Show Job Controls
Bid Cobra

DENTON IH 35 (0195-02-081)

Items: 292

County: DENTON
Length: 3.8600 MILES
Highway: IH 35
District: DALLAS
Control Number: 0195-02-081
DBE Goal: 0.0%
Project: F 2025(609)
Guaranty: $100,000.00
Time: 911 WORKING DAYS
Engineer's Estimate: $167,578,105.30
Date: 08/07/2025 (10 months ago)
Contract Number: 8253001
Type: WIDEN ROAD - ADD LANES
Project ID: A00138368
Contract Type: Federal
Project Description: RECONSTRUCT AND WIDEN 4 TO 6 LANE RURAL FREEWAY WITH RAMP MODIFICATIONS AND RECONSTRUCT AND WIDEN 4 LANE CONTINUOUS TO 4/6 LANE CONTINUOUS FRONTAGE ROADS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CHRISTOPHER ROCHA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (9)
E
Engineer's Estimate
$167,578,105.30
$128,704,133.71
Over/Under Est: -23.2% -$38,873,971.59
$129,110,427.47
Over/Under Est: -22.96% -$38,467,677.83
Amt Left: 0.32% $406,293.76
Over/Under Est: -21.65% -$36,279,756.90
Amt Left: 2.02% $2,594,214.69
Delta: -1.69% -$2,187,920.93
$143,455,210.22
Over/Under Est: -14.4% -$24,122,895.08
Amt Left: 11.46% $14,751,076.51
Delta: -9.26% -$12,156,861.82
$149,681,672.62
Over/Under Est: -10.68% -$17,896,432.68
Amt Left: 16.3% $20,977,538.91
Delta: -4.34% -$6,226,462.40
Over/Under Est: -9.26% -$15,526,097.93
Amt Left: 18.14% $23,347,873.66
Delta: -1.58% -$2,370,334.75
Over/Under Est: -9.26% -$15,526,097.93
Amt Left: 18.14% $23,347,873.66
Delta: 0.00% $0.00
Over/Under Est: -3.71% -$6,209,527.55
Amt Left: 25.38% $32,664,444.04
Delta: -6.13% -$9,316,570.38
$176,380,857.82
Over/Under Est: 5.25% $8,802,752.52
Amt Left: 37.04% $47,676,724.11
Delta: -9.30% -$15,012,280.07
Subcontractor Percentage Amount
NORTH TEXAS CONTRACTING, INC. 11.95% $15,380,143.98
OVERLAND CORPORATION 9.78% $12,587,264.28
LEGACY CONSTRUCTION MANAGEMENT SERVICES, LLC 2.74% $3,526,493.26
MICA CORPORATION 2.40% $3,088,899.21
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 1.63% $2,097,877.38
TORO BRAVO CONSTRUCTION, LLC 0.59% $759,354.39
INLET STRUCTURES SPECIALTIES 0.53% $682,131.91
TEXOP CONSTRUCTION 0.43% $553,427.77
STRIPE-A-ZONE, LLC 0.37% $476,205.29
WYLIE DRILLING & DRAINAGE, INC. 0.32% $411,853.23
ANTIGO CONSTRUCTION, INC. 0.17% $218,797.03
J.H. PAINTING COMPANY 0.15% $193,056.20
FORTSON CONTRACTING, INC. 0.10% $128,704.13
FC TRAFFIC CONTROL, INC. 0.10% $128,704.13
HOUSTON SAWING & DRILLING 0.03% $38,611.24
PROFESSIONAL TRAFFIC CONTROL LLC 0.02% $25,740.83
Total: 31.31% $40,297,264.26

Bid Items & Bid Tabulations

292 Total 0 of 292
DENTON  |  IH 35  |  DALLAS  |  0195-02-081  |  08/07/2025  |  $167,578,105.30  |  F 2025(609)  |  WIDEN ROAD - ADD LANES  |  911 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
INDUS ROAD & BRIDGE, INC.
WEBBER, LLC
MARIO SINACOLA & SONS EXCAVATING, INC.
RAGLE CONSTRUCTION, INC.
SEMA CONSTRUCTION, INC.
ZACHRY CONSTRUCTION CORPORATION
AUSTIN BRIDGE & ROAD SERVICES, LP
FLATIRON DRAGADOS CONSTRUCTORS, INC.
RPM XCONSTRUCTION, LLC
PREPARING ROW
STA 130.940 $106,610.000 $25,031.830 $76,519.930 $24,565.000 $107,000.000 $114,313.170 $114,556.290 $114,556.290 $60,000.000 $75,000.000
REMOV CONC (PAV)
SY 131,376.000 $10.000 $11.000 $9.500 $15.000 $16.000 $9.890 $8.250 $8.250 $22.730 $33.000
REMOV CONC (MOWSTRIP)
LF 4,300.000 $25.000 $7.000 $9.400 $15.000 $6.000 $9.970 $3.660 $3.660 $6.630 $8.000
REMOV CONC (RIPRAP)
SY 1,495.000 $20.000 $11.000 $20.700 $15.000 $8.000 $19.020 $10.430 $10.430 $22.470 $13.000
REMOV CONC (DRIVEWAYS)
SY 2,473.000 $30.000 $14.000 $16.100 $15.000 $13.500 $14.370 $10.420 $10.420 $12.360 $30.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 447.000 $25.000 $9.000 $11.600 $15.000 $16.000 $16.390 $13.450 $13.450 $60.300 $14.000
REMOV CONC (TRAFFIC BARRIER)
LF 13,552.000 $30.000 $16.000 $17.100 $35.000 $23.000 $22.570 $12.320 $12.320 $13.080 $50.000
RMV (2"-6") TRT/UNTRT BASE & ASPH PAV
SY 643.000 $10.000 $6.000 $2.850 $19.000 $8.500 $7.430 $11.210 $11.210 $26.490 $14.000
RMV (12"-16") TRT/UNTRT BASE & ASPH PAV
SY 76,868.000 $12.000 $8.000 $9.350 $5.000 $8.250 $4.330 $2.290 $2.290 $14.000 $7.000
EXCAV (ROADWAY)
CY 174,110.000 $18.000 $12.000 $13.200 $22.000 $18.000 $17.730 $20.000 $20.000 $12.000 $14.000
EMBANK (FNL)(DC)(TY C1)
CY 373,263.000 $20.000 $13.000 $12.300 $12.000 $9.000 $9.130 $15.000 $15.000 $24.000 $19.000
EMBANK (FNL)(DC)(TY C2)
CY 90,443.000 $50.000 $4.500 $52.000 $15.000 $6.750 $42.980 $48.810 $48.810 $12.000 $57.000
COMPOST MANUF TOPSOIL (4")
SY 297,872.000 $2.000 $2.100 $2.050 $0.920 $1.050 $2.100 $2.790 $2.790 $5.500 $2.200
BLOCK SODDING
SY 297,872.000 $4.000 $4.000 $3.650 $3.600 $4.800 $3.600 $3.600 $3.600 $3.600 $4.000
DRILL SEED (TEMP_WARM_COOL)
SY 265,637.000 $0.300 $0.250 $0.100 $0.110 $0.250 $0.110 $0.110 $0.110 $0.110 $0.120
VEGETATIVE WATERING
TGL 83,828.000 $8.000 $1.000 $4.200 $0.100 $1.000 $0.100 $0.010 $0.010 $3.000 $1.000
FL BS (CMP IN PLC)(TY D GR 1-2) (12")
SY 17,300.000 $30.000 $22.000 $17.400 $25.000 $20.000 $18.880 $23.540 $23.540 $42.840 $8.500
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 2,867.000 $90.000 $70.000 $79.500 $100.000 $83.000 $74.390 $103.590 $103.590 $68.780 $92.700
LIME (COM OR QK)(SLURRY)
TON 9,217.000 $320.000 $333.000 $302.000 $300.000 $335.000 $291.640 $347.320 $347.320 $280.000 $300.000
LIME TRT (EXIST MATL)(12")
SY 307,863.000 $7.000 $5.000 $6.200 $8.000 $3.400 $4.850 $5.530 $5.530 $8.000 $6.620
CEM TRT(PLNT MX)(CL L)(TYD)(GR1-2)(6")
