800
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 40,980.000 $8.200 $6.100 $16.400 $14.500 $11.380
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 8,560.000 $7.000 $5.720 $13.500 $20.000 $9.480
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 640.000 $9.250 $14.280 $16.700 $20.000 $25.440
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 29,070.000 $13.000 $10.330 $14.100 $14.500 $11.970
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 4,480.000 $13.000 $12.950 $16.200 $20.000 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 220.000 $13.250 $20.330 $27.600 $20.000 $17.610
PORT CTB (PINNING)
EA 5,996.000 $10.000 $64.730 $28.600 $81.500 $66.350
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 27,851.000 $85.000 $87.990 $90.000 $95.000 $85.000
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 80.000 $320.000 $406.460 $586.000 $550.000 $420.970
PERM CTB (SGL SLOPE) (TY 4) (42 )
LF 40.000 $320.000 $349.690 $490.000 $515.000 $285.640
PERM CTB (TRAN SSCB TO CTB) (MOD)
LF 300.000 $290.000 $266.350 $361.000 $336.000 $212.250
PERM CTB (TRAN SSCB TO SSTR) (MOD)
LF 20.000 $530.000 $268.600 $331.000 $510.000 $544.630
COLORED TEXTURED CONC (5")
SY 3,964.400 $66.000 $122.460 $130.000 $175.000 $185.410
COLORED TEXTURED CONC (8")
SY 769.300 $100.000 $134.640 $180.000 $369.000 $315.910
CONC CURB (MONO) (TY I)
LF 761.000 $8.000 $6.810 $2.650 $41.000 $2.330
CONC CURB (MONO) (TY II)
LF 30,721.000 $5.000 $7.580 $5.150 $23.000 $27.430
DRIVEWAYS (CONC)
SY 1,479.000 $100.000 $88.290 $79.000 $167.000 $184.470
DRIVEWAYS (CONC) (HES)
SY 6,696.000 $107.000 $165.240 $93.750 $190.000 $205.390
CONC SIDEWALKS (4")
SY 10,591.000 $70.000 $75.270 $64.000 $108.000 $80.990
CONC SIDEWALKS (5")
SY 2,735.000 $75.000 $77.290 $65.500 $110.000 $93.240
CURB RAMPS (TY 1)
EA 23.000 $2,450.000 $2,989.370 $2,140.000 $4,700.000 $2,995.580
CURB RAMPS (TY 2)
EA 3.000 $2,600.000 $3,162.400 $2,140.000 $6,200.000 $3,443.000
CURB RAMPS (TY 3)
EA 4.000 $3,000.000 $2,789.810 $1,920.000 $4,226.000 $3,340.810
CURB RAMPS (TY 7)
EA 2.000 $2,600.000 $2,904.540 $1,980.000 $6,372.000 $3,443.150
CURB RAMPS (TY 10)
EA 17.000 $2,550.000 $2,769.930 $1,980.000 $5,000.000 $3,544.950
CURB RAMPS (TY 21)
EA 4.000 $3,200.000 $3,261.890 $2,380.000 $5,548.000 $2,995.560
CURB RAMPS (TY 22)
EA 6.000 $3,500.000 $3,818.240 $2,880.000 $10,164.000 $4,206.590
CONC SIDEWALKS (SPECIAL)
SY 11,875.100 $85.000 $80.230 $116.000 $120.000 $118.060
CONC MEDIAN
SY 1,253.000 $100.000 $77.660 $157.000 $150.000 $113.650
CONC DIRECTIONAL ISLAND
SY 234.000 $125.000 $78.660 $157.000 $155.000 $119.770
CONC MEDIAN (MONO NOSE)
SY 121.000 $125.000 $127.660 $767.000 $333.000 $72.530
RIGHT OF WAY MARKERS
EA 11.000 $500.000 $480.000 $415.000 $870.000 $500.000
MTL W-BEAM GD FEN (TIM POST)
LF 713.000 $24.000 $22.560 $31.000 $27.590 $28.320
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,360.000 $1,230.770 $2,100.000 $1,634.980 $1,785.710
REMOVE METAL BEAM GUARD FENCE
LF 4,538.000 $3.050 $3.080 $3.750 $4.300 $4.340
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 16.000 $190.000 $256.410 $890.000 $253.090 $153.060
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,100.000 $2,923.080 $3,250.000 $2,935.870 $3,673.470
GUARDRAIL END TREATMENT (REMOVE)
EA 23.000 $260.000 $256.410 $850.000 $303.710 $459.180
CRASH CUSH ATTEN (MOVE & RESET)
