DENTON IH 35E (0196-01-109)

Items: 369

County: DENTON
Length: 2.2570 MILES
Highway: IH 35E
District: DALLAS
Control Number: 0196-01-109
DBE Goal: 7.0%
Project: F 2025(801)
Guaranty: $100,000.00
Time: 981 WORKING DAYS
Engineer's Estimate: $147,373,180.67
Date: 06/05/2025 (1 year ago)
Contract Number: 6253202
Type: RECONSTRUCT GRADE SEPARATION & EXISTING 4 LN FRTG
Project ID: A00064825
Contract Type: Federal
Project Description: RECONSTRUCT GRADE SEPARATION AND EXISTING 4 CONTINUOUS TO 4 LANE CONTINUOUS FRONTAGE ROADS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
AMANDA MILLER
CHRISTOPHER ROCHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$147,373,180.67
$123,539,232.30
Over/Under Est: -16.17% -$23,833,948.37
$131,055,174.43
Over/Under Est: -11.07% -$16,318,006.24
Amt Left: 6.08% $7,515,942.13
$134,940,118.72
Over/Under Est: -8.44% -$12,433,061.95
Amt Left: 9.23% $11,400,886.42
Delta: -2.96% -$3,884,944.29
Over/Under Est: -3.08% -$4,541,913.84
Amt Left: 15.62% $19,292,034.53
Delta: -5.85% -$7,891,148.11
$143,123,852.36
Over/Under Est: -2.88% -$4,249,328.31
Amt Left: 15.85% $19,584,620.06
Delta: -0.20% -$292,585.53
Over/Under Est: -2.3% -$3,390,167.47
Amt Left: 16.55% $20,443,780.90
Delta: -0.60% -$859,160.84
Subcontractor Percentage Amount
JAGOE-PUBLIC COMPANY 7.85% $9,699,309.56
AVANZA CONSTRUCTION & EARTHWORKS, LLC 4.58% $5,658,960.23
ANCORTEX, INC. 4.31% $5,325,353.40
ROYAL REBAR INC 3.79% $4,682,851.37
ALBATROSS CONSTRUCTION LLC 3.51% $4,336,888.73
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 0.79% $976,108.86
A R DANIEL CONSTRUCTION SERVICES, INCORPORATED 0.76% $939,041.43
STRIPE-A-ZONE, LLC 0.54% $667,213.65
TEXOP CONSTRUCTION 0.46% $568,367.18
ACT SAW CUTTING & REMOVAL 0.17% $210,048.74
BUYERS BARRICADES, INC. 0.14% $172,981.32
SCOTT DERR PAINTING CO, LLC 0.12% $148,269.70
SYNERGY SIGNS & SERVICES LLC 0.11% $135,913.89
JE CASEY, LLC 0.10% $123,558.08
IMT CONSTRUCTION, LLC 0.07% $86,490.66
HERMANOS STEEL, LLC 0.06% $74,134.85
CYCLONE SERVICES LLC 0.06% $74,134.85
5-04U, LLC 0.05% $61,779.04
ANTIGO CONSTRUCTION, INC. 0.05% $61,779.04
SK CONCRETE SERVICES LLC 0.03% $37,067.43
AMERICAN FENCE COMPANY, INC. 0.01% $12,355.81
CHIRON COMMUNICATION SERVICES, LLC 0.00% $0.00
Total: 27.56% $34,052,607.82

Bid Items & Bid Tabulations

369 Total 0 of 369
DENTON  |  IH 35E  |  DALLAS  |  0196-01-109  |  06/05/2025  |  $147,373,180.67  |  F 2025(801)  |  RECON GRADE SEPARATION & EXIST 4 LN...  |  981 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ZACHRY CONSTRUCTION CORPORATION
INDUS ROAD & BRIDGE, INC.
WEBBER, LLC
MARIO SINACOLA & SONS EXCAVATING, INC.
RAGLE CONSTRUCTION, INC.
FLATIRON DRAGADOS CONSTRUCTORS, INC.
PREPARING ROW
STA 105.000 $117,058.780 $109,523.810 $91,651.350 $127,619.040 $89,000.000 $165,000.000 $58,000.000
REMOV CONC (PAV)
SY 50,230.000 $12.000 $9.890 $16.000 $15.600 $12.000 $11.000 $16.000
REMOV CONC (MOWSTRIP)
LF 7,490.000 $11.000 $3.170 $10.000 $8.750 $12.000 $4.500 $5.500
REMOV CONC (RIPRAP)
SY 3,252.000 $20.000 $8.090 $20.000 $17.200 $12.000 $11.000 $15.000
REMOV CONC (MEDIANS)
SY 705.000 $30.000 $9.140 $16.000 $60.000 $12.000 $20.000 $40.000
REMOV CONC (DRIVEWAYS)
SY 8,209.000 $30.000 $9.550 $19.000 $16.300 $12.000 $16.500 $16.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 5,570.000 $30.000 $10.870 $10.000 $13.800 $12.000 $14.000 $20.000
REMOV CONC (CURB & GUTTER)
LF 12,304.000 $30.000 $4.650 $5.000 $6.900 $15.000 $8.000 $5.000
REMOV CONC (RETAINING WALLS)
SY 335.000 $100.000 $82.350 $40.000 $96.250 $100.000 $80.000 $170.000
REMOV CONC (TRAFFIC BARRIER)
LF 6,960.000 $30.000 $21.110 $42.000 $20.100 $35.000 $15.000 $23.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 1,067.000 $10.000 $7.810 $12.000 $8.100 $5.000 $8.000 $25.000
RMV (16"-20") TRT/UNTRT BASE & ASPH PAV
SY 68,514.000 $12.500 $6.620 $17.000 $9.550 $7.000 $11.000 $9.000
RMV (21"-25") TRT/UNTRT BASE & ASPH PAV
SY 28,011.000 $16.000 $7.640 $22.000 $12.100 $8.000 $13.500 $13.000
EXCAV (ROADWAY)
CY 247,268.000 $28.000 $18.000 $23.000 $16.000 $20.000 $22.000 $23.000
EMBANK (FNL)(DC)(TY C1)
CY 192,768.000 $20.000 $9.000 $15.000 $13.100 $20.000 $5.750 $5.100
EMBANK (FNL)(DC)(TY C2)
CY 92,242.000 $75.000 $40.000 $15.000 $61.000 $20.000 $27.000 $40.000
COMPOST MANUF TOPSOIL (4")
SY 146,075.000 $2.400 $2.510 $2.000 $2.800 $1.030 $0.940 $3.500
BLOCK SODDING
SY 146,075.000 $4.500 $3.720 $4.000 $3.700 $3.720 $6.000 $4.040
DRILL SEED (TEMP_WARM_COOL)
SY 56,050.000 $0.250 $0.240 $0.300 $0.250 $0.240 $0.300 $0.300
VEGETATIVE WATERING
TGL 30,069.000 $12.000 $29.570 $1.000 $5.200 $0.100 $1.000 $8.000
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
SY 28,956.000 $31.000 $22.540 $25.000 $25.600 $24.000 $23.000 $35.000
LIME (COM OR QK)(SLURRY)
TON 4,975.000 $320.000 $250.000 $350.000 $293.000 $320.000 $315.000 $320.000
LIME TRT (EXIST MATL)(10")
SY 70,059.000 $7.000 $3.500 $6.000 $5.200 $7.000 $4.000 $8.000
LIME TRT (EXIST MATL)(12")
SY 140,603.000 $8.000 $6.740 $7.000 $6.250 $8.000 $4.000 $13.000
CEM TRT(PLNT MX)(CL L)(TYD)(GR1-2)(6")
SY 70,059.000 $24.000 $20.950 $22.000 $17.000 $27.750 $19.000 $40.000
PRIME COAT(MC-30 OR AE-P)
GAL 5,739.000 $4.200 $3.000 $3.500 $3.000 $7.350 $4.500 $3.000
SP MIXES SP-B PG64-22
TON 38,323.000 $145.000 $95.000 $110.000 $95.000 $95.000 $145.000 $95.000
SP MIXES SP-C SAC-B PG64-22
TON 1,939.000 $150.000 $110.000 $125.000 $110.000 $110.000 $165.000 $110.000
