Show Job Controls
Bid Cobra

DELTA SH 19 (0136-04-048)

Items: 68

County: DELTA
Length: N/A
Highway: SH 19
District: PARIS
Control Number: 0136-04-048
DBE Goal: 400.0%
Project: STP 2024(417)HES
Guaranty: N/A
Time: 196 WORKING DAYS
Engineer's Estimate: $4,767,505.83
Date: 12/05/2023 (2 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
DANIEL TAYLOR
ZACHARY SMITH
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$4,767,505.83
$4,447,953.00
Over/Under Est: -6.7% -$319,552.83
Over/Under Est: -5.75% -$274,351.48
Amt Left: 1.02% $45,201.35
$4,808,250.14
Over/Under Est: 0.85% $40,744.31
Amt Left: 8.1% $360,297.14
Delta: -7.01% -$315,095.79
Over/Under Est: 4.66% $221,972.52
Amt Left: 12.17% $541,525.35
Delta: -3.77% -$181,228.21
Over/Under Est: 8.59% $409,312.37
Amt Left: 16.39% $728,865.20
Delta: -3.75% -$187,339.85
Over/Under Est: 10.24% $488,046.67
Amt Left: 18.16% $807,599.50
Delta: -1.52% -$78,734.30
Subcontractor Percentage Amount
BROTHERS RDC PAVING, LLC 12.68% $564,000.44
GILGAL STONES CONSULTING, LLC 11.73% $521,744.89
DIAMOND ELITE BARRICADES, LLC 0.66% $29,356.49
STRIPING TECHNOLOGY, L.P. 0.43% $19,126.20
ALPHA PAVING INDUSTRIES LLC 0.00% $0.00
Total: 25.50% $1,134,228.02

