REMOVING CONC (CURB)
|
LF
|
600.000
|
$6.000
|
$8.000
|
$15.000
|
$17.600
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
700.000
|
$15.000
|
$15.000
|
$20.000
|
$22.000
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
500.000
|
$150.000
|
$75.000
|
$50.000
|
$66.000
|
|
|
BACKFILL (TY A)
|
STA
|
100.000
|
$144.000
|
$250.000
|
$310.000
|
$605.000
|
|
|
BACKFILL (TY B)
|
STA
|
100.000
|
$110.000
|
$250.000
|
$310.000
|
$550.000
|
|
|
BLADING
|
HR
|
30.000
|
$150.000
|
$1.000
|
$225.000
|
$216.000
|
|
|
BULLDOZER WORK
|
HR
|
30.000
|
$130.000
|
$1.000
|
$225.000
|
$216.000
|
|
|
SPEC EXCAV WORK (BACKHOE)
|
HR
|
30.000
|
$128.000
|
$1.000
|
$250.000
|
$180.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
30.000
|
$143.000
|
$1.000
|
$125.000
|
$216.000
|
|
|
SPEC EXCAV WORK (FRONT-END LOADER)
|
HR
|
100.000
|
$145.000
|
$1.000
|
$190.000
|
$216.000
|
|
|
FLEXIBLE PAV STR REPAIR 12"-TYPICAL A
|
SY
|
2,500.000
|
$120.000
|
$518.000
|
$496.000
|
$569.800
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 4")
|
SY
|
26,000.000
|
$3.000
|
$6.000
|
$8.000
|
$4.840
|
|
|
PLAN & TEXT ASPH CONC PAV(4" TO 6")
|
SY
|
5,000.000
|
$3.000
|
$4.000
|
$8.000
|
$7.520
|
|
|
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
|
SY
|
700.000
|
$415.000
|
$450.000
|
$650.000
|
$569.000
|
|
|
FULL-DEPTH REPAIR CRCP (8"-10")
|
SY
|
3,000.000
|
$286.000
|
$300.000
|
$320.000
|
$385.000
|
|
|
FULL-DEPTH REPAIR CPCD (11"-13")
|
SY
|
1,000.000
|
$275.000
|
$300.000
|
$300.000
|
$460.000
|
|
|
FULL DEPTH REPAIR CPCD (8"-10"
|
SY
|
2,000.000
|
$261.000
|
$250.000
|
$280.000
|
$404.000
|
|
|
FULL-DEPTH REPAIR CRCP (11" - 13")
|
SQ
|
1,300.000
|
$305.000
|
$250.000
|
$370.000
|
$445.000
|
|
|
FULL-DEPTH REPAIR CRCP (14" - 15")
|
SQ
|
200.000
|
$375.000
|
$200.000
|
$585.000
|
$496.500
|
|
|
FULL-DEPTH REPAIR CPCD (14" - 15")
|
SQ
|
200.000
|
$375.000
|
$200.000
|
$550.000
|
$510.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
300.000
|
$360.000
|
$350.000
|
$415.000
|
$275.000
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
8,000.000
|
$125.000
|
$100.000
|
$150.000
|
$86.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
1,000.000
|
$200.000
|
$175.000
|
$150.000
|
$193.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
4,500.000
|
$180.000
|
$120.000
|
$200.000
|
$256.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
200.000
|
$560.000
|
$400.000
|
$615.000
|
$770.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
200.000
|
$160.000
|
$200.000
|
$200.000
|
$220.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
2,500.000
|
$25.000
|
$30.000
|
$75.000
|
$79.000
|
|
|
CLEANING EXISTING JOINTS
|
LF
|
800.000
|
$30.000
|
$40.000
|
$50.000
|
$30.000
|
|
|
CLEANING AND SEALING JOINTS (FOAM)
|
LF
|
800.000
|
$500.000
|
$100.000
|
$91.000
|
$110.500
|
|
|
CLEANING AND SEALING EXIST JOINTS (SEJ)
|
LF
|
400.000
|
$700.000
|
$110.000
|
$341.000
|
$76.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
50.000
|
$165.000