SP MIXES SP-D PG64-22
TON 4,818.000 $160.000 $110.000 $125.000 $110.000 $110.000 $165.000 $110.000
TACK COAT
GAL 4,434.000 $3.750 $2.000 $2.500 $2.000 $2.000 $4.500 $2.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 6,709.000 $200.000 $165.000 $190.000 $145.000 $165.000 $160.000 $165.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 50.000 $395.000 $589.810 $550.000 $1,150.000 $1,200.000 $250.000 $525.000
PLANE & TEXT ASPH CONC PAV(2")
SY 37,900.000 $2.650 $2.550 $4.000 $1.050 $4.500 $3.000 $2.000
PLANE ASPH CONC PAV(4")
SY 5,737.000 $6.500 $6.580 $7.000 $3.350 $7.000 $8.500 $6.000
PLANE ASPH CONC PAV(8")
SY 490.000 $7.000 $14.690 $15.000 $6.600 $18.000 $10.000 $20.000
CONC PVMT (CRCP) (10")
SY 100,347.000 $100.000 $93.100 $92.000 $89.750 $92.000 $109.200 $110.000
CONC PVMT (CRCP) (13")
SY 67,304.000 $115.000 $111.410 $110.000 $124.000 $115.000 $105.000 $135.000
CONC PVMT (CRCP)(HES) (10")
SY 3,757.000 $130.000 $112.100 $110.000 $110.000 $110.000 $135.000 $230.070
FULL - DEPTH REPAIR CPCD (10")
CY 15.000 $750.000 $760.220 $1,800.000 $1,600.000 $2,400.000 $1,750.000 $3,460.000
CUT & RESTORING PAV
SY 1,510.000 $350.000 $400.660 $235.000 $762.000 $715.000 $150.000 $120.000
CEM STABIL BKFL
CY 735.000 $175.000 $150.610 $220.000 $198.000 $275.000 $150.000 $275.000
FLOWABLE BACKFILL
CY 695.000 $400.000 $213.490 $180.000 $259.000 $400.000 $220.000 $230.000
TRENCH EXCAVATION PROTECTION
LF 16,382.000 $3.500 $8.040 $5.000 $9.100 $10.000 $4.000 $3.000
TEMPORARY SPL SHORING
SF 134,531.000 $40.000 $29.120 $31.000 $28.900 $35.000 $39.500 $60.000
DRILL SHAFT (18 IN)
LF 120.000 $300.000 $0.010 $115.000 $112.000 $230.000 $170.000 $172.210
DRILL SHAFT (24 IN)
LF 24.000 $140.000 $524.190 $170.000 $519.000 $150.000 $519.000 $145.320
DRILL SHAFT (30 IN)
LF 310.000 $180.000 $696.900 $275.000 $690.000 $250.000 $690.000 $250.140
DRILL SHAFT (36 IN)
LF 6,404.000 $230.000 $230.900 $210.000 $206.000 $225.000 $250.000 $210.000
DRILL SHAFT (42 IN)
LF 4,134.000 $250.000 $262.680 $265.000 $258.000 $300.000 $260.000 $270.000
DRILL SHAFT (48 IN)
LF 49.000 $330.000 $1,319.060 $900.000 $1,310.000 $860.000 $1,306.000 $1,000.000
DRILL SHAFT (54 IN)
LF 778.000 $600.000 $800.200 $590.000 $763.000 $560.000 $735.000 $610.000
DRILL SHAFT (96 IN)
LF 636.000 $1,700.000 $1,206.780 $1,300.000 $1,150.000 $1,350.000 $1,275.000 $1,100.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 39.000 $750.000 $875.670 $305.000 $867.000 $297.810 $867.000 $297.810
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 176.000 $830.000 $1,311.990 $805.000 $1,300.000 $790.290 $1,299.000 $790.290
CL C CONC (ABUT)(HPC)
CY 368.700 $1,280.000 $1,195.470 $1,000.000 $1,640.000 $1,650.000 $1,200.000 $2,000.000
CL C CONC (CAP)(HPC)
CY 591.000 $1,300.000 $1,590.000 $1,300.000 $1,690.000 $2,500.000 $1,825.000 $2,100.000
CL C CONC (CAP)(HPC)(MASS)
CY 400.800 $1,500.000 $3,000.000 $2,220.000 $2,590.000 $3,400.000 $2,300.000 $2,800.000
CL C CONC (COLUMN)(HPC)
CY 899.800 $1,200.000 $2,082.610 $1,600.000 $2,130.000 $2,100.000 $1,720.000 $2,500.000
CL C CONC (FOOTING)(HPC)(MASS)
CY 388.600 $1,500.000 $1,097.880 $950.000 $1,170.000 $2,000.000 $1,185.000 $1,900.000
CL C CONC (RAIL FOUNDATION)(HPC)
CY 401.000 $1,000.000 $900.000 $885.000 $607.000 $1,150.000 $600.000 $550.000
CL F CONC (COLUMN)(HPC)
CY 16.500 $1,535.990 $1,583.190 $2,000.000 $4,500.000 $3,300.000 $3,250.000 $4,000.000
REINF CONC SLAB (HPC)
SF 177,880.000 $27.000 $24.600 $21.000 $27.800 $34.000 $26.000 $26.000
APPROACH SLAB (HPC)
CY 672.000 $650.000 $618.500 $730.000 $718.000 $800.000 $600.000 $1,000.000
RETAINING WALL (MSE)
SF 87,541.000 $72.000 $91.230 $131.000 $61.500 $108.000 $85.000 $120.000
PRESTR CONC GIRDER (TX54)
LF 27,186.380 $205.000 $212.160 $225.000 $209.000 $200.000 $250.000 $220.000
RIPRAP (CONC)(4 IN)
CY 1,329.000 $560.000 $521.990 $475.000 $589.000 $615.000 $590.000 $800.000
RIPRAP (CONC)(5 IN)
CY 89.000 $600.000 $542.220 $555.000 $654.000 $635.000 $540.000 $810.000
RIPRAP (MOW STRIP)(4 IN)
CY 193.000 $680.000 $923.820 $565.000 $634.000 $700.000 $630.000 $1,100.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 17.000 $184.000 $413.480 $270.000 $738.000 $350.000 $225.000 $800.000
RAIL (TY SSTR)
LF 11,844.600 $70.000 $57.300 $95.000 $65.250 $90.000 $70.000 $83.000
RAIL (TY SSTR)(HPC)
LF 5,545.000 $85.000 $90.000 $100.000 $74.750 $65.000 $85.000 $85.000
RAIL (TY T80PP)
LF 2,472.000 $230.000 $127.650 $250.000 $119.000 $250.000 $185.000 $135.000
RAIL (HANDRAIL)(TY E)
LF 544.000 $155.000 $165.480 $150.000 $159.000 $135.000 $120.000 $160.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 923.000 $200.000 $350.000 $195.000 $227.000 $215.000 $185.000 $315.000
CONC BOX CULV (6 FT X 3 FT)
LF 130.000 $500.000 $431.050 $700.000 $602.000 $1,085.000 $935.000 $800.000
CONC BOX CULV (7 FT X 4 FT)
LF 107.000 $625.000 $567.410 $750.000 $608.000 $820.000 $775.000 $1,000.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 249.000 $785.000 $402.810 $1,000.000 $544.000 $540.000 $650.000 $600.000
RC PIPE (CL III)(24 IN)
LF 14,856.000 $130.000 $104.540 $100.000 $141.000 $180.000 $120.000 $140.000
RC PIPE (CL III)(30 IN)
LF 2,763.000 $150.000 $124.250 $125.000 $149.000 $200.000 $140.000 $150.000
RC PIPE (CL III)(36 IN)
LF 1,435.000 $170.000 $161.710 $155.000 $158.000 $220.000 $185.000 $190.000
RC PIPE (CL IV)(24 IN)
LF 450.000 $210.000 $150.490 $215.000 $191.000 $245.000 $130.000 $200.000