SY 167,492.000 $24.000 $16.500 $15.100 $17.000 $18.000 $16.210 $21.390 $21.390 $25.000 $15.000
SP MIXES SP-B PG64-22
TON 32,249.000 $140.000 $110.000 $127.000 $111.800 $130.000 $125.000 $120.000 $120.000 $129.650 $151.000
SP MIXES SP-C SAC-B PG64-22
TON 3,129.000 $145.000 $120.500 $135.000 $145.600 $135.000 $155.000 $148.000 $148.000 $155.780 $181.530
SP MIXES SP-D PG64-22
TON 11,176.000 $160.000 $126.000 $148.000 $122.650 $130.000 $122.000 $138.000 $138.000 $125.630 $146.400
TACK COAT
GAL 2,540.000 $4.500 $3.700 $3.050 $8.100 $5.000 $3.000 $4.000 $4.000 $3.020 $3.500
CONC PVMT (CRCP) (11")
SY 110,479.000 $105.000 $92.000 $88.000 $84.000 $80.000 $83.810 $109.910 $109.910 $105.000 $131.000
CONC PVMT (CRCP) (13")
SY 157,351.000 $115.000 $106.500 $92.500 $90.000 $95.000 $90.370 $115.590 $115.590 $115.000 $120.000
CONC PVMT (CRCP)(HES) (11")
SY 326.000 $180.000 $155.000 $214.000 $175.000 $140.000 $119.930 $144.990 $144.990 $732.410 $210.000
CEM STABIL BKFL
CY 1,544.000 $200.000 $170.000 $273.000 $200.000 $115.000 $165.030 $147.700 $147.700 $185.000 $280.000
FLOWABLE BACKFILL
CY 25.000 $400.000 $300.000 $513.000 $435.000 $280.000 $298.790 $528.030 $528.030 $347.930 $1,475.000
TRENCH EXCAVATION PROTECTION
LF 40,794.000 $10.000 $2.200 $2.950 $1.000 $1.000 $1.000 $3.270 $3.270 $2.360 $1.250
TEMPORARY SPL SHORING
SF 84,264.000 $40.000 $42.000 $1.860 $46.000 $10.000 $47.180 $38.400 $38.400 $25.540 $40.000
DRILL SHAFT (36 IN)
LF 30.000 $370.000 $670.000 $226.000 $410.000 $600.000 $701.790 $417.170 $417.170 $623.000 $766.000
DRILL SHAFT (42 IN)
LF 2,278.000 $250.000 $282.000 $320.000 $270.000 $265.000 $336.220 $274.620 $274.620 $402.110 $420.000
DRILL SHAFT (48 IN)
LF 1,031.000 $370.000 $325.000 $453.000 $320.000 $340.000 $344.960 $351.670 $351.670 $496.930 $415.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 30.000 $700.000 $160.000 $155.000 $300.000 $333.310 $265.790 $200.000 $200.000 $418.000 $270.000
DRILL SHAFT (SIGN MTS) (42 IN)
LF 32.000 $750.000 $545.000 $536.000 $800.000 $824.970 $809.180 $450.000 $450.000 $944.000 $865.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 119.000 $775.000 $590.000 $584.000 $800.000 $799.540 $801.090 $700.000 $700.000 $1,354.000 $865.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 78.000 $800.000 $698.000 $688.000 $850.000 $1,251.410 $845.370 $675.000 $675.000 $1,558.000 $910.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 200.000 $265.000 $335.000 $211.000 $305.000 $302.120 $294.660 $309.580 $309.580 $309.000 $325.000
CL A CONC (FLUME)
CY 17.000 $625.000 $555.000 $785.000 $900.000 $775.000 $590.000 $905.190 $905.190 $810.270 $731.000
CL C CONC (ABUT)(HPC)
CY 346.000 $1,200.000 $865.000 $1,490.000 $1,500.000 $975.000 $1,203.060 $1,265.110 $1,265.110 $1,655.120 $1,550.000
CL C CONC (CAP)(HPC)
CY 356.000 $1,300.000 $1,172.000 $1,500.000 $1,500.000 $1,100.000 $1,249.210 $1,683.220 $1,683.220 $2,220.950 $2,450.000
CL C CONC (COLUMN)(HPC)
CY 364.000 $1,200.000 $1,295.000 $1,600.000 $1,500.000 $1,650.000 $1,497.170 $2,083.760 $2,083.760 $2,770.810 $3,405.000
CL C CONC (RAIL FOUNDATION)(HPC)
CY 152.000 $950.000 $405.000 $653.000 $900.000 $590.000 $655.070 $1,000.000 $1,000.000 $811.950 $870.000
CL C CONC (MISC)
CY 98.000 $750.000 $1,100.000 $1,250.000 $3,000.000 $1,300.000 $979.000 $1,633.900 $1,633.900 $1,917.220 $863.000
REINF CONC SLAB (HPC)
SF 102,146.000 $26.000 $21.000 $22.700 $27.000 $24.000 $23.220 $24.900 $24.900 $28.340 $32.000
APPROACH SLAB (HPC)
CY 614.800 $700.000 $690.000 $625.000 $650.000 $640.000 $573.640 $615.490 $615.490 $866.910 $785.000
RETAINING WALL (MSE)
SF 97,332.000 $75.000 $96.000 $53.250 $80.000 $78.000 $62.170 $52.350 $52.350 $80.000 $65.000
PRESTR CONC GIRDER (TX62)
LF 11,254.000 $250.000 $240.000 $241.000 $210.000 $260.000 $276.010 $232.310 $232.310 $230.000 $330.000
RIPRAP (CONC)(4 IN)
CY 290.000 $700.000 $485.000 $678.000 $700.000 $595.000 $615.280 $617.370 $617.370 $719.240 $840.000
RIPRAP (CONC) (CL B) (4 IN)
CY 2.000 $700.000 $700.000 $1,180.000 $1,500.000 $1,050.000 $1,019.020 $1,566.700 $1,566.700 $1,324.930 $1,030.000
RIPRAP (CONC)(FLUME)
CY 46.000 $625.000 $550.000 $746.000 $870.000 $830.000 $595.000 $934.060 $934.060 $918.120 $1,125.000
RIPRAP (MOW STRIP)(4 IN)
CY 580.000 $750.000 $608.000 $553.000 $625.000 $600.000 $571.590 $799.080 $799.080 $540.180 $910.000
RIPRAP (PNEUM PLAC CONC)(4 IN)
CY 198.200 $1,500.000 $650.000 $277.000 $750.000 $100.000 $1,850.000 $1,620.000 $1,620.000 $540.000 $2,025.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 169.000 $225.000 $145.000 $430.000 $300.000 $170.000 $173.000 $197.860 $197.860 $363.060 $265.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 323.000 $200.000 $145.000 $289.000 $225.000 $175.000 $154.000 $177.910 $177.910 $161.780 $300.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 2,162.000 $200.000 $135.000 $216.000 $185.000 $180.000 $153.000 $151.950 $151.950 $127.110 $278.000
RAIL (TY SSTR)
LF 7,265.600 $80.000 $88.000 $49.250 $75.000 $70.000 $70.420 $52.520 $52.520 $76.350 $82.000
RAIL (TY SSTR)(HPC)
LF 1,328.000 $75.000 $95.000 $81.750 $90.000 $90.000 $86.840 $69.910 $69.910 $103.860 $130.000
RAIL (TY C221)
LF 1,131.000 $120.000 $108.000 $153.000 $300.000 $145.000 $146.300 $152.000 $152.000 $224.370 $325.000
RAIL (HANDRAIL)(TY F)
LF 106.000 $150.000 $145.000 $138.000 $225.000 $175.000 $144.340 $160.510 $160.510 $209.690 $220.000
