PREPARING ROW
|
STA
|
229.750
|
$2,000.000
|
$9,000.000
|
$5,937.000
|
$1,759.500
|
$9,100.000
|
$2,572.500
|
$5,000.000
|
$2,500.000
|
$7,209.780
|
|
|
REMOVING CONC (PAV)
|
SY
|
19,030.000
|
$7.760
|
$12.000
|
$17.000
|
$5.550
|
$11.000
|
$10.000
|
$15.000
|
$20.400
|
$5.790
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,607.000
|
$8.850
|
$7.000
|
$9.000
|
$9.110
|
$6.000
|
$15.000
|
$15.000
|
$15.200
|
$5.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
409.000
|
$28.000
|
$14.000
|
$15.000
|
$14.460
|
$6.000
|
$15.000
|
$15.000
|
$18.620
|
$6.840
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
296.000
|
$10.000
|
$15.000
|
$15.000
|
$16.310
|
$5.000
|
$15.000
|
$15.000
|
$6.750
|
$10.530
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
6,417.000
|
$11.000
|
$10.000
|
$15.000
|
$19.530
|
$7.000
|
$15.000
|
$15.000
|
$15.170
|
$5.260
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
359.000
|
$11.500
|
$10.000
|
$10.000
|
$4.360
|
$9.500
|
$21.000
|
$5.000
|
$13.010
|
$26.320
|
|
|
REMOVING STAB BASE AND ASPH PAV (4")
|
SY
|
24,233.000
|
$2.620
|
$4.000
|
$5.000
|
$7.600
|
$3.000
|
$8.400
|
$5.000
|
$3.320
|
$3.320
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
17,048.000
|
$8.000
|
$60.000
|
$13.000
|
$11.730
|
$12.000
|
$3.150
|
$30.000
|
$13.230
|
$28.420
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
131.430
|
$344.000
|
$200.000
|
$750.000
|
$579.070
|
$280.000
|
$525.000
|
$2,000.000
|
$970.750
|
$3,157.890
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
8,537.000
|
$12.100
|
$60.000
|
$20.000
|
$29.320
|
$26.000
|
$31.500
|
$9.000
|
$19.050
|
$12.630
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
43,660.000
|
$1.410
|
$0.880
|
$1.000
|
$0.780
|
$1.830
|
$1.050
|
$1.000
|
$2.670
|
$14.160
|
|
|
BLOCK SODDING
|
SY
|
43,660.000
|
$3.100
|
$4.250
|
$3.000
|
$3.010
|
$2.730
|
$4.200
|
$3.000
|
$3.010
|
$4.210
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
43,660.000
|
$0.170
|
$0.190
|
$0.120
|
$0.140
|
$0.100
|
$0.100
|
$0.100
|
$0.200
|
$1.160
|
|
|
VEGETATIVE WATERING
|
MG
|
13,170.600
|
$13.300
|
$4.000
|
$15.000
|
$11.730
|
$19.340
|
$0.010
|
$30.000
|
$26.070
|
$20.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
213.330
|
$162.100
|
$164.000
|
$150.000
|
$211.140
|
$160.000
|
$180.000
|
$196.000
|
$207.500
|
$184.460
|
|
|
LIME TRT (EXST MATL)(10")
|
SY
|
18,970.000
|
$2.350
|
$9.000
|
$8.000
|
$11.730
|
$8.000
|
$5.000
|
$30.000
|
$19.880
|
$9.410
|
|
|
CONC PVMT (JOINTED - CPCD) (10")
|
SY
|
11,906.000
|
$90.000
|
$90.000
|
$92.000
|
$90.740
|
$70.000
|
$73.500
|
$118.000
|
$86.000
|
$108.230
|
|
|
FULL - DEPTH REPAIR CPCD (10")
|
SY
|
500.000
|
$236.000
|
$175.000
|
$225.000
|
$234.600
|
$295.000
|
$315.000
|
$250.000
|
$325.000
|
$250.000
|
|
|
CUT & RESTORING PAV
|
SY
|
2,216.000
|
$77.000
|
$150.000
|
$110.000
|
$117.300
|
$170.000
