REMOV CONC (RIPRAP)
|
SY
|
20.000
|
$500.000
|
$125.000
|
$750.000
|
|
|
REMOV CONC (FOUNDATIONS)
|
CY
|
12.000
|
$420.000
|
$25.000
|
$750.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
180.000
|
$350.000
|
$500.000
|
$300.000
|
|
|
DRILL SHAFT (SIGN MTS) (30 IN)
|
LF
|
250.000
|
$300.000
|
$500.000
|
$400.000
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
120.000
|
$400.000
|
$700.000
|
$500.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
16.000
|
$545.000
|
$900.000
|
$600.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
32.000
|
$610.000
|
$900.000
|
$700.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
129.000
|
$900.000
|
$900.000
|
$800.000
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
50.000
|
$2,000.000
|
$1,500.000
|
$1,500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
30.000
|
$1,080.000
|
$900.000
|
$1,000.000
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
10.000
|
$22,704.800
|
$1.000
|
$2,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
50.000
|
$250.000
|
$100.000
|
$250.000
|
|
|
TMA (STATIONARY)
|
DAY
|
200.000
|
$300.000
|
$1.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
5.000
|
$700.000
|
$10.000
|
$1,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
40.000
|
$3.000
|
$1.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
40.000
|
$1.000
|
$1.000
|
$5.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
600.000
|
$30.000
|
$44.000
|
$40.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
1.000
|
$3,200.000
|
$1,900.000
|
$3,000.000
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
1.000
|
$75.000
|
$400.000
|
$50.000
|
|
|
MTL THRIE-BEAM GD FEN ADJUSTMENT
|
LF
|
25.000
|
$40.000
|
$12.000
|
$100.000
|
|
|
TERMINAL ANCHOR SECTION ADJUSTMENT
|
EA
|
25.000
|
$100.000
|
$122.000
|
$1,000.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,000.000
|
$1,200.000
|
$2,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
100.000
|
$14.000
|
$100.000
|
$5.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$600.000
|
$100.000
|
$500.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$800.000
|
$100.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$4,400.000
|
$4,444.000
|
$5,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
$1,628.000
|
$555.000
|
$500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
350.000
|
$30.000
|
$72.000
|
$50.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
2,000.000
|
$40.000
|
$72.000
|
$50.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
3,000.000
|
$56.000
|
$72.000
|
$50.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY A)
|
SF
|
300.000
|
$32.000
|
$72.000
|
$50.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
650.000
|
$65.000
|
$72.000
|
$50.000
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
2,000.000
|
$73.500
|
$72.000
|
$50.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$700.000
|
$759.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
|
EA
|
2.000
|
$800.000
|
$789.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$920.000
|
$888.000
|
$1,650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
1.000
|
$600.000
|
$888.000
|
$1,650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,000.000
|
$888.000
|
$1,750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
2.000
|
$1,000.000
|
$888.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P-BM)
|
EA
|
2.000
|
$1,000.000
|
$888.000
|
$1,650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
2.000
|
$650.000
|
$879.000
|
$1,750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
|
EA
|
1.000
|
$900.000
|
$888.000
|
$3,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SB(P-EXAL)
|
EA
|
1.000
|
$1,100.000
|
$888.000
|
$3,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
2.000
|
$1,500.000
|
$2,100.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
2.000
|
$1,100.000
|
$2,555.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
3.000
|
$1,300.000
|
$2,100.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$1,200.000
|
$2,100.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
2.000
|
$1,200.000
|
$2,555.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
2.000
|
$1,200.000
|
$2,555.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
1.000
|
$1,200.000
|
$2,555.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
1.000
|
$700.000
|
$2,555.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U-BM)
|
EA
|
1.000
|
$700.000
|
$2,555.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$3,300.000
|
$2,555.000
|
$3,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
|
EA
|
1.000
|
$1,300.000
|
$2,555.000
|
$3,500.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$1,300.000
|
$2,555.000
|
$5,000.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
2.000
|
$1,200.000
|
$2,555.000
|
$5,000.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
1.000
|
$3,200.000
|
$5,000.000
|
$7,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
3.000
|
$170.000
|
$253.000
|
$250.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
3.000
|
$250.000
|
$245.000
|
$2,500.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
16,000.000
|
$8.500
|
$7.000
|
$12.500
|
|
|
RELOCATE LRSA
|
EA
|
1.000
|
$4,400.000
|
$1,500.000
|
$5,000.000
|
|
|
REMOVE LRSA
|
EA
|
2.000
|
$900.000
|
$1,500.000
|
$2,500.000
|
|
|
INS OH SN SUP(25 FT BAL TEE)
|
EA
|
1.000
|
$41,000.000
|
$30,000.000
|
$40,000.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
1.000
|
$50,000.000
|
$30,000.000
|
$40,000.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
2.000
|
$50,000.000
|
$32,000.000
|
$40,000.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
2.000
|
$50,000.000
|
$35,000.000
|
$50,000.000
|
|
|
INS OH SN SUP(70 FT BRDG)
|
EA
|
1.000
|
$78,100.000
|
$49,000.000
|
$65,000.000
|
|
|
INS OH SN SUP(80 FT BRDG)
|
EA
|
1.000
|
$87,300.000
|
$67,000.000
|
$70,000.000
|
|
|
INS OH SN SUP(90 FT BRDG)
|
EA
|
1.000
|
$103,000.000
|
$67,000.000
|
$80,000.000
|
|
|
INS OH SN SUP(100 FT BRDG)
|
EA
|
1.000
|
$104,000.000
|
$74,000.000
|
$85,000.000
|
|
|
INS OH SN SUP(110 FT BRDG)
|
EA
|
1.000
|
$114,000.000
|
$84,000.000
|
$125,000.000
|
|
|
INS OH SN SUP(120 FT BRDG)
|
EA
|
1.000
|
$130,000.000
|
$90,000.000
|
$130,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
2.000
|
$4,000.000
|
$10,000.000
|
$20,000.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
5.000
|
$2,500.000
|
$2,510.000
|
$2,000.000
|
|
|
REMOVE SIGN WALKWAY
|
EA
|
3.000
|
$1,500.000
|
$1,999.000
|
$5,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
20.000
|
$100.000
|
$125.000
|
$50.000
|
|
Totals: |
$2,412,741.000
|
$2,084,886.000
|
$2,267,850.000
|