RETROFIT RAIL (TY SSTR)
LF 190.000 $75.000 $190.000 $345.000 $300.000 $205.000 $189.840 $142.510 $142.510 $125.590 $230.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 608.000 $160.000 $198.000 $241.000 $225.000 $195.000 $175.910 $249.250 $249.250 $363.320 $230.000
CONC BOX CULV (3 FT X 2 FT)
LF 7,798.000 $325.000 $290.000 $191.000 $240.000 $250.000 $250.000 $216.000 $216.000 $300.000 $370.000
CONC BOX CULV (3 FT X 3 FT)
LF 2,935.000 $375.000 $320.000 $251.000 $275.000 $270.000 $270.000 $259.650 $259.650 $400.000 $437.250
CONC BOX CULV (4 FT X 2 FT)
LF 258.000 $400.000 $360.000 $234.000 $325.000 $295.000 $295.000 $262.230 $262.230 $450.000 $465.650
CONC BOX CULV (4 FT X 3 FT)
LF 1,556.000 $450.000 $385.000 $242.000 $295.000 $320.000 $320.000 $329.740 $329.740 $500.000 $497.300
CONC BOX CULV (5 FT X 2 FT)
LF 931.000 $500.000 $440.000 $273.000 $350.000 $345.000 $345.000 $338.750 $338.750 $515.000 $527.800
CONC BOX CULV (5 FT X 3 FT)
LF 968.000 $525.000 $480.000 $293.000 $355.000 $370.000 $370.000 $366.400 $366.400 $550.000 $561.300
CONC BOX CULV (6 FT X 3 FT)
LF 298.000 $600.000 $510.000 $450.000 $480.000 $420.000 $420.000 $489.350 $489.350 $700.000 $641.000
CONC BOX CULV (8 FT X 3 FT)
LF 1,408.000 $800.000 $700.000 $575.000 $550.000 $545.000 $545.000 $659.660 $659.660 $900.000 $830.000
CONC BOX CULV (9 FT X 4 FT)
LF 1,057.000 $850.000 $825.000 $677.000 $680.000 $695.000 $695.000 $733.420 $733.420 $1,100.000 $1,003.000
CONC BOX CULV (9 FT X 5 FT)
LF 2,985.000 $900.000 $910.000 $726.000 $700.000 $749.000 $749.000 $800.790 $800.790 $1,250.000 $1,074.000
RC PIPE (CL III)(18 IN)
LF 190.000 $175.000 $60.000 $201.000 $240.000 $100.000 $100.000 $120.060 $120.060 $200.000 $185.000
RC PIPE (CL III)(24 IN)
LF 10,814.000 $125.000 $105.000 $100.000 $120.000 $113.000 $113.000 $90.000 $90.000 $150.000 $199.000
RC PIPE (CL III)(30 IN)
LF 2,511.000 $130.000 $130.000 $100.000 $125.000 $120.000 $120.000 $120.190 $120.190 $175.000 $212.000
RC PIPE (CL III)(36 IN)
LF 1,908.000 $180.000 $160.000 $129.000 $165.000 $150.000 $150.000 $149.840 $149.840 $200.000 $250.000
RC PIPE (CL III)(42 IN)
LF 786.000 $270.000 $215.000 $202.000 $185.000 $200.000 $200.000 $237.110 $237.110 $210.000 $312.000
RC PIPE (CL IV)(36 IN)
LF 2,070.000 $200.000 $225.000 $168.000 $190.000 $150.000 $150.000 $181.320 $181.320 $250.000 $260.000
RC PIPE (CL V)(24 IN)
LF 8,848.000 $160.000 $155.000 $119.000 $125.000 $128.000 $128.000 $175.000 $175.000 $225.000 $223.000
RC PIPE (CL V)(30 IN)
LF 169.000 $260.000 $255.000 $173.000 $155.000 $150.000 $150.000 $145.530 $145.530 $300.000 $250.000
RC PIPE (CL V)(36 IN)
LF 272.000 $280.000 $330.000 $191.000 $215.000 $214.000 $214.000 $213.850 $213.850 $350.000 $331.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 7.000 $5,500.000 $7,700.000 $6,490.000 $10,000.000 $6,500.000 $6,500.000 $9,000.000 $9,000.000 $12,247.980 $7,950.000
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 32.000 $8,000.000 $9,500.000 $10,640.000 $13,000.000 $10,000.000 $10,000.000 $10,492.120 $10,492.120 $16,425.310 $12,231.000
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 31.000 $7,500.000 $9,000.000 $10,260.000 $12,500.000 $10,000.000 $10,000.000 $10,247.930 $10,247.930 $15,807.100 $12,231.000
INLET (COMPL)(PCU)(3FT)(BOTH)
EA 19.000 $7,200.000 $9,500.000 $11,940.000 $13,500.000 $12,000.000 $12,000.000 $14,274.940 $14,274.940 $19,328.180 $14,680.000
INLET (COMPL)(PCU)(4FT)(LEFT)
EA 10.000 $8,500.000 $7,300.000 $9,130.000 $13,000.000 $9,000.000 $9,000.000 $8,427.200 $8,427.200 $14,690.350 $11,010.000
INLET (COMPL)(PCU)(4FT)(RIGHT)
EA 9.000 $10,000.000 $10,500.000 $10,260.000 $13,000.000 $10,000.000 $10,000.000 $10,295.750 $10,295.750 $16,932.200 $12,230.000
INLET (COMPL)(PCU)(4FT)(BOTH)
EA 4.000 $7,500.000 $11,900.000 $12,390.000 $14,000.000 $11,000.000 $11,000.000 $15,285.840 $15,285.840 $21,742.060 $13,500.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
EA 60.000 $8,500.000 $7,600.000 $9,790.000 $9,000.000 $7,000.000 $7,000.000 $7,888.190 $7,888.190 $13,003.370 $8,570.000
INLET (COMPL)(PSL)(FG)(5FTX5FT-3FTX3FT)
EA 3.000 $11,000.000 $8,500.000 $10,210.000 $10,000.000 $10,000.000 $10,000.000 $8,253.180 $8,253.180 $14,443.350 $12,230.000
INLET (COMPL)(PSL)(FG)(6FTX6FT-3FTX3FT)
EA 11.000 $15,000.000 $11,200.000 $12,020.000 $13,000.000 $14,000.000 $14,000.000 $10,520.890 $10,520.890 $17,492.490 $17,125.000
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 31.000 $7,500.000 $6,100.000 $9,150.000 $16,300.000 $6,000.000 $6,000.000 $6,933.610 $6,933.610 $10,545.520 $7,340.000
INLET (COMPL)(COB)(10 FT)(FTW)
EA 3.000 $7,000.000 $15,000.000 $17,920.000 $16,500.000 $15,000.000 $15,000.000 $15,706.470 $15,706.470 $23,329.770 $18,350.000
INLET (COMPL)(COB)(20 FT)(FTW)
EA 3.000 $9,000.000 $20,000.000 $29,590.000 $30,000.000 $27,500.000 $27,500.000 $28,232.560 $28,232.560 $38,223.130 $33,650.000
INLET (COMPL) (RWI) (TY II)
EA 27.000 $6,000.000 $11,500.000 $18,330.000 $17,000.000 $12,500.000 $12,500.000 $16,358.950 $16,358.950 $22,538.840 $15,300.000
INLET (COMPL)(RWI)(TY I)
EA 1.000 $5,000.000 $12,000.000 $17,640.000 $17,000.000 $12,500.000 $12,500.000 $15,629.360 $15,629.360 $22,837.890 $15,300.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 1.000 $9,500.000 $14,000.000 $30,210.000 $21,500.000 $15,000.000 $15,000.000 $16,197.680 $16,197.680 $44,997.820 $18,600.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $11,000.000 $14,500.000 $37,950.000 $17,000.000 $11,000.000 $11,000.000 $14,100.170 $14,100.170 $436,150.630 $15,800.000
