PREPARING ROW
|
STA
|
112.600
|
$5,000.000
|
$3,150.000
|
$7,600.000
|
$4,656.000
|
$4,186.000
|
$3,000.000
|
$4,056.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
13,461.000
|
$8.000
|
$10.000
|
$6.000
|
$9.080
|
$7.000
|
$13.000
|
$6.500
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
312.000
|
$20.000
|
$20.000
|
$10.000
|
$11.140
|
$9.400
|
$16.000
|
$10.500
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
214.000
|
$21.000
|
$20.000
|
$10.000
|
$8.520
|
$11.500
|
$24.000
|
$10.500
|
|
|
REMOVING CONC (CURB)
|
LF
|
698.000
|
$10.000
|
$10.000
|
$10.000
|
$5.700
|
$9.700
|
$5.000
|
$10.500
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
30.000
|
$28.000
|
$20.000
|
$20.000
|
$19.770
|
$48.000
|
$50.000
|
$10.500
|
|
|
REMOVE CONC (RAIL)
|
LF
|
17.000
|
$500.000
|
$525.000
|
$180.000
|
$193.540
|
$105.000
|
$235.000
|
$125.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
549.000
|
$25.000
|
$10.000
|
$10.000
|
$3.280
|
$4.750
|
$11.000
|
$8.500
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-6")
|
SY
|
312.000
|
$6.000
|
$7.350
|
$4.000
|
$4.460
|
$8.000
|
$5.000
|
$9.000
|
|
|
REMOV STAB BASE AND ASPH PAV (10"-18")
|
SY
|
13,417.000
|
$5.000
|
$6.300
|
$5.000
|
$8.550
|
$6.400
|
$7.000
|
$6.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
63,207.000
|
$5.500
|
$6.300
|
$5.000
|
$4.830
|
$5.000
|
$8.000
|
$10.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
601.000
|
$11.000
|
$24.000
|
$15.000
|
$13.470
|
$8.000
|
$20.000
|
$9.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
49,195.000
|
$3.500
|
$9.450
|
$1.000
|
$6.300
|
$2.000
|
$19.000
|
$7.500
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
6,436.000
|
$14.000
|
$14.700
|
$30.000
|
$37.640
|
$13.000
|
$51.000
|
$20.000
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
4,913.000
|
$1.000
|
$2.100
|
$1.150
|
$3.020
|
$1.150
|
$1.150
|
$10.000
|
|
|
BLOCK SODDING
|
SY
|
4,913.000
|
$3.000
|
$5.250
|
$2.490
|
$2.600
|
$2.490
|
$2.500
|
$3.000
|
|
|
CELL FBR MLCH SEED(PERM)(URBAN)(CLAY)
|
SY
|
96,995.000
|
$0.700
|
$0.250
|
$0.220
|
$0.230
|
$0.220
|
$0.220
|
$0.250
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
48,503.000
|
$0.400
|
$0.100
|
$0.220
|
$0.230
|
$0.220
|
$0.220
|
$0.250
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
48,492.000
|
$0.300
|
$0.100
|
$0.230
|
$0.240
|
$0.230
|
$0.230
|
$0.250
|
|
|
VEGETATIVE WATERING
|
MG
|
13,204.100
|
$4.000
|
$1.050
|
$4.500
|
$10.000
|
$18.000
|
$21.000
|
$17.000
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
70,116.000
|
$11.500
|
$8.000
|
$10.400
|
$7.110
|
$10.500
|
$8.500
|
$14.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
14,023.200
|
$5.000
|
$6.460
|
$6.250
|
$7.000
|
$6.250
|
$6.400
|
$3.750
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
16,800.000
|
$65.000
|
$57.450
|
$55.600
|
$58.510
|
$55.600
|
$57.000
|
$62.500
|
|
|
SUPERPAVE MIXTURES SP-C PG64-22
|
TON
|
1,492.000
|
$70.000
|
$67.160
|
$65.000
|
$68.410
|
$65.000
|
$67.000
|
$80.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
54,885.000
|
$45.000
|
$45.000
|
$48.000
|
$45.500
|
$55.100
|
$49.000
|
$62.000
|
|
|
CURB (TYPE I)
|
LF
|
396.000
|
$2.000
|
$4.000
|
$2.000
|
$1.580
|
$20.000
|
$2.000
|
$25.000
|
|
|
CURB (TYPE II)
|
LF
|
22,211.000
|
$2.000
|
$2.000
|
$1.000
|
$1.700
|
$2.750
|
$3.000
|
$8.000
|
|
|
CONC PVMT (CONT REINF-CRCP) (HES) (8")
|
SY
|
8,546.000
|
$55.000
|
$50.000
|
$48.000
|
$50.000
|
$60.000
|
$42.000
|
$80.000
|
|
|
CEM STABIL BKFL
|
CY
|
226.000