RC PIPE (CL IV)(30 IN)
LF 75.000 $240.000 $155.000 $225.000 $212.000 $260.000 $165.000 $210.000
RC PIPE (CL IV)(36 IN)
LF 445.000 $280.000 $183.110 $255.000 $180.000 $290.000 $200.000 $250.000
RC PIPE (CL IV)(48 IN)
LF 360.000 $400.000 $328.090 $375.000 $360.000 $495.000 $350.000 $400.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 7.000 $6,000.000 $6,021.660 $6,500.000 $5,350.000 $7,000.000 $7,400.000 $6,000.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 4.000 $6,250.000 $7,783.900 $8,500.000 $7,050.000 $9,600.000 $8,200.000 $8,000.000
JCTBOX(COMPL)(PJB)(3FTX5FT)
EA 1.000 $7,000.000 $10,867.190 $9,500.000 $12,280.000 $10,000.000 $8,600.000 $8,000.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 3.000 $5,500.000 $6,835.400 $6,000.000 $8,030.000 $10,500.000 $8,000.000 $7,000.000
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 5.000 $6,000.000 $7,721.320 $6,600.000 $8,240.000 $11,000.000 $8,750.000 $7,500.000
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 5.000 $6,000.000 $9,375.050 $6,600.000 $8,840.000 $11,000.000 $8,750.000 $7,500.000
INLET (COMPL)(PCO)(3FT)(BOTH)
EA 4.000 $7,000.000 $10,118.110 $7,600.000 $9,730.000 $11,750.000 $9,250.000 $7,500.000
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 20.000 $7,000.000 $8,571.710 $8,000.000 $8,920.000 $11,350.000 $7,750.000 $7,500.000
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 9.000 $7,000.000 $9,044.070 $8,000.000 $8,850.000 $11,350.000 $7,900.000 $7,500.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 26.000 $7,750.000 $9,724.270 $9,000.000 $10,340.000 $12,100.000 $8,500.000 $7,500.000
INLET (COMPL)(PCU)(4FT)(LEFT)
EA 5.000 $7,500.000 $8,890.500 $9,100.000 $9,570.000 $14,750.000 $8,600.000 $7,500.000
INLET (COMPL)(PCU)(4FT)(RIGHT)
EA 2.000 $7,500.000 $9,019.520 $9,300.000 $10,390.000 $14,750.000 $8,600.000 $7,500.000
INLET (COMPL)(PCU)(4FT)(BOTH)
EA 13.000 $8,000.000 $11,032.430 $10,500.000 $11,280.000 $16,500.000 $9,500.000 $7,500.000
INLET (COMPL)(PMBD)(4FT)
EA 15.000 $8,000.000 $7,582.760 $9,000.000 $10,100.000 $9,000.000 $7,450.000 $8,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 8.000 $6,000.000 $7,827.840 $7,000.000 $9,080.000 $7,750.000 $8,125.000 $8,200.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 8.000 $7,150.000 $12,255.920 $8,000.000 $10,740.000 $9,750.000 $9,950.000 $8,300.000
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 8.000 $8,000.000 $9,937.060 $7,900.000 $8,480.000 $13,250.000 $9,800.000 $8,300.000
INLET (COMPL)(PAZD)(RC)(3FTX3FT)
EA 1.000 $6,500.000 $10,154.820 $5,900.000 $12,180.000 $9,000.000 $7,680.000 $8,000.000
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
EA 2.000 $8,000.000 $8,165.360 $7,100.000 $10,430.000 $9,500.000 $8,850.000 $8,200.000
INLET (COMPL)(COB)(5 FT)(FTW)
EA 2.000 $9,000.000 $21,140.270 $10,900.000 $24,420.000 $20,000.000 $7,650.000 $8,200.000
INLET (COMPL)(CURB)(TY C)(NONE)(HOU)
EA 3.000 $5,600.000 $7,391.790 $6,500.000 $20,900.000 $11,500.000 $7,650.000 $6,000.000
JCT BOX (COMPL)(SPL)
EA 1.000 $38,600.000 $15,177.450 $18,000.000 $30,180.000 $22,000.000 $22,000.000 $30,000.000
INLET (COMPL)(DROP)
EA 2.000 $10,000.000 $20,705.720 $17,000.000 $36,390.000 $11,500.000 $16,500.000 $18,000.000
INLET (COMPL) (TY MSE2)
EA 42.000 $9,000.000 $10,658.660 $10,000.000 $19,850.000 $23,500.000 $5,950.000 $13,000.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $9,200.000 $8,127.140 $10,000.000 $17,680.000 $12,750.000 $11,350.000 $15,000.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $9,200.000 $8,731.160 $9,500.000 $18,130.000 $13,000.000 $11,350.000 $15,000.000
WINGWALL (FW - S) (HW=5 FT)
EA 1.000 $30,000.000 $8,330.430 $25,000.000 $18,880.000 $17,500.000 $12,525.000 $25,000.000
WINGWALL (FW - S) (HW=7 FT)
EA 1.000 $31,000.000 $18,257.540 $35,000.000 $36,770.000 $30,000.000 $18,780.000 $28,000.000
WINGWALL (SW - 0) (HW=6 FT)
EA 1.000 $33,000.000 $11,709.230 $35,000.000 $24,220.000 $21,500.000 $12,770.000 $22,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 3.000 $2,080.500 $2,049.470 $2,800.000 $2,210.000 $5,000.000 $1,340.000 $3,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $3,200.000 $2,258.380 $3,000.000 $3,150.000 $5,000.000 $1,500.000 $3,500.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 2.000 $5,000.000 $6,578.570 $5,200.000 $4,730.000 $7,500.000 $2,400.000 $5,200.000
JACK BOR OR TUN PIPE(48 IN)(RC)(CL IV)
LF 316.000 $1,800.000 $1,500.000 $1,300.000 $1,300.000 $1,800.000 $1,230.000 $1,150.000
JACK BOR TUN BOX CULV (6 FT X 3 FT)
LF 270.000 $3,800.000 $3,200.000 $2,900.000 $2,660.000 $3,500.000 $2,625.000 $3,200.000
ADJUSTING MANHOLES
EA 10.000 $2,500.000 $6,941.990 $4,000.000 $7,930.000 $6,500.000 $1,260.000 $2,500.000
ADJUSTING INLETS
EA 2.000 $3,500.000 $9,371.590 $4,000.000 $8,775.000 $7,500.000 $1,360.000 $2,500.000
ADJUSTING INLETS (CAP)
EA 6.000 $3,500.000 $7,839.500 $3,500.000 $8,775.000 $7,500.000 $950.000 $2,500.000
REMOV STR (INLET)
EA 37.000 $1,200.000 $2,145.240 $1,400.000 $1,660.000 $2,500.000 $900.000 $1,350.000
REMOV STR (SET)
EA 48.000 $328.500 $773.510 $900.000 $1,190.000 $850.000 $500.000 $1,200.000
REMOV STR (HEADWALL)
EA 24.000 $3,300.000 $1,467.210 $4,000.000 $2,390.000 $4,250.000 $1,650.000 $2,100.000
REMOV STR (PIPE)
LF 5,788.000 $35.000 $22.570 $55.000 $62.500 $40.000 $25.000 $25.000
REMOV STR (BOX CULVERT)
