PREPARING ROW
|
STA
|
105.900
|
$1,000.000
|
$500.000
|
$101.520
|
$550.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
680.000
|
$20.000
|
$20.000
|
$26.740
|
$19.000
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
105.900
|
$700.000
|
$750.000
|
$406.140
|
$1,000.000
|
|
|
BACKFILL (TY B)
|
STA
|
105.900
|
$150.000
|
$270.000
|
$87.120
|
$295.000
|
|
|
BLADING
|
STA
|
105.900
|
$150.000
|
$270.000
|
$20.670
|
$220.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
17.500
|
$400.000
|
$600.000
|
$410.420
|
$380.000
|
|
|
SPRINKLING (HOT PAVMT)
|
MG
|
25.000
|
$50.000
|
$55.000
|
$68.850
|
$150.000
|
|
|
PROOF ROLLING
|
HR
|
55.000
|
$150.000
|
$85.000
|
$77.750
|
$160.000
|
|
|
FL BS (CMP IN PLC)(TY E, GR4)(3")
|
SY
|
44,100.000
|
$5.000
|
$7.600
|
$5.520
|
$3.400
|
|
|
REWRK BS MATL (TY B)(10")(DENS CONT)
|
SY
|
47,320.000
|
$2.300
|
$2.900
|
$3.990
|
$9.350
|
|
|
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
|
GAL
|
24,710.000
|
$3.000
|
$3.500
|
$3.710
|
$4.300
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
14,824.000
|
$3.000
|
$3.500
|
$3.390
|
$3.650
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
3,765.000
|
$3.000
|
$3.500
|
$4.210
|
$3.800
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
1,000.000
|
$3.500
|
$8.000
|
$5.630
|
$4.350
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
100.000
|
$150.000
|
$190.000
|
$265.340
|
$220.000
|
|
|
AGGR(TY-PB GR-5 SAC-B)
|
CY
|
380.000
|
$150.000
|
$190.000
|
$294.730
|
$200.000
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
10,826.000
|
$100.000
|
$125.000
|
$153.980
|
$121.500
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
1,926.000
|
$100.000
|
$140.000
|
$118.060
|
$155.000
|
|
|
TOM (ASPHALT) PG 70-28
|
TON
|
124.000
|
$600.000
|
$815.000
|
$1,132.250
|
$805.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
1,000.000
|
$30.000
|
$77.000
|
$68.270
|
$79.500
|
|
|
PLANE ASPH CONC PAV (2"-3")
|
SY
|
34,467.000
|
$3.000
|
$1.500
|
$1.550
|
$1.550
|
|
|
CEM STABIL BKFL
|
CY
|
133.330
|
$150.000
|
$220.000
|
$256.510
|
$270.000
|
|
|
TEMPORARY SPL SHORING (COFFERDAM)
|
SF
|
2,000.000
|
$25.000
|
$10.000
|
$0.130
|
$10.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
351.000
|
$150.000
|
$130.000
|
$118.000
|
$125.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
136.000
|
$200.000
|
$140.000
|
$159.040
|
$165.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
66.000
|
$250.000
|
$220.000
|
$230.860
|
$245.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
14.000
|
$2,500.000
|
$1,500.000
|
$1,539.080
|
$1,600.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$2,500.000
|
$1,500.000
|
$1,539.080
|
$1,600.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,600.000
|
$2,000.000
|
$2,975.560
|
$3,100.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,700.000
|
$2,800.000
|
$3,591.190
|
$3,800.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
8.000
|
$3,000.000
|
$3,300.000
|
$4,617.250
|
$4,900.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
14.000
|
$2,000.000
|
$1,500.000
|
$2,052.110
|
$2,200.000
|
|
|
REMOV STR (PIPE)
|
EA
|
6.000
|
$1,500.000
|
$800.000
|
$256.510
|
$270.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$317,000.000
|
$410,000.000
|
$454,077.020
|
$470,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$8,000.000
|
$14,300.000
|
$4,691.890
|
$10,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
200.000
|
$30.000
|
$15.000
|
$21.950
|
$32.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
200.000
|
$10.000
|
$3.000
|
$2.860
|
$13.500
|
|
|
BLADING WORK (EROSION & SEDMT CONT)
|
HR
|
30.000
|
$100.000
|
$100.000
|
$97.960
|
$215.000
|
|
|
SANDBAGS FOR EROSION CONTROL
|
EA
|
380.000
|
$10.000
|
$8.000
|
$4.360
|
$4.600
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
635.000
|
$3.000
|
$4.500
|
$2.720
|
$2.700
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
635.000
|
$1.000
|
$1.000
|
$1.030
|
$0.860
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,110.000
|
$10.000
|
$5.500
|
$4.870
|
$5.150
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,110.000
|
$2.000
|
$1.000
|
$1.280
|
$1.350
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,996.000
|
$25.000
|
$60.000
|
$58.680
|
$62.500
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,023.000
|
$40.000
|
$45.000
|
$77.730
|
$88.500
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,411.000
|
$40.000
|
$20.000
|
$42.460
|
$41.500
|
|
|
TURNOUTS (ACP)
|
SY
|
107.000
|
$40.000
|
$20.000
|
$62.660
|
$41.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
21,180.000
|
$0.200
|
$0.420
|
$0.180
|
$0.190
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$300.000
|
$300.000
|
$266.770
|
$280.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
43.000
|
$500.000
|
$550.000
|
$523.290
|
$550.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
28.000
|
$90.000
|
$140.000
|
$92.350
|
$110.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
18.000
|
$20.000
|
$16.000
|
$72.110
|
$16.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
31,440.000
|
$0.200
|
$0.210
|
$0.330
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
215.000
|
$3.000
|
$2.650
|
$10.260
|
$2.700
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
6.000
|
$150.000
|
$105.000
|
$205.210
|
$110.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,440.000
|
$0.200
|
$0.210
|
$0.330
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
45,210.000
|
$0.200
|
$0.210
|
$0.330
|
$0.220
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
1,472.000
|
$3.000
|
$3.500
|
$3.590
|
$3.550
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
100.000
|
$1.500
|
$1.000
|
$5.080
|
$1.350
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,166.000
|
$1.500
|
$1.000
|
$3.630
|
$1.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
30,600.000
|
$0.500
|
$0.540
|
$0.390
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,430.000
|
$0.500
|
$0.540
|
$0.390
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
16,150.000
|
$0.500
|
$0.540
|
$0.390
|
$0.550
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
90.000
|
$20.000
|
$24.000
|
$20.520
|
$24.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
565.000
|
$3.000
|
$3.700
|
$3.590
|
$3.800
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
30,920.000
|
$0.750
|
$1.000
|
$0.560
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
82.000
|
$3.000
|
$5.000
|
$3.590
|
$4.850
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
3.000
|
$50.000
|
$55.000
|
$61.560
|
$54.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$4,000.000
|
$2,500.000
|
$1,795.600
|
$1,300.000
|
|
|
LITTER REMOVAL
|
CYC
|
2.000
|
$3,000.000
|
$2,000.000
|
$1,346.700
|
$1,100.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$15,000.000
|
$23,071.210
|
$9,200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
328.000
|
$250.000
|
$85.000
|
$13.320
|
$290.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
6.000
|
$500.000
|
$950.000
|
$974.750
|
$87.000
|
|
Totals: |
$3,489,048.500
|
$4,232,784.050
|
$4,438,362.763
|
$4,643,863.050
|