EA 38.000 $1,700.000 $1,101.570 $2,100.000 $1,725.000 $3,451.730
CRASH CUSH ATTEN (REMOVE)
EA 31.000 $1,000.000 $881.260 $2,350.000 $730.000 $493.400
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 28.000 $35,000.000 $13,869.600 $27,600.000 $19,000.000 $26,020.410
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 3.000 $65,000.000 $36,859.910 $37,750.000 $48,800.000 $45,918.370
PIPE UNDERDRAINS (TY 6) (6")
LF 8,757.000 $40.000 $31.860 $26.600 $55.000 $30.590
PIPE UNDERDRAINS (TY 6)(8")
LF 624.000 $25.000 $54.700 $28.800 $59.000 $32.960
REMOVE RD IL ASM (TRANS-BASE)
EA 71.000 $1,200.000 $772.680 $765.000 $772.950 $770.920
REPLACE LUMINAIRE W/(400W EQ) LED
EA 20.000 $720.000 $1,217.100 $1,210.000 $1,217.520 $1,214.330
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 16.000 $2,500.000 $2,520.050 $2,500.000 $2,520.930 $2,514.310
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 10.000 $2,300.000 $2,610.960 $2,590.000 $2,611.870 $2,605.010
IN RD IL (TY SA) 40T-8-8 (250W EQ) LED
EA 1.000 $6,100.000 $6,297.600 $6,240.000 $6,299.800 $6,283.270
IN RD IL (TY SP) 48S-10 (400W EQ) LED
EA 1.000 $5,000.000 $6,444.060 $6,380.000 $6,446.310 $6,429.390
IN RD IL (TY SP) 48S-10-10(400W EQ)LED
EA 8.000 $9,500.000 $7,983.360 $7,900.000 $7,986.150 $7,965.190
HI MST IL POLE (175 FT)( 80 MPH)
EA 8.000 $70,000.000 $66,132.430 $65,500.000 $66,155.470 $65,981.850
LED HI MST IL ASM (6 FIXT) (TY C)
EA 8.000 $30,000.000 $33,937.370 $33,600.000 $33,949.200 $33,860.100
CONDT (PVC) (SCH 40) (1")
LF 991.000 $17.000 $30.300 $30.000 $30.310 $30.230
CONDT (PVC) (SCH 40) (1 1/4")
LF 5,665.000 $55.000 $17.470 $17.300 $17.480 $17.430
CONDT (PVC) (SCH 40) (2")
LF 14,418.000 $22.000 $30.200 $29.900 $30.210 $30.130
CONDT (PVC) (SCH 40) (2") (BORE)
LF 3,940.000 $41.000 $49.340 $48.750 $49.360 $49.230
CONDT (PVC) (SCH 40) (2") (STL ENCSE)
LF 1,335.000 $120.000 $308.110 $305.000 $308.220 $307.410
CONDT (PVC) (SCH 40) (2 1/2") (BORE)
LF 150.000 $45.000 $103.020 $102.000 $103.060 $102.790
CONDT (PVC) (SCH 40) (3")
LF 16,050.000 $30.000 $30.360 $30.000 $30.370 $30.290
CONDT (PVC) (SCH 40) (3") (BORE)
LF 4,115.000 $44.000 $44.490 $44.000 $44.510 $44.390
CONDT (PVC) (SCH 80) (2")
LF 1,446.000 $23.000 $53.530 $53.000 $53.550 $53.410
CONDT (PVC) (SCH 80) (2") (BORE)
LF 946.000 $40.000 $102.520 $102.000 $102.550 $102.290
CONDT (PVC) (SCH 80) (3")
LF 523.000 $25.000 $58.080 $57.500 $58.100 $57.950
CONDT (PVC) (SCH 80) (4")
LF 85.000 $33.000 $61.610 $61.000 $61.630 $61.470
CONDT (PVC) (SCH 80) (4") (BORE)
LF 1,668.000 $71.000 $109.190 $108.000 $109.220 $108.940
CONDT (RM) (1")
LF 690.000 $50.000 $83.330 $82.500 $83.360 $83.140
CONDT (RM) (1 1/2")
LF 600.000 $44.000 $73.380 $72.750 $73.410 $73.210
CONDT (RM) (2")
LF 3,529.000 $44.000 $88.880 $88.000 $88.910 $88.680
CONDUIT (PREPARE)
LF 2,160.000 $7.000 $17.120 $17.000 $17.130 $17.080
ITS MULTI-DUCT CND (PVC-40)
LF 14,020.000 $42.000 $37.370 $37.000 $37.380 $37.290
ITS MULTI-DUCT CND (PVC-40)(BORE)
LF 1,650.000 $51.000 $55.350 $54.750 $55.370 $55.220
ELEC CONDR (NO.14) INSULATED
LF 860.000 $1.000 $2.830 $2.800 $2.830 $2.820
ELEC CONDR (NO.12) INSULATED
LF 920.000 $2.000 $2.320 $2.300 $2.320 $2.320
ELEC CONDR (NO.10) BARE
LF 2,025.000 $2.750 $2.980 $2.950 $2.980 $2.970
ELEC CONDR (NO.10) INSULATED
LF 5,280.000 $2.750 $3.030 $3.000 $3.030 $3.020
ELEC CONDR (NO.8) BARE
LF 9,450.000 $3.000 $3.140 $3.100 $3.140 $3.130
