PREPARING ROW
|
STA
|
146.550
|
$5,000.000
|
$12,382.000
|
$6,423.000
|
$4,000.000
|
$16,200.000
|
$1,850.000
|
$1,260.000
|
$21,115.190
|
$4,425.000
|
$29,078.450
|
|
|
REMOVING CONC (PAV)
|
SY
|
441.000
|
$10.000
|
$8.000
|
$4.500
|
$10.000
|
$8.000
|
$12.000
|
$11.550
|
$19.280
|
$15.000
|
$12.140
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
337.000
|
$15.000
|
$4.600
|
$27.000
|
$10.000
|
$2.500
|
$11.500
|
$5.250
|
$25.000
|
$30.000
|
$17.110
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
108.000
|
$15.000
|
$7.000
|
$11.000
|
$12.000
|
$16.000
|
$21.750
|
$11.550
|
$12.000
|
$12.000
|
$18.850
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
362.000
|
$10.000
|
$4.400
|
$9.000
|
$10.000
|
$2.300
|
$12.250
|
$11.550
|
$11.500
|
$12.000
|
$6.830
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
3,353.000
|
$9.000
|
$5.500
|
$4.000
|
$10.000
|
$7.000
|
$10.750
|
$9.450
|
$9.500
|
$10.000
|
$7.910
|
|
|
REMOVING CONC (FLUME)
|
SY
|
28.000
|
$25.000
|
$13.500
|
$16.000
|
$12.000
|
$25.000
|
$150.000
|
$21.000
|
$70.890
|
$35.000
|
$97.910
|
|
|
REMOVE CONC (MISC)
|
EA
|
1.000
|
$2,000.000
|
$1,400.000
|
$159.000
|
$285.000
|
$712.690
|
$1,450.000
|
$735.000
|
$1,773.020
|
$1,500.000
|
$1,757.480
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
62,930.000
|
$2.500
|
$3.400
|
$2.500
|
$3.270
|
$4.600
|
$2.650
|
$3.150
|
$2.250
|
$4.000
|
$1.680
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
98,208.000
|
$7.250
|
$7.000
|
$8.000
|
$10.000
|
$9.500
|
$8.000
|
$19.020
|
$17.500
|
$15.000
|
$12.340
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
34,368.000
|
$12.500
|
$9.200
|
$8.500
|
$10.000
|
$16.000
|
$11.500
|
$17.690
|
$8.750
|
$20.000
|
$22.580
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
28,559.000
|
$8.000
|
$5.000
|
$3.000
|
$20.000
|
$17.000
|
$19.500
|
$10.430
|
$7.000
|
$20.000
|
$19.480
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
284.000
|
$35.000
|
$45.000
|
$36.000
|
$30.000
|
$20.000
|
$23.000
|
$31.500
|
$23.500
|
$30.000
|
$22.910
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
37,168.000
|
$1.000
|
$1.000
|
$0.810
|
$0.850
|
$2.400
|
$3.100
|
$0.600
|
$1.250
|
$0.820
|
$1.870
|
|
|
BLOCK SODDING
|
SY
|
32,308.000
|
$3.400
|
$3.500
|
$2.590
|
$2.710
|
$3.020
|
$3.200
|
$3.100
|
$3.500
|
$2.630
|
$3.470
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
43,741.000
|
$0.160
|
$0.170
|
$0.160
|
$0.170
|
$0.120
|
$0.130
|
$3.100
|
$0.160
|
$0.160
|
$0.100
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
32,308.000
|
$0.120
|
$0.240
|
$0.230
|
$0.240
|
$0.110
|
$0.120
|
$0.020
|
$0.050
|
$0.230
|
$0.060
|
|
|
VEGETATIVE WATERING
|
MG
|
5,606.000
|
$14.000
|
$25.000
|
$21.000
|
$16.000
|
$13.100
|
$25.000
|
$3.000
|
$15.000
|
$18.000
|
$18.650
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
107.000
|
$14.000
|
$25.000
|
$50.000
|
$16.000
|
$35.930
|
$39.000
|
$73.500
|
$75.000
|
$18.000
|
$17.190
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
1,641.000
|
$150.000
|
$155.000
|
$183.000
|
$165.000
|
$170.000
|
$159.000
|
$155.000
|
$154.810
|
$155.000
|
$154.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
70,521.000
|
$4.000
|
$3.300
|
$4.500
|
$4.000
|
$7.000
|
$3.320
|
$2.750
|
$3.500
|
$4.550
|
$7.500
|
|
|
CEMENT
|
TON
|
649.090
|
$140.000
|
$190.000
|
$148.000
|
$210.000
|
$127.570
|
$215.000
|
$155.000
|
$194.850
|
$125.000
|
$145.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
32,782.000
|
$4.000
|
$2.800
|
$2.000
|
$5.000
|
$2.840
|
$2.750
|
$2.750
|
$2.250
|
$3.250
|
$7.500
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
25,265.500
|
$67.000
|
$72.000
|
$70.500
|
$73.660
|
$62.000
|
$60.000
|
$63.000
|
$64.800
|
$70.500
|
$63.920
|
|
|
SUPERPAVE MIXTURES SP-C SAC-B PG70-22
|
TON
|
2,538.800
|
$100.000
|
$88.500
|
$87.000
|
$125.900
|
$79.000
|
$78.000
|
$85.000
|
$82.140
|
$87.000
|
$81.030
|
|
|
CONC PVMT (CONT REINF - CRCP) (10.5")
|
SY
|
84,092.000
|
$61.000
|
$55.000
|
$65.000
|
$57.750
|
$70.000
|
$66.500
|
$63.000
|
$64.250
|
$70.000
|
$70.000
|
|
|
CURB (TYPE I)
|
LF
|
810.000
|
$5.000
|
$19.000
|
$4.000
|
$9.000
|
$2.230
|
$12.500
|
$6.000
|
$5.000
|
$21.000
|
$5.560
|
|
|
CUT & RESTORING PAV
|
SY
|
161.000
|
$130.000
|
$90.000
|
$198.000
|
$75.000
|
$120.840
|
$137.000
|
$125.000
|
$126.080
|
$150.000
|
$300.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
91.000
|
$190.000
|
$130.000
|
$123.000
|
$136.000
|
$135.000
|
$173.000
|
$225.000
|
$123.080
|
$150.000
|
$220.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
15,041.000
|
$6.000
|
$4.200
|
$0.500
|
$5.000
|
$0.750
|
$2.100
|
$1.000
|
$1.000
|
$1.000
|
$3.500
|
|
|
TEMPORARY SPL SHORING
|
SF
|
8,944.000
|
$23.000
|
$23.000
|
$20.000
|
$15.000
|
$13.350
|
$16.000
|
$1.000
|
$6.750
|
$20.000
|
$5.500
|
|
|
TEMPORARY SPL SHORING (RAILR TIE BACK)
|
SF
|
25,830.000
|
$35.000
|
$33.000
|
$55.000
|
$35.000
|
$72.000
|
$60.500
|
$1.000
|
$35.000
|
$53.500
|
$35.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
1,120.000
|
$60.000
|
$150.000
|
$86.000
|
$95.000
|
$78.000
|
$83.000
|
$86.050
|
$146.720
|
$80.000
|
$77.000
|
|
|
DRILL SHAFT (30 IN)
|
LF
|
316.000
|
$140.000
|
$150.000
|
$184.000
|
$195.000
|
$228.000
|
$179.000
|
$178.570
|
$164.290
|
$205.000
|
$175.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
316.000
|
$160.000
|
$170.000
|
$242.000
|
$245.000
|
$280.000
|
$225.000
|
$241.830
|
$219.860
|
$275.000
|
$228.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
756.000
|
$300.000
|
$275.000
|
$398.000
|
$425.000
|
$425.000
|
$373.000
|
$435.520
|
$316.680
|
$450.000
|
$443.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
594.000
|
$415.000
|
$580.000
|
$578.000
|
$605.000
|
$605.000
|
$525.000
|
$587.540
|
$477.160
|
$650.000
|
$554.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
11.000
|
$310.000
|
$210.000
|
$247.450
|
$239.690
|
$229.300
|
$260.000
|
$244.200
|
$200.000
|
$210.000
|
$250.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
78.000
|
$360.000
|
$230.000
|
$283.130
|
$270.310
|
$258.600
|
$298.000
|
$275.410
|
$220.000
|
$230.000
|
$288.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
66.000
|
$390.000
|
$360.000
|
$427.610
|
$341.490
|
$326.690
|
$449.000
|
$347.920
|