WINGWALL (FW - 0) (HW=5 FT)
EA 2.000 $19,500.000 $28,000.000 $21,700.000 $26,000.000 $14,000.000 $14,000.000 $7,939.140 $7,939.140 $37,793.290 $20,200.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $15,000.000 $22,000.000 $18,951.100 $27,000.000 $13,000.000 $13,000.000 $21,364.740 $21,364.740 $36,020.960 $18,900.000
WINGWALL (FW - S) (HW=8 FT)
EA 3.000 $20,000.000 $36,000.000 $61,800.000 $63,000.000 $40,000.000 $40,000.000 $24,475.970 $24,475.970 $123,881.410 $54,750.000
WINGWALL (FW - S) (HW=10 FT)
EA 1.000 $40,000.000 $86,000.000 $103,100.000 $110,000.000 $85,000.000 $85,000.000 $68,795.850 $68,795.850 $208,565.410 $111,500.000
WINGWALL (PW - 2) (HW=5 FT)
EA 1.000 $17,500.000 $20,000.000 $19,080.000 $34,000.000 $14,000.000 $14,000.000 $11,614.170 $11,614.170 $40,821.920 $25,000.000
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $16,000.000 $38,000.000 $38,840.000 $62,000.000 $41,000.000 $41,000.000 $31,021.490 $31,021.490 $102,352.710 $55,600.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1)(C)
EA 1.000 $7,200.000 $16,800.000 $16,930.000 $10,000.000 $7,000.000 $7,000.000 $9,855.050 $9,855.050 $12,363.050 $17,850.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $2,000.000 $2,900.000 $2,150.000 $3,100.000 $2,500.000 $2,500.000 $2,918.630 $2,918.630 $3,027.000 $18,400.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 1.000 $3,000.000 $3,900.000 $3,680.000 $3,400.000 $3,500.000 $3,500.000 $3,377.710 $3,377.710 $3,392.760 $13,500.000
REMOV STR (INLET)
EA 18.000 $2,000.000 $1,250.000 $1,680.000 $1,800.000 $1,500.000 $1,500.000 $1,279.340 $1,279.340 $2,305.820 $1,850.000
REMOV STR (SET)
EA 7.000 $2,000.000 $800.000 $1,210.000 $1,300.000 $1,750.000 $1,750.000 $4,177.130 $4,177.130 $1,680.690 $2,200.000
REMOV STR (WINGWALL)
EA 10.000 $3,500.000 $5,750.000 $4,830.000 $4,500.000 $5,000.000 $5,000.000 $2,654.300 $2,654.300 $2,919.280 $8,550.000
REMOV STR (PIPE)
LF 5,378.000 $30.000 $45.000 $29.800 $44.000 $70.000 $70.000 $30.000 $30.000 $68.730 $86.000
REMOV STR (BOX CULVERT)
LF 2,019.000 $40.000 $110.000 $50.750 $83.000 $100.000 $100.000 $40.000 $40.000 $200.000 $123.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 2.000 $100,000.000 $80,000.000 $81,000.000 $150,000.000 $275,000.000 $126,503.640 $51,893.300 $51,893.300 $99,056.750 $226,000.000
REMOV STR (APPROACH SLAB)
EA 1.000 $8,500.000 $6,000.000 $15,450.000 $6,500.000 $15,000.000 $16,985.220 $10,148.770 $10,148.770 $19,085.480 $10,000.000
MOBILIZATION
LS 1.000 $15,300,000.000 $12,850,000.000 $12,900,000.000 $13,100,000.000 $14,000,000.000 $14,968,167.340 $15,000,000.000 $15,000,000.000 $15,435,000.000 $17,650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 37.000 $250,000.000 $15,000.000 $54,400.000 $90,000.000 $280,000.000 $316,967.820 $100,000.000 $100,000.000 $60,000.000 $100,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $15,000.000 $21,000.000 $25,680.000 $10,000.000 $85,000.000 $7,253.620 $17,215.500 $17,215.500 $25,000.000 $24,000.000
TMA (STATIONARY)
DAY 698.000 $350.000 $190.000 $175.000 $200.000 $245.000 $210.000 $332.490 $332.490 $300.790 $1,500.000
TMA (MOBILE OPERATION)
DAY 200.000 $200.000 $550.000 $175.000 $1,250.000 $350.000 $950.000 $984.610 $984.610 $795.000 $100.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 992.000 $45.000 $35.000 $43.750 $45.000 $33.000 $33.000 $43.140 $43.140 $43.140 $60.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 348.000 $55.000 $74.000 $89.750 $65.000 $70.000 $70.000 $88.670 $88.670 $88.670 $137.000
ROCK FILTER DAMS (REMOVE)
LF 1,340.000 $15.000 $9.000 $14.400 $1.000 $9.000 $12.560 $14.230 $14.230 $14.230 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 8,837.000 $40.000 $36.000 $36.750 $29.000 $33.500 $16.790 $36.280 $36.280 $36.280 $48.000
CONSTRUCTION EXITS (REMOVE)
SY 8,837.000 $8.000 $9.000 $12.800 $1.000 $9.000 $8.830 $12.660 $12.660 $12.660 $13.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 14,375.000 $4.000 $4.000 $3.500 $1.650 $3.500 $3.500 $3.440 $3.440 $3.440 $5.010
TEMP SEDMT CONT FENCE (REMOVE)
LF 14,375.000 $0.950 $1.000 $0.950 $0.100 $1.000 $1.100 $0.920 $0.920 $0.920 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 6,709.000 $6.000 $6.000 $6.800 $4.250 $5.750 $5.750 $6.740 $6.740 $6.740 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 6,709.000 $2.500 $1.000 $1.750 $0.250 $1.000 $1.270 $1.720 $1.720 $1.720 $2.000
CONSTRUCTING DETOURS
SY 84,278.000 $110.000 $93.000 $102.000 $115.000 $95.000 $94.980 $118.410 $118.410 $99.560 $127.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 30,810.000 $35.000 $50.000 $30.750 $20.000 $75.000 $33.750 $27.280 $27.280 $71.240 $80.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 12,990.000 $45.000 $50.000 $25.000 $45.000 $75.000 $55.090 $32.500 $32.500 $68.240 $86.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 500.000 $60.000 $50.000 $70.500 $45.000 $75.000 $78.770 $73.570 $73.570 $71.690 $89.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 99,930.000 $9.000 $9.000 $7.900 $8.000 $6.500 $8.050 $5.450 $5.450 $14.600 $4.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 36,630.000 $10.000 $5.000 $13.600 $12.000 $6.500 $7.770 $5.570 $5.570 $13.020 $6.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 940.000 $10.000 $8.000 $13.700 $12.000 $6.500 $14.920 $11.960 $11.960 $15.780 $11.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 30,810.000 $15.000 $10.000 $9.400 $5.000 $10.000 $12.930 $9.280 $9.280 $15.890 $7.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 12,990.000 $20.000 $7.000 $15.900 $5.000 $10.000 $11.880 $7.920 $7.920 $17.210 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 500.000 $30.000 $12.500 $23.500 $5.000 $10.000 $22.700 $30.090 $30.090 $18.010 $18.000