|
$168.000
|
$150.000
|
$228.740
|
$148.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
7,726.000
|
$3.000
|
$1.000
|
$4.000
|
$2.350
|
$0.500
|
$3.150
|
$10.000
|
$3.610
|
$1.050
|
|
|
TEMPORARY SPL SHORING
|
SF
|
843.000
|
$43.000
|
$25.000
|
$65.000
|
$41.050
|
$30.000
|
$52.500
|
$10.000
|
$36.050
|
$57.890
|
|
|
CL C CONC (CAP)(HPC)(EXTEND)
|
CY
|
236.000
|
$2,500.000
|
$2,000.000
|
$5,500.000
|
$1,407.600
|
$3,525.000
|
$2,100.000
|
$9,500.000
|
$9,622.950
|
$9,473.680
|
|
|
BRIDGE MEDIAN (HPC)
|
SF
|
19,860.000
|
$5.000
|
$10.000
|
$20.000
|
$12.080
|
$10.000
|
$10.500
|
$12.000
|
$23.160
|
$23.160
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
449.000
|
$360.000
|
$450.000
|
$430.000
|
$450.780
|
$528.000
|
$525.000
|
$450.000
|
$453.550
|
$408.420
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
147.000
|
$130.000
|
$110.000
|
$125.000
|
$152.740
|
$141.000
|
$315.000
|
$200.000
|
$207.150
|
$184.210
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
73.000
|
$513.000
|
$520.000
|
$510.000
|
$469.200
|
$666.000
|
$840.000
|
$450.000
|
$532.510
|
$519.890
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
2,156.000
|
$9.300
|
$10.000
|
$40.000
|
$11.150
|
$12.000
|
$31.500
|
$25.000
|
$21.540
|
$21.050
|
|
|
RAIL (TY T221)
|
LF
|
8,260.000
|
$41.000
|
$55.000
|
$54.000
|
$50.670
|
$70.000
|
$42.000
|
$65.000
|
$85.430
|
$37.890
|
|
|
RAIL (TY PR11)
|
LF
|
15,591.000
|
$80.000
|
$100.000
|
$60.000
|
$77.560
|
$81.000
|
$105.000
|
$90.000
|
$71.790
|
$131.370
|
|
|
RETROFIT RAIL (TY T221)(HPC)
|
LF
|
3,150.000
|
$65.000
|
$110.000
|
$136.000
|
$205.270
|
$101.000
|
$111.000
|
$90.000
|
$104.440
|
$73.750
|
|
|
CONC BOX CULV (8 FT X 5 FT)(EXTEND)
|
LF
|
66.000
|
$890.000
|
$1,300.000
|
$2,150.000
|
$1,055.700
|
$580.000
|
$630.000
|
$1,500.000
|
$435.890
|
$1,157.890
|
|
|
CONC BOX CULV (9 FT X 9 FT)(EXTEND)
|
LF
|
26.000
|
$886.000
|
$1,600.000
|
$2,250.000
|
$1,195.870
|
$780.000
|
$840.000
|
$2,000.000
|
$1,405.960
|
$1,578.950
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
82.000
|
$75.000
|
$120.000
|
$112.000
|
$67.100
|
$163.000
|
$70.000
|
$250.000
|
$93.340
|
$115.790
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
7,337.000
|
$64.000
|
$70.000
|
$72.000
|
$69.790
|
$80.000
|
$85.000
|
$81.000
|
$128.110
|
$104.210
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
616.000
|
$89.000
|
$100.000
|
$105.000
|
$85.940
|
$95.000
|
$100.000
|
$110.000
|
$157.810
|
$136.840
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
158.000
|
$126.500
|
$110.000
|
$135.000
|
$152.750
|
$128.000
|
$130.000
|
$150.000
|
$207.570
|
$184.210
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
3.000
|
$4,000.000
|
$4,000.000
|
$5,600.000
|
$5,529.750
|
$9,300.000
|
$5,500.000
|
$4,400.000
|
$4,473.560
|
$7,052.630
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
5.000