Bid Items & Bid Tabulations

68 Total 0 of 68
DELTA  |  SH 19  |  PARIS  |  0136-04-048  |  12/05/2023  |  $4,767,505.83  |  STP 2024(417)HES  |  HAZARD ELIM & SAFETY  |  196 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GARRET SHIELDS INFRASTRUCTURE
TRUE ROADS CONSTRUCTION, LLC
3LW CIVIL LLC
LONGVIEW BRIDGE AND ROAD, LTD.
HIGHWAY 19 CONSTRUCTION LLC
EAST TEXAS BRIDGE, INC.
REMOVING CONC (RIPRAP)
SY 6.000 $80.000 $40.000 $525.000 $100.000 $300.000 $100.000 $100.000
REMOVING CONCRETE(MOW STRIP)
LF 5,670.000 $25.000 $15.000 $14.000 $14.000 $11.000 $10.000 $10.000
REMOVING CONC (SAWCUT)
LF 80.000 $71.330 $50.000 $78.000 $40.000 $60.000 $75.000 $100.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,231.000 $32.000 $60.000 $46.000 $35.000 $50.000 $30.000 $32.000
BROADCAST SEED (TEMP) (WARM)
SY 119.000 $0.600 $1.000 $3.000 $0.650 $5.500 $10.000 $6.000
BROADCAST SEED (TEMP) (COOL)
SY 119.000 $0.600 $1.000 $3.000 $0.650 $5.500 $10.000 $6.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 237.000 $1.800 $1.000 $3.000 $0.650 $4.400 $10.000 $10.000
VEGETATIVE WATERING
MG 2.000 $250.000 $1,000.000 $300.000 $0.010 $250.000 $1,000.000 $1,000.000
PLAN & TEXT ASPH CONC PAV(0" TO 6")
SY 29,344.000 $7.000 $6.000 $8.250 $7.000 $6.000 $5.500 $8.000
CUT & RESTORE CONC PAVING
SY 48.000 $350.000 $300.000 $200.000 $350.000 $450.000 $350.000 $500.000
CUT & RESTORE ASPH PAVING
SY 1,881.000 $148.330 $150.000 $150.000 $158.520 $195.000 $300.000 $125.000
CUT AND RESTORE PAV (FLEX BASE)
SY 330.000 $368.330 $50.000 $60.000 $150.000 $170.000 $45.000 $50.000
FLOWABLE BACKFILL
CY 420.000 $443.000 $500.000 $325.000 $450.000 $295.000 $250.000 $400.000
CL C CONC (RAIL FOUNDATION)
CY 11.200 $750.000 $1,000.000 $1,600.000 $1,530.000 $1,000.000 $1,200.000 $1,500.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 16.000 $250.000 $300.000 $385.000 $236.000 $500.000 $750.000 $500.000
RIPRAP (CONC)(5 IN)
CY 3.000 $640.000 $600.000 $2,500.000 $850.000 $2,000.000 $1,000.000 $2,500.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 10.000 $500.000 $300.000 $750.000 $550.000 $400.000 $200.000 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 333.000 $560.000 $600.000 $635.000 $450.000 $800.000 $550.000 $800.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 3,294.000 $55.000 $50.000 $48.000 $52.000 $46.000 $55.000 $50.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 1,070.000 $55.000 $50.000 $48.000 $57.000 $66.000 $75.000 $70.000
RETROFIT RAIL (TY T221)
LF 720.000 $260.000 $140.000 $156.000 $190.000 $165.000 $250.000 $250.000
RETROFIT RAIL (ADD HSS)
LF 3,187.000 $170.000 $130.000 $130.000 $152.500 $170.000 $180.000 $145.000
CONC BOX CULV (3 FT X 2 FT)
LF 20.000 $400.000 $500.000 $740.000 $918.000 $950.000 $750.000 $1,200.000
RC PIPE (CL III)(12 IN)
LF 306.000 $48.000 $70.000 $59.000 $76.000 $65.000 $55.000 $60.000
RC PIPE (CL III)(15 IN)
LF 2,933.000 $47.000 $80.000 $65.000 $79.000 $75.000 $55.000 $65.000
RC PIPE (CL III)(18 IN)
LF 1,214.000 $53.000 $100.000 $70.000 $109.880 $75.000 $55.000 $75.000
RC PIPE (CL III)(24 IN)
LF 1,207.000 $82.500 $100.000 $90.000 $142.360 $100.000 $75.000 $100.000
RC PIPE (CL III)(36 IN)
LF 50.000 $180.000 $230.000 $185.000 $227.380 $200.000 $150.000 $200.000
HEADWALL (CH - PW - A - 0) (DES= 3)
EA 1.000 $6,000.000 $5,000.000 $10,000.000 $4,000.000 $8,000.000 $9,000.000 $10,000.000
WINGWALL (FW - S) (HW=3 FT)
EA 2.000 $6,000.000 $5,000.000 $8,500.000 $9,163.620 $10,000.000 $8,000.000 $12,500.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 1.000 $7,000.000 $5,000.000 $10,000.000 $9,017.200 $10,000.000 $18,000.000 $7,500.000
SET (TY II) (12 IN) (RCP) (6: 1) (P)
EA 34.000 $400.000 $800.000 $700.000 $845.000 $1,100.000 $750.000 $1,000.000
SET (TY II) (15 IN) (RCP) (6: 1) (P)