ELEC CONDR (NO.8) INSULATED
LF 48,346.000 $2.250 $3.380 $3.350 $3.380 $3.380
ELEC CONDR (NO.6) BARE
LF 15,571.000 $3.000 $3.710 $3.650 $3.710 $3.700
ELEC CONDR (NO.6) INSULATED
LF 41,563.000 $3.500 $3.670 $3.650 $3.670 $3.660
ELEC CONDR (NO.4) BARE
LF 790.000 $3.500 $3.890 $3.850 $3.890 $3.880
ELEC CONDR (NO.4) INSULATED
LF 2,722.000 $3.650 $5.050 $5.000 $5.050 $5.040
ELEC CONDR (NO.2) BARE
LF 798.000 $4.250 $5.810 $5.750 $5.810 $5.790
ELEC CONDR (NO.2) INSULATED
LF 4,544.000 $5.000 $6.460 $6.400 $6.470 $6.450
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 4.000 $7,000.000 $6,878.380 $6,810.000 $6,880.780 $6,862.720
ITS GND BOX(PCAST) TY 1 (243660)
EA 13.000 $5,300.000 $5,858.240 $5,800.000 $5,860.280 $5,844.900
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
EA 9.000 $6,500.000 $7,201.590 $7,130.000 $7,204.100 $7,185.190
ITS GND BOX(PCAST) TY 2 (366048)W/APRN
EA 2.000 $11,000.000 $9,928.700 $9,830.000 $9,932.160 $9,906.100
ITS GND BOX(PCAST) TY 2 (366060)
EA 6.000 $8,000.000 $7,423.800 $7,350.000 $7,426.390 $7,406.900
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
EA 5.000 $9,000.000 $8,711.600 $8,630.000 $8,714.640 $8,691.770
REMOVE ITS GROUND BOX
EA 26.000 $1,100.000 $1,189.830 $1,180.000 $1,190.240 $1,187.120
GROUND BOX TY A (122311)
EA 24.000 $1,300.000 $1,945.340 $1,930.000 $1,946.020 $1,940.910
GROUND BOX TY A (122311)W/APRON
EA 80.000 $1,750.000 $3,096.790 $3,070.000 $3,097.860 $3,089.730
GROUND BOX TY C (162911)W/APRON
EA 43.000 $1,905.000 $4,120.970 $4,080.000 $4,122.400 $4,111.580
GROUND BOX TY D (162922)
EA 7.000 $1,800.000 $2,201.890 $2,180.000 $2,202.660 $2,196.880
GROUND BOX TY D (162922)W/APRON
EA 31.000 $4,000.000 $3,590.700 $3,560.000 $3,591.950 $3,582.520
REMOVE GROUND BOX
EA 39.000 $450.000 $772.680 $765.000 $772.950 $770.920
TIMBER POLE (CL 2) 40 FT
EA 46.000 $3,200.000 $5,154.240 $5,100.000 $5,156.030 $5,142.500
TIMBER POLE (CL 2) 70 FT
EA 9.000 $3,200.000 $505.020 $500.000 $505.200 $503.870
REMOVE ELECTRICAL SERVICES
EA 11.000 $900.000 $1,232.250 $1,220.000 $1,232.680 $1,229.440
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
EA 3.000 $11,000.000 $16,847.480 $16,680.000 $16,853.350 $16,809.120
ELC SRV TY D 120/240 060(NS)SS(E)PS(U)
EA 1.000 $10,000.000 $18,180.740 $18,000.000 $18,187.070 $18,139.340
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
EA 7.000 $20,000.000 $16,695.980 $16,530.000 $16,701.790 $16,657.960
ELC SRV TY D 120/240 060(NS)SS(N)TP(O)
EA 7.000 $7,250.000 $12,277.050 $12,160.000 $12,281.320 $12,249.090
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 3.000 $9,800.000 $18,180.740 $18,000.000 $18,187.070 $18,139.340
ELC SRV TY D 120/240 125(NS)SS(N)PS(U)
EA 1.000 $6,100.000 $18,685.760 $18,500.000 $18,692.270 $18,643.210
ELC SRV TY K 277/480 060(NS)SS(N)SF(U)
EA 1.000 $7,000.000 $77,768.100 $77,000.000 $77,795.190 $77,591.030
EL SR TY C 120/240 100(NS) AL(E) PS (U)
EA 2.000 $7,000.000 $24,670.250 $24,430.000 $24,678.850 $24,614.080
ALUMINUM SIGNS (TY A)
SF 130.250 $40.000 $34.670 $30.000 $31.740 $30.200
ALUMINUM SIGNS (TY G)
SF 72.000 $50.000 $47.380 $41.000 $41.410 $41.270
ALUMINUM SIGNS (TY O)
SF 5,021.000 $40.000 $64.830 $56.000 $56.670 $56.470
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 25.000 $800.000 $1,438.720 $1,250.000 $717.310 $1,253.270
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 4.000 $1,000.000 $1,785.400 $1,550.000 $842.300 $1,555.270