|
$3,740.000
|
$5,500.000
|
$4,800.000
|
$4,234.400
|
$7,700.000
|
$6,300.000
|
$5,300.000
|
$4,778.920
|
$5,263.160
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
9.000
|
$4,444.000
|
$5,500.000
|
$5,600.000
|
$5,010.870
|
$8,000.000
|
$6,300.000
|
$5,800.000
|
$5,174.340
|
$5,789.470
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
7.000
|
$4,240.000
|
$5,500.000
|
$5,800.000
|
$5,010.870
|
$8,100.000
|
$6,300.000
|
$5,900.000
|
$4,929.460
|
$5,789.470
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
29.000
|
$4,600.000
|
$6,500.000
|
$6,200.000
|
$5,858.070
|
$8,500.000
|
$6,300.000
|
$6,500.000
|
$5,802.000
|
$6,315.790
|
|
|
INLET (COMPL)(PCO)(4FT)(RIGHT)
|
EA
|
1.000
|
$4,500.000
|
$10,000.000
|
$6,300.000
|
$6,127.800
|
$9,400.000
|
$7,350.000
|
$7,200.000
|
$5,988.500
|
$6,526.320
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
5.000
|
$5,500.000
|
$4,500.000
|
$6,700.000
|
$7,125.430
|
$9,200.000
|
$7,350.000
|
$8,000.000
|
$6,362.080
|
$7,157.890
|
|
|
INLET (COMPL)(PCO)(5FT)(RIGHT)
|
EA
|
1.000
|
$5,000.000
|
$10,500.000
|
$6,800.000
|
$7,172.940
|
$9,200.000
|
$8,400.000
|
$6,800.000
|
$6,719.710
|
$7,157.890
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
2.000
|
$5,000.000
|
$10,500.000
|
$9,500.000
|
$9,881.330
|
$10,300.000
|
$6,300.000
|
$5,800.000
|
$8,429.270
|
$11,578.950
|
|
|
WINGWALL (PW - 1) (HW=14 FT)
|
EA
|
1.000
|
$90,000.000
|
$30,000.000
|
$112,000.000
|
$67,142.380
|
$100,000.000
|
$105,000.000
|
$107,000.000
|
$121,520.650
|
$125,789.470
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
2.000
|
$26,280.000
|
$18,000.000
|
$32,000.000
|
$33,142.100
|
$35,000.000
|
$42,000.000
|
$32,500.000
|
$46,832.600
|
$34,842.110
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,250.000
|
$2,000.000
|
$2,500.000
|
$1,609.120
|
$1,300.000
|
$945.000
|
$1,250.000
|
$1,229.580
|
$2,315.790
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
$1,420.000
|
$2,000.000
|
$2,700.000
|
$2,079.370
|
$1,500.000
|
$1,155.000
|
$1,300.000
|
$1,428.370
|
$2,526.320
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,480.000
|
$3,000.000
|
$3,400.000
|
$2,536.260
|
$2,200.000
|
$1,785.000
|
$2,150.000
|
$875.030
|
$2,842.110
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$3,000.000
|
$3,500.000
|
$3,600.000
|
$3,944.790
|
$2,000.000
|
$2,100.000
|
$2,050.000
|
$2,118.940
|
$3,578.950
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
|
LF
|
115.000
|
$630.000
|
$760.000
|
$875.000
|
$643.900
|
$803.000
|
$945.000
|
$700.000
|
$886.970
|
$1,115.790
|
|
|
JACK BOR OR TUN PIPE(36 IN)(RC)(CL III)
|
LF
|
48.000
|
$1,150.000
|
$1,325.000
|
$1,600.000
|
$1,338.180
|
$1,400.000
|
$1,680.000
|
$770.000
|
$1,514.220
|
$1,368.420
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
21.000
|
$1,000.000
|
$1,500.000
|
$3,800.000
|
$1,803.050
|
$3,500.000
|
$3,150.000
|