EA 196.000 $550.000 $1,000.000 $730.000 $1,091.440 $1,200.000 $800.000 $1,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 83.000 $800.000 $1,000.000 $925.000 $1,618.440 $1,300.000 $950.000 $1,200.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 46.000 $1,400.000 $2,000.000 $1,385.000 $2,106.440 $1,700.000 $1,250.000 $1,600.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 6.000 $6,400.000 $6,000.000 $5,800.000 $6,000.000 $6,000.000 $4,500.000 $8,000.000
SET (TY II) (42 IN) (CMP) (6: 1) (P)
EA 2.000 $6,500.000 $5,000.000 $9,500.000 $6,000.000 $8,500.000 $12,000.000 $12,000.000
CLEAN EXIST CULVERTS
EA 1.000 $1,000.000 $5,000.000 $3,200.000 $3,689.800 $5,000.000 $2,000.000 $5,000.000
REMOV STR (SET)
EA 367.000 $200.000 $100.000 $420.000 $200.000 $725.000 $500.000 $600.000
REMOV STR (HEADWALL)
EA 2.000 $1,500.000 $1,000.000 $2,125.000 $2,061.260 $2,000.000 $500.000 $2,500.000
REMOV STR (PIPE)
LF 5,710.000 $12.000 $20.000 $16.000 $16.000 $30.000 $50.000 $15.000
MOBILIZATION
LS 1.000 $432,682.350 $400,000.000 $288,000.000 $200,000.000 $400,000.000 $400,000.000 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $7,500.000 $4,000.000 $7,500.000 $5,000.000 $6,500.000 $5,000.000 $20,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,900.000 $4.000 $4.000 $5.000 $3.500 $5.000 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,900.000 $1.000 $2.000 $0.350 $1.000 $1.000 $1.000 $2.000
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
LF 1,000.000 $23.000 $15.000 $30.000 $23.210 $20.000 $100.000 $25.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 1,000.000 $15.000 $15.000 $22.000 $14.090 $9.000 $25.000 $12.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 1,000.000 $23.000 $15.000 $26.000 $17.870 $17.000 $25.000 $20.000
MTL W-BEAM GD FEN (STEEL POST)
LF 4,675.000 $29.000 $40.000 $27.500 $27.000 $29.000 $31.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 26.000 $2,200.000 $2,500.000 $2,100.000 $2,328.660 $2,200.000 $3,100.000 $2,300.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 26.000 $850.000 $1,000.000 $1,000.000 $1,000.000 $1,000.000 $250.000 $1,050.000
REMOVE METAL BEAM GUARD FENCE
LF 5,695.000 $5.000 $2.000 $2.250 $1.000 $2.200 $2.000 $2.500
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 6.000 $200.000 $500.000 $180.000 $150.000 $165.000 $250.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $3,100.000 $3,000.000 $2,900.000 $2,750.000 $3,025.000 $2,950.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 32.000 $300.000 $500.000 $240.000 $150.000 $220.000 $350.000 $250.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,000.000 $1,000.000 $2,400.000 $2,206.810 $2,200.000 $1,500.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $550.000 $1,000.000 $960.000 $1,385.800 $900.000 $1,500.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 1.000 $3,000.000 $10,000.000 $12,000.000 $10,188.580 $9,600.000 $8,500.000 $10,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 113.000 $36.350 $50.000 $30.000 $42.100 $28.000 $35.000 $35.000
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 1,727.000 $2.000 $2.000 $1.800 $1.500 $1.650 $1.500 $2.000
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 6,500.000 $2.000 $2.000 $1.440 $1.500 $1.321 $1.200 $1.650
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 6,900.000 $2.000 $2.000 $1.440 $1.500 $1.320 $1.200 $1.650
REFL PAV MRKR TY II-C-R
EA 87.000 $10.000 $10.000 $12.000 $30.000 $11.000 $10.000 $12.000
D-GR HMA TY-C SAC-A PG64-22(EXEMPT)
TON 3,233.000 $220.000 $150.000 $198.000 $250.000 $135.000 $189.000 $195.000
BONDING COURSE
GAL 2,353.000 $10.000 $10.000 $8.500 $25.000 $6.500 $7.900 $10.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $16,500.000 $1,000.000 $18,000.000 $8,000.000 $20,000.000 $15,000.000 $25,000.000
TMA (STATIONARY)
DAY 77.000 $150.000 $300.000 $350.000 $75.000 $250.000 $250.000 $300.000
TMA (MOBILE OPERATION)
DAY 38.000 $80.000 $300.000 $350.000 $75.000 $300.000 $1,000.000 $300.000
Totals: $4,767,505.830 $4,447,953.000 $4,493,154.350 $4,808,250.140 $4,989,478.350 $5,176,818.200 $5,255,552.500