|
$147.740
|
$144.000
|
$160.000
|
$96.110
|
$150.000
|
$152.000
|
$150.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
5,513.000
|
$2.500
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$6.000
|
$2.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
217.000
|
$60.000
|
$50.000
|
$50.000
|
$57.520
|
$51.000
|
$55.000
|
$52.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,312.000
|
$150.000
|
$150.000
|
$135.000
|
$145.000
|
$128.000
|
$137.000
|
$150.000
|
|
|
DRILL SHAFT (SIGN MTS) (12 IN)
|
LF
|
16.000
|
$124.940
|
$141.520
|
$75.000
|
$131.600
|
$75.000
|
$75.000
|
$140.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
116.000
|
$124.940
|
$173.420
|
$136.000
|
$165.320
|
$136.000
|
$136.000
|
$175.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
15.000
|
$200.000
|
$293.560
|
$390.000
|
$288.310
|
$390.000
|
$390.000
|
$525.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
114.000
|
$776.140
|
$945.000
|
$800.000
|
$648.440
|
$1,100.000
|
$1,200.000
|
$1,000.000
|
|
|
CL C CONC (BENT)(HPC)
|
CY
|
259.000
|
$800.000
|
$735.000
|
$1,000.000
|
$1,051.690
|
$1,100.000
|
$1,900.000
|
$1,150.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
5.000
|
$400.000
|
$630.000
|
$900.000
|
$820.530
|
$807.000
|
$430.000
|
$825.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
40,466.000
|
$20.000
|
$16.000
|
$18.000
|
$19.540
|
$22.000
|
$12.000
|
$19.000
|
|
|
BRIDGE SIDEWALK (HPC)
|
SF
|
7,693.000
|
$6.830
|
$7.000
|
$10.000
|
$6.050
|
$7.300
|
$5.000
|
$8.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
161.000
|
$500.000
|
$420.000
|
$435.000
|
$450.000
|
$431.000
|
$600.000
|
$450.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
19,048.000
|
$50.000
|
$30.000
|
$54.000
|
$60.000
|
$60.000
|
$51.000
|
$56.750
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,289.000
|
$135.000
|
$125.000
|
$136.000
|
$131.430
|
$154.000
|
$131.000
|
$164.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
5,825.000
|
$125.000
|
$135.000
|
$133.000
|
$136.710
|
$140.000
|
$126.000
|
$150.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
87.300
|
$700.000
|
$525.000
|
$430.000
|
$377.360
|
$415.000
|
$315.000
|
$400.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
36.000
|
$500.000
|
$525.000
|
$415.000
|
$372.450
|
$360.000
|
$400.000
|
$425.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
17.900
|
$548.680
|
$525.000
|
$450.000
|
$392.990
|
$650.000
|
$330.000
|
$640.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
372.000
|
$100.000
|
$99.000
|
$125.000
|
$100.880
|
$101.000
|
$120.000
|
$98.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,361.500
|
$100.000
|
$99.000
|
$175.000
|
$89.940
|
$103.000
|
$90.000
|
$110.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
70.200
|
$50.000
|
$525.000
|
$460.000
|
$538.510
|
$708.000
|
$345.000
|
$425.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
1,957.000
|
$8.200
|
$10.000
|
$15.000
|
$7.640
|
$6.000
|
$12.000
|
$15.000
|
|
|
RAIL (TY T221)(HPC)
|
LF
|
824.000
|
$60.000
|
$50.000
|
$50.000
|
$58.270
|
$66.000
|
$58.000
|
$82.000
|
|
|
RAIL (TY T551)
|
LF
|
34.000
|
$20.000
|
$200.000
|
$200.000
|
$125.560
|
$162.000
|
$49.000
|
$105.000
|
|
|
RAIL (TY T551)(HPC)
|
LF
|
689.000
|
$100.000
|
$50.000
|
$60.000
|
$59.730
|
$66.000
|
$53.000
|
$55.000
|
|
|
RAIL (TY C221)
|
LF
|
1,370.000
|
$60.000
|
$100.000
|
$68.000
|
$46.200
|
$82.000
|
$80.000
|
$72.000
|
|
|
RAIL (TY C221)(HPC)
|
LF
|
794.000
|
$87.210
|
$100.000
|
$97.000