|
$140.000
|
$125.000
|
$154.000
|
|
|
PIPE (PVC) (SCH 40) (8 IN)
|
LF
|
50.000
|
$160.000
|
$100.000
|
$160.000
|
$176.000
|
|
|
PIPE (PVC) (SCH 40) (10 IN)
|
LF
|
50.000
|
$220.000
|
$100.000
|
$220.000
|
$231.000
|
|
|
PIPE (PVC) (SCH 40) (12 IN)
|
LF
|
150.000
|
$265.000
|
$150.000
|
$265.000
|
$291.500
|
|
|
MOBILIZATION (CALLOUT 1)
|
EA
|
251.000
|
$80.000
|
$1.000
|
$1.000
|
$600.000
|
|
|
MOBILIZATION (CALLOUT 2)
|
EA
|
98.000
|
$84.000
|
$1.000
|
$750.000
|
$120.000
|
|
|
MOBILIZATION (CALLOUT 3)
|
EA
|
28.000
|
$95.000
|
$1,000.000
|
$1,000.000
|
$975.000
|
|
|
MOBILIZATION (CALLOUT 4)
|
EA
|
140.000
|
$45.000
|
$1.000
|
$1.000
|
$60.000
|
|
|
MOBILIZATION (CALLOUT 5)
|
EA
|
48.000
|
$5.250
|
$1.000
|
$1.000
|
$1,150.000
|
|
|
MOBILIZATION (CALLOUT 6)
|
EA
|
24.000
|
$1,637.000
|
$2,000.000
|
$3,500.000
|
$1,150.000
|
|
|
MOBILIZATION (CALLOUT 7)
|
EA
|
60.000
|
$75.000
|
$1.000
|
$1.000
|
$1,180.000
|
|
|
MOBILIZATION (CALLOUT 8)
|
EA
|
131.000
|
$52.000
|
$1.000
|
$1.000
|
$1,100.000
|
|
|
MOBILIZATION (CALLOUT 9)
|
EA
|
191.000
|
$332.000
|
$100.000
|
$850.000
|
$5,635.000
|
|
|
MOBILIZATION (CALLOUT 10)
|
EA
|
54.000
|
$1,430.000
|
$2,500.000
|
$1,750.000
|
$600.000
|
|
|
MOBILIZATION (CALLOUT 11)
|
EA
|
54.000
|
$125.000
|
$1.000
|
$1.000
|
$110.000
|
|
|
MOBILIZATION (CALLOUT 12)
|
EA
|
19.000
|
$689.000
|
$15,000.000
|
$15,000.000
|
$16,500.000
|
|
|
MOBILIZATION (CALLOUT 13)
|
EA
|
323.000
|
$24.000
|
$1.000
|
$650.000
|
$1.000
|
|
|
MOBILIZATION (CALLOUT 14)
|
EA
|
1,472.000
|
$48.000
|
$1.000
|
$250.000
|
$55.000
|
|
|
MOBILIZATION (CALLOUT 15)
|
EA
|
1,503.000
|
$48.000
|
$1.000
|
$1.000
|
$55.000
|
|
|
MOBILIZATION (CALLOUT 16)
|
EA
|
97.000
|
$10.500
|
$600.000
|
$500.000
|
$1,000.000
|
|
|
MOBILIZATION (CALLOUT 18)
|
EA
|
10.000
|
$52.000
|
$6,000.000
|
$5,200.000
|
$4,200.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
48.000
|
$1,500.000
|
$2,000.000
|
$5,500.000
|
$2,000.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
200.000
|
$119.000
|
$80.000
|
$100.000
|
$245.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
300.000
|
$95.000
|
$60.000
|
$85.000
|
$165.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
200.000
|
$18.000
|
$25.000
|
$10.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
300.000
|
$26.000
|
$25.000
|
$10.000
|
$15.000
|
|
|
PORT CTB (ALIGNING)
|
LF
|
4,000.000
|
$7.000
|
$9.000
|
$7.000
|
$11.000
|
|
|
CONC CURB (TY I)
|
LF
|
300.000
|
$26.000
|
$60.000
|
$50.000
|
$44.000
|
|
|
CONC CURB (TY II)
|
LF
|
300.000
|
$26.000
|
$64.000
|
$50.000
|
$55.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
700.000
|
$43.000
|
$140.000
|
$50.000
|
$82.500
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
2,000.000
|
$15.000
|
$10.000
|
$1.000
|
$35.000
|
|
|
GATE (REPAIR) (DOUBLE) (6' X 14')
|
EA
|
2.000
|
$800.000
|
$1,000.000
|
$800.000
|
$3,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
2,500.000
|
$8.000
|
$5.000
|
$15.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