$5,000.000
|
$4,092.440
|
$1,578.950
|
|
|
REMOV STR (INLET)
|
EA
|
3.000
|
$710.000
|
$500.000
|
$1,200.000
|
$919.110
|
$1,300.000
|
$1,050.000
|
$750.000
|
$487.560
|
$631.580
|
|
|
REMOV STR (SET)
|
EA
|
1.000
|
$555.000
|
$500.000
|
$1,200.000
|
$626.550
|
$1,300.000
|
$525.000
|
$500.000
|
$487.540
|
$421.050
|
|
|
REMOV STR (WINGWALL)
|
EA
|
3.000
|
$1,460.000
|
$2,500.000
|
$3,800.000
|
$1,525.050
|
$4,200.000
|
$2,100.000
|
$1,000.000
|
$2,580.880
|
$2,631.580
|
|
|
REMOV STR (PIPE)
|
LF
|
135.000
|
$25.000
|
$20.000
|
$35.000
|
$21.040
|
$33.000
|
$31.500
|
$20.000
|
$16.460
|
$21.050
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
5.000
|
$691.250
|
$1,200.000
|
$2,200.000
|
$874.320
|
$700.000
|
$315.000
|
$750.000
|
$776.500
|
$526.320
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$707,882.070
|
$2,000,000.000
|
$1,900,000.000
|
$2,170,045.530
|
$2,100,000.000
|
$5,000,000.000
|
$2,600,000.000
|
$2,500,000.000
|
$1,383,954.980
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
39.000
|
$10,000.000
|
$20,000.000
|
$8,500.000
|
$11,729.980
|
$1,400.000
|
$31,500.000
|
$30,000.000
|
$5,500.000
|
$4,084.140
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,737.000
|
$25.600
|
$22.800
|
$23.000
|
$36.130
|
$22.000
|
$23.430
|
$22.000
|
$37.900
|
$31.340
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,737.000
|
$10.100
|
$5.630
|
$7.500
|
$9.940
|
$7.420
|
$7.900
|
$1.000
|
$12.240
|
$12.630
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,469.000
|
$22.000
|
$23.300
|
$19.000
|
$26.120
|
$18.080
|
$19.260
|
$20.000
|
$24.530
|
$15.860
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,469.000
|
$7.000
|
$7.630
|
$7.500
|
$9.930
|
$7.290
|
$7.760
|
$1.000
|
$8.030
|
$9.320
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
41,518.000
|
$1.700
|
$2.000
|
$1.700
|
$2.600
|
$2.460
|
$1.710
|
$1.610
|
$2.900
|
$1.880
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
41,518.000
|
$0.350
|
$0.390
|
$0.400
|
$0.800
|
$0.410
|
$0.440
|
$0.100
|
$1.200
|
$0.320
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
8,745.000
|
$3.800
|
$4.390
|
$5.000
|
$5.950
|
$4.800
|
$5.110
|
$4.800
|
$4.620
|
$3.990
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
8,745.000
|
$1.100
|
$0.740
|
$0.400
|
$1.600
|
$0.410
|
$0.440
|
$0.100
|
$0.780
|
$0.320
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
42,090.000
|
$20.500
|
$10.000
|
$24.000
|
$61.610
|
$40.000
|
$31.500
|
$25.000
|
$63.170
|
$63.160
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
39,505.000
|
$6.000
|
$10.000
|
$4.000
|
$6.100
|
$6.000
|
$6.300
|
$10.000
|
$16.840
|
$15.790
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
42,090.000
|
$5.500
|
$1.000
|
$4.200
|
$10.000
|
$8.350
|
$6.300
|
$5.000
|
$9.470
|
$8.420
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
24,455.000
|
$50.000
|
$73.600
|
$74.000