$340.000
|
$355.000
|
$436.000
|
|
|
CL F CONC (BENT)(HPC)
|
CY
|
723.200
|
$1,200.000
|
$500.000
|
$625.000
|
$700.000
|
$700.000
|
$865.000
|
$630.000
|
$700.000
|
$800.000
|
$1,400.000
|
|
|
CL S CONC (JUNCTION BOX)
|
CY
|
6.000
|
$1,000.000
|
$800.000
|
$1,000.000
|
$1,700.000
|
$1,200.000
|
$1,150.000
|
$1,680.000
|
$1,101.270
|
$3,000.000
|
$1,268.350
|
|
|
CL F CONC (ABUT) (HPC)
|
CY
|
286.800
|
$800.000
|
$485.000
|
$822.000
|
$850.000
|
$1,000.000
|
$1,050.000
|
$945.000
|
$600.000
|
$850.000
|
$900.000
|
|
|
CL F CONC (MISC) (HPC)
|
CY
|
13.600
|
$1,750.000
|
$1,450.000
|
$678.000
|
$1,100.000
|
$1,121.000
|
$5,600.000
|
$945.000
|
$350.000
|
$1,200.000
|
$1,200.000
|
|
|
RETAINING WALL (SPREAD FOOTING)
|
SF
|
198.000
|
$80.000
|
$68.000
|
$134.000
|
$125.000
|
$170.000
|
$74.000
|
$168.000
|
$400.000
|
$110.000
|
$400.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
180.000
|
$525.000
|
$340.000
|
$526.000
|
$500.000
|
$332.480
|
$420.000
|
$525.000
|
$376.910
|
$415.000
|
$550.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
107.000
|
$425.000
|
$365.000
|
$300.000
|
$600.000
|
$345.510
|
$475.000
|
$525.000
|
$402.040
|
$510.000
|
$600.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
5.400
|
$550.000
|
$448.000
|
$382.000
|
$500.000
|
$432.560
|
$420.000
|
$630.000
|
$502.550
|
$625.000
|
$1,100.000
|
|
|
RIPRAP (STONE TY R)(DRY)(12 IN)
|
CY
|
4.200
|
$125.000
|
$200.000
|
$328.000
|
$220.000
|
$376.960
|
$237.000
|
$525.000
|
$199.570
|
$620.000
|
$1,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
50.600
|
$425.000
|
$396.000
|
$1,026.000
|
$550.000
|
$376.360
|
$370.000
|
$525.000
|
$439.730
|
$450.000
|
$700.000
|
|
|
STR STEEL (RAILROAD DECK - GIRDER)
|
LB
|
578,525.000
|
$2.250
|
$2.650
|
$2.550
|
$2.320
|
$1.210
|
$2.190
|
$3.500
|
$2.000
|
$2.750
|
$3.100
|
|
|
STR STEEL (RAILROAD THROUGH - GIRDER)
|
LB
|
550,810.000
|
$3.000
|
$2.150
|
$2.550
|
$2.320
|
$1.500
|
$2.180
|
$4.000
|
$2.500
|
$2.750
|
$3.150
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
52,520.000
|
$6.000
|
$14.500
|
$4.650
|
$3.000
|
$2.250
|
$2.400
|
$5.250
|
$2.570
|
$2.750
|
$4.450
|
|
|
RAIL (HANDRAIL)(TY A)
|
LF
|
52.000
|
$75.000
|
$45.000
|
$75.000
|
$145.000
|
$85.290
|
$377.000
|
$100.000
|
$200.000
|
$77.000
|
$123.580
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
125.000
|
$140.000
|
$55.000
|
$102.000
|
$140.000
|
$102.240
|
$197.000
|
$125.000
|
$200.000
|
$116.000
|
$105.050
|
|
|
WATERPROOFING (TY 6)
|
SY
|
130.000
|
$130.000
|
$96.000
|
$79.000
|
$110.000
|
$77.610
|
$45.000
|
$215.000
|
$96.430
|
$100.000
|
$67.000
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
74.000
|
$220.000
|
$156.000
|
$362.000
|
$225.000
|
$210.000
|
$315.000
|
$425.000
|
$181.740
|
$325.000
|
$196.350
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
20.000
|
$150.000
|
$250.000
|
$99.000
|
$80.000
|
$150.000
|
$344.000
|
$315.000
|
$119.050
|
$350.000
|
$576.430
|
|
|
CONC BOX CULV (3 FT X 3 FT)
|
LF
|
330.000
|
$157.000
|
$132.000
|
$155.000
|
$155.000
|
$134.000
|
$173.000
|
$149.000
|
$151.830
|
$185.000
|
$143.210
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
1,405.000
|
$320.000
|
$250.000
|
$278.000
|
$275.000
|
$251.000
|
$341.000
|
$249.000
|
$450.000
|
$315.000
|
$263.260
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
1,623.000
|
$500.000
|
$355.000
|
$414.000
|
$455.000
|
$354.000
|
$519.000
|
$369.000
|
$700.000
|
$470.000
|
$366.300
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
4,452.000
|
$51.000
|
$40.000
|
$44.000
|
$55.000
|
$46.050
|
$71.000
|
$48.500
|
$70.000
|
$75.000
|
$60.860
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
4,849.000
|
$65.000
|
$54.000
|
$58.000
|
$66.000
|
$58.100
|
$80.250
|
$57.500
|
$75.000
|
$90.000
|
$69.360
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
2,594.000
|
$80.000
|
$69.000
|
$71.000
|
$85.000
|
$72.650
|
$99.000
|
$69.000
|
$100.000
|
$105.000
|
$85.860
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
2,143.000
|
$106.000
|
$92.000
|
$97.000
|
$110.000
|
$97.100
|
$131.000
|
$90.000
|
$140.000
|
$130.000
|
$115.550
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
3.000
|
$2,500.000
|
$2,700.000
|
$4,300.000
|
$3,500.000
|
$3,262.000
|
$4,700.000
|
$2,100.000
|
$8,712.780
|
$6,200.000
|
$8,000.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
2.000
|
$3,500.000
|
$4,800.000
|
$5,100.000
|
$5,000.000
|
$4,192.000
|
$6,150.000
|
$4,200.000
|
$4,470.930
|
$7,000.000
|
$4,744.880
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
11.000
|
$4,750.000
|
$3,700.000
|
$6,100.000
|
$4,200.000
|
$3,473.000
|
$5,350.000
|
$4,200.000
|
$4,226.700
|
$6,000.000
|
$4,098.340
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
11.000
|
$4,750.000
|
$3,600.000
|
$5,900.000
|
$4,000.000
|
$3,376.000
|
$5,100.000
|
$4,200.000
|
$4,086.700
|
$6,000.000
|
$3,000.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
68.000
|
$5,200.000
|
$3,800.000
|
$6,500.000
|
$5,000.000
|
$4,117.000
|
$6,500.000
|
$4,500.000
|
$5,235.080
|
$6,500.000
|
$4,574.810
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$3,900.000
|
$2,900.000
|
$5,400.000
|
$2,800.000
|
$2,923.000
|
$3,750.000
|
$3,150.000
|
$3,381.930
|
$5,000.000
|
$8,000.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
3.000
|
$4,500.000
|
$3,200.000
|
$6,000.000
|
$3,500.000
|
$3,603.000
|
$4,800.000
|
$3,300.000
|
$3,971.900
|
$6,000.000
|
$4,092.080
|
|
|
INLET(COMPL)CL(2)-02 (FW)(20')
|
EA
|
7.000
|
$10,000.000
|
$6,400.000
|
$12,500.000
|
$3,500.000
|
$9,973.000
|
$9,500.000
|
$7,350.000
|
$4,841.700
|
$13,500.000
|
$5,918.570
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$9,000.000
|
$12,000.000
|
$10,200.000
|
$13,000.000
|
$10,290.000
|
$9,400.000
|
$11,550.000
|
$9,055.120
|
$15,000.000
|
$10,160.570
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$13,000.000
|
$15,000.000
|
$17,500.000
|
$20,000.000
|
$17,850.000
|
$11,500.000
|
$13,650.000
|
$9,055.120
|
$25,000.000
|
$17,545.440
|
|
|
REMOV STR (BOX CULVERT)
|
EA
|
2.000
|
$8,500.000
|
$2,600.000
|
$3,900.000
|
$5,000.000
|
$6,750.000
|
$7,600.000
|
$6,300.000
|
$4,053.990
|
$5,500.000
|
$4,524.770
|
|
|
REMOV STR (INLET)
|
EA
|
4.000
|
$750.000
|
$800.000
|
$790.000
|
$550.000