2,500.000
|
$6.000
|
$5.000
|
$15.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
1,000.000
|
$23.000
|
$20.000
|
$23.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
1,000.000
|
$15.000
|
$2.000
|
$23.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
|
EA
|
500.000
|
$11.000
|
$20.000
|
$32.000
|
$22.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
|
EA
|
500.000
|
$125.000
|
$20.000
|
$55.000
|
$27.500
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
|
EA
|
500.000
|
$12.000
|
$2.000
|
$40.000
|
$27.500
|
|
|
POTHOLE REPAIR (STANDARD)
|
SY
|
3,000.000
|
$117.000
|
$120.000
|
$125.000
|
$132.000
|
|
|
POTHOLE REPAIR (SAW - CUT)
|
SY
|
500.000
|
$96.000
|
$130.000
|
$150.000
|
$143.000
|
|
|
SPALLING REPAIR (POLYMERIC) (FLEXIBLE)
|
GAL
|
2,500.000
|
$60.000
|
$35.000
|
$55.000
|
$87.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
8,000.000
|
$4.000
|
$4.000
|
$6.000
|
$17.950
|
|
|
SPOT MOWING
|
AC
|
420.000
|
$62.000
|
$100.000
|
$100.000
|
$86.250
|
|
|
FULL-WIDTH MOWING (URBAN)
|
AC
|
9,344.000
|
$60.000
|
$78.000
|
$85.000
|
$86.250
|
|
|
PAVEMENT EDGES, STRUCTURES & FIXTURES
|
MI
|
596.000
|
$630.000
|
$1,250.000
|
$500.000
|
$1,437.500
|
|
|
BROADCAST APPLICATION
|
AC
|
8,772.000
|
$140.000
|
$135.000
|
$100.000
|
$143.750
|
|
|
LITTER REMOVAL
|
AC
|
9,344.000
|
$24.000
|
$28.000
|
$50.000
|
$32.200
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
MI
|
24,413.600
|
$41.000
|
$79.000
|
$70.000
|
$86.900
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
MI
|
2,403.600
|
$45.000
|
$82.000
|
$150.000
|
$86.900
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
MI
|
4,241.600
|
$45.000
|
$82.000
|
$70.000
|
$86.900
|
|
|
DEBRIS REMOVAL (SPOT DEBRIS)
|
MI
|
200.000
|
$75.000
|
$82.000
|
$150.000
|
$86.900
|
|
|
DEBRIS REMOVAL (DIRECT CONNECTOR)
|
MI
|
5,004.000
|
$48.000
|
$82.000
|
$70.000
|
$86.900
|
|
|
DEBRIS REMOVAL BETWEEN BARRIERS
|
MI
|
30.000
|
$100.000
|
$82.000
|
$100.000
|
$86.900
|
|
|
CLEANING / SWEEPING (CENTER MEDIAN)
|
MI
|
3,370.800
|
$138.000
|
$202.000
|
$210.000
|
$218.900
|
|
|
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
|
MI
|
3,370.800
|
$137.000
|
$202.000
|
$210.000
|
$218.900
|
|
|
CLEANING / SWEEPING (FRONTAGE ROAD)
|
MI
|
2,691.600
|
$152.000
|
$202.000
|
$210.000
|
$218.900
|
|
|
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
|
MI
|
1,983.120
|
$148.000
|
$202.000
|
$205.000
|
$218.900
|
|
|
CLEANING / SWEEPING (AGGREGATE REMOVAL)
|
MI
|
2,700.000
|
$135.000
|
$202.000
|
$210.000
|
$218.900
|
|
|
CLEANING / SWEEPING (SPOT)
|
MI
|
100.000
|
$170.000
|
$202.000
|
$205.000
|
$218.900
|
|
|
CLEANING / SWEEPING (HANDWORK)
|
SY
|
15,000.000
|
$3.000
|
$1.000
|
$3.000
|
$1.100
|
|
|
CLEANING / SWEEPING (DIRECT CONNECTOR)
|
MI
|
1,240.560
|
$155.000
|
$202.000
|
$205.000
|
$218.900
|
|
|
CLEANING/SWEEPING(HOV LANE)
|
MI
|
120.000
|
$150.000
|
$202.000
|
$205.000
|
$218.900
|
|
|
GRAFFITI REMOVAL (BLAST CLEANING)
|
SF
|
10,000.000
|