|
$81.460
|
$87.000
|
$80.000
|
$79.000
|
|
|
RAIL (TY PR1)
|
LF
|
129.000
|
$120.000
|
$100.000
|
$110.000
|
$75.650
|
$102.000
|
$52.000
|
$81.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
283.000
|
$115.000
|
$50.000
|
$90.000
|
$74.990
|
$84.000
|
$79.000
|
$82.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
492.000
|
$45.310
|
$60.000
|
$56.000
|
$60.340
|
$65.000
|
$65.000
|
$78.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
194.000
|
$400.000
|
$400.000
|
$356.000
|
$383.960
|
$360.000
|
$400.000
|
$400.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
|
LF
|
42.000
|
$400.000
|
$945.000
|
$712.000
|
$767.920
|
$810.000
|
$1,300.000
|
$1,250.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
4,844.000
|
$50.000
|
$49.000
|
$61.000
|
$65.820
|
$54.000
|
$65.000
|
$50.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,230.000
|
$68.910
|
$60.000
|
$71.250
|
$76.790
|
$86.000
|
$85.000
|
$64.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
1,268.000
|
$70.000
|
$75.000
|
$81.500
|
$87.760
|
$76.000
|
$100.000
|
$79.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
390.000
|
$150.000
|
$125.000
|
$133.000
|
$142.610
|
$139.000
|
$180.000
|
$130.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
2.000
|
$2,450.000
|
$2,750.000
|
$2,300.000
|
$2,468.330
|
$3,400.000
|
$3,200.000
|
$4,000.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
3.000
|
$5,000.000
|
$4,200.000
|
$3,305.000
|
$3,565.360
|
$7,332.000
|
$4,400.000
|
$6,555.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
16.000
|
$3,875.000
|
$3,150.000
|
$2,545.000
|
$2,742.590
|
$3,700.000
|
$3,000.000
|
$4,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
16.000
|
$4,152.000
|
$3,750.000
|
$3,560.000
|
$3,839.620
|
$4,100.000
|
$3,700.000
|
$5,500.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
4.000
|
$4,095.000
|
$3,750.000
|
$3,200.000
|
$3,428.240
|
$4,000.000
|
$3,400.000
|
$5,500.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
4.000
|
$5,090.000
|
$4,200.000
|
$3,700.000
|
$3,976.760
|
$4,300.000
|
$3,600.000
|
$5,800.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
3.000
|
$5,650.000
|
$3,500.000
|
$3,940.000
|
$4,251.010
|
$4,000.000
|
$3,800.000
|
$6,200.000
|
|
|
INLET(COMPL)(WALL)(SPL)
|
EA
|
11.000
|
$2,700.000
|
$3,150.000
|
$4,070.000
|
$4,388.140
|
$3,600.000
|
$2,000.000
|
$5,800.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$23,000.000
|
$31,500.000
|
$24,000.000
|
$25,506.070
|
$28,000.000
|
$30,000.000
|
$25,000.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$28,875.000
|
$42,000.000
|
$32,150.000
|
$34,693.740
|
$36,000.000
|
$35,000.000
|
$33,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
2.000
|
$1,500.000
|
$21,000.000
|
$25,500.000
|
$27,425.890
|
$15,000.000
|
$8,600.000
|
$12,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (4: 1) (C)
|
EA
|
5.000
|
$1,250.000
|
$525.000
|
$865.000
|
$932.480
|
$1,600.000
|
$700.000
|
$1,600.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (C)
|
EA
|
1.000
|
$1,300.000
|
$630.000
|
$865.000
|
$932.480
|
$1,800.000
|
$700.000
|
$1,600.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$893.110
|
$735.000
|
$865.000
|
$932.480
|
$1,700.000
|
$1,000.000
|
$1,750.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (C)
|
EA
|
2.000
|
$2,212.800
|
$945.000
|
$1,020.000
|
$1,097.040
|
$1,900.000
|
$1,200.000
|
$1,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$600.000
|
$945.000
|
$1,020.000
|
$1,097.040
|
$1,300.000
