DALLAS IH0030 (6464-74-001)

Items: 162

County: DALLAS
Length: N/A
Highway: IH0030
District: DALLAS
Control Number: 6464-74-001
DBE Goal: 0.0%
Project: RMC - 646474001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $14,010,369.86
Date: 07/09/2024 (1 year ago)
Contract Number: N/A
Type: PERFORMANCE BASED CONTRACT
Mail/Deliver Bids To: N/A
DARIUS HAGGARD
HUSAM ALSAAD
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$14,010,369.86
$11,678,853.00
Over/Under Est: -16.64% -$2,331,516.86
Over/Under Est: 68.62% $9,614,421.14
Amt Left: 102.29% $11,945,938.00

Bid Items & Bid Tabulations

162 Total 0 of 162
DALLAS  |  IH0030  |  DALLAS  |  6464-74-001  |  07/09/2024  |  $14,010,369.86  |  RMC - 646474001  |  PERFORMANCE BASED CONTRACT  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
FIREMAN EXCAVATING, INC.
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 300.000 $140.000 $270.000 $270.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(16")
SY 150.000 $100.000 $450.000 $420.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 500.000 $60.000 $140.000 $120.000
FLEXIBLE PAV STR REPAIR 12"-TYPICAL A
SY 150.000 $165.000 $304.500 $250.000
PLAN & TEXT ASPH CONC PAV(0" TO 4")
SY 500.000 $1.000 $38.000 $12.000
HALF - DEPTH REPAIR CRCP (10")
SY 100.000 $275.000 $195.000 $500.000
HALF - DEPTH REPAIR CRCP (12")
SY 200.000 $375.000 $220.000 $550.000
HALF - DEPTH REPAIR CRCP (15")
SY 300.000 $475.000 $240.000 $600.000
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 200.000 $651.000 $500.000 $950.000
FULL-DEPTH REPAIR CRCP (8"-10")
SY 350.000 $325.000 $270.000 $450.000
FULL-DEPTH REPAIR CRCP (11" - 13")
SQ 250.000 $392.000 $295.000 $500.000
FULL-DEPTH REPAIR CRCP (14" - 15")
SQ 200.000 $250.000 $370.000 $550.000
CONCRETE PAINT FINISH
SF 200.000 $61.170 $25.000 $40.000
OPAQUE SEALER FINISH
SF 200.000 $5.000 $25.000 $40.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 400.000 $143.000 $200.000 $450.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 250.000 $257.000 $325.000 $500.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 225.000 $185.000 $250.000 $150.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 500.000 $40.000 $50.000 $70.000
CLEANING EXISTING JOINTS
LF 500.000 $22.950 $10.000 $70.000
CLEANING AND SEALING JOINTS (FOAM)
LF 2,000.000 $80.000 $70.000 $100.000
CLEANING AND SEALING EXIST JOINTS (SEJ)
LF 1,000.000 $45.000 $85.000 $150.000
MOBILIZATION (CALLOUT 1)
EA 30.000 $5,000.000 $1,000.000 $15,000.000
MOBILIZATION (CALLOUT 2)
EA 100.000 $1,500.000 $1.000 $15,000.000
MOBILIZATION (CALLOUT 3)
EA 150.000 $500.000 $1.000 $150.000
MOBILIZATION (CALLOUT 4)
EA 24.000 $1,000.000 $1.000 $1,000.000
MOBILIZATION (CALLOUT 5)
EA 40.000 $300.000 $1.000 $1,000.000
MOBILIZATION (CALLOUT 6)
EA 50.000 $150.000 $1.000 $1,000.000
MOBILIZATION (CALLOUT 7)
EA 10.000 $1,000.000 $1.000 $20,000.000
MOBILIZATION (CALLOUT 8)
EA 150.000 $500.000 $1.000 $1,000.000
MOBILIZATION (CALLOUT 9)
EA 30.000 $750.000 $1.000 $6,000.000
MOBILIZATION (CALLOUT 10)
EA 50.000 $750.000 $1.000 $6,000.000
MOBILIZATION (CALLOUT 11)
EA 20.000 $300.000 $1.000 $1,000.000