|
$70.380
|
$61.800
|
$73.500
|
$70.000
|
$68.330
|
$98.640
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
11,807.000
|
$4.100
|
$5.000
|
$4.500
|
$16.570
|
$5.000
|
$2.400
|
$2.000
|
$3.510
|
$4.750
|
|
|
CONC CURB (DOWEL)
|
LF
|
39,646.000
|
$8.500
|
$7.000
|
$15.000
|
$8.060
|
$15.000
|
$15.000
|
$11.000
|
$8.520
|
$14.740
|
|
|
DRIVEWAYS (CONC)
|
SY
|
4,889.000
|
$70.000
|
$70.000
|
$78.000
|
$82.430
|
$70.000
|
$75.000
|
$70.000
|
$88.600
|
$80.350
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
3,051.000
|
$95.000
|
$90.000
|
$84.000
|
$102.350
|
$101.000
|
$88.000
|
$85.000
|
$101.730
|
$82.220
|
|
|
CONC SIDEWALKS (4")
|
SY
|
28,870.000
|
$48.400
|
$50.000
|
$54.000
|
$59.580
|
$50.000
|
$50.000
|
$75.000
|
$58.040
|
$57.910
|
|
|
CURB RAMPS (TY 1)
|
EA
|
5.000
|
$1,350.000
|
$1,400.000
|
$1,800.000
|
$1,791.350
|
$2,400.000
|
$1,575.000
|
$2,200.000
|
$1,911.140
|
$1,613.030
|
|
|
CURB RAMPS (TY 7)
|
EA
|
19.000
|
$1,500.000
|
$1,800.000
|
$1,800.000
|
$1,923.480
|
$2,000.000
|
$1,575.000
|
$2,200.000
|
$2,048.500
|
$1,955.990
|
|
|
CURB RAMPS (TY 10)
|
EA
|
2.000
|
$1,802.000
|
$2,500.000
|
$1,900.000
|
$2,009.340
|
$2,000.000
|
$1,575.000
|
$2,200.000
|
$2,153.650
|
$2,141.800
|
|
|
CONC MEDIAN(MONO NOSE)
|
SY
|
202.000
|
$130.000
|
$120.000
|
$134.000
|
$96.770
|
$136.000
|
$147.000
|
$250.000
|
$237.190
|
$228.310
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,889.000
|
$20.000
|
$19.900
|
$21.000
|
$22.770
|
$19.900
|
$23.430
|
$22.000
|
$22.110
|
$20.950
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
8.000
|
$1,260.000
|
$950.000
|
$1,000.000
|
$1,352.190
|
$950.000
|
$1,331.250
|
$1,250.000
|
$1,258.040
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
12,565.000
|
$2.400
|
$1.950
|
$2.000
|
$2.950
|
$1.950
|
$3.200
|
$3.000
|
$3.680
|
$2.050
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$216.300
|
$125.000
|
$135.000
|
$260.080
|
$125.000
|
$266.250
|
$250.000
|
$252.660
|
$131.580
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$178.400
|
$125.000
|
$135.000
|
$233.330
|
$125.000
|
$266.250
|
$250.000
|
$252.660
|
$131.580
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,330.000
|
$2,500.000
|
$2,600.000
|
$2,886.280
|
$2,500.000
|
$2,822.250
|
$2,650.000
|
$2,626.630
|
$2,631.580
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
36.000
|
$1,160.000
|
$2,000.000
|
$3,200.000
|
$1,555.440
|
$1,350.000
|
$1,155.000
|
$2,000.000
|
$2,631.890
|
$2,631.580
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
36.000
|
$660.000
|
$1,200.000
|
$900.000
|
$919.080
|
$700.000
|
$630.000
|
$1,000.000
|
$1,579.130
|
$1,578.950
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
39.000
|
$15,000.000
|
$8,000.000
|
$9,600.000
|
$25,529.560
|
$21,850.000
|
$21,000.000
|
$10,000.000
|
$28,950.790
|
$28,947.370
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