|
$1,000.000
|
$850.000
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$266.720
|
$525.000
|
$865.000
|
$932.480
|
$315.000
|
$1,000.000
|
$850.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
3.000
|
$1,099.520
|
$1,575.000
|
$1,525.000
|
$1,645.550
|
$2,400.000
|
$1,000.000
|
$2,300.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
1.000
|
$1,363.720
|
$945.000
|
$2,800.000
|
$3,016.840
|
$2,700.000
|
$1,000.000
|
$5,997.660
|
|
|
REMOV STR (PIPE)
|
LF
|
1,000.000
|
$16.270
|
$21.000
|
$15.250
|
$16.460
|
$13.000
|
$25.000
|
$13.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
16.000
|
$82.210
|
$105.000
|
$51.000
|
$54.850
|
$315.000
|
$500.000
|
$420.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
2,010.000
|
$5.300
|
$3.500
|
$2.000
|
$3.070
|
$2.500
|
$2.000
|
$2.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,200,000.000
|
$1,366,000.000
|
$1,600,000.000
|
$1,500,000.000
|
$1,600,000.000
|
$1,500,000.000
|
$1,900,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$15,000.000
|
$31,500.000
|
$10,000.000
|
$10,800.000
|
$5,562.240
|
$10,000.000
|
$36,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
325.000
|
$28.890
|
$30.000
|
$25.000
|
$28.060
|
$17.250
|
$25.000
|
$28.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
325.000
|
$10.790
|
$11.000
|
$1.000
|
$11.840
|
$11.250
|
$5.000
|
$12.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$19.340
|
$26.000
|
$23.000
|
$25.140
|
$11.750
|
$17.500
|
$25.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$9.160
|
$11.000
|
$0.500
|
$7.790
|
$7.990
|
$6.000
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
18,358.000
|
$2.430
|
$2.000
|
$1.350
|
$3.000
|
$1.160
|
$1.350
|
$1.750
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
18,358.000
|
$0.640
|
$0.550
|
$0.100
|
$1.000
|
$0.500
|
$0.100
|
$0.350
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
940.000
|
$5.640
|
$6.300
|
$3.500
|
$8.000
|
$3.990
|
$3.500
|
$4.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
940.000
|
$1.150
|
$1.050
|
$0.500
|
$1.000
|
$0.500
|
$1.000
|
$0.350
|
|
|
CONSTRUCTING DETOURS
|
SY
|
5,269.000
|
$60.000
|
$84.000
|
$60.000
|
$59.560
|
$59.000
|
$75.000
|
$90.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
6,560.000
|
$30.000
|
$18.000
|
$10.000
|
$20.000
|
$48.000
|
$29.000
|
$33.500
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
11,429.000
|
$4.360
|
$11.000
|
$5.000
|
$2.850
|
$6.000
|
$4.000
|
$6.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
6,560.000
|
$5.000
|
$4.000
|
$5.000
|
$3.390
|
$7.400
|
$5.000
|
$7.500
|
|
|
LANDSCAPE PAVERS
|
SY
|
373.000
|
$10.000
|
$50.000
|
$130.000
|
$48.080
|
$39.000
|
$40.000
|
$75.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
73.000
|
$120.000
|
$40.000
|
$45.000
|
$26.600
|
$35.000
|
$26.000
|
$50.000
|
|
|
INTERSECTIONS (CONC)
|
SY
|
1,634.000
|
$55.270
|
$84.000
|
$60.000
|
$51.000
|
$77.000
|
$100.000
|
$90.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
6,263.000
|
$45.000
|
$34.000
|
$40.000
|
$40.310
|
$48.000
|
$34.000
|
$46.500
|
|
|
CURB RAMPS (TY 1)
|
EA
|
8.000
|
$2,471.000
|
$1,500.000
|
$1,500.000
|
$1,422.520
|
$1,700.000
|
$1,325.000
|
$1,500.000
|
|
|
CURB RAMPS (TY 6)
|
EA
|
1.000
|
$2,250.000
|
$1,500.000
|
$1,500.000
|
$2,165.620
|
$1,700.000
|
$2,050.000
|
$1,550.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
11.000
|
$2,250.000
|
$1,500.000
|
$1,500.000
|
$1,605.110
|
$1,700.000
|
$1,500.000
|
$1,600.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