MOBILIZATION (CALLOUT 12)
EA 20.000 $400.000 $1.000 $5,000.000
MOBILIZATION (CALLOUT 13)
EA 208.000 $150.000 $1.000 $100.000
MOBILIZATION (CALLOUT 14)
EA 10.000 $3,000.000 $1.000 $10,000.000
MOBILIZATION (CALLOUT 15)
EA 50.000 $500.000 $1.000 $2,000.000
MOBILIZATION (CALLOUT 16)
EA 24.000 $500.000 $1.000 $2,000.000
MOBILIZATION (CALLOUT 17)
EA 20.000 $1,000.000 $1.000 $7,000.000
MOBILIZATION (CALLOUT 18)
EA 20.000 $300.000 $1.000 $1,000.000
MOBILIZATION (CALLOUT 19)
EA 50.000 $100.000 $1.000 $1,000.000
BARR, SIGNS, TRAFFIC HANDLING
EA 120.000 $5,000.000 $1.000 $2,000.000
PORT CTB (ALIGNING)
LF 4,000.000 $6.000 $40.000 $21.000
DRIVEWAYS (CONC)
SY 200.000 $160.000 $145.000 $200.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 400.000 $30.000 $35.000 $60.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 1,000.000 $40.000 $55.000 $80.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 20.000 $500.000 $450.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 8.000 $918.500 $450.000 $1,100.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $2,460.290 $3,150.000 $10,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 4.000 $2,028.000 $3,200.000 $10,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 20.000 $718.250 $900.000 $500.000
RELOCATE SM RD SN SUP&AM TY S80
EA 8.000 $651.250 $900.000 $500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 200.000 $17.000 $50.000 $25.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 200.000 $30.900 $80.000 $25.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 2,000.000 $30.000 $45.000 $80.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 2,000.000 $30.000 $45.000 $80.000
REFL PAV MRK TY I (W)12"(SLD)(060MIL)
LF 6,000.000 $4.300 $8.000 $5.000
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 40.000 $226.000 $375.000 $200.000
REFL PAV MRK TY I(W)(ENTR GORE)(090MIL)
EA 40.000 $765.000 $2,000.000 $700.000
REFL PAV MRK TY I(W)(EXIT GORE)(090MIL)
EA 40.000 $1,025.000 $2,300.000 $1,500.000
REFL PAV MRK TY I (Y)12"(SLD)(060MIL)
LF 4,000.000 $5.000 $7.800 $5.000
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
LF 16,250.000 $0.940 $3.100 $1.500
PAVEMENT SEALER 6"
LF 90,000.000 $0.670 $0.260 $0.250
PAVEMENT SEALER 12"
LF 6,000.000 $1.250 $1.600 $2.500
PAVEMENT SEALER (ENTR GORE)
EA 30.000 $230.630 $450.000 $200.000
PAVEMENT SEALER (EXIT GORE)
EA 30.000 $506.880 $460.000 $700.000
REF PROF PAV MRK TY I(W)6"(SLD)(060MIL)
LF 80,000.000 $0.850 $1.570 $1.500
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 80,000.000 $1.060 $1.570 $1.500
RE PM W/RET REQ TY I (W)6"(BRK)(060MIL)
LF 45,000.000 $0.440 $0.800 $0.800
RE PM W/RET REQ TY I (W)6"(BRK)(090MIL)
LF 25,000.000 $0.750 $1.000 $1.050
RE PM W/RET REQ TY I (W)6"(SLD)(060MIL)
LF 400,000.000 $0.400 $0.580 $0.800
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 400,000.000 $0.550 $0.730 $1.050
RE PM W/RET REQ TY I (Y)6"(SLD)(060MIL)
LF 400,000.000 $1.000 $0.580 $0.800
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 400,000.000 $1.000 $0.750 $1.050
REFL PAV MRK TY I (W)12"(DOT)(060MIL)
LF 6,000.000 $2.120 $2.300 $5.000