PORT CTB (PINNING)
EA 240.000 $70.000 $108.000 $105.000 $125.000 $85.000 $65.710 $11.170 $11.170 $63.180 $103.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 12,181.000 $100.000 $100.000 $66.500 $85.000 $78.000 $81.700 $82.460 $82.460 $101.270 $111.000
CONC CURB (MONO) (TY II)
LF 47,103.000 $11.000 $6.000 $4.500 $2.000 $5.500 $7.240 $3.510 $3.510 $6.540 $3.000
CONC CURB (DOWELED)
LF 587.000 $15.000 $48.000 $22.900 $60.000 $17.250 $31.000 $42.080 $42.080 $42.810 $82.000
DRIVEWAYS (CONC)
SY 3,425.000 $120.000 $95.000 $91.250 $95.000 $95.000 $104.900 $116.150 $116.150 $120.200 $120.000
DRIVEWAYS (CONC) (HES)
SY 114.000 $150.000 $200.000 $162.000 $175.000 $130.000 $107.160 $215.970 $215.970 $207.650 $135.000
DRIVEWAYS (ACP)
SY 150.000 $52.000 $224.000 $107.000 $55.000 $70.000 $125.000 $112.280 $112.280 $141.410 $178.000
CONC SIDEWALKS (4")
SY 12,209.000 $75.000 $65.000 $72.250 $70.000 $57.000 $77.770 $74.000 $74.000 $70.220 $80.000
CURB RAMPS (TY 1)
EA 12.000 $2,700.000 $3,400.000 $3,430.000 $3,200.000 $1,910.000 $3,068.710 $3,197.660 $3,197.660 $3,902.440 $3,500.000
CURB RAMPS (TY 2)
EA 4.000 $3,100.000 $3,400.000 $3,690.000 $3,500.000 $2,200.000 $3,108.780 $3,316.610 $3,316.610 $4,172.530 $3,500.000
CURB RAMPS (TY 7)
EA 6.000 $2,800.000 $3,400.000 $3,900.000 $3,500.000 $2,425.000 $3,234.470 $3,555.450 $3,555.450 $4,172.530 $3,970.000
CURB RAMPS (TY 20)
EA 2.000 $4,500.000 $5,800.000 $4,080.000 $3,200.000 $1,935.000 $3,760.120 $5,491.450 $5,491.450 $3,902.450 $4,280.000
CURB RAMPS (TY 21)
EA 4.000 $3,400.000 $3,600.000 $3,830.000 $2,950.000 $3,450.000 $3,759.880 $6,103.610 $6,103.610 $3,632.350 $5,090.000
MILL RUMBLE STRIPS (CONC) (SHLDR)
LF 36,250.000 $4.000 $0.820 $1.100 $0.800 $0.930 $0.750 $0.800 $0.800 $12.000 $1.700
FILL MILLED CONCR RUMBLE STRIPS (SHLDR)
LF 7,946.000 $7.000 $12.000 $6.900 $22.000 $5.000 $30.000 $12.000 $12.000 $30.000 $32.000
CONC MEDIAN
SY 4,439.000 $95.000 $75.000 $72.250 $70.000 $50.000 $69.650 $88.940 $88.940 $83.380 $96.000
RIGHT OF WAY MARKERS
EA 53.000 $350.000 $645.000 $410.000 $415.000 $600.000 $480.000 $405.000 $405.000 $400.000 $495.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,137.500 $34.000 $29.000 $28.300 $28.500 $28.500 $28.500 $25.000 $25.000 $27.990 $33.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 11.000 $2,400.000 $2,250.000 $2,320.000 $2,500.000 $2,200.000 $2,200.000 $1,890.000 $1,890.000 $2,290.000 $2,550.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,500.000 $1,250.000 $1,620.000 $1,250.000 $1,250.000 $1,250.000 $1,178.000 $1,178.000 $1,595.000 $1,450.000
REMOVE METAL BEAM GUARD FENCE
LF 2,300.000 $2.500 $2.700 $2.800 $2.500 $2.500 $2.500 $2.000 $2.000 $2.750 $2.900
REMOVE TERMINAL ANCHOR SECTION
EA 7.000 $500.000 $210.000 $278.000 $200.000 $200.000 $200.000 $250.000 $250.000 $275.000 $230.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $110.000 $210.000 $278.000 $200.000 $200.000 $200.000 $250.000 $250.000 $275.000 $230.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 5.000 $4.000 $255.000 $278.000 $250.000 $250.000 $250.000 $200.000 $200.000 $2.750 $290.000
RM MTL BM GD FEN TRANS (T101)
EA 8.000 $300.000 $255.000 $278.000 $250.000 $250.000 $250.000 $200.000 $200.000 $275.000 $290.000
GUARDRAIL END TREATMENT (INSTALL)
EA 15.000 $3,250.000 $3,000.000 $3,240.000 $2,950.000 $2,950.000 $2,950.000 $2,850.000 $2,850.000 $3,195.000 $3,400.000
GUARDRAIL END TREATMENT (REMOVE)
EA 19.000 $325.000 $255.000 $278.000 $250.000 $250.000 $250.000 $200.000 $200.000 $275.000 $290.000
GDRAIL END TRT(INST)(WOOD POST)(TY I)
EA 2.000 $500.000 $3,000.000 $3,240.000 $2,950.000 $2,950.000 $2,950.000 $2,860.000 $2,860.000 $3,195.000 $3,400.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 35.000 $2,000.000 $2,550.000 $1,230.000 $1,250.000 $1,600.000 $3,250.000 $1,215.000 $1,215.000 $1,215.000 $1,585.000
CRASH CUSH ATTEN (REMOVE)
EA 14.000 $1,200.000 $1,200.000 $805.000 $1,500.000 $1,120.000 $1,000.000 $795.000 $795.000 $795.000 $1,135.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 14.000 $10,000.000 $11,500.000 $7,470.000 $10,000.000 $7,500.000 $8,684.440 $7,376.000 $7,376.000 $7,376.000 $7,875.000
PIPE UNDERDRAINS (TY 8) (6")
LF 5,888.000 $40.000 $42.000 $31.500 $55.000 $25.000 $36.250 $34.120 $34.120 $23.200 $30.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 8.000 $280.000 $310.000 $258.000 $395.000 $500.000 $400.000 $255.000 $255.000 $330.000 $450.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 16.000 $1,700.000 $1,900.000 $1,820.000 $1,573.000 $1,725.800 $2,095.000 $1,596.600 $1,596.600 $1,634.000 $2,360.000
IN RD IL (TY SA) 40B-8 (250W EQ) LED