5.000
|
$2.000
|
$1,500.000
|
$1,500.000
|
$1,528.830
|
$1,700.000
|
$1,450.000
|
$1,700.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
1.000
|
$650.000
|
$2,500.000
|
$1,500.000
|
$1,592.600
|
$1,700.000
|
$1,475.000
|
$2,700.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
2,083.000
|
$17.590
|
$1.500
|
$3.150
|
$1.620
|
$2.250
|
$1.500
|
$2.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,150.000
|
$16.000
|
$18.600
|
$17.000
|
$17.730
|
$18.000
|
$17.000
|
$20.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
5.000
|
$30.000
|
$1,655.260
|
$1,500.000
|
$1,564.800
|
$1,375.000
|
$1,500.000
|
$1,500.000
|
|
|
MTL W-BEAM GD FEN (SPECIAL)
|
LF
|
37.500
|
$2,104.370
|
$72.330
|
$25.000
|
$26.080
|
$70.000
|
$25.000
|
$38.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,050.000
|
$2.100
|
$2.840
|
$3.000
|
$3.130
|
$2.750
|
$3.000
|
$2.100
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
1.000
|
$2,000.000
|
$155.000
|
$175.000
|
$182.560
|
$150.000
|
$175.000
|
$275.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$2,000.000
|
$191.160
|
$175.000
|
$182.560
|
$185.000
|
$175.000
|
$325.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$250.000
|
$2,221.600
|
$2,100.000
|
$2,190.710
|
$2,150.000
|
$2,100.000
|
$250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$276.760
|
$309.990
|
$175.000
|
$182.560
|
$300.000
|
$175.000
|
$265.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
9.000
|
$6,000.000
|
$13,650.000
|
$6,000.000
|
$9,000.000
|
$7,396.110
|
$8,110.900
|
$8,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
11.000
|
$1,031.200
|
$2,520.000
|
$1,500.000
|
$834.560
|
$1,450.000
|
$3,695.520
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
9.000
|
$522.940
|
$1,050.000
|
$1,000.000
|
$1,000.000
|
$750.000
|
$2,190.690
|
$1,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
22.000
|
$8.800
|
$12.770
|
$53.000
|
$59.980
|
$53.000
|
$53.000
|
$23.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
22.000
|
$0.730
|
$1.480
|
$2.500
|
$29.890
|
$2.500
|
$2.500
|
$2.750
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
44.000
|
$1.100
|
$1.550
|
$2.600
|
$30.030
|
$2.600
|
$2.600
|
$2.750
|
|
|
GROUND BOX TY D (162922)
|
EA
|
2.000
|
$505.760
|
$878.530
|
$1,345.000
|
$792.980
|
$1,345.000
|
$1,345.000
|
$1,650.000
|
|
|
REMOVE GROUND BOX
|
EA
|
2.000
|
$145.080
|
$229.360
|
$510.000
|
$473.240
|
$510.000
|
$510.000
|
$425.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
9.000
|
$21.530
|
$26.350
|
$28.000
|
$76.380
|
$26.000
|
$26.000
|
$26.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
603.500
|
$22.360
|
$28.780
|
$23.000
|
$30.110
|
$21.000
|
$21.000
|
$28.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
117.000
|
$30.000
|
$28.780
|
$40.000
|
$35.060
|
$40.000
|
$40.000
|
$28.000
|
|
|
REFURBISH ALUMINUM SIGNS (TY A)
|
EA
|
1.000
|
$453.070
|
$505.540
|
$500.000
|
$635.470
|
$630.000
|
$630.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$453.070
|
$542.110
|
$465.000
|
$503.320
|
$655.000
|
$450.000
|
$550.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
39.000
|
$620.590
|
$666.710
|
$525.000
|
$555.750
|
$726.000
|
$475.000
|
$650.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
4.000
|
$619.920
|
$742.290
|
$710.000
|
$777.240
|
$1,000.000
|
$675.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$690.000
|
$953.390
|
$1,025.000
|
$1,198.700
|
$1,400.000
|
$850.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