REFL PAV MRKR TY I-C
EA 1,000.000 $4.250 $6.400 $5.000
REFL PAV MRKR TY I-R
EA 200.000 $11.250 $10.700 $10.000
REFL PAV MRKR TY II-C-R
EA 400.000 $5.000 $6.400 $8.000
REFL PAV MRKR TY II-C-C
EA 1,500.000 $6.010 $10.700 $8.000
ELIM EXT PAV MRK & MRKS (6")
LF 45,000.000 $0.750 $0.830 $0.850
ELIM EXT PAV MRK & MRKS (12")
LF 6,000.000 $1.660 $3.450 $5.000
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 30.000 $489.000 $785.000 $500.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 30.000 $504.000 $785.000 $1,500.000
PAV SURF PREP FOR MRK (6")
LF 45,000.000 $0.240 $0.050 $0.100
PAV SURF PREP FOR MRK (12")
LF 6,000.000 $1.320 $0.700 $1.000
PAV SURF PREP FOR MRK (ENTR GORE)
EA 30.000 $188.160 $400.000 $250.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 30.000 $148.000 $400.000 $750.000
POTHOLE REPAIR (SAW - CUT)
SY 1,000.000 $134.000 $150.000 $200.000
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 6,500.000 $8.750 $10.000 $5.000
CRACK CLEANING AND SEALING (JCP)
LF 2,000.000 $9.000 $10.000 $3.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 500.000 $376.000 $200.000 $600.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 2,000.000 $5.000 $8.000 $20.000
FULL - WIDTH MOWING
AC 240.000 $200.000 $180.000 $80.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 160.000 $608.000 $500.000 $400.000
BROADCAST APPLICATION
AC 120.000 $172.320 $500.000 $800.000
LITTER REMOVAL (SPOT)
AC 40.000 $100.000 $100.000 $2,000.000
LITTER REMOVAL - TRACT (2)
AC 480.000 $300.000 $200.000 $100.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 2,500.000 $45.000 $1.000 $80.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (2)
CYC 104.000 $1,200.000 $200.000 $180.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (3)
CYC 104.000 $1,005.000 $900.000 $262.000
DEBRIS-ENTRANCE/EXIT RAMPS - AREA (4)
CYC 104.000 $1,700.000 $600.000 $55.000
DEBRIS REMOVAL (HOV/MNGD LANE) AREA(2)
CYC 200.000 $646.790 $1,000.000 $1,630.000
DEBRIS REMOVAL (HOV/MNGD LANE) AREA(3)
CYC 200.000 $941.300 $800.000 $2,400.000
DEBRIS REMOVAL (HOV/MNGD LANE) AREA(4)
CYC 200.000 $250.000 $500.000 $325.000
DEBRIS REMOVAL BETWEEN BARRIERS
MI 352.000 $80.000 $300.000 $80.000
CLEANING / SWEEPING (HANDWORK)
SY 3,000.000 $15.000 $7.000 $2.100
CLEAN / SWEEP - (ENTR/ EXT RMP)(AREA 2)
MI 54.480 $180.000 $225.000 $200.000
CLEAN / SWEEP - (ENTR/ EXT RMP)(AREA 3)
MI 79.440 $180.000 $225.000 $200.000
CLEAN / SWEEP - (ENTR/ EXT RMP)(AREA 4)
MI 15.840 $180.000 $225.000 $200.000
CLEANING/SWEEPING(HOV LANE)
MI 1,313.280 $210.000 $225.000 $200.000
GRAFFITI REMOVAL (PAINTING)
SF 500.000 $0.400 $10.000 $40.000
DRAIN INLET CLEANING
EA 150.000 $150.000 $200.000 $120.000
DOWNSPOUT CLEANING
EA 150.000 $54.000 $150.000 $150.000
STORM SEWER CLEANING (PIPE)(37"-42"DIA)
LF 300.000 $6.000 $25.000 $50.000
SLOTTED DRAIN CLEANING
LF 500.000 $2.600 $25.000 $30.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $38.500 $30.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 700.000 $50.880 $40.000 $100.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 100.000 $50.000 $50.000 $400.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 10.000 $38.000 $50.000 $40.000