LF 333.000 $40.000 $49.210 $225.000 $96.250 $115.000 $60.000 $51.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $140,000.000 $70,068.280 $120,000.000 $92,500.000 $175,000.000 $1,000,000.000 $150,000.000
REMOV STR (RET WALL)
LF 505.000 $150.000 $57.750 $42.000 $80.000 $175.000 $60.000 $165.000
REMOVE STR (DRAINAGE FLUME)
EA 2.000 $4,300.000 $2,218.960 $1,800.000 $2,550.000 $4,000.000 $1,350.000 $3,800.000
MOBILIZATION
LS 1.000 $13,520,289.150 $11,500,000.000 $13,100,000.000 $13,400,000.000 $14,200,000.000 $14,000,000.000 $14,398,301.320
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 40.000 $150,000.000 $50,000.000 $20,000.000 $94,196.400 $190,000.000 $175,000.000 $50,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $15,500.000 $15,829.860 $19,000.000 $25,340.000 $10,000.000 $95,000.000 $20,000.000
TMA (STATIONARY)
DAY 115.000 $350.000 $400.000 $200.000 $824.000 $300.000 $865.000 $400.000
TMA (MOBILE OPERATION)
DAY 67.000 $550.000 $1,600.000 $575.000 $824.000 $1,500.000 $995.000 $1,123.900
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 465.000 $42.500 $38.430 $39.000 $38.500 $48.000 $35.000 $35.350
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 457.000 $80.000 $96.810 $69.000 $96.750 $65.000 $65.000 $65.660
ROCK FILTER DAMS (REMOVE)
LF 922.000 $14.500 $20.750 $12.000 $20.800 $5.000 $12.000 $12.120
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,201.000 $32.000 $35.510 $39.000 $35.500 $29.000 $35.000 $35.350
CONSTRUCTION EXITS (REMOVE)
SY 1,201.000 $11.000 $11.980 $11.000 $12.000 $5.000 $11.000 $11.110
TEMP SEDMT CONT FENCE (INSTALL)
LF 21,540.000 $3.900 $3.620 $4.000 $3.600 $1.650 $3.500 $3.540
TEMP SEDMT CONT FENCE (REMOVE)
LF 21,540.000 $1.000 $0.900 $1.200 $0.900 $0.100 $1.100 $1.110
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,643.000 $4.500 $7.200 $6.000 $7.200 $4.250 $5.900 $5.960
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,643.000 $1.100 $0.920 $1.300 $0.900 $0.100 $1.250 $1.260
CONSTRUCTING DETOURS
SY 41,293.000 $140.000 $104.630 $115.000 $139.000 $122.000 $110.000 $180.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 375.900 $55.000 $5.280 $96.000 $90.000 $90.000 $70.000 $85.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 24,150.000 $45.000 $27.020 $75.000 $51.000 $20.000 $52.500 $53.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,920.000 $60.000 $45.560 $83.000 $62.750 $65.000 $120.000 $70.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 220.000 $65.000 $92.950 $83.000 $141.000 $65.000 $120.000 $63.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 42,300.000 $8.000 $4.410 $10.000 $10.900 $10.000 $9.000 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 4,120.000 $9.000 $2.890 $5.600 $24.700 $10.000 $9.000 $14.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 740.000 $15.000 $11.000 $9.600 $46.500 $10.000 $9.000 $14.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 24,150.000 $12.000 $5.890 $14.000 $11.700 $5.000 $12.000 $12.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,920.000 $13.000 $7.310 $13.000 $21.700 $5.000 $12.000 $13.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 220.000 $15.000 $35.580 $14.000 $51.250 $5.000 $12.000 $19.000
PORT CTB(FUR & INSTL)(F-SHAPE)(TY T)
LF 30.000 $200.000 $69.200 $200.000 $151.000 $160.000 $150.000 $6.000
PORT CTB(MOVE)(F-SHAPE)(TY T)
LF 20.000 $30.000 $51.310 $33.000 $16.300 $50.000 $28.000 $35.000
PORT CTB(REMOVE)(F-SHAPE)(TY T)
LF 30.000 $20.000 $82.330 $31.000 $17.900 $35.000 $30.000 $4.000
PORT CTB (PINNING)
EA 464.000 $60.000 $15.240 $75.000 $51.250 $100.000 $55.000 $110.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 4,146.000 $100.000 $81.220 $135.000 $107.000 $100.000 $90.000 $93.000
PERM CTB (F-SHAPE) (TY 1)
LF 3,207.000 $150.000 $55.800 $125.000 $87.250 $90.000 $85.000 $88.000
COLORED TEXTURED CONC (4")
SY 2,672.000 $160.000 $97.030 $110.000 $74.250 $150.000 $90.000 $110.000
CONC CURB (MONO) (TY II)
LF 36,708.000 $8.000 $2.780 $6.000 $4.850 $3.000 $5.000 $5.000
CONC CURB & GUTTER (TY II)
LF 1,264.000 $50.000 $38.530 $18.000 $51.250 $24.000 $33.000 $57.790
CONC CURB (DOWELED)
LF 737.000 $15.000 $38.040 $39.000 $24.700 $34.000 $21.000 $42.810
CONC CURB (TY F2)
LF 544.000 $210.000 $223.970 $188.000 $377.000 $250.000 $290.000 $198.000
CONC CURB (TY C1)
LF 969.000 $75.000 $106.240 $91.000 $281.000 $140.000 $172.000 $101.670
DRIVEWAYS (CONC)
SY 1,002.000 $115.000 $104.040 $137.000 $160.000 $130.000 $140.000 $215.000
DRIVEWAYS (CONC) (HES)
SY 5,406.000 $165.000 $123.660 $150.000 $135.000 $140.000 $105.000 $225.000
DRIVEWAYS (ACP)
SY 732.000 $55.000 $301.320 $375.000 $283.000 $255.860 $155.000 $320.000
CONC SIDEWALKS (4")
SY 11,966.000 $72.000 $88.000 $60.000 $70.500 $75.000 $63.000 $84.000
CURB RAMPS (TY 1)
EA 9.000 $2,800.000 $2,831.910 $3,400.000 $3,150.000 $2,800.000 $2,225.000 $5,100.000
CURB RAMPS (TY 2)
EA 3.000 $2,900.000 $3,373.990 $3,400.000 $3,530.000 $2,900.000 $2,350.000 $5,100.000
CURB RAMPS (TY 3)
EA 2.000 $3,100.000 $3,344.860 $3,400.000 $3,840.000 $2,900.000 $2,300.000 $5,100.000
CURB RAMPS (TY 5)
EA 6.000 $3,500.000 $2,547.210 $3,400.000 $4,090.000 $2,900.000 $3,660.000 $5,100.000
CURB RAMPS (TY 7)
EA 1.000 $3,900.000 $3,315.450 $3,400.000 $3,590.000 $2,900.000 $2,285.000 $5,100.000
CURB RAMPS (TY 10)
EA 3.000 $2,800.000 $3,384.350 $3,600.000 $3,590.000 $3,000.000 $2,285.000 $5,100.000
CURB RAMPS (TY 21)
EA 6.000 $4,300.000 $2,561.820 $3,600.000 $2,790.000 $3,100.000 $2,350.000 $5,100.000