EA 13.000 $5,000.000 $6,200.000 $4,720.000 $5,130.000 $4,746.950 $4,960.000 $5,206.950 $5,206.950 $5,643.000 $5,580.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 25.000 $4,500.000 $6,650.000 $4,570.000 $5,758.000 $5,737.550 $4,517.000 $5,844.370 $5,844.370 $6,146.000 $5,080.000
CONDT (PVC) (SCH 40) (2")
LF 7,785.000 $20.000 $12.000 $10.500 $11.400 $14.200 $18.600 $11.570 $11.570 $11.000 $21.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 2,171.000 $35.000 $17.000 $14.400 $23.700 $29.720 $39.850 $24.060 $24.060 $15.000 $45.000
CONDT (PVC) (SCH 40) (3")
LF 17,926.000 $20.000 $15.000 $12.000 $23.000 $14.240 $26.700 $23.350 $23.350 $13.000 $30.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 3,850.000 $40.000 $22.000 $15.800 $30.000 $28.450 $32.350 $30.450 $30.450 $19.000 $36.500
CONDT (PVC) (SCH 80) (2")
LF 40.000 $22.000 $15.000 $40.750 $11.600 $62.270 $19.900 $11.770 $11.770 $13.000 $22.500
CONDT (RM) (1")
LF 415.000 $35.000 $34.000 $41.000 $53.000 $58.950 $54.950 $53.800 $53.800 $30.100 $61.800
CONDUIT (PREPARE)
LF 2,497.000 $5.000 $2.000 $2.250 $11.000 $2.920 $13.850 $11.170 $11.170 $1.700 $15.600
ITS MULTI-DUCT CND (PVC-40)
LF 8,972.000 $37.000 $21.000 $30.750 $37.000 $22.820 $38.360 $37.560 $37.560 $18.600 $43.250
ITS MULTI-DUCT CND (PVC-40)(BORE)
LF 2,110.000 $43.000 $30.000 $33.250 $45.000 $37.650 $54.250 $45.680 $45.680 $26.800 $61.000
ELEC CONDR (NO.12) BARE
LF 395.000 $1.500 $1.300 $3.750 $1.660 $5.920 $2.250 $1.680 $1.680 $1.200 $2.550
ELEC CONDR (NO.12) INSULATED
LF 790.000 $1.800 $1.440 $2.000 $1.800 $3.460 $2.350 $1.830 $1.830 $1.300 $2.650
ELEC CONDR (NO.8) BARE
LF 9,098.000 $2.500 $2.200 $1.800 $2.900 $1.810 $2.500 $2.940 $2.940 $2.000 $2.850
ELEC CONDR (NO.8) INSULATED
LF 34,023.000 $2.250 $2.600 $1.950 $3.280 $2.170 $2.860 $3.330 $3.330 $2.300 $3.250
ELEC CONDR (NO.6) INSULATED
LF 135.000 $2.500 $5.200 $8.650 $3.500 $4.020 $3.350 $3.550 $3.550 $4.700 $3.800
ELEC CONDR (NO.4) BARE
LF 928.000 $4.000 $4.300 $2.800 $4.600 $3.350 $3.400 $4.670 $4.670 $3.900 $3.850
ELEC CONDR (NO.4) INSULATED
LF 1,856.000 $3.500 $5.000 $3.550 $4.700 $4.020 $4.100 $4.770 $4.770 $4.500 $4.650
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
EA 15.000 $5,500.000 $7,200.000 $6,940.000 $8,622.000 $6,639.120 $5,035.000 $8,751.330 $8,751.330 $6,536.000 $5,700.000
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
EA 5.000 $7,500.000 $13,500.000 $10,670.000 $11,964.000 $9,924.190 $8,470.000 $12,143.460 $12,143.460 $12,100.000 $9,550.000
GROUND BOX TY A (122311)
EA 9.000 $1,700.000 $1,500.000 $1,080.000 $1,080.000 $1,747.830 $1,460.000 $1,096.200 $1,096.200 $1,380.000 $1,650.000
GROUND BOX TY A (122311)W/APRON
EA 30.000 $1,750.000 $2,100.000 $1,480.000 $1,412.000 $1,835.510 $2,350.000 $1,433.180 $1,433.180 $1,846.000 $2,650.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $800.000 $2,000.000 $1,110.000 $778.000 $1,085.280 $877.000 $789.670 $789.670 $1,792.000 $990.000
ELC SRV TY A 240/480 060(NS)SS(E)GC(O)
EA 6.000 $9,500.000 $13,000.000 $12,750.000 $13,062.000 $15,541.230 $13,395.000 $13,257.930 $13,257.930 $12,010.000 $15,100.000
ELC SRV TY D 120/240 060(NS)SS(N)PS(U)
EA 1.000 $10,000.000 $14,400.000 $8,810.000 $8,547.000 $13,236.430 $13,890.000 $8,675.210 $8,675.210 $13,156.000 $15,700.000
ALUMINUM SIGNS (TY G)
SF 207.000 $35.000 $63.000 $31.250 $35.000 $38.200 $32.000 $30.000 $30.000 $35.000 $35.000
ALUMINUM SIGNS (TY O)
SF 1,597.000 $40.000 $34.000 $33.000 $37.000 $32.560 $35.050 $40.600 $40.600 $30.000 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 78.000 $2,750.000 $1,000.000 $910.000 $732.000 $858.850 $1,042.000 $605.000 $605.000 $530.000 $840.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 71.000 $1,100.000 $1,100.000 $1,030.000 $894.000 $975.610 $1,143.000 $685.000 $685.000 $630.000 $1,025.000
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 12.000 $1,200.000 $1,800.000 $1,350.000 $1,290.000 $1,286.960 $1,578.000 $1,120.000 $1,120.000 $725.000 $1,500.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $1,200.000 $1,650.000 $1,360.000 $1,205.000 $1,300.360 $1,402.000 $990.000 $990.000 $900.000 $1,385.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,250.000 $2,100.000 $1,340.000 $1,562.000 $1,278.830 $1,790.000 $1,220.000 $1,220.000 $1,000.000 $1,800.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 3.000 $3,300.000 $3,100.000 $2,210.000 $2,357.000 $2,518.660 $3,430.000 $1,885.000 $1,885.000 $2,200.000 $2,700.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 8.000 $3,750.000 $4,900.000 $3,390.000 $4,495.000 $2,990.880 $4,495.000 $3,069.000 $3,069.000 $2,300.000 $4,950.000
INSTALL LRSS (STRUCT STEEL)
LB 1,440.000 $9.000 $14.000 $5.800 $10.000 $6.660 $7.400 $8.000 $8.000 $8.800 $8.150
REMOVE LRSA
EA 7.000 $3,250.000 $1,200.000 $1,510.000 $1,200.000 $870.920 $1,165.000 $1,000.000 $1,000.000 $2,099.000 $1,300.000
INS OH SN SUP(25 FT CANT)
EA 4.000 $40,000.000 $40,000.000 $37,910.000 $41,924.000 $48,544.420 $48,675.000 $42,552.860 $42,552.860 $50,035.000 $54,000.000
INS OH SN SUP(30 FT CANT)
EA 4.000 $45,000.000 $44,000.000 $43,600.000 $59,945.000 $50,624.100 $75,915.000 $60,844.180 $60,844.180 $57,395.000 $84,000.000
INS OH SN SUP(35 FT CANT)
EA 1.000 $50,000.000 $56,000.000 $55,400.000 $83,937.000 $62,366.520 $110,110.000 $85,196.060 $85,196.060 $71,564.000 $122,000.000
INS OH SN SUP(40 FT CANT)