32.000
|
$17.800
|
$12.960
|
$12.000
|
$12.420
|
$25.000
|
$42.000
|
$25.000
|
$26.320
|
$26.320
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
249.000
|
$25.000
|
$32.080
|
$17.000
|
$20.530
|
$51.000
|
$63.000
|
$51.000
|
$53.690
|
$53.680
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
170.000
|
$1.350
|
$1.660
|
$1.300
|
$1.550
|
$3.500
|
$10.500
|
$3.500
|
$3.680
|
$3.680
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
310.000
|
$1.900
|
$2.970
|
$3.000
|
$2.230
|
$4.500
|
$10.500
|
$4.500
|
$4.740
|
$4.740
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
1.000
|
$1,107.000
|
$985.500
|
$1,050.000
|
$1,178.920
|
$2,750.000
|
$3,150.000
|
$2,750.000
|
$2,895.080
|
$2,894.740
|
|
|
REMOVE GROUND BOX
|
EA
|
1.000
|
$441.400
|
$246.590
|
$210.000
|
$263.470
|
$275.000
|
$250.000
|
$275.000
|
$289.510
|
$289.470
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
133.000
|
$24.000
|
$25.750
|
$26.000
|
$36.950
|
$28.000
|
$31.950
|
$30.000
|
$27.110
|
$29.470
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
24.000
|
$452.000
|
$519.000
|
$470.000
|
$560.320
|
$685.000
|
$489.900
|
$460.000
|
$546.380
|
$721.050
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$590.000
|
$649.000
|
$590.000
|
$783.940
|
$800.000
|
$649.650
|
$610.000
|
$683.240
|
$842.110
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$715.000
|
$777.000
|
$700.000
|
$842.310
|
$955.000
|
$798.750
|
$750.000
|
$817.990
|
$1,005.260
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$815.000
|
$877.000
|
$780.000
|
$865.710
|
$1,105.000
|
$862.650
|
$810.000
|
$923.270
|
$1,163.160
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
4.000
|
$938.500
|
$954.000
|
$1,000.000
|
$967.660
|
$1,250.000
|
$1,038.380
|
$975.000
|
$1,004.330
|
$1,315.790
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$1,567.000
|
$1,569.000
|
$1,500.000
|
$1,557.720
|
$2,475.000
|
$1,757.250
|
$1,650.000
|
$1,651.770
|
$2,605.260
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
58,674.000
|
$0.690
|
$1.000
|
$1.050
|
$1.290
|
$1.000
|
$1.070
|
$1.000
|
$1.050
|
$1.050
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
114,338.000
|
$0.770
|
$0.680
|
$0.700
|
$1.170
|
$0.680
|
$0.720
|
$0.680
|
$0.720
|
$0.720
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
12,996.000
|
$1.180
|
$1.350
|
$1.400
|
$2.350
|
$1.350
|
$1.440
|
$1.350
|
$1.420
|
$1.420
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
649.000
|
$6.780
|
$7.500
|
$8.000
|
$9.970
|
$7.500
|
$7.990
|
$7.500
|
$7.900
|
$7.890
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
218.000
|
$150.000
|
$150.500
|
$160.000
|
$275.650
|
$150.500
|
$160.280
|
$150.000
|
$158.440
|
$158.420
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
80.000
|
$156.000
|
$225.000
|
$230.000
|
$392.950
|
$225.000
|
$239.630
|
$225.000
|
$236.870
|
$236.840
