DEAF SMITH IH 40 (0090-01-032)

Items: 67

County: DEAF SMITH
Length: N/A
Highway: IH 40
District: AMARILLO
Control Number: 0090-01-032
DBE Goal: N/A
Project: BR 2018(777)
Guaranty: N/A
Time: 377 WORKING DAYS
Engineer's Estimate: $7,866,942.87
Date: 04/03/2018 (8 years ago)
Contract Number: N/A
Type: 2018 BMIP PROGRAM
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$7,866,942.87
$8,261,962.00
Over/Under Est: 5.02% $395,019.13
$8,403,947.69
Over/Under Est: 6.83% $537,004.82
Amt Left: 1.72% $141,985.69
Over/Under Est: 46.82% $3,683,458.93
Amt Left: 39.8% $3,288,439.80
Delta: -37.44% -$3,146,454.11

Bid Items & Bid Tabulations

67 Total 0 of 67
DEAF SMITH  |  IH 40  |  AMARILLO  |  0090-01-032  |  04/03/2018  |  $7,866,942.87  |  BR 2018(777)  |  2018 BMIP PROGRAM  |  377 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GILVIN-TERRILL, LTD.
DCI CONTRACTING, INC.
SCR CIVIL CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 1,315.000 $15.000 $55.000 $11.120 $55.000
EXCAVATION (ROADWAY)
CY 887.000 $15.000 $30.000 $21.390 $60.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 229.000 $40.000 $30.000 $22.960 $53.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 9,399.000 $0.260 $0.500 $0.660 $0.450
BROADCAST SEED (TEMP) (COOL)
SY 9,399.000 $0.090 $0.500 $0.580 $0.400
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 9,399.000 $0.780 $2.000 $1.710 $2.750
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")
SY 151.000 $75.000 $100.000 $39.880 $60.000
FLOWABLE BACKFILL
CY 37.000 $250.000 $500.000 $477.420 $800.000
CL C CONC (VEH DEFL WALL)
CY 1,769.000 $1,300.000 $1,460.000 $1,158.070 $1,665.000
REINF CONC SLAB (HPC)
SF 18,672.000 $33.000 $30.500 $28.540 $47.000
APPROACH SLAB (HPC)
CY 54.600 $600.000 $1,000.000 $799.450 $780.000
EPOXY WATERPROOF FINISH
SF 27,334.000 $4.000 $5.000 $26.600 $23.200
CONC STR REPAIR (EPOXY MORTAR)
SF 39.000 $150.000 $100.000 $344.630 $300.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 630.000 $100.000 $100.000 $42.680 $160.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 2,959.000 $180.000 $100.000 $168.730 $175.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 1.000 $4,000.000 $5,000.000 $19,200.000 $5,600.000
RIPRAP (CONC)(4 IN)
CY 323.000 $450.000 $700.000 $800.340 $725.000
RIPRAP (CONC)(6 IN)
CY 366.000 $450.000 $750.000 $689.710 $700.000
RIPRAP (MOW STRIP)(4 IN)
CY 58.000 $500.000 $700.000 $780.380 $750.000
CLEANING AND SEALING EXISTING JOINTS
LF 1,535.000 $25.000 $40.000 $48.390 $100.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 292.000 $35.000 $40.000 $48.640 $100.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 70.000 $45.000 $40.000 $48.390 $30.000
CLEANING EXISTING JOINTS
LF 332.000 $20.000 $35.000 $48.640 $50.000
MULTI-LAYER POLYMER OVERLAY
SY 13,436.000 $50.000 $50.000 $50.780 $99.000
CLEAN & PAINT EXIST STR (SYSTEM I-B)
LS 1.000 $442,500.000 $285,000.000 $303,360.000 $265,000.000
RAIL (TY SSTR)(HPC)
LF 1,030.000 $80.000 $100.000 $122.960 $122.000
RETROFIT RAIL (TY SSTR)(HPC)
LF 36.000 $300.000 $100.000 $156.470 $160.000
ARMOR JOINT (SEALED)
LF 258.000 $110.000 $100.000 $84.750 $112.000
INLET (COMPL)(TY A)
EA 2.000 $6,000.000 $10,000.000 $5,760.000 $12,100.000