RIGHT OF WAY MARKERS
EA 92.000 $380.000 $300.000 $370.000 $522.000 $415.000 $450.000 $300.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,263.000 $26.000 $24.050 $25.000 $25.000 $24.050 $25.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,200.000 $1,776.000 $1,800.000 $3,150.000 $1,776.000 $1,900.000 $1,900.000
MTL BEAM GD FEN TRANS (TL2)
EA 6.000 $1,600.000 $982.000 $1,000.000 $1,200.000 $982.000 $1,200.000 $1,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,550.000 $1,134.000 $1,200.000 $1,300.000 $1,134.000 $1,300.000 $1,300.000
TL-2 31" SHORT RADIUS (COMPLETE)
EA 1.000 $14,000.000 $16,577.000 $17,000.000 $20,000.000 $16,577.000 $20,000.000 $20,000.000
REMOVE METAL BEAM GUARD FENCE
LF 5,250.000 $3.000 $3.000 $3.500 $3.000 $3.500 $3.000 $3.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 19.000 $250.000 $225.000 $270.000 $200.000 $500.000 $200.000 $200.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $252.500 $250.000 $270.000 $250.000 $350.000 $250.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,100.000 $2,971.000 $3,100.000 $3,000.000 $2,971.000 $3,000.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 18.000 $295.000 $250.000 $270.000 $250.000 $300.000 $250.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 54.000 $1,100.000 $1,235.000 $3,000.000 $1,770.000 $1,250.000 $1,100.000 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 23.000 $750.000 $825.000 $1,800.000 $1,180.000 $1,800.000 $1,150.000 $650.860
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 6.000 $14,500.000 $33,437.500 $48,000.000 $27,500.000 $35,000.000 $35,000.000 $27,500.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 3.000 $38,000.000 $51,750.000 $73,000.000 $42,000.000 $40,000.000 $35,000.000 $42,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 23.000 $7,300.000 $6,950.000 $12,000.000 $7,460.000 $9,000.000 $15,000.000 $7,326.090
PIPE UNDERDRAINS (TY 8) (6")
LF 6,244.000 $55.000 $33.170 $40.000 $30.500 $70.000 $0.100 $48.180
REMOVE RD IL ASM (TRANS-BASE)
EA 43.000 $800.000 $662.560 $1,050.000 $656.000 $992.570 $656.000 $992.570
REMOVE RD IL ASM (U/P)
EA 4.000 $750.000 $569.640 $670.000 $564.000 $641.240 $564.000 $641.240
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 16.000 $2,000.000 $1,386.730 $1,900.000 $1,370.000 $1,866.280 $1,373.000 $1,866.280
IN RD IL (TY SP) 48S-12 (400W EQ) LED
EA 6.000 $8,500.000 $6,668.020 $6,700.000 $6,600.000 $6,482.360 $6,602.000 $6,482.360
IN RD IL (TY SP) 48S-12-12(400W EQ)LED
EA 2.000 $8,600.000 $8,262.810 $10,500.000 $8,180.000 $9,139.910 $8,181.000 $9,139.910
IN RD IL (TY SA) 50B-12 (400W EQ) LED
EA 14.000 $5,000.000 $5,511.570 $6,500.000 $5,460.000 $6,228.960 $5,457.000 $6,228.960
IN RD IL (TY SA) 50T-12 (400W EQ) LED
EA 21.000 $5,100.000 $5,827.700 $6,200.000 $5,770.000 $5,943.360 $5,770.000 $5,943.360
IN RD IL (TY SA) 50T-12-12(400W EQ)LED
EA 2.000 $7,000.000 $7,718.420 $8,400.000 $7,640.000 $7,979.310 $7,642.000 $797.310
CONDT (PVC) (SCH 40) (2")
LF 7,718.000 $20.000 $25.250 $16.000 $25.000 $15.530 $25.000 $15.530
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,494.000 $26.000 $19.190 $24.000 $19.000 $23.390 $19.000 $23.390
CONDT (PVC) (SCH 40) (3")
LF 20,490.000 $25.500 $16.160 $18.000 $16.000 $16.910 $16.000 $16.910
CONDT (PVC) (SCH 40) (3") (BORE)
LF 6,035.000 $45.000 $23.230 $27.000 $23.000 $26.070 $23.000 $26.070
CONDT (PVC) (SCH 80) (4") (BORE)
LF 1,970.000 $70.000 $44.440 $36.000 $44.000 $34.900 $44.000 $34.900
CONDT (RM) (2")
LF 7,563.000 $65.000 $41.410 $72.000 $41.000 $70.080 $41.000 $70.080
CONDUIT (PREPARE)
LF 175.000 $6.000 $8.080 $23.000 $8.000 $21.940 $8.000 $21.940
ITS MULTI-DUCT CND (PVC-40)
LF 6,260.000 $35.000 $27.270 $30.000 $27.000 $28.760 $27.000 $28.760
ITS MULTI-DUCT CND (PVC-40)(BORE)
LF 1,814.000 $54.000 $32.320 $41.000 $32.000 $40.030 $32.000 $40.030
ELEC CONDR (NO.12) INSULATED
LF 640.000 $1.500 $2.930 $4.000 $2.900 $3.570 $2.900 $3.570
ELEC CONDR (NO.10) BARE
LF 1,078.000 $3.000 $1.620 $2.500 $1.600 $2.310 $1.600 $2.310
ELEC CONDR (NO.10) INSULATED
LF 2,156.000 $2.900 $1.520 $2.600 $1.500 $2.520 $1.500 $2.520
ELEC CONDR (NO.8) BARE
LF 13,644.000 $1.800 $1.620 $3.200 $1.600 $3.050 $1.600 $3.050
ELEC CONDR (NO.8) INSULATED
LF 30,988.000 $2.200 $1.920 $3.300 $1.900 $3.190 $1.900 $3.190
ELEC CONDR (NO.6) BARE
LF 5,717.000 $2.400 $1.920 $3.500 $1.900 $3.420 $1.900 $3.420
ELEC CONDR (NO.6) INSULATED
LF 5,200.000 $4.000 $2.320 $7.200 $2.300 $6.960 $2.300 $6.960
TRAY CABLE (3 CONDR) (14 AWG)
LF 3,475.000 $4.000 $2.320 $7.000 $2.300 $6.730 $2.300 $6.730
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
EA 7.000 $7,200.000 $6,316.540 $7,200.000 $6,250.000 $7,018.310 $6,254.000 $7,018.310
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
EA 6.000 $8,950.000 $9,585.910 $11,000.000 $9,490.000 $10,610.950 $9,491.000 $10,610.950
REMOVE ITS GROUND BOX
EA 23.000 $1,500.000 $1,202.910 $1,300.000 $1,190.000 $1,203.580 $1,191.000 $1,203.580
GROUND BOX TY A (122311)W/APRON
EA 13.000 $1,800.000 $2,121.000 $2,100.000 $2,100.000 $2,020.540 $2,100.000 $2,020.540
GROUND BOX TY C (162911)
EA 8.000 $1,500.000 $1,988.690 $1,700.000 $1,970.000 $1,636.570 $1,969.000 $1,636.570
GROUND BOX TY C (162911)W/APRON
EA 10.000 $2,450.000 $2,237.150 $2,200.000 $2,220.000 $2,104.540 $2,215.000 $2,104.540
REMOVE GROUND BOX
EA 3.000 $650.000 $1,202.910 $540.000 $1,190.000 $524.610 $1,191.000 $524.610
REMOVE ELECTRICAL SERVICES