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
20,474.000
|
$0.650
|
$1.000
|
$1.050
|
$1.290
|
$1.000
|
$1.070
|
$1.000
|
$1.050
|
$1.050
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
127,660.000
|
$0.640
|
$0.680
|
$0.700
|
$1.170
|
$0.680
|
$0.720
|
$0.680
|
$0.720
|
$0.720
|
|
|
WK ZN PAV MRK REMOV (Y)12"(SLD)
|
LF
|
498.000
|
$3.500
|
$5.000
|
$5.200
|
$6.740
|
$5.000
|
$5.330
|
$5.000
|
$5.260
|
$5.260
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,639.000
|
$3.750
|
$4.000
|
$4.200
|
$6.450
|
$4.000
|
$4.260
|
$4.000
|
$4.210
|
$4.210
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
98,475.000
|
$0.430
|
$0.440
|
$0.450
|
$0.820
|
$0.440
|
$0.470
|
$0.440
|
$0.460
|
$0.460
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
3,710.000
|
$0.950
|
$0.550
|
$0.600
|
$1.170
|
$0.550
|
$0.590
|
$0.550
|
$0.580
|
$0.580
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
71.000
|
$6.300
|
$3.500
|
$3.600
|
$4.690
|
$3.500
|
$3.730
|
$3.500
|
$3.680
|
$3.680
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
111,323.000
|
$0.060
|
$0.050
|
$0.060
|
$0.230
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
9,434.000
|
$0.140
|
$0.100
|
$0.110
|
$0.470
|
$0.100
|
$0.110
|
$0.100
|
$0.110
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
806.000
|
$1.570
|
$0.500
|
$0.550
|
$1.170
|
$0.500
|
$0.530
|
$0.500
|
$0.530
|
$0.530
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
442.000
|
$1.390
|
$0.750
|
$0.800
|
$2.350
|
$0.750
|
$0.800
|
$0.750
|
$0.790
|
$0.790
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
55.000
|
$21.500
|
$3.500
|
$37.000
|
$35.190
|
$35.500
|
$37.810
|
$35.500
|
$37.370
|
$37.370
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
55.000
|
$35.900
|
$45.500
|
$47.000
|
$35.190
|
$45.500
|
$48.460
|
$45.500
|
$47.900
|
$47.890
|
|
|
INSTALL HWY TRF SIG (ISOLATED)
|
EA
|
2.000
|
$25,272.000
|
$23,450.490
|
$8,200.000
|
$33,821.590
|
$6,050.000
|
$6,300.000
|
$6,050.000
|
$6,369.180
|
$6,368.420
|
|
|
TRF SIG CBL (TY A)(14 AWG)(16 CONDR)
|
LF
|
617.000
|
$4.000
|
$4.850
|
$3.200
|
$3.240
|
$5.500
|
$5.250
|
$5.500
|
$5.790
|
$5.790
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
617.000
|
$1.500
|
$1.860
|
$1.250
|
$1.710
|
$3.300
|
$3.150
|
$3.300
|
$3.470
|
$3.470
|
|
|
RELOCATE PED POLE ASSEMBLY
|
EA
|
2.000
|
$1,582.000
|
$1,279.980
|
$800.000
|
$1,109.050
|
$6,050.000
|
$6,300.000
|
$6,050.000
|
$6,369.180
|
$6,368.420
|
|
|
SPOT MOWING
|
AC
|
30.000
|
$90.000
|
$190.940
|
$110.000
|
$100.810
|
$1,500.000
|
$210.000
|
$200.000
|
$124.870
|
$684.210
|
|
|
LITTER REMOVAL (SPOT)
|
AC
|
30.000
|
$20.000
|
$1,000.000
|
$76.000
|
$84.460
|
$800.000
|
$1,575.000
|
$500.000
|
$26.320
|
$473.680
|
|
|
NO. OF WORKING DAYS
|
$/D
|
800.000
|
$998.000
|
$816.000
|
$927.000
|
$5.000
|
$700.000
|
$851.000
|
$998.000
|
$998.000
|