|
$400.000
|
$760.000
|
$315.000
|
$414.890
|
$750.000
|
$658.140
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$800.000
|
$900.000
|
$775.000
|
$600.000
|
$700.000
|
$760.000
|
$420.000
|
$951.980
|
$1,100.000
|
$697.220
|
|
|
REMOV STR (SET)
|
EA
|
9.000
|
$350.000
|
$375.000
|
$576.000
|
$300.000
|
$350.000
|
$572.000
|
$315.000
|
$383.650
|
$450.000
|
$469.690
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,500.000
|
$900.000
|
$968.000
|
$800.000
|
$1,500.000
|
$1,560.000
|
$2,100.000
|
$542.940
|
$1,500.000
|
$1,389.100
|
|
|
REMOV STR (HEADWALL)
|
EA
|
23.000
|
$1,300.000
|
$650.000
|
$1,350.000
|
$300.000
|
$1,325.000
|
$1,150.000
|
$840.000
|
$544.090
|
$1,000.000
|
$514.960
|
|
|
REMOV STR (PIPE)
|
LF
|
2,779.000
|
$15.000
|
$19.500
|
$9.000
|
$12.000
|
$19.000
|
$26.000
|
$11.550
|
$17.000
|
$20.000
|
$30.000
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
2.000
|
$25,000.000
|
$75,000.000
|
$52,000.000
|
$50,000.000
|
$50,000.000
|
$59,000.000
|
$63,000.000
|
$15,412.450
|
$75,000.000
|
$55,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,977,750.000
|
$2,186,000.000
|
$3,500,000.000
|
$3,800,000.000
|
$3,640,000.000
|
$3,400,000.000
|
$3,737,759.570
|
$3,982,007.760
|
$4,200,000.000
|
$3,997,375.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
25.000
|
$11,000.000
|
$9,750.000
|
$8,400.000
|
$14,000.000
|
$17,600.000
|
$9,000.000
|
$31,500.000
|
$9,578.240
|
$20,000.000
|
$12,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
286.000
|
$35.000
|
$58.000
|
$41.000
|
$45.000
|
$29.950
|
$73.000
|
$26.630
|
$41.840
|
$41.620
|
$29.950
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
286.000
|
$8.000
|
$9.000
|
$9.000
|
$5.000
|
$14.950
|
$18.000
|
$13.310
|
$8.750
|
$9.140
|
$14.950
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
500.000
|
$25.000
|
$20.000
|
$24.670
|
$25.000
|
$12.250
|
$23.000
|
$18.640
|
$19.500
|
$25.050
|
$12.250
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
500.000
|
$6.000
|
$8.300
|
$7.600
|
$5.000
|
$8.990
|
$8.200
|
$10.650
|
$8.250
|
$7.720
|
$8.990
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
17,857.000
|
$1.750
|
$1.750
|
$1.930
|
$2.250
|
$1.200
|
$3.200
|
$1.540
|
$1.750
|
$1.960
|
$1.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
17,857.000
|
$0.600
|
$0.550
|
$0.390
|
$0.250
|
$0.500
|
$1.500
|
$0.110
|
$0.500
|
$0.400
|
$0.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
396.000
|
$4.000
|
$4.200
|
$6.000
|
$6.250
|
$2.550
|
$6.500
|
$4.210
|
$4.000
|
$6.090
|
$2.550
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
396.000
|
$0.800
|
$0.800
|
$2.500
|
$0.250
|
$0.500
|
$0.500
|
$1.070
|
$0.800
|
$2.540
|
$0.500
|
|
|
CONSTRUCTING DETOURS
|
SY
|
18,005.000
|
$75.000
|
$38.000
|
$33.000
|
$72.860
|
$30.530
|
$25.000
|
$39.200
|
$31.000
|
$50.000
|
$38.550
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
7,920.000
|
$28.000
|
$20.000
|
$64.000
|
$45.000
|
$18.810
|
$65.000
|
$21.000
|
$37.000
|
$31.000
|
$48.890
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
1,080.000
|
$40.000
|
$22.000
|
$80.000
|
$45.000
|
$65.230
|
$71.000
|
$25.200
|
$45.000
|
$50.000
|
$41.120
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
1,760.000
|
$6.000
|
$6.400
|
$3.400
|
$4.500
|
$5.560
|
$15.000
|
$5.250
|
$6.500
|
$10.000
|
$3.250
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
320.000
|
$15.000
|
$11.000
|
$8.700
|
$4.500
|
$5.560
|
$29.000
|
$5.250
|
$38.000
|
$12.000
|
$17.900
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
7,920.000
|
$6.500
|
$7.500
|
$8.300
|
$4.500
|
$13.370
|
$5.200
|
$5.250
|
$6.750
|
$13.000
|
$4.580
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
1,080.000
|
$10.000
|
$8.000
|
$8.300
|
$4.500
|
$13.120
|
$12.850
|
$5.250
|
$13.000
|
$15.000
|
$4.290
|
|
|
COLORED TEXTURED CONC (5")
|
SY
|
3,279.000
|
$70.000
|
$75.000
|
$69.000
|
$100.000
|
$67.000
|
$104.000
|
$105.000
|
$75.560
|
$71.000
|
$80.000
|
|
|
COLORED TEXTURED CONC (6"-17")
|
SY
|
353.000
|
$120.000
|
$133.000
|
$134.000
|
$130.000
|
$120.000
|
$153.000
|
$149.000
|
$135.330
|
$127.000
|
$165.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
27,512.000
|
$2.500
|
$2.500
|
$1.850
|
$4.250
|
$1.700
|
$3.000
|
$4.200
|
$9.500
|
$3.000
|
$4.500
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
790.000
|
$25.000
|
$19.000
|
$31.000
|
$23.000
|
$16.000
|
$20.000
|
$31.500
|
$17.000
|
$17.000
|
$26.210
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,022.000
|
$17.000
|
$52.000
|
$29.000
|
$40.000
|
$6.000
|
$19.000
|
$10.650
|
$0.100
|
$25.000
|
$40.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
9,873.000
|
$88.000
|
$55.000
|
$68.000
|
$75.000
|
$55.000
|
$73.250
|
$78.000
|
$52.570
|
$59.000
|
$65.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
6,521.000
|
$50.000
|
$41.000
|
$46.000
|
$55.000
|
$36.000
|
$43.500
|
$52.500
|
$38.500
|
$45.000
|
$50.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
3.000
|
$1,700.000
|
$1,120.000
|
$1,700.000
|
$2,000.000
|
$1,000.000
|
$1,350.000
|
$1,575.000
|
$1,050.750
|
$1,300.000
|
$1,854.110
|
|
|
CURB RAMPS (TY 2)
|
EA
|
2.000
|
$1,700.000
|
$1,120.000
|
$1,700.000
|
$2,000.000
|
$1,000.000
|
$1,825.000
|
$1,575.000
|
$1,050.750
|
$1,300.000
|
$1,823.640
|
|
|
CURB RAMPS (TY 7)
|
EA
|
157.000
|
$1,300.000
|
$1,650.000
|
$1,700.000
|
$2,000.000
|
$1,400.000
|
$1,150.000
|
$1,785.000
|
$1,471.050
|
$1,800.000
|
$1,587.650
|
|
|
CURB RAMPS (TY 21)
|
EA
|
11.000
|
$1,600.000
|
$2,120.000
|
$1,700.000
|
$2,200.000
|
$1,900.000
|
$1,425.000
|
$1,890.000
|
$1,996.430
|
$2,200.000
|
$2,661.300
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE B)
|
SY
|
483.000
|
$82.000
|
$89.000
|
$89.000
|
$200.000
|
$79.000
|
$156.000
|
$136.500
|
$83.010
|
$93.000
|
$90.000
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
1,176.000
|
$80.000
|
$56.000
|
$31.000
|
$65.000
|
$50.000
|
$52.000
|
$25.000
|
$52.540
|
$52.000
|
$50.080
|
|
|
CONC MEDIAN(MONO NOSE)
|
SY
|
60.000
|
$150.000
|
$58.000
|
$209.000
|
$150.000
|
$51.000
|
$420.000
|
$157.500
|
$53.590
|
$55.000
|
$74.520
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
600.000
|
$2.800
|
$3.200
|
$3.000
|
$4.760
|
$2.000
|
$4.250
|
$5.250
|
$3.000
|
$4.000
|