EA 5.000 $1,500.000 $1,695.790 $1,600.000 $1,680.000 $1,537.720 $1,679.000 $1,537.720
ELC SRV TY A 240/480 100(NS)SS(E)GC(U)
EA 1.000 $13,000.000 $12,001.830 $14,000.000 $11,880.000 $13,489.980 $11,883.000 $13,489.980
ELC SRV TY D 120/240 060(NS)SS(N)TP(O)
EA 2.000 $12,250.000 $7,244.730 $12,000.000 $7,170.000 $11,298.980 $7,173.000 $11,298.980
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 1.000 $13,000.000 $12,256.350 $14,000.000 $12,140.000 $13,160.980 $12,135.000 $13,160.980
ELC SRV TY D 120/240 070(NS)SS(N)SP(U)
EA 2.000 $12,250.000 $10,359.570 $11,000.000 $10,260.000 $10,766.980 $10,257.000 $10,766.980
ALUMINUM SIGNS (TY A)
SF 181.000 $35.000 $35.000 $24.000 $40.250 $22.750 $40.300 $22.750
ALUMINUM SIGNS (TY G)
SF 204.000 $45.000 $32.000 $43.000 $37.500 $42.220 $37.500 $42.220
ALUMINUM SIGNS (TY O)
SF 2,293.000 $55.000 $31.000 $33.000 $53.750 $31.600 $53.700 $31.600
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 48.000 $700.000 $615.000 $1,100.000 $605.000 $1,055.700 $615.000 $676.770
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 4.000 $815.000 $700.000 $1,200.000 $775.000 $1,140.190 $700.000 $717.170
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 57.000 $840.000 $750.000 $1,200.000 $716.000 $1,172.880 $750.000 $853.540
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 4.000 $980.000 $890.000 $1,400.000 $810.000 $1,299.400 $890.000 $949.500
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 14.000 $1,100.000 $745.000 $1,200.000 $669.000 $1,134.270 $745.000 $747.480
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 29.000 $1,150.000 $865.000 $1,400.000 $790.000 $1,296.670 $865.000 $944.440
IN SM RD SN SUP&AM TYS80(1)SB(U)
EA 9.000 $2,100.000 $1,150.000 $1,650.000 $1,150.000 $1,579.230 $1,150.000 $1,222.220
IN SM RD SN SUP&AM TYS80(1)SB(U-BM)
EA 2.000 $1,100.000 $1,195.000 $1,700.000 $1,360.000 $1,625.650 $1,195.000 $1,196.970
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 4.000 $4,200.000 $2,350.000 $2,800.000 $2,240.000 $2,718.830 $2,350.000 $2,217.170
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 6.000 $4,400.000 $2,300.000 $3,400.000 $3,540.000 $3,295.430 $2,300.000 $2,181.820
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 1.000 $4,300.000 $2,400.000 $3,500.000 $3,780.000 $3,379.430 $2,400.000 $2,252.530
IN SRSS & AM (RAIL)(90 MPH)(P MOUNT)
EA 2.000 $3,200.000 $3,950.000 $8,000.000 $6,000.000 $7,877.580 $3,950.000 $7,877.580
IN SRSS & AM (RAIL)(90 MPH)(T MOUNT)
EA 6.000 $3,200.000 $4,250.000 $8,400.000 $6,180.000 $8,206.580 $4,250.000 $8,206.580
INSTALL LRSS (STRUCT STEEL)
LB 1,320.000 $9.700 $8.950 $7.000 $8.000 $6.550 $8.000 $6.550
INS OH SN SUP(30 FT CANT)
EA 2.000 $57,000.000 $32,000.000 $41,000.000 $36,800.000 $40,324.930 $36,799.000 $40,324.930
INS OH SN SUP(35 FT CANT)
EA 1.000 $50,000.000 $55,000.000 $76,000.000 $73,100.000 $74,470.930 $73,106.000 $74,470.930
INS OH SN SUP(40 FT CANT)
EA 8.000 $70,000.000 $42,000.000 $56,000.000 $52,300.000 $54,863.930 $52,258.000 $54,863.930
REMOVE OVERHD SIGN SUP
EA 9.000 $9,000.000 $5,377.240 $3,700.000 $5,320.000 $3,586.860 $5,324.000 $3,586.860
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 1.000 $2,400.000 $2,697.710 $1,700.000 $2,670.000 $1,629.430 $2,671.000 $1,629.430
RELOCATE OVERHD SIGN SUP (SIGN ONLY)
EA 4.000 $3,800.000 $4,047.070 $1,150.000 $4,010.000 $1,086.290 $4,007.000 $1,086.290
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 12.000 $50.000 $55.000 $72.000 $45.000 $97.000 $45.000 $45.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 103.000 $23.000 $18.000 $27.000 $20.000 $27.000 $20.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
EA 6.000 $30.000 $8.500 $9.000 $20.000 $40.000 $20.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 103.000 $22.000 $18.000 $27.000 $20.000 $27.000 $20.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 11.000 $23.000 $19.000 $27.000 $20.000 $30.000 $20.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF1
EA 31.000 $40.000 $3.500 $9.000 $20.000 $30.000 $20.000 $20.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 6.000 $62.000 $55.000 $82.000 $45.000 $110.000 $45.000 $45.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 22,351.000 $1.500 $1.450 $1.600 $1.550 $1.450 $1.450 $1.470
WK ZN PAV MRK REMOV (W)6"(DOT)
LF 1,358.000 $2.400 $2.000 $2.100 $2.150 $2.000 $2.000 $2.030
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 92,859.000 $1.400 $1.150 $1.200 $1.200 $1.150 $1.150 $1.170
WK ZN PAV MRK REMOV (W)8"(LNDP)
LF 1,552.000 $2.300 $2.000 $2.200 $2.150 $2.000 $2.000 $2.030
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 24,061.000 $2.300 $2.200 $2.300 $2.350 $2.200 $2.200 $2.230
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 4,316.000 $5.400 $6.470 $7.000 $6.900 $6.470 $6.470 $6.570
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 1,469.000 $11.000 $12.300 $13.000 $13.100 $12.300 $12.300 $12.490
WK ZN PAV MRK REMOV (W)(ARROW)
EA 22.000 $230.000 $210.000 $217.000 $224.000 $210.000 $210.000 $213.200
WK ZN PAV MRK REMOV (W)(WORD)
EA 21.000 $250.000 $250.000 $260.000 $266.000 $250.000 $250.000 $253.810
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 100,540.000 $1.200 $1.150 $1.220 $1.200 $1.150 $1.150 $1.170
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,781.000 $2.800 $1.530 $1.100 $3.800 $1.500 $1.000 $2.960