$600.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
3,654.580
|
$90.000
|
$101.890
|
$110.000
|
$116.010
|
$107.750
|
$100.000
|
$110.000
|
$98.600
|
$115.260
|
|
|
TACK COAT
|
GAL
|
997.300
|
$4.000
|
$3.090
|
$11.000
|
$3.520
|
$10.000
|
$6.000
|
$10.000
|
$7.060
|
$3.900
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$12,000.000
|
$5,000.000
|
$16,000.000
|
$9,181.250
|
$13,000.000
|
$15,000.000
|
$18,000.000
|
$139.740
|
$11,231.580
|
|
|
CONDUIT (PREPARE)
|
LF
|
191.000
|
$3.000
|
$3.730
|
$1.300
|
$1.950
|
$4.500
|
$4.200
|
$4.500
|
$4.740
|
$4.740
|
|
|
GROUND BOX (PREPARE)
|
EA
|
3.000
|
$267.000
|
$361.810
|
$190.000
|
$381.700
|
$450.000
|
$420.000
|
$450.000
|
$473.740
|
$473.680
|
|
MULTIPOLYMER PAV MRK (W)(4")(SLD)
|
LF
|
46,185.000
|
$0.550
|
$0.750
|
$0.800
|
$0.820
|
$0.750
|
$0.800
|
$0.750
|
$0.790
|
$0.790
|
|
MULTIPOLYMER PAV MRK (W)(4")(BRK)
|
LF
|
21,769.000
|
$0.680
|
$0.750
|
$0.800
|
$0.880
|
$0.750
|
$0.800
|
$0.750
|
$0.790
|
$0.790
|
|
MULTIPOLYMER PAV MRK (W)(8")(SLD)
|
LF
|
9,434.000
|
$1.200
|
$1.500
|
$1.600
|
$1.760
|
$1.500
|
$1.600
|
$1.500
|
$1.580
|
$1.580
|
|
MULTIPOLYMER PAV MRK (W)(12")(SLD)
|
LF
|
806.000
|
$3.900
|
$6.500
|
$6.700
|
$5.100
|
$6.500
|
$6.920
|
$6.500
|
$6.840
|
$6.840
|
|
MULTIPOLYMER PAV MRK (W)(24")(SLD)
|
LF
|
442.000
|
$9.460
|
$12.000
|
$12.300
|
$10.030
|
$12.000
|
$12.780
|
$12.000
|
$12.630
|
$12.630
|
|
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
|
LF
|
43,369.000
|
$0.560
|
$0.750
|
$0.800
|
$0.820
|
$0.750
|
$0.800
|
$0.750
|
$0.790
|
$0.790
|
|
MULTIPOLYMER PAV MRK (BLK)(4")(BRK)
|
LF
|
21,769.000
|
$0.800
|
$0.750
|
$0.800
|
$1.000
|
$0.750
|
$0.800
|
$0.750
|
$0.790
|
$0.790
|
|
MULTIYPOLYMER PAV MRK (W) (ARROW)
|
EA
|
55.000
|
$180.000
|
$200.000
|
$205.000
|
$293.250
|
$200.000
|
$213.000
|
$200.000
|
$210.550
|
$210.530
|
|
MULTIPOLYMER PAV MRK (W) (WORD)
|
EA
|
55.000
|
$220.000
|
$225.000
|
$230.000
|
$334.300
|
$225.000
|
$239.630
|
$225.000
|
$236.870
|
$236.840
|
|
|
RADAR COMMUNICATION CABLE
|
LF
|
296.000
|
$2.500
|
$4.480
|
$3.700
|
$4.060
|
$6.600
|
$6.300
|
$6.600
|
$6.950
|
$6.950
|
|
|
TMA (STATIONARY)
|
DAY
|
530.000
|
$220.000
|
$100.000
|
$235.000
|
$234.600
|
$125.000
|
$151.000
|
$400.000
|
$249.160
|
$192.980
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
391.000
|
$100.000
|
$100.000
|
$750.000
|
$263.920
|
$440.000
|
$365.000
|
$735.000
|
$91.860
|
$684.210
|
|
|
FLOATING TURBIDITY BARRIER (INSTALL)
|
LF
|
200.000
|
$120.000
|
$120.000
|
$68.000
|
$293.250
|
$67.310
|
$126.000
|
$100.000
|
$29.880
|
$131.580
|
|
|
FLOATING TURBIDITY BARRIER (REMOVE)
|
LF
|
200.000
|
$70.000
|
$50.000
|
$25.000
|
$58.650
|
$24.550
|
$31.500
|
$20.000
|
$18.350
|
$26.320
|
|
Totals: |
$15,974,483.913
|
$21,269,536.653
|
$21,509,734.470
|
$21,896,865.151
|
$22,183,369.719
|
$24,424,775.381
|
$26,101,552.250
|
$26,422,349.006
|