EA 2.000 $60,000.000 $59,000.000 $57,600.000 $68,250.000 $62,479.230 $91,650.000 $69,273.750 $69,273.750 $73,388.000 $101,000.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 1.000 $10,000.000 $1,300.000 $1,240.000 $4,573.000 $3,247.480 $1,945.000 $4,641.600 $4,641.600 $3,604.000 $2,150.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
EA 68.000 $100.000 $72.000 $55.750 $88.000 $100.000 $55.000 $55.000 $55.000 $65.000 $101.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
EA 47.000 $100.000 $22.000 $15.200 $20.000 $20.000 $20.000 $27.000 $27.000 $30.000 $33.250
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
EA 30.000 $100.000 $22.000 $22.300 $20.000 $20.000 $20.000 $27.000 $27.000 $30.000 $37.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
EA 152.000 $100.000 $22.000 $15.200 $20.000 $20.000 $20.000 $27.000 $27.000 $30.000 $33.250
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 27.000 $100.000 $82.000 $55.750 $85.000 $100.000 $55.000 $55.000 $55.000 $55.000 $97.500
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 2,855.000 $0.650 $0.600 $0.450 $0.450 $0.450 $0.450 $0.460 $0.460 $0.580 $0.650
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 8,635.000 $0.450 $0.400 $0.300 $0.300 $0.300 $0.300 $0.310 $0.310 $0.380 $0.450
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 1,798.000 $0.700 $2.700 $2.050 $2.000 $2.000 $2.000 $2.040 $2.040 $2.560 $2.850
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,997.000 $0.700 $1.000 $0.750 $0.750 $0.750 $0.750 $0.770 $0.770 $0.960 $1.100
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 12.000 $2.000 $10.000 $7.100 $7.000 $7.000 $7.000 $7.140 $7.140 $8.950 $10.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 10,080.000 $0.350 $0.400 $0.300 $0.300 $0.300 $0.300 $0.310 $0.310 $0.380 $0.450
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 16,932.000 $1.000 $2.000 $1.450 $1.450 $1.450 $1.450 $1.480 $1.480 $1.850 $2.100
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 27,949.000 $1.100 $1.500 $1.150 $1.150 $1.150 $1.150 $1.170 $1.170 $1.470 $1.650
WK ZN PAV MRK REMOV (W)8"(DOT)
LF 1,076.000 $0.700 $2.600 $2.050 $2.000 $2.000 $2.000 $2.040 $2.040 $2.560 $2.850
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 4,273.000 $0.700 $2.900 $2.250 $2.200 $2.200 $2.200 $2.240 $2.240 $2.810 $3.150
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 29,279.000 $1.100 $1.500 $1.150 $1.150 $1.150 $1.150 $1.170 $1.170 $1.470 $1.650
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 987.000 $1.200 $3.300 $2.550 $2.500 $2.500 $2.500 $2.550 $2.550 $3.200 $3.550
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 13,568.000 $1.700 $1.600 $1.200 $1.200 $1.200 $1.200 $1.220 $1.220 $1.530 $1.700
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 5,185.000 $5.000 $5.000 $3.800 $3.750 $3.750 $3.750 $3.830 $3.830 $4.800 $5.350
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 897.000 $7.000 $11.000 $8.100 $8.000 $8.000 $8.000 $8.160 $8.160 $10.230 $11.350
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 31.000 $220.000 $255.000 $197.000 $195.000 $195.000 $195.000 $198.900 $198.900 $249.410 $280.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 12.000 $300.000 $355.000 $273.000 $270.000 $270.000 $270.000 $275.400 $275.400 $345.340 $385.000
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 10.000 $350.000 $595.000 $456.000 $450.000 $450.000 $450.000 $459.000 $459.000 $575.560 $640.000
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 3.000 $175.000 $245.000 $187.000 $185.000 $185.000 $185.000 $188.700 $188.700 $236.620 $265.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 45.000 $200.000 $365.000 $278.000 $275.000 $275.000 $275.000 $280.500 $280.500 $351.730 $390.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 16.000 $3.750 $100.000 $76.000 $75.000 $75.000 $75.000 $76.500 $76.500 $95.930 $110.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 850.000 $5.000 $5.000 $3.800 $3.750 $3.750 $3.750 $3.820 $3.820 $4.800 $5.500
PAVEMENT SLER 6"
LF 150,294.000 $0.550 $0.350 $0.250 $0.230 $0.230 $0.230 $0.230 $0.230 $0.290 $0.350
PAVEMENT SLER 8"
LF 13,568.000 $0.300 $0.350 $0.250 $0.270 $0.270 $0.270 $0.280 $0.280 $0.350 $0.400
PAVEMENT SLER 12"
LF 6,605.000 $0.500 $1.100 $0.800 $0.800 $0.800 $0.800 $0.820 $0.820 $1.020 $1.150
PAVEMENT SLER 24"
LF 897.000 $0.750 $1.800 $1.350 $1.350 $1.350 $1.350 $1.380 $1.380 $1.730 $2.000
PAVEMENT SLER (ARROW)
EA 41.000 $1.000 $60.000 $45.500 $45.000 $45.000 $45.000 $45.900 $45.900 $57.560 $64.000
PAVEMENT SLER (WORD)
EA 45.000 $30.000 $73.000 $55.750 $55.000 $55.000 $55.000 $56.100 $56.100 $70.350 $78.000
PAVEMENT SLER (UTURN ARROW)
EA 12.000 $40.000 $86.000 $65.750 $65.000 $65.000 $65.000 $66.300 $66.300 $83.140 $95.000
PAVEMENT SLER (YLD TRI)
EA 16.000 $60.000 $19.000 $14.200 $14.000 $14.000 $14.000 $14.280 $14.280 $17.910 $20.000
PAVEMENT SLER (NUMBER)
EA 3.000 $6.000 $52.000 $40.500 $40.000 $40.000 $40.000 $40.800 $40.800 $51.160 $57.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 14,130.000 $0.500 $1.000 $0.750 $0.750 $0.750 $0.750 $0.770 $0.770 $0.960 $1.100
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 69,536.000 $0.900 $1.000 $0.700 $0.700 $0.700 $0.700 $0.710 $0.710 $0.900 $1.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 65,641.000 $0.500 $1.000 $0.700 $0.700 $0.700 $0.700 $0.710 $0.710 $0.900 $1.000
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 570.000 $3.000 $3.300 $2.500 $2.450 $2.450 $2.450 $2.500 $2.500 $3.130 $3.500