$4.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$250.000
|
$220.000
|
$200.000
|
$119.550
|
$225.000
|
$263.000
|
$525.000
|
$200.000
|
$400.000
|
$250.030
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
110.000
|
$15.000
|
$25.000
|
$46.000
|
$35.000
|
$15.000
|
$24.250
|
$52.500
|
$35.500
|
$48.000
|
$37.840
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
28.000
|
$220.000
|
$290.000
|
$220.000
|
$180.000
|
$225.000
|
$236.000
|
$228.980
|
$270.000
|
$280.000
|
$225.030
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 4
|
EA
|
4.000
|
$230.000
|
$290.000
|
$255.000
|
$250.000
|
$250.000
|
$262.000
|
$244.950
|
$270.000
|
$280.000
|
$250.030
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 4
|
EA
|
3.000
|
$380.000
|
$315.000
|
$430.000
|
$380.000
|
$350.000
|
$367.000
|
$426.000
|
$300.000
|
$310.000
|
$350.040
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
10.000
|
$9.000
|
$5.200
|
$11.930
|
$10.980
|
$10.500
|
$12.500
|
$11.180
|
$5.000
|
$5.150
|
$11.030
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
333.000
|
$12.000
|
$7.500
|
$14.010
|
$12.520
|
$11.980
|
$15.000
|
$12.760
|
$7.000
|
$7.150
|
$12.580
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
635.000
|
$17.000
|
$14.600
|
$27.840
|
$24.560
|
$23.500
|
$30.000
|
$25.030
|
$14.000
|
$14.500
|
$24.680
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
339.000
|
$25.000
|
$18.000
|
$29.150
|
$28.750
|
$27.500
|
$31.000
|
$29.290
|
$17.000
|
$17.500
|
$28.880
|
|
|
CONDT (RM) (3")
|
LF
|
38.000
|
$38.000
|
$37.000
|
$43.450
|
$38.150
|
$36.500
|
$46.000
|
$38.870
|
$35.000
|
$36.000
|
$38.330
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
776.000
|
$0.700
|
$0.750
|
$2.650
|
$1.100
|
$1.050
|
$3.000
|
$1.120
|
$0.700
|
$0.750
|
$1.100
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
2,448.000
|
$1.100
|
$0.950
|
$1.570
|
$1.100
|
$1.050
|
$1.750
|
$1.120
|
$0.900
|
$0.950
|
$1.100
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,299.000
|
$1.250
|
$0.950
|
$1.660
|
$1.150
|
$1.100
|
$1.750
|
$1.170
|
$0.900
|
$0.950
|
$1.160
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
620.000
|
$1.400
|
$1.150
|
$1.860
|
$1.150
|
$1.100
|
$2.000
|
$1.170
|
$1.100
|
$1.150
|
$1.160
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
1,310.000
|
$1.300
|
$1.300
|
$2.410
|
$3.640
|
$3.480
|
$2.500
|
$3.710
|
$1.200
|
$1.250
|
$3.650
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
10.000
|
$940.000
|
$980.000
|
$1,055.300
|
$925.080
|
$885.000
|
$1,110.000
|
$942.530
|
$920.000
|
$950.000
|
$929.350
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
|
EA
|
2.000
|
$5,500.000
|
$4,250.000
|
$6,500.000
|
$5,090.580
|
$4,870.000
|
$6,825.000
|
$5,186.550
|
$4,000.000
|
$4,100.000
|
$5,114.070
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
45.000
|
$500.000
|
$435.000
|
$490.000
|
$470.380
|
$450.000
|
$473.000
|
$468.600
|
$410.000
|
$425.000
|
$490.060
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$580.000
|
$530.000
|
$580.000
|
$522.650
|
$500.000
|
$525.000
|
$601.730
|
$500.000
|
$525.000
|
$580.070
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
14.000
|
$650.000
|
$645.000
|
$715.000
|
$810.100
|
$775.000
|
$814.000
|
$777.450
|
$610.000
|
$625.000
|
$715.080
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$650.000
|
$775.000
|
$790.000
|
$1,019.160
|
$975.000
|
$1,024.000
|
$852.000
|
$730.000
|
$750.000
|
$790.090
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$900.000
|
$900.000
|
$925.000
|
$1,149.820
|
$1,100.000
|
$1,155.000
|
$985.130
|
$820.000
|
$850.000
|
$925.100
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$2,000.000
|
$2,100.000
|
$3,184.060
|
$2,404.170
|
$2,300.000
|
$2,415.000
|
$2,023.500
|
$2,000.000
|
$2,100.000
|
$2,016.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
1.000
|
$400.000
|
$425.000
|
$375.000
|
$418.120
|
$400.000
|
$420.000
|
$426.000
|
$400.000
|
$410.000
|
$509.250
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
4.000
|
$23.000
|
$52.000
|
$45.000
|
$47.040
|
$45.000
|
$48.000
|
$47.930
|
$50.000
|
$52.000
|
$45.010
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
2.000
|
$85.000
|
$52.000
|
$45.000
|
$47.040
|
$45.000
|
$48.000
|
$47.930
|
$50.000
|
$70.000
|
$45.010
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
17,050.000
|
$0.500
|
$0.320
|
$0.500
|
$0.320
|
$0.310
|
$0.520
|
$0.330
|
$0.500
|
$0.500
|
$0.310
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
16,582.000
|
$0.500
|
$0.320
|
$0.500
|
$0.320
|
$0.310
|
$0.520
|
$0.330
|
$0.500
|
$0.500
|
$0.310
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
395.000
|
$0.800
|
$0.800
|
$1.000
|
$0.820
|
$0.780
|
$1.050
|
$0.830
|
$1.000
|
$1.000
|
$0.780
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
547.000
|
$1.100
|
$1.700
|
$1.000
|
$1.720
|
$1.650
|
$1.050
|
$1.760
|
$1.000
|
$1.000
|
$1.650
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
36,440.000
|
$0.650
|
$0.750
|
$0.750
|
$0.750
|
$0.720
|
$0.800
|
$0.770
|
$0.800
|
$0.750
|
$0.720
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
3,025.000
|
$1.000
|
$0.850
|
$1.000
|
$0.850
|
$0.810
|
$1.050
|
$0.860
|
$1.000
|
$1.000
|
$0.810
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
38,278.000
|
$0.750
|
$0.750
|
$0.750
|
$0.750
|
$0.720
|
$0.800
|
$0.770
|
$0.800
|
$0.750
|
$0.720
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,748.000
|
$1.000
|
$1.050
|
$1.000
|
$1.050
|
$1.000
|
$1.050
|
$1.070
|
$1.000
|
$1.000
|
$1.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,242.000
|
$3.100
|
$3.100
|
$3.100
|
$3.140
|
$3.000
|
$3.250
|
$3.200
|
$3.250
|
$3.100
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
718.000
|
$6.000
|
$6.650
|
$5.300
|
$6.790
|
$6.500
|
$5.500
|
$6.920
|
$5.500
|
$5.300
|
$6.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
36.000
|
$140.000
|
$130.000
|
$133.000
|
$132.750
|
$127.000
|
$140.000
|
$135.260
|
$127.000
|
$133.000
|
$127.010
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
36.000
|
$190.000
|
$150.000
|
$153.000
|
$149.480
|
$143.000
|
$160.000
|
$152.300
|
$143.000
|
$153.000
|
$143.020
|
|
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
|
EA
|
15.000
|
$40.000
|
$58.000
|
$38.000
|
$57.490
|
$55.000