PIPE (PVC) (SCH 40) (6 IN)
LF 102.000 $80.000 $60.000 $50.310 $168.000
SHOT BLASTING
SY 13,436.000 $10.000 $7.000 $10.300 $5.600
REMOV STR (SET)
EA 2.000 $800.000 $5,000.000 $640.000 $3,000.000
REMOV STR (BRIDGE SLAB)
EA 1.000 $175,000.000 $250,000.000 $122,240.000 $225,000.000
REMOVE STR (CONC)
EA 2.000 $4,000.000 $4,500.000 $1,920.000 $10,000.000
REMOV STR (APPROACH SLAB)
EA 2.000 $5,400.000 $12,000.000 $3,200.000 $11,200.000
ADJUST STL SHOES
EA 13.000 $800.000 $3,500.000 $2,560.000 $4,250.000
MOBILIZATION
LS 1.000 $900,000.000 $825,000.000 $875,584.000 $1,150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $11,000.000 $15,000.000 $15,825.460 $22,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 4,420.000 $6.000 $5.000 $3.190 $4.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,420.000 $2.000 $1.000 $0.640 $3.000
CONCRETE CURB (SPECIAL)
LF 2,182.000 $35.000 $15.000 $19.200 $48.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,150.000 $28.000 $25.000 $26.880 $23.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,800.000 $2,150.000 $1,984.000 $1,950.000
REMOVE METAL BEAM GUARD FENCE
LF 3,575.000 $3.000 $3.000 $2.260 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 18.000 $300.000 $300.000 $217.600 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $2,600.000 $2,750.000 $2,816.000 $2,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 10.000 $300.000 $300.000 $256.000 $225.000
CRASH CUSH ATTEN (INSTL)(R)(N)(70)
EA 15.000 $12,000.000 $18,500.000 $19,776.000 $26,400.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 16.000 $30.000 $20.000 $38.400 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 29.000 $30.000 $25.000 $46.080 $30.000
RE PM W/RET REQ TY II (W) 4" (BRK)
LF 50.000 $0.500 $0.400 $1.280 $0.450
RE PM W/RET REQ TY II (W) 4" (SLD)
LF 2,510.000 $0.400 $0.400 $1.280 $0.450
RE PM W/RET REQ TY II (Y) 4" (SLD)
LF 11,220.000 $0.400 $0.400 $0.640 $0.450
PAV SURF PREP FOR MRK (4")
LF 13,780.000 $0.600 $2.000 $0.660 $2.250
JT / CRCK ROUT / SEAL(RUBBER - ASPHALT)
LF 105.000 $12.000 $30.000 $12.800 $42.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 38.000 $120.000 $75.000 $67.380 $80.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 525.000 $50.000 $75.000 $97.540 $45.000
REP STL BRIDGE MEMBER (GIRDER END)
EA 13.000 $2,000.000 $1,000.000 $3,840.000 $2,400.000
REP STL BRIDGE MEMBER(STRAIGHTEN MEMB)
EA 1.000 $4,000.000 $10,000.000 $10,240.000 $35,000.000
BRIDGE JOINT REPAIR (ARMOR)
LF 25.000 $250.000 $300.000 $256.000 $360.000
BRIDGE JOINT REPAIR (SEJ)
LF 72.000 $150.000 $300.000 $222.240 $80.000
BRIDGE JOINT REPLACEMENT (ARMOR)
LF 488.000 $350.000 $290.000 $280.710 $255.000
BRIDGE JOINT REPLACEMENT (SEJ)
LF 249.000 $450.000 $310.000 $281.000 $417.000
CARBON FIBER REINF POLYMER PROTECTION
SF 319.000 $80.000 $45.000 $28.160 $115.000
REPLACE ELASTOMERIC BEARING PADS
EA 23.000 $1,200.000 $1,000.000 $1,068.540 $3,850.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 6.000 $11,000.000 $15,000.000 $18,560.000 $27,000.000
TMA (STATIONARY)
EA 6.000 $20,000.000 $25,000.000 $17,066.680 $58,000.000
Totals: $7,866,942.870 $8,261,962.000 $8,403,947.690 $11,550,401.800