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 33.000 $900.000 $1,675.620 $1,450.000 $983.590 $1,459.630
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 18.000 $1,075.000 $1,415.610 $1,230.000 $793.390 $1,233.140
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 10.000 $1,200.000 $1,577.390 $1,370.000 $950.980 $1,374.070
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $1,050.000 $1,508.060 $1,310.000 $820.560 $1,313.670
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000 $2,100.000 $1,999.190 $1,730.000 $896.640 $1,741.500
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 8.000 $1,700.000 $1,854.730 $1,610.000 $1,168.350 $1,615.660
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $1,400.000 $2,478.760 $2,150.000 $1,277.030 $2,159.250
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 6.000 $1,800.000 $2,459.110 $2,130.000 $1,331.380 $2,142.140
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 4.000 $1,500.000 $4,680.170 $4,050.000 $2,238.880 $4,076.910
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 2.000 $3,700.000 $6,326.900 $5,480.000 $2,151.940 $5,511.380
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 6.000 $4,500.000 $6,326.900 $5,480.000 $2,206.280 $5,511.380
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 24.000 $7,500.000 $9,389.230 $8,130.000 $3,977.820 $8,178.980
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $1,100.000 $2,184.080 $1,890.000 $690.140 $1,902.560
RELOCATE SM RD SN SUP&AM(SIGN ONLY)
EA 5.000 $425.000 $1,854.730 $1,610.000 $108.680 $1,615.660
INSTALL LRSS (STRUCT STEEL)
LB 284.500 $8.000 $12.190 $10.600 $6.630 $10.620
REMOVE LRSA
EA 2.000 $2,400.000 $1,768.070 $1,530.000 $1,545.460 $1,540.170
INS OH SN SUP(20 FT CANT)
EA 2.000 $30,000.000 $38,781.840 $33,560.000 $33,898.990 $33,782.970
INS OH SN SUP(25 FT CANT)
EA 2.000 $32,100.000 $65,926.820 $57,100.000 $57,626.270 $57,429.030
INS OH SN SUP(30 FT BAL TEE)
EA 1.000 $37,000.000 $81,007.360 $70,100.000 $70,808.080 $70,565.730
INS OH SN SUP(30 FT CANT)
EA 8.000 $36,300.000 $62,887.600 $54,400.000 $54,949.500 $54,781.560
INS OH SN SUP(40 FT CANT)
EA 1.000 $46,300.000 $112,699.610 $97,500.000 $98,510.100 $98,172.940
INS OH SN SUP(90 FT BRDG)
EA 2.000 $70,000.000 $138,359.650 $119,700.000 $120,939.400 $120,525.470
INS OH SN SUP(120 FT BRDG)
EA 1.000 $70,000.000 $173,270.240 $149,900.000 $151,454.550 $150,936.180
REMOVE OVERHD SIGN SUP
EA 16.000 $10,600.000 $14,837.870 $12,840.000 $12,969.700 $12,925.310
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 11.000 $1,900.000 $1,929.850 $1,670.000 $1,686.870 $1,681.100
SIGN WALKWAY (48 IN) WITH HNDRL
LF 9.000 $1,000.000 $866.700 $750.000 $757.580 $754.980
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 2.000 $110.000 $46.160 $30.000 $46.570 $62.500
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
EA 119.000 $71.000 $461.540 $30.000 $69.320 $119.380
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 81.000 $17.000 $20.510 $45.000 $23.830 $21.350
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 5.000 $25.000 $25.640 $50.000 $45.560 $27.710
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 57.000 $16.000 $20.510 $45.000 $23.830 $21.190
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 4.000 $9.000 $25.640 $50.000 $45.560 $23.700