|
$40.000
|
$58.580
|
$39.000
|
$38.000
|
$55.010
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
60.000
|
$8.000
|
$10.500
|
$5.300
|
$10.450
|
$10.000
|
$5.500
|
$10.650
|
$5.500
|
$5.300
|
$10.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
51,117.000
|
$0.150
|
$0.130
|
$0.120
|
$0.130
|
$0.120
|
$0.130
|
$0.130
|
$0.100
|
$0.120
|
$0.120
|
|
|
PAVEMENT SEALER 8"
|
LF
|
6,748.000
|
$0.300
|
$0.250
|
$0.250
|
$0.250
|
$0.240
|
$0.270
|
$0.260
|
$0.300
|
$0.250
|
$0.240
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,150.000
|
$0.500
|
$0.680
|
$1.200
|
$0.680
|
$0.650
|
$1.250
|
$0.690
|
$1.250
|
$1.200
|
$0.650
|
|
|
PAVEMENT SEALER 24"
|
LF
|
778.000
|
$1.000
|
$1.500
|
$2.000
|
$1.520
|
$1.450
|
$2.100
|
$1.540
|
$2.000
|
$2.000
|
$1.450
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
36.000
|
$50.000
|
$25.000
|
$28.000
|
$25.090
|
$24.000
|
$30.000
|
$25.560
|
$28.500
|
$28.000
|
$24.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
36.000
|
$50.000
|
$55.000
|
$48.000
|
$55.400
|
$53.000
|
$50.000
|
$56.450
|
$49.000
|
$48.000
|
$53.010
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
15.000
|
$6.000
|
$22.000
|
$28.000
|
$21.950
|
$21.000
|
$30.000
|
$22.370
|
$28.500
|
$28.000
|
$21.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
7,369.000
|
$0.600
|
$0.580
|
$0.440
|
$0.570
|
$0.550
|
$0.450
|
$0.590
|
$0.500
|
$0.440
|
$0.550
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
21,794.000
|
$0.550
|
$0.530
|
$0.420
|
$0.530
|
$0.510
|
$0.450
|
$0.540
|
$0.400
|
$0.420
|
$0.510
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
599.000
|
$0.750
|
$0.570
|
$1.000
|
$0.570
|
$0.550
|
$1.050
|
$0.590
|
$1.000
|
$1.000
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
21,355.000
|
$0.900
|
$0.530
|
$0.420
|
$0.530
|
$0.510
|
$0.500
|
$0.540
|
$0.400
|
$0.420
|
$0.510
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
255.000
|
$2.900
|
$3.750
|
$3.800
|
$3.820
|
$3.650
|
$4.000
|
$3.890
|
$4.000
|
$3.800
|
$3.650
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
639.000
|
$3.500
|
$3.750
|
$3.800
|
$3.820
|
$3.650
|
$4.000
|
$3.890
|
$4.000
|
$3.800
|
$3.650
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
77,309.000
|
$0.450
|
$0.420
|
$0.450
|
$0.430
|
$0.410
|
$0.500
|
$0.440
|
$0.500
|
$0.450
|
$0.410
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
51,036.000
|
$0.140
|
$0.120
|
$0.040
|
$0.110
|
$0.110
|
$0.050
|
$0.120
|
$0.050
|
$0.040
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
7,069.000
|
$0.250
|
$0.250
|
$0.100
|
$0.250
|
$0.240
|
$0.110
|
$0.260
|
$0.240
|
$0.100
|
$0.240
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,150.000
|
$0.510
|
$0.460
|
$0.250
|
$0.470
|
$0.450
|
$0.270
|
$0.480
|
$0.300
|
$0.250
|
$0.450
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
778.000
|
$1.200
|
$0.920
|
$0.500
|
$0.940
|
$0.900
|
$0.550
|
$0.960
|
$0.500
|
$0.500
|
$0.900
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
38.000
|
$18.000
|
$21.500
|
$22.000
|
$21.950
|
$21.000
|
$23.000
|
$22.370
|
$22.500
|
$22.000
|
$21.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
36.000
|
$40.000
|
$38.000
|
$32.000
|
$38.680
|
$37.000
|
$33.000
|
$39.410
|
$32.500
|
$32.000
|
$37.000
|
|
|
PAV SURF PREP FOR MRK (18")(YLD TRI)
|
EA
|
15.000
|
$7.000
|
$14.500
|
$15.000
|
$14.630
|
$14.000
|
$16.000
|
$14.910
|
$15.500
|
$15.000
|
$14.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
894.000
|
$1.000
|
$1.050
|
$0.250
|
$1.050
|
$1.000
|
$0.260
|
$1.070
|
$0.300
|
$0.250
|
$1.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
3.000
|
$5,500.000
|
$6,200.000
|
$4,368.390
|
$4,547.020
|
$4,350.000
|
$4,590.000
|
$4,632.750
|
$6,000.000
|
$6,200.000
|
$4,568.010
|
|
|
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
|
EA
|
3.000
|
$13,500.000
|
$17,700.000
|
$15,684.710
|
$13,118.420
|
$12,550.000
|
$16,470.000
|
$13,365.750
|
$17,000.000
|
$17,500.000
|
$13,178.980
|
|
|
TEMP TRAF SIGNALS
|
EA
|
3.000
|
$60,000.000
|
$47,000.000
|
$59,266.130
|
$44,424.910
|
$42,500.000
|
$62,230.000
|
$63,000.000
|
$45,000.000
|
$46,000.000
|
$44,630.010
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
24.000
|
$230.000
|
$227.000
|
$236.030
|
$214.290
|
$205.000
|
$248.000
|
$218.330
|
$220.000
|
$225.000
|
$215.270
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
7.000
|
$275.000
|
$227.000
|
$230.870
|
$214.280
|
$205.000
|
$243.000
|
$218.330
|
$220.000
|
$225.000
|
$215.270
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
24.000
|
$250.000
|
$227.000
|
$266.350
|
$214.290
|
$205.000
|
$280.000
|
$218.330
|
$220.000
|
$225.000
|
$215.270
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
14.000
|
$250.000
|
$227.000
|
$230.650
|
$214.290
|
$205.000
|
$242.000
|
$218.330
|
$220.000
|
$225.000
|
$215.270
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
24.000
|
$250.000
|
$227.000
|
$237.660
|
$214.290
|
$205.000
|
$250.000
|
$218.330
|
$220.000
|
$225.000
|
$215.270
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
7.000
|
$250.000
|
$227.000
|
$226.840
|
$214.280
|
$205.000
|
$239.000
|
$218.330
|
$220.000
|
$225.000
|
$215.270
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
19.000
|
$700.000
|
$435.000
|
$590.100
|
$601.040
|
$575.000
|
$620.000
|
$612.380
|
$420.000
|
$430.000
|
$603.820
|
|
|
BACK PLATE (12")(3 SEC)(VENTED)ALUM
|
EA
|
24.000
|
$90.000
|
$135.000
|
$108.550
|
$97.740
|
$93.500
|
$114.000
|
$99.580
|
$130.000
|
$135.000
|
$98.190
|
|
|
BACK PLATE (12")(4 SEC)(VENTED)ALUM
|
EA
|
7.000
|
$100.000
|
$145.000
|
$112.430
|
$114.980
|
$110.000
|
$118.000
|
$117.150
|
$140.000
|
$145.000
|
$115.510
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
1,315.000
|
$1.400
|
$1.650
|
$1.570
|
$1.200
|
$1.150
|
$1.750
|
$1.220
|
$1.600
|
$1.650
|
$1.210
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
455.000
|
$1.650
|
$1.900
|
$1.890
|
$1.200
|
$1.150
|
$2.000
|
$1.220
|
$1.500
|
$1.850
|
$1.210
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
1,320.000
|
$2.600
|
$2.270
|
$2.890
|
$1.720
|
$1.650
|
$3.000
|
$1.760
|
$2.750
|
$2.250
|
$1.730
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
1,725.000
|
$4.200
|
$3.620
|
$4.660
|
$3.110
|
$2.980
|
$5.000
|
$3.170
|
$3.500
|