1.000
|
$700.000
|
$930.230
|
$1,450.000
|
$1,143.710
|
$1,300.000
|
$850.000
|
$975.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$1,370.000
|
$1,547.130
|
$225.000
|
$1,463.570
|
$2,200.000
|
$1,200.000
|
$1,550.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$1,160.000
|
$1,967.420
|
$2,700.000
|
$1,532.970
|
$2,700.000
|
$2,700.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
2.000
|
$2,387.000
|
$3,456.540
|
$3,695.000
|
$3,739.000
|
$3,695.000
|
$3,000.000
|
$3,500.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
3,333.000
|
$3.560
|
$5.750
|
$4.000
|
$7.830
|
$4.000
|
$4.000
|
$6.000
|
|
|
REMOVE LRSA
|
EA
|
7.000
|
$700.000
|
$1,196.930
|
$675.000
|
$963.450
|
$675.000
|
$675.000
|
$1,200.000
|
|
|
RELOCATE LRSS (SIGN ONLY)
|
EA
|
2.000
|
$2,600.000
|
$1,489.770
|
$2,885.000
|
$754.040
|
$2,885.000
|
$2,885.000
|
$1,500.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
2,035.000
|
$1.210
|
$1.030
|
$1.000
|
$1.040
|
$1.000
|
$1.000
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
22,100.000
|
$1.000
|
$0.910
|
$0.880
|
$0.920
|
$0.880
|
$0.880
|
$1.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
52.000
|
$10.000
|
$6.820
|
$6.600
|
$6.890
|
$6.600
|
$6.600
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
6.000
|
$108.670
|
$183.930
|
$178.000
|
$185.690
|
$178.000
|
$178.000
|
$155.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
3.000
|
$123.940
|
$257.290
|
$249.000
|
$259.750
|
$249.000
|
$249.000
|
$155.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
15,040.000
|
$0.940
|
$0.910
|
$0.880
|
$0.920
|
$0.880
|
$0.880
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,087.000
|
$0.950
|
$0.830
|
$0.800
|
$0.830
|
$0.800
|
$0.800
|
$1.050
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
777.000
|
$1.080
|
$2.170
|
$2.100
|
$2.190
|
$2.100
|
$2.100
|
$3.750
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
288.000
|
$3.000
|
$3.100
|
$3.000
|
$3.130
|
$3.000
|
$3.000
|
$3.750
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
266.000
|
$6.360
|
$6.200
|
$6.000
|
$6.260
|
$6.000
|
$6.000
|
$10.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
15.000
|
$113.060
|
$112.630
|
$109.000
|
$113.710
|
$109.000
|
$109.000
|
$160.000
|
|
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
|
EA
|
1.000
|
$300.000
|
$133.300
|
$129.000
|
$134.570
|
$129.000
|
$129.000
|
$160.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
12.000
|
$155.720
|
$125.030
|
$121.000
|
$126.230
|
$121.000
|
$121.000
|
$160.000
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
4.000
|
$72.200
|
$62.000
|
$60.000
|
$62.590
|
$60.000
|
$60.000
|
$47.500
|
|
|
PAVEMENT SEALER 4"
|
LF
|
35,097.000
|
$0.100
|
$0.210
|
$0.200
|
$0.210
|
$0.200
|
$0.200
|
$0.160
|
|
|
PAVEMENT SEALER 8"
|
LF
|
6,087.000
|
$0.250
|
$0.400
|
$0.390
|
$0.400
|
$0.390
|
$0.390
|
$0.400
|
|
|
PAVEMENT SEALER 12"
|
LF
|
1,065.000
|
$2.200
|
$0.870
|
$0.840
|
$0.880
|
$0.840
|
$0.840
|
$0.900
|
|
|
PAVEMENT SEALER 24"
|
LF
|
266.000
|
$3.000
|
$1.760
|
$1.700
|
$1.770
|
$1.700
|
$1.700
|
$1.550
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
15.000
|
$25.000
|
$20.670
|
$20.000
|
$20.860
|
$20.000
|
$20.000
|
$27.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
12.000
|
$33.000
|
$25.830
|
$25.000
|
$26.080
|
$25.000
|
$25.000
|
$27.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
4.000
|
$18.000
|
$5.170
|
$5.000
|
$5.220
|
$5.000
|
$5.000
|
$27.000
|
|
|
PAVEMENT SEALER (NUMBER)
|
EA
|
1.000
|