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 1,226.000 $0.800 $1.240 $0.400 $1.110 $1.140
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 2,353.000 $0.800 $1.240 $0.350 $1.110 $1.140
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 45,683.000 $1.500 $1.800 $0.650 $1.610 $1.710
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 2,316.000 $1.600 $2.730 $0.600 $2.440 $2.740
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 172,539.000 $1.500 $1.490 $0.600 $1.330 $1.480
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 14,229.000 $1.210 $2.850 $0.850 $2.550 $2.740
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 1,655.000 $6.000 $5.390 $1.700 $4.820 $6.220
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 109,676.000 $1.250 $1.490 $0.600 $1.330 $1.480
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 105.000 $2.150 $2.910 $0.850 $2.610 $3.430
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 210.000 $2.600 $2.910 $1.000 $2.610 $11.420
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 24,058.000 $1.150 $1.730 $0.950 $1.550 $1.600
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 696.000 $3.250 $4.650 $3.750 $4.160 $6.570
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 3,073.000 $4.000 $5.580 $3.750 $4.990 $5.420
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,723.000 $9.250 $13.630 $7.500 $12.200 $13.250
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 45.000 $145.000 $241.600 $125.000 $216.280 $222.700
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 21.000 $225.000 $371.690 $146.000 $332.740 $342.610
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 7.000 $220.000 $520.360 $151.000 $465.840 $479.660
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 50.000 $175.000 $371.690 $121.000 $332.740 $342.610
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 63.000 $45.000 $109.030 $45.000 $97.600 $108.490
RE PM TY II (W) 6" (BRK)
LF 27,080.000 $0.800 $0.420 $0.400 $0.380 $0.500
RE PM TY II (W) 6" (DOT)
LF 105.000 $0.500 $1.240 $0.450 $1.110 $1.270
RE PM TY II (W) 6" (SLD)
LF 63,742.000 $0.850 $0.360 $0.400 $0.320 $0.430
RE PM TY II (W) 8" (DOT)
LF 210.000 $0.850 $1.240 $0.400 $1.110 $1.270
RE PM TY II (W) 8" (SLD)
LF 24,058.000 $0.610 $0.810 $0.400 $0.720 $0.780
RE PM TY II (W) 12" (LNDP)
LF 696.000 $2.400 $1.540 $0.550 $1.380 $1.420
RE PM TY II (W) 12" (SLD)
LF 3,073.000 $1.900 $2.290 $0.700 $2.050 $2.110
RE PM TY II (W) 24" (SLD)
LF 1,723.000 $20.000 $3.720 $1.350 $3.330 $3.430
RE PM TY II (W) (ARROW)
EA 11.000 $100.000 $117.700 $101.000 $105.370 $108.490
RE PM TY II (W) (WORD)
EA 9.000 $100.000 $204.430 $88.500 $183.010 $188.440
RE PM TY II (W) 36" (YLD TRI)
EA 63.000 $27.000 $44.600 $55.250 $39.930 $55.960
RE PM TY II (Y) 6" (SLD)
LF 45,349.000 $0.850 $0.360 $0.350 $0.320 $0.430
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 27,800.000 $1.800 $1.240 $0.700 $1.110 $1.140
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 66,618.000 $2.000 $1.080 $0.700 $0.960 $1.080
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 50,741.000 $2.000 $1.080 $0.700 $0.960 $1.080
REFL PAV MRKR TY I-C
EA 96.000 $5.500 $12.390 $7.400 $11.090 $11.420
REFL PAV MRKR TY II-A-A
EA 88.000 $5.500 $12.390 $7.400 $11.090 $11.420
REFL PAV MRKR TY II-C-C
EA 136.000 $5.500 $8.980 $7.400 $8.040 $11.420
REFL PAV MRKR TY II-C-R
EA 2,636.000 $5.500 $8.980 $7.400 $8.040 $8.280