$3.600
|
$3.130
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
2,186.000
|
$1.100
|
$1.050
|
$1.310
|
$1.410
|
$1.350
|
$1.500
|
$1.440
|
$1.000
|
$1.050
|
$1.420
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM&ILSN
|
EA
|
1.000
|
$6,500.000
|
$6,000.000
|
$9,671.000
|
$5,531.690
|
$5,292.000
|
$10,155.000
|
$5,635.980
|
$5,800.000
|
$6,000.000
|
$5,557.220
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM&ILSN
|
EA
|
1.000
|
$6,550.000
|
$7,300.000
|
$10,293.000
|
$6,684.640
|
$6,395.000
|
$10,810.000
|
$6,810.680
|
$7,000.000
|
$7,200.000
|
$6,715.500
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM&ILSN
|
EA
|
1.000
|
$6,900.000
|
$7,750.000
|
$10,895.000
|
$7,493.700
|
$7,169.000
|
$11,440.000
|
$7,634.990
|
$7,500.000
|
$7,700.000
|
$7,528.300
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM&ILSN
|
EA
|
1.000
|
$8,500.000
|
$8,200.000
|
$11,704.000
|
$8,061.290
|
$7,712.000
|
$12,290.000
|
$8,213.280
|
$7,900.000
|
$8,100.000
|
$8,098.510
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
2.000
|
$10,000.000
|
$8,300.000
|
$11,418.000
|
$8,151.710
|
$7,798.500
|
$11,990.000
|
$8,305.410
|
$8,000.000
|
$8,200.000
|
$8,189.340
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM&ILSN
|
EA
|
1.000
|
$8,000.000
|
$8,700.000
|
$12,687.000
|
$8,560.940
|
$8,190.000
|
$13,322.000
|
$8,722.350
|
$8,400.000
|
$8,600.000
|
$8,600.470
|
|
|
INS TRF SIG PL AM(S)1 ARM(50')LUM&ILSN
|
EA
|
2.000
|
$16,000.000
|
$19,500.000
|
$20,827.000
|
$18,344.880
|
$17,550.000
|
$21,870.000
|
$18,690.750
|
$18,500.000
|
$19,000.000
|
$18,429.570
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM&ILSN
|
EA
|
1.000
|
$16,000.000
|
$19,500.000
|
$21,500.000
|
$19,040.000
|
$18,215.000
|
$22,575.000
|
$19,398.980
|
$18,500.000
|
$19,000.000
|
$19,127.900
|
|
|
PED POLE ASSEMBLY
|
EA
|
9.000
|
$1,800.000
|
$1,400.000
|
$1,819.110
|
$1,980.830
|
$1,895.000
|
$1,910.000
|
$2,018.180
|
$1,300.000
|
$1,350.000
|
$1,989.970
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
16.000
|
$850.000
|
$620.000
|
$941.010
|
$778.740
|
$745.000
|
$990.000
|
$793.430
|
$600.000
|
$615.000
|
$782.340
|
|
|
PED DETECT PUSH BUTTON (STANDARD)
|
EA
|
3.000
|
$430.000
|
$290.000
|
$408.810
|
$318.810
|
$305.000
|
$430.000
|
$324.830
|
$280.000
|
$300.000
|
$320.290
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
2.000
|
$3,000.000
|
$3,650.000
|
$3,187.360
|
$2,952.950
|
$2,825.000
|
$3,347.000
|
$3,008.630
|
$3,500.000
|
$3,600.000
|
$2,966.580
|
|
|
POTHOLE REPAIR (SAW - CUT)
|
SY
|
400.000
|
$75.000
|
$135.000
|
$135.000
|
$118.570
|
$130.280
|
$28.000
|
$74.200
|
$21.500
|
$75.000
|
$74.270
|
|
|
FULL - WIDTH MOWING
|
CYC
|
6.000
|
$2,500.000
|
$840.000
|
$750.000
|
$850.000
|
$2,000.000
|
$840.000
|
$7,350.000
|
$2,830.250
|
$1,500.000
|
$800.090
|
|
|
LITTER REMOVAL
|
CYC
|
26.000
|
$500.000
|
$1,600.000
|
$985.000
|
$1,100.000
|
$1,830.270
|
$2,820.000
|
$1,260.000
|
$1,258.700
|
$2,100.000
|
$1,500.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
15,000.000
|
$632.000
|
$575.000
|
$546.000
|
$632.000
|
$632.000
|
$582.000
|
$632.000
|
$599.000
|
$632.000
|
$632.000
|
|
|
SOUND WALLS
|
SF
|
8,264.000
|
$30.000
|
$42.000
|
$42.000
|
$48.000
|
$48.000
|
$40.000
|
$45.000
|
$25.000
|
$40.000
|
$55.000
|
|
|
RAILROAD WATERPROOFING MEMBRANE
|
SY
|
670.000
|
$150.000
|
$93.000
|
$150.000
|
$148.510
|
$127.550
|
$156.000
|
$105.440
|
$151.530
|
$200.000
|
$88.880
|
|
|
DECK DRAIN SYSTEM DLE
|
LS
|
1.000
|
$15,000.000
|
$5,500.000
|
$25,000.000
|
$43,000.000
|
$39,123.260
|
$33,100.000
|
$50,678.440
|
$56,006.520
|
$38,000.000
|
$60,368.250
|
|
|
RAILROAD HANDRAIL W/ FENCE
|
LF
|
465.000
|
$100.000
|
$52.000
|
$97.000
|
$168.000
|
$70.000
|
$41.000
|
$264.640
|
$35.000
|
$100.000
|
$60.010
|
|
|
INST COMPR TRANSITION RAIL 136# TO 133#
|
EA
|
4.000
|
$3,100.000
|
$3,500.000
|
$3,449.740
|
$5,673.540
|
$3,449.740
|
$3,650.000
|
$3,673.970
|
$4,299.490
|
$3,500.000
|
$5,270.590
|
|
|
MOVE COMPR TRANSITION RAIL 136# TO 133#
|
EA
|
2.000
|
$3,100.000
|
$600.000
|
$594.000
|
$2,667.700
|
$594.000
|
$625.000
|
$632.610
|
$1,015.230
|
$600.000
|
$4,500.510
|
|
|
DBL INSIDE GDRAIL FOR OPEN DECK BR
|
LF
|
162.000
|
$30.000
|
$82.000
|
$79.680
|
$61.770
|
$79.680
|
$84.000
|
$84.860
|
$220.000
|
$81.000
|
$200.020
|
|
|
DBL INSIDE GDRAIL FOR BALLAST DECK BR
|
LF
|
380.000
|
$35.000
|
$82.000
|
$79.680
|
$56.820
|
$79.680
|
$84.000
|
$84.860
|
$101.520
|
$81.000
|
$200.020
|
|
|
INSTALL NEW NO. 11 RH HHTO TURNOUT
|
EA
|
2.000
|
$130,461.000
|
$207,000.000
|
$204,099.690
|
$219,766.550
|
$204,099.690
|
$215,000.000
|
$217,366.170
|
$240,837.560
|
$207,000.000
|
$175,619.710
|
|
|
REPLACE TRACK GATE POSTS
|
EA
|
2.000
|
$17.000
|
$1,600.000
|
$2,500.000
|
$1,000.000
|
$1,200.000
|
$3,650.000
|
$3,096.290
|
$100.000
|
$2,500.000
|
$5,000.560
|
|
|
REMOVE TRACK
|
LF
|
5,553.000
|
$8.540
|
$25.500
|
$24.910
|
$9.840
|
$24.910
|
$26.250
|
$26.530
|
$34.500
|
$26.000
|
$34.100
|
|
|
SUBBALLAST
|
CY
|
9,028.000
|
$67.000
|
$38.000
|
$52.510
|
$58.000
|
$51.880
|
$101.000
|
$54.580
|
$35.000
|
$45.000
|
$46.680
|
|
|
TRACK 136# HH CWR W/ WOOD TIES AND BAL
|
LF
|
5,253.000
|
$200.000
|
$235.000
|
$228.340
|
$136.710
|
$228.340
|
$239.500
|
$243.180
|
$150.000
|
$231.000
|
$311.230
|
|
|
TRACK 136# ISHH CWR W/ WOOD TIES
|
LF
|
224.000
|
$200.000
|
$220.000
|
$217.960
|
$158.760
|
$217.960
|
$230.000
|
$232.130
|
$284.260
|
$221.000
|
$310.030
|
|
|
REMOVE EXISTING NO. 11 RH HHTO TURNOUT
|
EA
|
1.000
|
$7,578.000
|
$13,000.000
|
$12,852.680
|
$7,808.200
|
$12,852.680
|
$13,500.000
|
$13,688.100
|
$11,040.610
|
$13,000.000
|
$14,501.630
|
|
|
DBL INSIDE GDRAIL FOR OPEN DECK(REMOVE)
|
LF
|
162.000
|
$2.800
|
$27.500
|
$27.380
|
$24.100
|
$27.380
|
$31.000
|
$29.160
|
$34.500
|
$28.000
|
$34.100
|
|
|
PROVIDE TRACK 136# HH CWR TRACK PANEL
|
LF
|
896.000
|
$175.000
|
$220.000
|
$217.960
|
$89.760
|
$217.960
|
$230.000
|
$232.130
|
$263.960
|
$224.000
|
$229.430
|
|
|
SHIFT RAIL W/ 50% TIE RENEWAL
|
LF
|
2,007.000
|
$52.480
|
$40.000
|
$39.160
|
$15.190
|
$39.160
|
$41.500
|
$41.710
|
$111.680
|
$40.000
|
$125.010
|
|
|
PROVIDE COMPR TRANS RAIL 136# TO 133#
|
EA
|
2.000
|
$1,500.000
|
$2,500.000
|
$2,467.500
|
$3,005.840
|
$2,467.500
|