RAISE RAIL ELEMENT
LF 10.000 $1.000 $50.000 $30.000
RAISE RAIL (TYPE SPECIFIED)
LF 10.000 $1.000 $50.000 $30.000
REALIGN EXISTING RAIL
LF 1,000.000 $15.000 $10.000 $30.000
REPAIR RAIL ELEMENT (T4S)
LF 10.000 $88.000 $100.000 $400.000
REM / REPL TIMBER POST W / O CONC FND
EA 160.000 $115.000 $100.000 $120.000
REM / REPL STEEL POST W / O CONC FND
EA 160.000 $115.000 $200.000 $120.000
REALIGN POSTS
EA 20.000 $20.000 $50.000 $40.000
REMOVE & REPLACE BLOCKOUT
EA 160.000 $18.940 $25.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 100.000 $17.000 $45.000 $60.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 10.000 $25.000 $120.000 $100.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 10.000 $80.000 $200.000 $40.000
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $80.000 $500.000 $40.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 10.000 $3,743.320 $4,000.000 $7,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 4.000 $400.000 $1,500.000 $1,000.000
REM & RESET SGT IMPACT HEAD
EA 4.000 $292.000 $350.000 $400.000
REPLACE SGT CABLE ASSEMBLY
EA 4.000 $25.000 $120.000 $200.000
REPLACE SGT CABLE ANCHOR
EA 4.000 $25.000 $120.000 $200.000
REPLACE SGT STRUT
EA 4.000 $30.000 $120.000 $100.000
REPLACE SGT OBJECT MARKER
EA 10.000 $25.000 $120.000 $100.000
REMOVE AND REPLACE (TRACC)
EA 70.000 $3,000.000 $1.000 $3,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 15.000 $15,000.000 $1.000 $7,000.000
REMOVE AND REPLACE (SMTC) (N)
EA 15.000 $15,795.000 $25,000.000 $20,000.000
REPAIR (SMTC) (N)
EA 25.000 $820.000 $3,500.000 $4,000.000
REMOVE AND REPLACE (SMTC) (W)
EA 25.000 $8,700.000 $20,000.000 $30,000.000
REPAIR (SMTC) (W)
EA 25.000 $1,700.000 $2,250.000 $6,000.000
REPAIR (TRACC) (BAY)
EA 150.000 $1,000.000 $500.000 $800.000
REPAIR (WIDE TRACC) (BAY)
EA 4.000 $1,500.000 $750.000 $1,000.000
REPAIR (SMTC) (N)
LF 2,025.000 $150.000 $200.000 $200.000
BRIDGE JOINT REPAIR (ARMOR)
LF 200.000 $433.000 $550.000 $500.000
BRIDGE JOINT REPAIR (SEJ)
LF 300.000 $726.000 $625.000 $650.000
SP MIXES SP-C SAC-A PG76-22
TON 250.000 $196.000 $360.000 $350.000
TACK COAT
GAL 40.000 $85.000 $14.700 $20.000
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
TON 250.000 $250.000 $380.000 $375.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 730.000 $125.000 $1.000 $1.000
TMA (STATIONARY)
DAY 730.000 $175.000 $1.000 $1.000
TMA (MOBILE OPERATION)
DAY 50.000 $750.000 $1.000 $900.000
LANE CLOSURE (SETUP AND REMOV)(TY 5)
EA 10.000 $650.000 $500.000 $3,000.000
LANE CLOSURE (SETUP AND REMOV)(TY 9)
EA 70.000 $650.000 $500.000 $2,000.000
LANE CLOSURE (MAINTENANCE) (TY 5)
HR 100.000 $41.000 $300.000 $50.000
CLEANING GUARDRAIL
LF 1,000.000 $1.000 $10.000 $10.000
CLEANING ATTENUATOR
LF 300.000 $1.000 $10.000 $40.000
PERF BASED OPER & MAINT MANAGED LANES
MO 24.000 $92,000.000 $117,000.000 $250,000.000
PARTIAL ABG REPAIR
LF 2,000.000 $1,400.000 $400.000 $1,200.000
COMPLETE ABG REPAIR
EA 50.000 $2,500.000 $5,000.000 $20,000.000
Totals: $14,010,369.860 $11,678,853.000 $23,624,791.000