ELIM EXT PM & MRKS (4")
LF 68,521.000 $0.950 $0.680 $0.500 $0.610 $0.630
ELIM EXT PM & MRKS (8")
LF 80.000 $2.000 $1.860 $0.950 $1.660 $1.710
ELIM EXT PM & MRKS (24")
LF 151.000 $3.500 $6.190 $4.250 $5.550 $5.710
ELIM EXT PM & MRKS (ARROW)
EA 15.000 $64.750 $247.790 $23.700 $221.830 $228.410
ELIM EXT PM & MRKS (WORD)
EA 5.000 $74.000 $371.690 $26.300 $332.740 $342.610
PAV SURF PREP FOR MRK (6")
LF 145,264.000 $0.350 $0.300 $0.150 $0.270 $0.340
PAV SURF PREP FOR MRK (8")
LF 24,268.000 $0.250 $0.480 $0.200 $0.430 $0.570
PAV SURF PREP FOR MRK (12")
LF 3,769.000 $0.750 $1.240 $0.800 $1.110 $1.540
PAV SURF PREP FOR MRK (24")
LF 1,723.000 $1.250 $2.790 $1.600 $2.500 $3.140
PAV SURF PREP FOR MRK (ARROW)
EA 45.000 $22.000 $55.750 $14.200 $49.910 $85.650
PAV SURF PREP FOR MRK (DBL ARROW)
EA 21.000 $27.000 $92.920 $25.300 $83.180 $125.620
PAV SURF PREP FOR MRK (UTURN ARR)
EA 7.000 $31.000 $123.900 $21.300 $110.910 $125.620
PAV SURF PREP FOR MRK (WORD)
EA 50.000 $28.000 $123.900 $15.800 $110.910 $119.910
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 63.000 $5.000 $30.970 $1.200 $27.730 $28.550
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $56,600.000 $52,269.610 $51,800.000 $52,287.830 $52,150.610
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 2.000 $29,100.000 $52,269.620 $51,800.000 $52,287.830 $52,150.610
TEMP TRAF SIGNALS
EA 8.000 $118,600.000 $127,770.170 $126,500.000 $127,814.690 $127,479.260
VEH SIG SEC (12")LED(GRN)
EA 44.000 $545.000 $987.820 $978.000 $988.160 $985.570
VEH SIG SEC (12")LED(GRN ARW)
EA 16.000 $600.000 $987.820 $978.000 $988.160 $985.570
VEH SIG SEC (12")LED(YEL)
EA 52.000 $649.000 $987.820 $978.000 $988.160 $985.570
VEH SIG SEC (12")LED(YEL ARW)
EA 12.000 $545.000 $987.820 $978.000 $988.160 $985.570
VEH SIG SEC (12")LED(RED)
EA 52.000 $545.000 $987.820 $978.000 $988.160 $985.570
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $550.000 $987.820 $978.000 $988.170 $985.570
PED SIG SEC (LED)(COUNTDOWN)
EA 36.000 $1,200.000 $1,858.480 $1,840.000 $1,859.120 $1,854.240
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 46.000 $260.000 $499.970 $495.000 $500.140 $498.830
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 4.000 $285.000 $592.900 $587.000 $593.100 $591.550
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
EA 4.000 $270.000 $616.130 $610.000 $616.340 $614.720
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 2,763.000 $3.000 $3.480 $3.450 $3.490 $3.480
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 3,071.000 $4.000 $4.650 $4.600 $4.650 $4.640
TRF SIG CBL (TY A)(14 AWG)(12 CONDR)
LF 2,928.000 $4.150 $9.290 $9.200 $9.300 $9.270
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
LF 1,334.000 $6.700 $10.450 $10.400 $10.460 $10.430
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 2,855.000 $8.250 $11.620 $11.500 $11.620 $11.590
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 10,833.000 $3.250 $3.480 $3.450 $3.490 $3.480
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 1.000 $12,500.000 $20,907.850 $20,700.000 $20,915.130 $20,860.240
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 1.000 $13,300.000 $23,230.940 $23,000.000 $23,239.030 $23,178.050
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 1.000 $40,000.000 $54,592.710 $54,100.000 $54,611.730 $54,468.410
INS TRF SIG PL AM(S)1 ARM(55')LUM