$2,750.000
|
$2,627.890
|
$3,908.630
|
$2,500.000
|
$3,055.340
|
|
|
PROVIDE TRACK 136# ISHH CWR TRACK PANEL
|
LF
|
237.000
|
$104.000
|
$228.000
|
$217.960
|
$91.430
|
$217.960
|
$230.000
|
$232.130
|
$263.960
|
$221.000
|
$230.030
|
|
|
PROVIDE COMPR JOINT BAR 136# TO EXIST
|
EA
|
2.000
|
$1,100.000
|
$505.000
|
$498.750
|
$458.410
|
$498.750
|
$530.000
|
$531.170
|
$507.620
|
$505.000
|
$3,055.340
|
|
|
SUPPLY SINGLE SWITCH POINT DERAIL
|
EA
|
1.000
|
$60,000.000
|
$38,500.000
|
$38,046.750
|
$54,073.130
|
$38,046.750
|
$40,500.000
|
$40,519.790
|
$52,401.010
|
$39,000.000
|
$50,215.640
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$13,000.000
|
$12,500.000
|
$9,000.000
|
$13,000.000
|
$16,250.000
|
$11,037.830
|
$10,300.000
|
$16,000.000
|
$6,000.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
1,458.000
|
$10.000
|
$1.050
|
$16.350
|
$1.200
|
$1.150
|
$17.500
|
$1.220
|
$1.000
|
$1.050
|
$1.210
|
|
|
GROUND BOX (PREPARE)
|
EA
|
10.000
|
$480.000
|
$258.000
|
$441.010
|
$245.640
|
$235.000
|
$464.000
|
$250.280
|
$250.000
|
$260.000
|
$246.780
|
|
|
RADAR DETECTOR
|
EA
|
21.000
|
$1,000.000
|
$620.000
|
$587.940
|
$757.840
|
$725.000
|
$618.000
|
$772.130
|
$600.000
|
$615.000
|
$761.340
|
|
|
RADAR COMMUNICATION CABLE
|
LF
|
3,852.000
|
$2.000
|
$2.600
|
$3.350
|
$3.500
|
$3.350
|
$3.500
|
$3.570
|
$2.500
|
$2.600
|
$3.520
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$17,000.000
|
$36,500.000
|
$27,000.000
|
$37,751.060
|
$15,725.000
|
$14,750.000
|
$10,000.000
|
$5,400.000
|
$80,000.000
|
$20,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
104.000
|
$35.000
|
$67.500
|
$138.000
|
$61.010
|
$42.000
|
$37.000
|
$110.000
|
$31.000
|
$75.000
|
$75.000
|
|
|
BYPASS PUMPING
|
LS
|
1.000
|
$30,000.000
|
$92,000.000
|
$325,000.000
|
$27,841.030
|
$24,200.000
|
$93,500.000
|
$94,785.000
|
$91,326.530
|
$30,000.000
|
$24,202.720
|
|
|
REMOVE EXISTING MANHOLE
|
EA
|
14.000
|
$1,000.000
|
$2,600.000
|
$1,800.000
|
$1,113.640
|
$968.000
|
$2,600.000
|
$2,662.500
|
$2,551.020
|
$1,100.000
|
$968.110
|
|
|
REMOVE EXIST SAN SEWER PIPE (6 -12")
|
LF
|
3,122.000
|
$12.000
|
$71.000
|
$2.300
|
$34.510
|
$30.000
|
$73.000
|
$74.550
|
$71.430
|
$32.000
|
$30.000
|
|
|
CASING (STEEL) (16 IN) (OPEN TRENCH)
|
LF
|
66.000
|
$100.000
|
$163.000
|
$131.000
|
$232.390
|
$202.000
|
$167.000
|
$170.400
|
$163.270
|
$210.000
|
$202.020
|
|
|
CASING (STEEL) (16 IN) (BORED)
|
LF
|
270.000
|
$270.000
|
$450.000
|
$674.000
|
$472.840
|
$411.000
|
$467.000
|
$473.930
|
$425.000
|
$420.000
|
$411.050
|
|
|
CASING (STEEL) (18 IN) (BORED)
|
LF
|
283.000
|
$320.000
|
$475.000
|
$673.000
|
$505.050
|
$439.000
|
$493.000
|
$500.550
|
$479.590
|
$450.000
|
$439.050
|
|
|
SAN SEWER SLEEVE (12IN) (PVC) (C900)
|
LF
|
216.000
|
$50.000
|
$82.000
|
$75.000
|
$102.390
|
$89.000
|
$83.500
|
$85.200
|
$80.150
|
$92.000
|
$89.010
|
|
|
SAN SEWER SLEEVE (16IN) (PVC) (C900)
|
LF
|
36.000
|
$60.000
|
$108.000
|
$96.000
|
$139.210
|
$121.000
|
$111.000
|
$112.890
|
$102.470
|
$125.000
|
$121.010
|
|
|
TRENCH SAFETY
|
LF
|
24,248.000
|
$5.000
|
$2.100
|
$0.500
|
$5.750
|
$5.000
|
$2.080
|
$2.130
|
$2.040
|
$5.250
|
$5.000
|
|
|
SAN SEWER (8 IN) (PVC) (SDR 26) <10'
|
LF
|
3,757.000
|
$60.000
|
$144.000
|
$82.000
|
$60.970
|
$53.000
|
$146.000
|
$149.100
|
$125.000
|
$65.000
|
$53.010
|
|
|
SAN SEWER (8 IN) (PVC) (SDR 26) 10'-14'
|
LF
|
775.000
|
$65.000
|
$209.000
|
$82.000
|
$64.430
|
$56.000
|
$215.000
|
$218.330
|
$185.000
|
$68.000
|
$56.010
|
|
|
SAN SEWER (8 IN) (PVC) (SDR 26) >14'
|
LF
|
626.000
|
$70.000
|
$294.000
|
$82.000
|
$92.040
|
$80.000
|
$302.000
|
$306.720
|
$293.880
|
$94.000
|
$80.010
|
|
|
SAN SEWER (8 IN) (PVC) (SDR 35) <10'
|
LF
|
2,280.000
|
$55.000
|
$141.000
|
$67.000
|
$59.820
|
$52.000
|
$144.000
|
$146.970
|
$137.030
|
$64.000
|
$52.010
|
|
|
SAN SEWER (8 IN) (PVC) (SDR 35)10'-14'
|
LF
|
635.000
|
$60.000
|
$210.000
|
$67.000
|
$62.120
|
$54.000
|
$214.000
|
$217.260
|
$200.000
|
$66.000
|
$54.010
|
|
|
SAN SEWER (10 IN) (PVC) (SDR 35) <10'
|
LF
|
1,722.000
|
$63.000
|
$145.000
|
$67.000
|
$64.430
|
$56.000
|
$148.000
|
$150.170
|
$40.500
|
$68.000
|
$56.010
|
|
|
SAN SEWER (10 IN) (PVC) (SDR 35)10'-14'
|
LF
|
150.000
|
$68.000
|
$210.000
|
$67.000
|
$93.190
|
$81.000
|
$217.000
|
$220.460
|
$211.220
|
$95.000
|
$81.010
|
|
|
SAN SEWER (10 IN) (PVC) (SDR 26) <10'
|
LF
|
585.000
|
$70.000
|
$147.000
|
$78.000
|
$66.730
|
$58.000
|
$151.000
|
$153.360
|
$150.000
|
$71.000
|
$58.010
|
|
|
SAN SEWER (10 IN) (PVC) (SDR 26)10'-14'
|
LF
|
858.000
|
$75.000
|
$214.000
|
$78.000
|
$69.030
|
$60.000
|
$220.000
|
$223.650
|
$214.290
|
$72.000
|
$60.010
|
|
|
SAN SEWER (10 IN) (PVC) (SDR 26) >14'
|
LF
|
182.000
|
$80.000
|
$300.000
|
$78.000
|
$96.640
|
$84.000
|
$307.000
|
$312.050
|
$298.980
|
$98.000
|
$84.010
|
|
|
SAN SEWER (12 IN) (PVC) (SDR 35) <10'
|
LF
|
27.000
|
$70.000
|
$300.000
|
$92.000
|
$72.480
|
$63.000
|
$307.000
|
$312.050
|
$298.980
|
$75.000
|
$63.010
|
|
|
8 IN RJDI SAN SEWER CARR PIPE <10'
|
LF
|
273.000
|
$70.000
|
$250.000
|
$122.000
|
$139.210
|
$121.000
|
$258.000
|
$261.990
|
$251.020
|
$135.000
|
$121.010
|
|
|
8 IN RJDI SAN SEWER CARR PIPE 10'-14'
|
LF
|
70.000
|
$75.000
|
$251.000
|
$154.000
|
$158.760
|
$138.000
|
$259.000
|
$263.060
|
$252.040
|
$150.000
|
$138.020
|
|
|
10 IN RJDI SAN SEWER CARR PIPE <10'
|
LF
|
307.000
|
$75.000
|
$263.000
|
$127.000
|
$158.760
|
$138.000
|
$271.000
|
$275.840
|
$264.290
|
$150.000
|
$138.020
|
|
|
MANHOLE (SAN SEWER) (4' DIA) (CIP)
|
EA
|
25.000
|
$3,500.000
|
$8,200.000
|
$6,400.000
|
$8,624.970
|
$7,497.000
|
$8,500.000
|
$8,653.130
|
$9,089.990
|
$7,600.000
|
$7,497.840
|
|
|
MANHOLE (SAN SEWER) (4' DIA) (CIP)(DR)
|
EA
|
3.000
|
$4,000.000
|
$10,500.000
|
$6,400.000
|
$9,544.180
|
$8,296.000
|
$10,750.000
|
$10,969.500
|
$10,510.200
|
$9,000.000
|
$8,296.930
|
|
|
ADDITIONAL DEPTH CONCRETE MANHOLE
|
LF
|
14.000
|
$250.000
|
$875.000
|
$150.000
|
$498.150
|
$433.000
|
$908.000
|
$921.230
|
$882.650
|
$450.000
|
$433.050
|
|
|
MANHOLE (SAN SEWER) (5' DIA) (CIP)
|
EA
|
2.000
|
$3,500.000
|
$11,000.000
|
$6,400.000
|
$10,240.210
|
$8,901.000
|
$11,300.000
|
$11,502.000
|
$11,020.410
|
$9,500.000
|
$8,902.000
|
|
|
MANHOLE (SAN SEWER) (4' DIA) (FGL)
|
EA
|
22.000