$50.000
|
$28.930
|
$28.000
|
$29.210
|
$28.000
|
$28.000
|
$38.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,872.000
|
$0.570
|
$0.410
|
$0.400
|
$0.420
|
$0.400
|
$0.400
|
$0.700
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
18,223.000
|
$0.410
|
$0.390
|
$0.380
|
$0.400
|
$0.380
|
$0.380
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
14,002.000
|
$0.420
|
$0.390
|
$0.380
|
$0.400
|
$0.380
|
$0.380
|
$0.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
3.000
|
$3.710
|
$5.170
|
$5.000
|
$5.220
|
$5.000
|
$5.000
|
$5.250
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
407.000
|
$3.740
|
$3.510
|
$3.400
|
$3.550
|
$3.400
|
$3.400
|
$5.250
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
11,850.000
|
$0.550
|
$0.360
|
$0.350
|
$0.370
|
$0.350
|
$0.350
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
340.000
|
$1.030
|
$0.670
|
$0.650
|
$0.680
|
$0.650
|
$0.650
|
$2.100
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
68.000
|
$1.050
|
$1.240
|
$1.200
|
$1.250
|
$1.200
|
$1.200
|
$5.250
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$75.000
|
$94.030
|
$91.000
|
$94.930
|
$91.000
|
$91.000
|
$160.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$79.910
|
$99.200
|
$96.000
|
$100.150
|
$96.000
|
$96.000
|
$160.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
35,097.000
|
$0.060
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.100
|
$0.160
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
6,087.000
|
$0.430
|
$0.210
|
$0.200
|
$0.210
|
$0.200
|
$0.200
|
$0.350
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
777.000
|
$0.550
|
$1.240
|
$1.200
|
$1.250
|
$1.200
|
$1.200
|
$0.550
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
266.000
|
$0.980
|
$1.550
|
$1.500
|
$1.560
|
$1.500
|
$1.500
|
$1.050
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
15.000
|
$26.150
|
$15.500
|
$15.000
|
$15.650
|
$15.000
|
$15.000
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
12.000
|
$34.610
|
$20.670
|
$20.000
|
$20.860
|
$20.000
|
$20.000
|
$10.500
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
4.000
|
$10.160
|
$5.170
|
$5.000
|
$5.220
|
$5.000
|
$5.000
|
$5.250
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$20,000.000
|
$10,000.000
|
$16,600.140
|
$10,446.980
|
$7,500.000
|
$20,000.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
343.000
|
$8.000
|
$3.640
|
$6.350
|
$5.910
|
$6.350
|
$6.350
|
$6.500
|
|
|
RELOCATE ITS RADIO
|
EA
|
1.000
|
$500.000
|
$2,774.670
|
$5,750.000
|
$3,312.640
|
$5,750.000
|
$5,750.000
|
$5,000.000
|
|
|
ITS POLE (60 FT)(REL)
|
EA
|
1.000
|
$4,000.000
|
$4,998.590
|
$4,110.000
|
$5,915.430
|
$4,110.000
|
$4,110.000
|
$9,000.000
|
|
|
WATER LINE GROUTING
|
CY
|
26.000
|
$200.000
|
$284.160
|
$275.000
|
$301.670
|
$480.000
|
$275.000
|
$350.000
|
|
|
16" WATER ABANDONMENT PLUG
|
EA
|
2.000
|
$2,000.000
|
$929.970
|
$900.000
|
$987.270
|
$1,250.000
|
$900.000
|
$2,000.000
|
|
|
TOPSOIL
|
CY
|
25.000
|
$20.000
|
$51.670
|
$25.000
|
$40.890
|
$56.000
|
$20.000
|
$30.000
|
|
|
BLOCK SOD PLACEMENT
|
SY
|
200.000
|
$6.000
|
$10.330
|
$5.000
|
$5.110
|
$2.500
|
$2.750
|
$3.000
|
|
|
CATHODIC PROTECTION
|
LF
|
536.000
|
$20.000
|
$41.330
|
$40.000
|
$43.880
|
$40.000
|
$40.000
|
$35.000
|
|
|
TRENCH SAFETY
|
LF
|
76.000
|
$2.000
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$45.000
|
|
|
UTILITY MARKERS
|
LF
|
500.000
|
$5.000
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$1.000
|
|
|
24" STEEL CASING BY OTHER THAN OPEN CUT