EA 5.000 $41,400.000 $55,754.260 $55,200.000 $55,773.680 $55,627.310
INS TRF SIG PL AM(S)2 ARM(50-44')LUM
EA 1.000 $40,000.000 $69,692.820 $69,000.000 $69,717.100 $69,534.140
INS TRF SIG PL AM(S)2 ARM(55-32')LUM
EA 1.000 $45,000.000 $72,015.910 $71,300.000 $72,041.010 $71,851.950
INS TRF SIG PL AM(S)2 ARM(55-44')LUM
EA 2.000 $45,000.000 $81,308.290 $80,500.000 $81,336.620 $81,123.170
PED POLE ASSEMBLY
EA 33.000 $4,200.000 $9,292.380 $9,200.000 $9,295.610 $9,271.220
PED DETECT PUSH BUTTON (APS)
EA 34.000 $1,300.000 $1,858.480 $1,840.000 $1,859.120 $1,854.240
PED DETECTOR CONTROLLER UNIT
EA 3.000 $3,250.000 $3,484.640 $3,450.000 $3,485.860 $3,476.710
INSTALL BBU SYSTEM
EA 3.000 $3,300.000 $10,453.920 $10,350.000 $10,457.570 $10,430.120
INSTALL FUSED DISCONNECT
EA 2.000 $105.000 $1,162.560 $1,150.000 $1,162.960 $1,159.910
ANTI-GRAFFITI COATING (PERMNENT-TY II)
SF 8,350.000 $0.800 $0.810 $0.800 $0.810 $0.630
ANTI-GRAFFITI COATNG (PERMNENT-TY III)
SF 95,810.000 $1.000 $0.990 $0.950 $1.000 $0.840
DRAIN INLET CLEANING
EA 4.000 $1,400.000 $600.000 $2,500.000 $4,400.000 $280.510
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 688.000 $5.750 $10.000 $55.000 $38.000 $4.080
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 856.000 $6.000 $12.000 $60.000 $39.000 $5.100
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 1,003.000 $7.500 $13.000 $65.000 $44.000 $7.140
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
LF 1,116.000 $10.000 $25.000 $75.000 $74.000 $8.160
STORM SEWER CLEANING (PIPE)(55"-74"DIA)
LF 30.000 $11.000 $40.000 $300.000 $126.000 $30.600
STORM SEWER CLEAN (BOX CULV)(12-<24 SF)
LF 31.000 $15.000 $40.000 $500.000 $52.000 $45.900
LANDSCAPE AMENITY (INTERPRETIVE SIGN)
EA 5.000 $250.000 $16,224.580 $14,040.000 $14,181.820 $14,148.690
LANDSCAPE AMENITY (DOUBLE-BANNER POLE)
EA 19.000 $9,600.000 $39,668.200 $34,200.000 $34,540.400 $34,459.710
TIP TESTING(DRILL SHAFT)
EA 4.000 $5,300.000 $5,750.000 $5,750.000 $5,885.080 $5,822.430
VEHICLE ARRESTING BARRIER (REMOVE)
EA 2.000 $21,500.000 $25,458.080 $25,210.000 $25,466.950 $25,400.120
VEH ARRESTING BAR (FURN AND INSTALL)
EA 1.000 $1,150,000.000 $941,610.590 $932,300.000 $941,938.670 $939,466.710
VIVDS TEMPORARY
EA 4.000 $35,600.000 $63,885.090 $63,300.000 $63,907.340 $63,739.630
VIVDS PROSR SYS (INSTALL ONLY)
EA 3.000 $1,800.000 $7,550.060 $7,480.000 $7,552.690 $7,532.870
VIVDS CAM ASSY (INSTALL ONLY)
EA 23.000 $1,900.000 $1,393.860 $1,380.000 $1,394.340 $1,390.680
VIVDS CABLING (INSTALL ONLY)
LF 13,000.000 $3.000 $2.320 $2.300 $2.320 $2.320
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 1.000 $10,000.000 $16,892.930 $16,730.000 $16,898.820 $16,854.470
SYSTEM INTEGRATION
LS 1.000 $50,000.000 $105,827.030 $104,800.000 $105,863.900 $105,586.080
ITS RVSD (DATA COLLECT & WWA) SYS
EA 2.000 $11,000.000 $26,796.390 $26,530.000 $26,805.720 $26,735.380
ITS RVSD (DC & WWA)(RELOCATE)
EA 6.000 $5,000.000 $13,686.050 $13,550.000 $13,690.820 $13,654.890
ITS POLE MNT CAB (TY 2)(CONF 2)
EA 3.000 $11,000.000 $8,181.330 $8,100.000 $8,184.180 $8,162.700
ITS POLE (60 FT)(90 MPH)
EA 2.000 $26,000.000 $24,695.500 $24,450.000 $24,704.110 $24,639.270
ITS POLE (50 FT) (90 MPH)
EA 1.000 $21,000.000 $15,822.290 $15,670.000 $15,827.800 $15,786.270
ITS POLE (60 FT)(RELOCATE)
EA 2.000 $5,000.000 $7,782.370 $7,710.000 $7,785.080 $7,764.650
ITS POLE MNT CAB (TY 1)(CONF 2)