|
$5,000.000
|
$8,400.000
|
$6,250.000
|
$8,489.210
|
$7,379.000
|
$8,600.000
|
$8,733.000
|
$8,367.350
|
$7,800.000
|
$7,379.830
|
|
|
MANHOLE (SAN SEWER) (4' DIA) (FGL)(DR)
|
EA
|
1.000
|
$5,500.000
|
$10,500.000
|
$5,800.000
|
$9,842.150
|
$8,555.000
|
$10,700.000
|
$10,863.000
|
$10,408.160
|
$9,000.000
|
$8,555.960
|
|
|
MANHOLE (SAN SEWER) (5' DIA) (FGL)
|
EA
|
5.000
|
$6,000.000
|
$14,000.000
|
$9,500.000
|
$11,922.180
|
$10,363.000
|
$14,450.000
|
$14,697.000
|
$14,081.630
|
$11,500.000
|
$10,364.160
|
|
|
ADDITIONAL DEPTH FGL MANHOLE
|
LF
|
30.000
|
$500.000
|
$950.000
|
$315.000
|
$716.730
|
$623.000
|
$960.000
|
$974.480
|
$933.670
|
$650.000
|
$623.070
|
|
|
SERVICE CONNECTION (SAN SEWER)
|
EA
|
78.000
|
$900.000
|
$4,900.000
|
$2,300.000
|
$2,341.180
|
$2,035.000
|
$5,000.000
|
$5,112.000
|
$4,500.000
|
$2,200.000
|
$2,035.230
|
|
|
PLUG AND ABANDON SAN SEWER (6IN)
|
EA
|
7.000
|
$450.000
|
$760.000
|
$882.000
|
$1,197.620
|
$1,041.000
|
$785.000
|
$798.750
|
$765.310
|
$1,150.000
|
$1,041.120
|
|
|
PLUG AND ABANDON SAN SEWER (8IN)
|
EA
|
23.000
|
$500.000
|
$810.000
|
$900.000
|
$1,778.600
|
$1,546.000
|
$835.000
|
$852.000
|
$816.330
|
$1,700.000
|
$1,546.170
|
|
|
PLUG AND ABANDON SAN SEWER (10IN)
|
EA
|
2.000
|
$550.000
|
$890.000
|
$975.000
|
$1,922.410
|
$1,671.000
|
$918.000
|
$931.880
|
$892.860
|
$1,800.000
|
$1,671.190
|
|
|
ABANDON MANHOLE
|
EA
|
15.000
|
$500.000
|
$985.000
|
$1,600.000
|
$1,392.050
|
$1,210.000
|
$1,020.000
|
$1,038.380
|
$994.900
|
$1,350.000
|
$1,210.140
|
|
|
SWR (FLOWABLE BACKFILL)
|
CY
|
44.000
|
$100.000
|
$255.000
|
$134.000
|
$271.510
|
$236.000
|
$261.000
|
$266.250
|
$255.100
|
$250.000
|
$236.030
|
|
|
CONCRETE ENCASEMENT
|
LF
|
30.000
|
$20.000
|
$72.000
|
$86.000
|
$118.500
|
$103.000
|
$73.000
|
$74.550
|
$71.430
|
$110.000
|
$103.010
|
|
|
WATER MAIN (PVC) (C - 900) (8")
|
LF
|
7,920.000
|
$80.000
|
$106.000
|
$70.000
|
$59.820
|
$52.000
|
$110.000
|
$111.830
|
$107.140
|
$58.000
|
$52.010
|
|
|
WATER MAIN (RJDI) (CL 52) (8")
|
LF
|
172.000
|
$60.000
|
$130.000
|
$75.000
|
$87.430
|
$76.000
|
$134.000
|
$136.320
|
$133.270
|
$84.000
|
$76.010
|
|
|
8" RJDI WATER CARRIER PIPE
|
LF
|
765.000
|
$65.000
|
$125.000
|
$114.000
|
$88.590
|
$77.000
|
$129.000
|
$131.000
|
$125.510
|
$84.000
|
$77.010
|
|
|
REMOVE EXIST WATER PIPE (2")
|
LF
|
340.000
|
$8.000
|
$72.000
|
$2.500
|
$34.510
|
$30.000
|
$73.000
|
$74.550
|
$71.430
|
$33.000
|
$30.000
|
|
|
REMOVE EXIST WATER PIPE (6")
|
LF
|
40.000
|
$10.000
|
$74.000
|
$11.000
|
$34.510
|
$30.000
|
$75.000
|
$76.680
|
$73.470
|
$33.000
|
$30.000
|
|
|
REMOVE EXIST WATER PIPE (8")
|
LF
|
260.000
|
$12.000
|
$76.000
|
$3.500
|
$34.510
|
$30.000
|
$77.000
|
$78.810
|
$75.510
|
$33.000
|
$30.000
|
|
|
ADDITIONAL FITTINGS
|
LB
|
6,259.000
|
$2.500
|
$9.400
|
$8.000
|
$10.350
|
$9.000
|
$9.400
|
$9.590
|
$9.180
|
$9.000
|
$9.000
|
|
|
WATER SERVICE RPL & RECON (2")
|
EA
|
7.000
|
$1,000.000
|
$4,600.000
|
$1,760.000
|
$3,268.440
|
$2,841.000
|
$4,725.000
|
$4,819.130
|
$4,617.350
|
$3,200.000
|
$2,841.320
|
|
|
WATER SERVICE RPL & RECON (1")
|
EA
|
36.000
|
$800.000
|
$3,080.000
|
$1,209.000
|
$2,203.120
|
$1,915.000
|
$3,125.000
|
$3,195.000
|
$3,061.220
|
$1,950.000
|
$1,915.210
|
|
|
FIRE HYDRANT (NEW)
|
EA
|
25.000
|
$3,000.000
|
$6,750.000
|
$5,100.000
|
$6,814.150
|
$5,923.000
|
$6,925.000
|
$7,082.250
|
$6,785.710
|
$6,500.000
|
$5,923.660
|
|
|
CASING (STEEL) (16 IN) (BORED)
|
LF
|
678.000
|
$290.000
|
$440.000
|
$700.000
|
$444.080
|
$386.000
|
$450.000
|
$457.950
|
$438.780
|
$420.000
|
$386.040
|
|
|
4" - 12" WATER ABANDONMENT PLUG/CAP
|
EA
|
61.000
|
$500.000
|
$2,325.000
|
$800.000
|
$1,233.290
|
$1,072.000
|
$2,400.000
|
$2,449.500
|
$2,346.940
|
$1,200.000
|
$1,072.120
|
|
|
6" INSERTION VALVE
|
EA
|
1.000
|
$7,000.000
|
$6,400.000
|
$10,263.000
|
$15,521.950
|
$1,349.000
|
$6,600.000
|
$6,709.500
|
$6,428.570
|
$15,000.000
|
$13,493.510
|
|
|
WTR (GATE VALVE & BOX) COMPL (8")
|
EA
|
23.000
|
$1,250.000
|
$2,150.000
|
$2,300.000
|
$2,167.460
|
$1,884.000
|
$2,200.000
|
$2,236.500
|
$2,142.860
|
$2,100.000
|
$1,884.210
|
|
|
TAP SADDLE AND VALVE (2")
|
EA
|
1.000
|
$1,000.000
|
$2,350.000
|
$2,300.000
|
$2,784.100
|
$2,420.000
|
$2,400.000
|
$2,449.500
|
$2,346.940
|
$2,600.000
|
$2,420.270
|
|
|
TAP SLEEVE (GATE VALVE & BOX) (8")
|
EA
|
8.000
|
$5,000.000
|
$3,180.000
|
$4,200.000
|
$4,117.480
|
$3,579.000
|
$3,250.000
|
$3,322.800
|
$3,183.670
|
$4,000.000
|
$3,579.400
|
|
|
TAP SLEEVE (GATE VALVE & BOX) (6")
|
EA
|
3.000
|
$4,500.000
|
$2,580.000
|
$3,700.000
|
$3,475.530
|
$3,021.000
|
$2,600.000
|
$2,662.500
|
$2,551.020
|
$3,300.000
|
$3,021.340
|
|
|
TAP SLEEVE (GATE VALVE & BOX) (16"X6")
|
EA
|
1.000
|
$7,000.000
|
$4,000.000
|
$4,500.000
|
$7,643.630
|
$6,644.000
|
$4,060.000
|
$4,153.500
|
$3,979.590
|
$7,200.000
|
$6,644.750
|
|
|
TAP SLEEVE (GATE VALVE & BOX) (16"X8")
|
EA
|
1.000
|
$8,000.000
|
$4,100.000
|
$5,000.000
|
$8,185.490
|
$7,115.000
|
$4,175.000
|
$4,260.000
|
$4,081.630
|
$7,800.000
|
$7,115.800
|
|
|
2" IRRIGATION SLEEVE
|
LF
|
3,889.000
|
$8.000
|
$19.500
|
$7.000
|
$37.970
|
$33.000
|
$19.800
|
$20.240
|
$19.390
|
$36.000
|
$33.000
|
|
|
4" IRRIGATION SLEEVE
|
LF
|
3,889.000
|
$15.000
|
$22.500
|
$8.500
|
$40.270
|
$35.000
|
$23.000
|
$23.430
|
$22.450
|
$38.000
|
$35.000
|
|
|
SOD RESTORATION
|
SY
|
22,528.000
|
$5.000
|
$3.500
|
$3.900
|
$5.000
|
$3.890
|
$6.400
|
$6.000
|
$16.330
|
$3.150
|
$3.250
|
|
|
GRAVEL RESTORATION
|
SY
|
2,534.000
|
$15.000
|
$6.000
|
$21.000
|
$0.620
|
$15.880
|
$13.800
|
$13.850
|
$16.330
|
$13.000
|
$9.220
|
|
|
ASPHALT RESTORATION
|
SY
|
3,061.000
|
$50.000
|
$56.000
|
$109.000
|
$35.000
|
$45.400
|
$21.750
|
$85.200
|
$13.270
|
$122.000
|
$63.800
|
|
|
CONCRETE RESTORATION
|
SY
|
1,479.000
|
$60.000
|
$92.000
|
$143.000
|
$25.000
|
$54.040
|
$121.000
|
$122.480
|
$81.630
|
$210.000
|
$118.700
|
|
|
DEMOLISH ACME MONUMENT SIGN
|
LS
|
1.000
|
$2,500.000
|
$1,100.000
|
$500.000
|
$1,000.000
|
$749.070
|
$2,500.000
|
$2,130.000
|
$2,040.820
|
$2,500.000
|
$2,740.950
|
|
Totals: |
$43,333,718.640
|
$43,621,757.470
|
$44,281,030.620
|
$45,187,736.150
|
$45,673,886.353
|
$47,492,272.190
|
$48,739,724.000
|
$48,805,077.655
|
$49,425,466.580
|
$52,035,641.061
|