$1.500
|
$1.000
|
$1.500
|
$0.980
|
|
|
GRAFFITI REMOVAL (PAINTING)
|
SF
|
150,000.000
|
$3.000
|
$0.500
|
$2.000
|
$1.210
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
2,000.000
|
$2.000
|
$0.600
|
$2.000
|
$1.090
|
|
|
TREE TRIMMING
|
MI
|
30.000
|
$2,300.000
|
$2,000.000
|
$2,000.000
|
$5,720.000
|
|
|
BRUSH REMOVAL
|
MI
|
20.000
|
$2,000.000
|
$2,000.000
|
$2,500.000
|
$5,720.000
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
30.000
|
$1,230.000
|
$1,500.000
|
$2,000.000
|
$2,860.000
|
|
|
TREE REMOVAL (4" - 12" DIA)
|
EA
|
50.000
|
$80.000
|
$75.000
|
$100.000
|
$660.000
|
|
|
TREE REMOVAL (12" - 18" DIA)
|
EA
|
30.000
|
$270.000
|
$150.000
|
$250.000
|
$1,375.000
|
|
|
TREE REMOVAL (18" - 24" DIA)
|
EA
|
8.000
|
$200.000
|
$200.000
|
$500.000
|
$2,200.000
|
|
|
TREE REMOVAL (24" - 30" DIA)
|
EA
|
4.000
|
$500.000
|
$300.000
|
$700.000
|
$3,080.000
|
|
|
STUMP REMOVAL
|
EA
|
20.000
|
$30.000
|
$100.000
|
$800.000
|
$357.500
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
25,000.000
|
$14.000
|
$1.000
|
$14.000
|
$5.500
|
|
|
DRAIN INLET CLEANING
|
EA
|
800.000
|
$90.000
|
$100.000
|
$200.000
|
$132.000
|
|
|
DOWNSPOUT CLEANING
|
EA
|
200.000
|
$190.000
|
$200.000
|
$75.000
|
$132.000
|
|
|
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
|
LF
|
10,000.000
|
$8.000
|
$8.000
|
$5.250
|
$9.900
|
|
|
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
|
LF
|
2,000.000
|
$7.000
|
$12.000
|
$7.000
|
$9.900
|
|
|
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
|
LF
|
5,000.000
|
$7.000
|
$3.000
|
$10.000
|
$9.900
|
|
|
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
|
LF
|
500.000
|
$8.000
|
$2.000
|
$12.000
|
$9.900
|
|
|
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
|
LF
|
1,200.000
|
$11.000
|
$2.000
|
$18.000
|
$9.900
|
|
|
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
|
LF
|
300.000
|
$18.000
|
$20.000
|
$19.500
|
$9.900
|
|
|
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
|
LF
|
2,000.000
|
$23.000
|
$10.000
|
$26.000
|
$9.900
|
|
|
SLOTTED DRAIN CLEANING
|
LF
|
1,200.000
|
$8.000
|
$10.000
|
$8.000
|
$2.200
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
52,000.000
|
$15.000
|
$40.000
|
$25.000
|
$55.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
1,000.000
|
$49.000
|
$25.000
|
$25.000
|
$110.000
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
540.000
|
$30.000
|
$25.000
|
$35.000
|
$110.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
3,300.000
|
$35.000
|
$25.000
|
$28.000
|
$27.500
|
|
|
REM / REPL TIMBER POST W / O CONC FND
|
EA
|
7,300.000
|
$63.000
|
$1.000
|
$22.000
|
$41.800
|
|
|
REM / REPL STEEL POST W / O CONC FND
|
EA
|
1,284.000
|
$71.000
|
$1.000
|
$56.000
|
$49.500
|
|
|
REALIGN POSTS
|
EA
|
3,000.000
|
$21.000
|
$1.000
|
$1.000
|
$11.000
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
8,600.000
|
$37.000
|
$1.000
|
$22.000
|
$11.000
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
600.000
|
$3,128.000
|
$6,500.000