|
EA
|
460.000
|
$550.000
|
$516.650
|
$500.000
|
$548.480
|
$365.000
|
$700.000
|
$450.000
|
|
|
16" WATER CARRIER PIPE
|
LF
|
460.000
|
$125.000
|
$72.330
|
$70.000
|
$76.790
|
$107.000
|
$70.000
|
$120.000
|
|
|
DUCTILE IRON WATER FITTINGS W/RESTRAINT
|
TON
|
2.000
|
$5,000.000
|
$2,066.600
|
$2,000.000
|
$2,193.940
|
$8,200.000
|
$2,000.000
|
$7,500.000
|
|
|
16" DIP WATER
|
LF
|
76.000
|
$150.000
|
$516.650
|
$500.000
|
$548.480
|
$218.000
|
$500.000
|
$300.000
|
|
|
CONNECTION TO EXISTING 16 WATER MAIN
|
EA
|
2.000
|
$4,500.000
|
$5,166.500
|
$5,000.000
|
$5,484.850
|
$3,800.000
|
$5,000.000
|
$6,500.000
|
|
|
6" BLOW-OFF VALVE
|
EA
|
1.000
|
$15,000.000
|
$10,333.000
|
$10,000.000
|
$10,969.690
|
$11,400.000
|
$10,000.000
|
$20,000.000
|
|
|
REMOVE EXIST BLOW-OFF AND SUMP MANHOLE
|
EA
|
1.000
|
$1,800.000
|
$1,859.940
|
$1,800.000
|
$1,974.540
|
$4,000.000
|
$1,800.000
|
$8,000.000
|
|
|
CONSTRUCTION STAKING
|
LF
|
536.000
|
$7.000
|
$1.000
|
$2.000
|
$22.490
|
$2.000
|
$2.000
|
$1.000
|
|
|
CONSTRUCTION SURVEY
|
LF
|
536.000
|
$5.000
|
$1.000
|
$2.000
|
$22.490
|
$2.000
|
$2.000
|
$1.000
|
|
|
SANITARY LINE GROUTING
|
CY
|
97.000
|
$200.000
|
$155.000
|
$150.000
|
$165.560
|
$275.000
|
$150.000
|
$250.000
|
|
|
30" SEWER ABANDONMENT PLUG
|
EA
|
4.000
|
$3,200.000
|
$2,841.580
|
$2,750.000
|
$3,035.310
|
$5,100.000
|
$2,750.000
|
$3,000.000
|
|
|
REMOVE 5' SEWER MANHOLE
|
EA
|
2.000
|
$3,500.000
|
$3,099.900
|
$3,000.000
|
$3,311.240
|
$2,100.000
|
$3,000.000
|
$3,000.000
|
|
|
PRE-CCTV INSPECTION
|
LF
|
633.000
|
$4.250
|
$2.070
|
$2.000
|
$2.210
|
$11.000
|
$2.000
|
$5.000
|
|
|
POST-CCTV INSPECTION
|
LF
|
632.000
|
$3.000
|
$2.070
|
$2.000
|
$2.210
|
$11.000
|
$2.000
|
$5.000
|
|
|
MANHOLE VACUUM TESTING
|
EA
|
3.000
|
$225.000
|
$516.650
|
$500.000
|
$551.870
|
$1,500.000
|
$500.000
|
$1,000.000
|
|
|
BYPASS PUMPING
|
LF
|
632.000
|
$50.000
|
$15.500
|
$15.000
|
$16.560
|
$18.000
|
$15.000
|
$35.000
|
|
|
TRENCH SAFETY
|
LF
|
632.000
|
$2.000
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$15.000
|
|
|
UTILITY MARKERS
|
EA
|
600.000
|
$5.000
|
$1.000
|
$1.000
|
$1.100
|
$1.000
|
$1.000
|
$1.000
|
|
|
CONCRETE COLLAR
|
EA
|
3.000
|
$250.000
|
$516.650
|
$500.000
|
$551.870
|
$900.000
|
$500.000
|
$2,400.000
|
|
|
42" STEEL CASING BY OPEN CUT
|
LF
|
150.000
|
$750.000
|
$361.660
|
$350.000
|
$386.310
|
$233.000
|
$350.000
|
$450.000
|
|
|
30" SEWER CARRIER PIPE
|
LF
|
150.000
|
$250.000
|
$258.330
|
$250.000
|
$275.940
|
$270.000
|
$250.000
|
$300.000
|
|
|
DUCTILE IRON SEWER FITTINGS
|
TON
|
1.000
|
$5,000.000
|
$2,066.600
|
$2,000.000
|
$2,207.490
|
$16,000.000
|
$2,000.000
|
$7,500.000
|
|
|
30" DIP SEWER
|
LF
|
482.000
|
$320.000
|
$258.330
|
$250.000
|
$275.940
|
$186.000
|
$400.000
|
$330.000
|
|
|
5' MANHOLE
|
EA
|
3.000
|
$7,500.000
|
$7,878.910
|
$7,625.000
|
$8,416.070
|
$4,200.000
|
$7,625.000
|
$17,000.000
|
|
|
EPOXY MANHOLE LINER (SPECTRASHIELD)
|
LF
|
56.000
|
$225.000
|
$361.660
|
$350.000
|
$386.310
|
$183.000
|
$350.000
|
$350.000
|
|
|
5' EXTRA DEPTH MANHOLE
|
EA
|
13.000
|
$500.000
|
$413.320
|
$400.000
|
$441.500
|
$483.000
|
$400.000
|
$1,000.000
|
|
|
CONSTRUCTION STAKING
|
LF
|
632.000
|
$7.000
|
$1.000
|
$2.000
|
$22.490
|
$2.000
|
$2.000
|
$1.000
|
|
|
CONSTRUCTION SURVEY
|
LF
|
632.000
|
$5.000
|
$1.000
|
$2.000
|
$22.490
|
$2.000
|
$2.000
|
$1.000
|
|
Totals: |
$15,478,259.027
|
$15,229,273.892
|
$15,682,080.420
|
$15,747,711.176
|
$16,521,880.100
|
$16,857,170.860
|
$19,404,674.000
|