EA 6.000 $1,000.000 $11,150.850 $11,040.000 $11,154.740 $11,125.460
ITS POLE (40 FT)(REM)
EA 1.000 $4,000.000 $1,545.360 $1,530.000 $1,545.900 $1,541.840
ITS POLE (30 FT)(90 MPH)
EA 1.000 $10,000.000 $11,039.750 $10,930.000 $11,043.590 $11,014.610
ITS POLE (40 FT)(90 MPH)
EA 1.000 $12,500.000 $13,231.540 $13,100.000 $13,236.150 $13,201.410
GROUND BOX (PREPARE)
EA 2.000 $750.000 $1,242.350 $1,230.000 $1,242.790 $1,239.520
ITS RADIO(SNGL)(5 GHZ)-I-U
EA 14.000 $5,000.000 $10,893.290 $10,790.000 $10,897.090 $10,868.490
RELOCATE ITS RADIO
EA 3.000 $1,000.000 $7,267.240 $7,200.000 $7,269.780 $7,250.700
REMOVE ITS RADIO
EA 14.000 $1,000.000 $3,126.080 $3,100.000 $3,127.170 $3,118.960
RELOCATE CCTV FIELD EQUIPMENT
EA 6.000 $5,000.000 $8,065.180 $7,990.000 $8,067.990 $8,046.810
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 2,200.000 $16.000 $8.030 $7.950 $8.030 $8.010
FIBER OPTIC FUSION SPLICE
EA 684.000 $88.000 $90.650 $89.750 $90.680 $90.440
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 22.000 $3,500.000 $2,167.550 $2,150.000 $2,168.300 $2,162.610
FO SPLICE ENCLOSURE (TYPE 1)
EA 18.000 $2,700.000 $2,815.990 $2,790.000 $2,816.980 $2,809.580
FIBER OPTIC CBL (SINGLE-MODE)(6 FIBER)
LF 1,195.000 $3.000 $13.690 $13.600 $13.690 $13.650
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 4.000 $100.000 $1,743.330 $1,730.000 $1,743.940 $1,739.360
FIBER OPTIC CBL (SNGL-MODE)(48 FIBER)
LF 24,925.000 $5.000 $3.760 $3.700 $3.760 $3.750
FIBER OPTIC CBL (SNGL-MODE)(72 FIBER)
LF 12,675.000 $8.250 $4.100 $4.050 $4.100 $4.090
FIBER OPTIC CBL (12 SMF)(AERIAL)
LF 1,280.000 $24.000 $1.010 $1.000 $1.010 $1.010
FIBER OPTIC CBL (48 SMF)(AERIAL)
LF 9,755.000 $21.000 $18.300 $18.100 $18.310 $18.260
FIBER OPTIC SPLICE ENCL (TY 1)(AERIAL)
EA 3.000 $3,000.000 $5,542.090 $5,490.000 $5,544.030 $5,529.480
FIBER OPTIC CBL (72 SMF)(AERIAL)
LF 9,755.000 $3.000 $18.640 $18.500 $18.640 $18.590
ETHERNET SWITCH (INSTALL ONLY)
EA 8.000 $5,000.000 $2,783.670 $2,760.000 $2,784.640 $2,777.340
INSTALL SLDMS
EA 2.000 $5,000.000 $25,352.030 $25,100.000 $25,360.860 $25,294.310
REMOVE SLDMS
EA 4.000 $5,000.000 $6,226.900 $6,170.000 $6,229.070 $6,212.730
INSTALLATION OF TERMINAL SERVER
EA 2.000 $440.000 $1,944.330 $1,930.000 $1,945.010 $1,939.900
REMOVE EXIST GND MT COMM CABINET
EA 7.000 $5,000.000 $4,080.570 $4,040.000 $4,081.990 $4,071.270
ITS GRND MNT CAB (TY 4) (CONF 2)
EA 3.000 $30,000.000 $29,538.650 $29,250.000 $29,548.940 $29,471.390
REMOVE AND RELOCATE SLDMS SYSTEM
EA 2.000 $90,000.000 $22,276.450 $22,060.000 $22,284.220 $22,225.730
REMOVE AND RELOCATE DMS
EA 1.000 $89,200.000 $111,341.850 $110,200.000 $111,380.650 $111,088.350
DECORATIVE ILLUM ASSEMBLY (PILASTER)
EA 41.000 $4,100.000 $14,920.320 $14,770.000 $14,925.520 $14,886.350
DECORATIVE ILLUMINATION ASSEMBLY
EA 39.000 $4,100.000 $14,029.470 $13,890.000 $14,034.360 $13,997.520
ACCESS CONTROL SYSTEM SOFTWARE/FIRMWARE
LS 1.000 $20,000.000 $59,355.050 $58,800.000 $59,375.730 $60,063.270
RELO AUTOMATED BARRICADE GATE ASSEMBLY
EA 3.000 $11,000.000 $21,633.060 $21,420.000 $21,640.590 $21,583.800
AUTOMATED BARRICADE GATE ASSEMBLY
EA 22.000 $25,000.000 $50,488.910 $49,990.000 $50,506.500 $50,373.960
REMOV AUTOMATED BARRICADE GATE ASSEMBLY
EA 27.000 $11,000.000 $3,873.510 $3,840.000 $3,874.860 $3,864.690
Totals: $202,715,257.604 $217,964,538.502 $221,370,118.193 $229,225,287.753 $232,710,000.001