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 160.000 $2.000 $2.500 $2.600 $2.650 $2.500 $2.500 $2.540
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 411.000 $1.800 $3.300 $3.500 $3.500 $3.300 $3.300 $3.350
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 16,326.000 $1.200 $1.200 $1.300 $1.300 $1.200 $1.200 $1.220
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,612.000 $3.600 $3.750 $4.000 $4.000 $3.750 $3.750 $3.810
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,785.000 $9.800 $8.000 $9.000 $8.500 $8.000 $8.000 $8.120
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 48.000 $175.000 $195.000 $210.000 $208.000 $195.000 $195.000 $197.970
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
EA 4.000 $350.000 $320.000 $330.000 $341.000 $320.000 $320.000 $324.870
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 7.000 $390.000 $450.000 $465.000 $479.000 $450.000 $450.000 $456.850
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 9.000 $210.000 $185.000 $195.000 $197.000 $185.000 $185.000 $187.820
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 42.000 $220.000 $275.000 $290.000 $293.000 $275.000 $275.000 $279.190
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 47.000 $65.000 $75.000 $80.000 $80.000 $75.000 $75.000 $76.140
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 1,791.000 $1.100 $1.200 $1.300 $1.300 $1.200 $1.200 $1.220
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 653.000 $3.500 $3.750 $4.000 $4.000 $3.750 $3.750 $3.810
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 7,700.000 $0.800 $0.700 $0.800 $0.750 $0.700 $0.700 $0.710
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 10,084.000 $1.500 $0.870 $1.000 $0.950 $0.870 $0.870 $0.880
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 10,448.000 $1.500 $0.870 $1.000 $0.950 $0.870 $0.870 $0.880
PAVEMENT SLER 6"
LF 102,663.000 $0.250 $0.150 $0.170 $0.150 $0.150 $0.150 $0.150
PAVEMENT SLER 8"
LF 13,709.000 $1.300 $0.250 $0.300 $0.250 $0.250 $0.250 $0.250
PAVEMENT SLER 12"
LF 3,566.000 $1.200 $0.500 $0.550 $0.550 $0.500 $0.500 $0.510
PAVEMENT SLER 24"
LF 1,647.000 $1.700 $1.000 $1.050 $1.050 $1.000 $1.000 $1.020
PAVEMENT SLER (ARROW)
EA 43.000 $58.000 $45.000 $47.000 $48.000 $45.000 $45.000 $45.690
PAVEMENT SLER (WORD)
EA 38.000 $62.000 $55.000 $57.000 $58.500 $55.000 $55.000 $55.840
PAVEMENT SLER (LN REDUCT ARROW)
EA 7.000 $70.000 $60.000 $62.000 $64.000 $60.000 $60.000 $60.910
PAVEMENT SLER (U-L ARROW)
EA 2.000 $65.000 $75.000 $79.000 $80.000 $75.000 $75.000 $76.140
PAVEMENT SLER (YLD TRI)
EA 47.000 $15.000 $30.000 $32.000 $32.000 $30.000 $30.000 $30.460
PAVEMENT SLER (NUMBER)
EA 9.000 $18.000 $40.000 $42.000 $42.500 $40.000 $40.000 $40.610
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 21,050.000 $0.600 $0.750 $0.800 $0.800 $0.750 $0.750 $0.760
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 49,029.000 $0.600 $0.700 $0.800 $0.750 $0.700 $0.700 $0.710
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 46,767.000 $0.600 $0.700 $0.800 $0.750 $0.700 $0.700 $0.710
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 1,027.000 $3.200 $2.450 $2.600 $2.600 $2.450 $2.450 $2.490
MOBILE RETROREFLECTIVITY DATA COLLECT
MI 21.300 $1.200 $175.000 $181.000 $186.000 $175.000 $175.000 $177.660
REFL PAV MRKR TY I-C
EA 334.000 $5.100 $6.250 $7.000 $6.650 $6.250 $6.250 $6.350
REFL PAV MRKR TY II-C-R
EA 1,887.000 $4.800 $6.250 $7.000 $6.650 $6.250 $6.250 $6.350
ELIM EXT PM & MRKS (4")
LF 27,708.000 $0.450 $0.550 $0.600 $0.600 $0.550 $0.550 $0.560
ELIM EXT PM & MRKS (6")
LF 600.000 $0.700 $0.550 $0.600 $0.600 $0.550 $0.550 $0.560
ELIM EXT PM & MRKS (8")
LF 1,371.000 $0.750 $0.750 $0.800 $0.800 $0.750 $0.750 $0.760
ELIM EXT PM & MRKS (12")
LF 573.000 $2.100 $2.500 $2.600 $2.650 $2.500 $2.500 $2.540
ELIM EXT PM & MRKS (24")
LF 200.000 $3.100 $5.000 $5.200 $5.350 $5.000 $5.000 $5.080
ELIM EXT PM & MRKS (ARROW)
EA 4.000 $60.000 $55.000 $57.000 $58.500 $55.000 $55.000 $55.840
ELIM EXT PM & MRKS (DBL ARROW)
EA 5.000 $110.000 $65.000 $67.000 $69.250 $65.000 $65.000 $65.990
ELIM EXT PM & MRKS (WORD)
EA 6.000 $60.000 $60.000 $62.000 $64.000 $60.000 $60.000 $60.910
PAV SURF PREP FOR MRK (6")
LF 122,462.000 $0.060 $0.200 $0.220 $0.200 $0.200 $0.200 $0.200
PAV SURF PREP FOR MRK (8")
LF 16,051.000 $0.150 $0.250 $0.280 $0.250 $0.250 $0.250 $0.250
PAV SURF PREP FOR MRK (12")
LF 3,833.000 $0.400 $0.750 $0.800 $0.800 $0.750 $0.750 $0.760
PAV SURF PREP FOR MRK (24")
LF 1,785.000 $1.000 $1.250 $1.300 $1.350 $1.250 $1.250 $1.270
PAV SURF PREP FOR MRK (ARROW)
EA 55.000 $32.000 $40.000 $43.000 $42.500 $40.000 $40.000 $40.610
PAV SURF PREP FOR MRK (U/LT ARROW)
EA 4.000 $32.000 $55.000 $57.000 $58.500 $55.000 $55.000 $55.840
PAV SURF PREP FOR MRK (NUMBER)
EA 9.000 $18.000 $35.000 $37.000 $37.250 $35.000 $35.000 $35.530
PAV SURF PREP FOR MRK (WORD)
EA 42.000 $35.000 $45.000 $47.000 $48.000 $45.000 $45.000 $45.690
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 47.000 $19.000 $20.000 $22.000 $21.300 $20.000 $20.000 $20.300
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 2.000 $46,500.000 $9,262.710 $54,000.000 $9,170.000 $52,368.400 $9,171.000 $52,368.400
REMOVING TRAFFIC SIGNALS (DIAMOND)
EA 2.000 $30,000.000 $20,125.260 $19,000.000 $19,930.000 $18,504.420 $19,926.000 $18,504.420
TEMP TRAF SIGNALS
EA 2.000 $115,000.000 $205,032.020 $242,000.000 $203,000.000 $237,663.580 $203,002.000 $237,663.580
VEH SIG SEC (12")LED(GRN)