REFL PAV MRKR TY I-C
EA 43.000 $4.500 $8.200 $6.350 $6.250 $6.250 $6.250 $6.380 $6.380 $7.990 $9.000
REFL PAV MRKR TY II-A-A
EA 152.000 $5.500 $8.200 $6.350 $6.250 $6.250 $6.250 $6.380 $6.380 $7.990 $9.000
REFL PAV MRKR TY II-C-R
EA 1,689.000 $7.000 $8.200 $6.350 $6.250 $6.250 $6.250 $6.380 $6.380 $7.990 $9.000
ELIM EXT PM & MRKS (4")
LF 105,845.000 $0.500 $0.800 $0.600 $0.570 $0.570 $0.570 $0.580 $0.580 $0.730 $0.800
ELIM EXT PM & MRKS (8")
LF 13,065.000 $0.500 $1.000 $0.800 $0.770 $0.770 $0.770 $0.790 $0.790 $0.980 $1.100
ELIM EXT PM & MRKS (12")
LF 1,204.000 $0.500 $3.500 $2.550 $2.500 $2.500 $2.500 $2.550 $2.550 $3.200 $3.600
PAV SURF PREP FOR MRK (6")
LF 150,294.000 $0.150 $0.300 $0.200 $0.200 $0.200 $0.200 $0.200 $0.200 $0.260 $0.300
PAV SURF PREP FOR MRK (8")
LF 13,568.000 $0.400 $0.330 $0.250 $0.250 $0.250 $0.250 $0.260 $0.260 $0.320 $0.350
PAV SURF PREP FOR MRK (12")
LF 6,605.000 $0.350 $1.000 $0.750 $0.750 $0.750 $0.750 $0.770 $0.770 $0.960 $1.100
PAV SURF PREP FOR MRK (24")
LF 897.000 $0.500 $1.700 $1.250 $1.250 $1.250 $1.250 $1.280 $1.280 $1.600 $1.800
PAV SURF PREP FOR MRK (ARROW)
EA 41.000 $10.000 $52.000 $40.500 $40.000 $40.000 $40.000 $40.800 $40.800 $51.160 $57.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 12.000 $40.000 $79.000 $60.750 $60.000 $60.000 $60.000 $61.200 $61.200 $76.740 $85.000
PAV SURF PREP FOR MRK (NUMBER)
EA 3.000 $40.000 $46.000 $35.500 $35.000 $35.000 $35.000 $35.700 $35.700 $44.770 $50.000
PAV SURF PREP FOR MRK (WORD)
EA 45.000 $75.000 $59.000 $45.500 $45.000 $45.000 $45.000 $45.900 $45.900 $57.560 $64.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 16.000 $10.000 $39.000 $30.500 $30.000 $30.000 $30.000 $30.600 $30.600 $38.370 $43.000
INSTALL CIRCUIT BREAKER
EA 1.000 $30,000.000 $1,200.000 $861.000 $784.000 $1,605.210 $424.000 $795.760 $795.760 $1,102.000 $480.000
FULL - WIDTH MOWING
CYC 10.000 $4,500.000 $3,600.000 $5,060.000 $5,000.000 $2,500.000 $18,750.000 $10,000.000 $10,000.000 $10,551.070 $5,600.000
LITTER REMOVAL
CYC 10.000 $4,500.000 $2,000.000 $1,520.000 $1,200.000 $2,500.000 $5,400.000 $5,000.000 $5,000.000 $11,199.560 $4,900.000
ANTI-GRAFFITI COATNG (PERMNENT-TY III)
SF 101,191.000 $0.900 $1.000 $0.750 $1.070 $0.900 $0.900 $0.750 $0.750 $1.100 $1.250
BRIDGE JOINT REPAIR (ARMOR)
LF 34.000 $650.000 $900.000 $284.000 $500.000 $250.000 $185.370 $298.030 $298.030 $800.000 $1,100.000
ITS COM CBL (ETHERNET)
LF 100.000 $4.000 $11.000 $9.100 $1.960 $14.700 $27.200 $1.990 $1.990 $10.200 $31.000
SYSTEM INTEGRATION
LS 1.000 $64,000.000 $79,000.000 $25,470.000 $18,604.000 $152,905.900 $17,545.000 $18,883.060 $18,883.060 $73,178.000 $19,750.000
ITS RVSD (DC & WWA)(RELOCATE)
EA 2.000 $2,800.000 $3,500.000 $2,100.000 $2,772.000 $7,382.020 $7,160.000 $2,813.580 $2,813.580 $3,183.000 $8,050.000
ITS POLE (60 FT)(RELOCATE)
EA 2.000 $2,500.000 $5,800.000 $4,870.000 $10,171.000 $26,298.760 $6,595.000 $10,323.570 $10,323.570 $5,232.000 $7,450.000
ITS POLE MNT CAB (TY 3)(CONF 1)(REL)
EA 2.000 $8,500.000 $8,300.000 $1,830.000 $3,785.000 $6,483.090 $3,065.000 $3,841.780 $3,841.780 $3,352.000 $3,450.000
GROUND BOX (PREPARE)
EA 9.000 $400.000 $850.000 $411.000 $1,367.000 $789.460 $1,270.000 $1,387.510 $1,387.510 $784.000 $1,450.000
RELOCATE ITS RADIO
EA 6.000 $2,500.000 $3,650.000 $1,400.000 $3,157.000 $8,820.110 $5,095.000 $3,204.360 $3,204.360 $3,361.000 $5,750.000
REMOVE ITS RADIO
EA 2.000 $2,500.000 $950.000 $621.000 $2,772.000 $2,092.730 $2,355.000 $2,813.580 $2,813.580 $841.000 $2,650.000
RELOCATE CCTV FIELD EQUIPMENT
EA 2.000 $5,500.000 $2,800.000 $1,710.000 $2,772.000 $3,577.140 $7,650.000 $2,813.580 $2,813.580 $2,521.000 $8,600.000
FIBER OPTIC FUSION SPLICE
EA 144.000 $215.000 $69.000 $50.000 $45.770 $58.450 $93.950 $46.460 $46.460 $64.000 $110.000
FO SPLICE ENCLOSURE (TYPE 1)
EA 3.000 $2,800.000 $3,400.000 $2,470.000 $1,135.000 $2,787.720 $2,500.000 $1,152.030 $1,152.030 $3,147.000 $2,815.000
FIBER OPTIC CBL (SINGLE-MODE)(6 FIBER)
LF 256.000 $3.000 $27.000 $18.800 $2.270 $20.100 $4.550 $2.300 $2.300 $23.900 $5.150
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 4.000 $1,300.000 $3,700.000 $2,690.000 $1,138.000 $3,020.880 $1,505.000 $1,155.070 $1,155.070 $3,424.000 $1,700.000
FIBER OPTIC CBL (SNGL-MODE)(48 FIBER)
LF 29,322.000 $5.000 $5.000 $3.550 $2.850 $3.890 $3.000 $2.890 $2.890 $4.600 $3.400
FIBER OPTIC PATCH PANEL (96 POSITION)
EA 2.000 $20,000.000 $20,000.000 $14,110.000 $1,850.000 $15,401.670 $5,565.000 $1,877.750 $1,877.750 $17,961.000 $6,300.000
ETHERNET SWITCH (INSTALL ONLY)
EA 2.000 $1,200.000 $450.000 $572.000 $933.000 $4,075.520 $2,540.000 $947.000 $947.000 $413.000 $2,860.000
ITS GRND MNT CAB (TY 4) (CONF 2)
EA 2.000 $3,500.000 $19,000.000 $18,210.000 $16,636.000 $16,463.470 $21,630.000 $16,885.540 $16,885.540 $16,816.000 $24,500.000
Totals: $167,578,105.300 $128,704,133.710 $129,110,427.474 $131,298,348.400 $143,455,210.220 $149,681,672.624 $152,052,007.377 $152,052,007.377 $161,368,577.743 $176,380,857.820
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
MATERIAL FURNISHED BY THE STATE (PART) $16,300.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $300,000.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $15,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $600,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $800,000.00
Total: $1,731,300.00