EA 27.000 $480.000 $265.630 $500.000 $263.000 $491.200 $263.000 $491.200
VEH SIG SEC (12")LED(GRN ARW)
EA 14.000 $475.000 $265.630 $510.000 $263.000 $496.800 $263.000 $496.800
VEH SIG SEC (12")LED(YEL)
EA 37.000 $490.000 $265.630 $500.000 $263.000 $491.200 $263.000 $491.200
VEH SIG SEC (12")LED(YEL ARW)
EA 8.000 $480.000 $265.630 $600.000 $263.000 $584.300 $263.000 $584.300
VEH SIG SEC (12")LED(RED)
EA 37.000 $490.000 $274.720 $500.000 $272.000 $491.200 $272.000 $491.200
VEH SIG SEC (12")LED(RED ARW)
EA 8.000 $455.000 $265.630 $510.000 $263.000 $496.800 $263.000 $496.800
PED SIG SEC (LED)(COUNTDOWN)
EA 24.000 $1,200.000 $656.500 $770.000 $650.000 $738.720 $650.000 $738.720
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
EA 41.000 $285.000 $281.790 $400.000 $279.000 $382.000 $279.000 $382.000
BACKPLATE W/REF BRDR(4 SEC)(VENT)ALUM
EA 2.000 $340.000 $355.520 $500.000 $352.000 $460.400 $352.000 $460.400
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 7,832.000 $3.700 $2.120 $4.500 $2.100 $4.100 $2.100 $4.100
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 163.000 $4.000 $2.530 $14.000 $2.500 $13.550 $2.500 $13.550
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 2,840.000 $8.500 $6.770 $8.000 $6.700 $7.630 $6.700 $7.630
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 7,140.000 $3.700 $2.020 $3.500 $2.000 $3.230 $2.000 $3.230
INS TRF SIG PL AM(S)1 ARM(36')LUM&ILSN
EA 1.000 $18,000.000 $17,355.840 $20,000.000 $17,180.000 $19,237.780 $17,184.000 $19,237.780
INS TRF SIG PL AM(S)1 ARM(40')ILSN
EA 1.000 $17,850.000 $16,378.160 $18,500.000 $16,220.000 $17,729.980 $16,216.000 $17,729.980
INS TRF SIG PL AM(S)1 ARM(40')LUM&ILSN
EA 1.000 $19,100.000 $18,276.960 $21,000.000 $18,100.000 $20,129.580 $18,096.000 $20,129.580
INS TRF SIG PL AM(S)1 ARM(50')ILSN
EA 1.000 $39,500.000 $35,583.310 $38,000.000 $35,230.000 $36,734.980 $35,231.000 $36,734.980
INS TRF SIG PL AM(S)1 ARM(50')LUM&ILSN
EA 1.000 $34,600.000 $38,455.750 $42,000.000 $38,080.000 $40,075.380 $38,075.000 $40,075.380
INS TRF SIG PL AM(S)1 ARM(55')ILSN
EA 1.000 $42,250.000 $36,428.680 $39,000.000 $36,070.000 $37,552.580 $36,068.000 $37,552.580
INS TRF SIG PL AM(S)1 ARM(60')LUM&ILSN
EA 2.000 $36,900.000 $40,898.940 $44,000.000 $40,490.000 $42,592.060 $40,494.000 $42,592.060
INS TRF SIG PL AM(S)1 ARM(65')LUM&ILSN
EA 2.000 $37,700.000 $41,811.980 $45,000.000 $41,400.000 $43,475.460 $41,398.000 $43,475.460
IN TRF SG PL AM(S)2ARM(55-36')LUM&ILSN
EA 1.000 $43,000.000 $47,425.560 $52,000.000 $46,960.000 $51,130.670 $46,956.000 $51,130.670
PED POLE ASSEMBLY
EA 18.000 $4,800.000 $1,771.540 $3,500.000 $1,750.000 $3,393.750 $1,754.000 $3,393.750
PED DETECT PUSH BUTTON (APS)
EA 24.000 $1,360.000 $1,118.070 $1,700.000 $1,110.000 $1,606.250 $1,107.000 $1,606.250
PED DETECTOR CONTROLLER UNIT
EA 4.000 $4,500.000 $4,747.000 $4,700.000 $4,700.000 $4,597.570 $4,700.000 $4,597.570
FULL - WIDTH MOWING
CYC 9.000 $4,250.000 $3,895.000 $3,900.000 $1,500.000 $5,000.000 $2,000.000 $9,691.420
LITTER REMOVAL
CYC 9.000 $4,700.000 $2,008.300 $2,300.000 $15,000.000 $1,400.000 $2,000.000 $7,492.330
MEMBRANE UNDERSEAL
GAL 7,581.000 $3.850 $2.000 $2.300 $2.000 $5.750 $15.000 $2.000
ITS COM CBL (ETHERNET)
LF 209.000 $4.000 $8.790 $10.000 $8.700 $9.760 $8.700 $9.760
BBU SYSTEM (EXTERNAL BATTERY CABINET)
EA 1.000 $10,300.000 $9,125.350 $15,000.000 $9,040.000 $14,707.950 $9,035.000 $14,707.950
ITS RVSD (DC & WWA)(RELOCATE)
EA 3.000 $13,500.000 $3,013.840 $4,500.000 $2,980.000 $4,345.150 $2,984.000 $4,345.150
ITS POLE (60 FT)(90 MPH)
EA 1.000 $24,500.000 $32,156.380 $33,000.000 $31,840.000 $32,407.510 $31,838.000 $32,407.510
ITS POLE (40 FT)(RELOCATE)
EA 1.000 $7,500.000 $5,230.790 $9,000.000 $5,180.000 $8,693.750 $5,179.000 $8,693.750
ITS POLE (60 FT)(RELOCATE)
EA 1.000 $7,600.000 $6,057.980 $9,100.000 $6,000.000 $8,916.350 $5,998.000 $8,916.350
ITS POLE (40 FT)(REM)
EA 1.000 $1,400.000 $1,986.670 $1,500.000 $1,970.000 $1,393.420 $1,967.000 $1,393.420
GROUND BOX (PREPARE)
EA 4.000 $350.000 $902.940 $450.000 $894.000 $432.120 $894.000 $432.120
RELOCATE CCTV FIELD EQUIPMENT
EA 3.000 $7,800.000 $3,013.840 $4,500.000 $2,980.000 $4,345.150 $2,984.000 $4,345.150
FIBER OPTIC FUSION SPLICE
EA 504.000 $120.000 $67.670 $59.000 $67.000 $56.000 $67.000 $56.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 9.000 $2,900.000 $1,796.790 $2,900.000 $1,780.000 $2,766.400 $1,779.000 $2,766.400
FIBER OPTIC CBL (SNGL-MODE)(48 FIBER)
LF 16,998.000 $3.600 $5.860 $5.000 $5.800 $4.550 $5.800 $4.550
FIBER OPTIC CBL (SNGL-MODE)(72 FIBER)
LF 8,499.000 $4.000 $6.060 $5.200 $6.000 $4.830 $6.000 $4.830
REMOVE FIBER OPTIC CABLE
LF 7,842.000 $2.100 $1.520 $1.500 $1.500 $1.400 $1.500 $1.400
RELOCATE EXIST GND MT COMM CABINET
EA 3.000 $5,800.000 $8,381.990 $11,500.000 $8,300.000 $10,850.840 $8,299.000 $10,850.840
INSTALL GND MT COMM CABINET FOUNDATION
EA 3.000 $4,300.000 $5,724.680 $5,100.000 $5,670.000 $5,000.350 $5,668.000 $5,000.350
Totals: $147,373,180.665 $123,539,232.293 $131,055,174.430 $134,940,118.720 $142,831,266.830 $143,123,852.360 $143,983,013.198
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $200,000.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $18,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $500,000.00
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (PART) $550,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $500,000.00
Total: $1,768,000.00