|
$4,000.000
|
$5,720.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
50.000
|
$39.000
|
$1.000
|
$20.000
|
$33.000
|
|
|
REMOVE AND REPLACE DAT
|
EA
|
125.000
|
$1,025.000
|
$1.000
|
$1,025.000
|
$1,650.000
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
150.000
|
$217.000
|
$1.000
|
$200.000
|
$198.000
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
150.000
|
$246.000
|
$1.000
|
$250.000
|
$198.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
20.000
|
$221.000
|
$100.000
|
$221.000
|
$330.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
20.000
|
$343.000
|
$100.000
|
$343.000
|
$330.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
25.000
|
$72.000
|
$10.000
|
$72.000
|
$110.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-4)
|
EA
|
25.000
|
$103.000
|
$10.000
|
$103.000
|
$110.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
20.000
|
$1,688.000
|
$1,000.000
|
$7,500.000
|
$1,650.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
10.000
|
$1,325.000
|
$1,000.000
|
$7,500.000
|
$1,650.000
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
72.000
|
$360.000
|
$100.000
|
$360.000
|
$550.000
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
250.000
|
$2.000
|
$3.000
|
$2.000
|
$3.300
|
|
|
POST AND CABLE FENCE(REMV / REPL POSTS)
|
EA
|
20.000
|
$50.000
|
$100.000
|
$50.000
|
$60.500
|
|
|
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
|
EA
|
10.000
|
$100.000
|
$50.000
|
$100.000
|
$110.000
|
|
|
POST AND CABLE FENCE (REMV/ REPL CABLE)
|
LF
|
3,000.000
|
$4.000
|
$3.000
|
$4.000
|
$4.400
|
|
|
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
|
EA
|
25.000
|
$250.000
|
$200.000
|
$500.000
|
$990.000
|
|
|
REPAIR (REACT)
|
EA
|
40.000
|
$2,351.000
|
$500.000
|
$800.000
|
$11,000.000
|
|
|
REPAIR (QUAD) (N) (BAY)
|
EA
|
80.000
|
$1,400.000
|
$50.000
|
$4,900.000
|
$660.000
|
|
|
REPAIR (QUAD) (W) (BAY)
|
EA
|
60.000
|
$336.000
|
$50.000
|
$4,900.000
|
$220.000
|
|
|
REPAIR (QUAD - ELITE) NARROW (BAY)
|
EA
|
30.000
|
$100.000
|
$50.000
|
$4,900.000
|
$880.000
|
|
|
REPAIR (QUAD - ELITE) WIDE (BAY)
|
EA
|
15.000
|
$1,295.000
|
$100.000
|
$4,900.000
|
$1,100.000
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
80.000
|
$19,109.000
|
$6,000.000
|
$8,000.000
|
$29,700.000
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
25.000
|
$22,589.000
|
$6,000.000
|
$8,000.000
|
$35,200.000
|
|
|
REPAIR (TRACC) (BAY)
|
EA
|
350.000
|
$843.000
|
$10.000
|
$1.000
|
$440.000
|
|
|
REPAIR (WIDE TRACC) (BAY)
|
EA
|
80.000
|
$450.000
|
$10.000
|
$1.000
|
$880.000
|
|
|
REPAIR (SMTC) (N)
|
LF
|
5,000.000
|
$246.000
|
$72.000
|
$75.000
|
$220.000
|
|
|
REPAIR (SMTC) (W)
|
LF
|
600.000
|
$361.000
|
$72.000
|
$75.000
|
$220.000
|
|
|
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
|
EA
|
8.000
|
$10,250.000
|
$10,000.000
|
$10,250.000
|
$28,600.000
|
|
|
REPAIR (QUADGUARD)(MASH)(N)(BAY)
|
EA
|
20.000
|
$363.000
|
$1,200.000
|
$4,900.000
|
$770.000
|
|
|
REMOVE AND REPLACE (TAU)(MASH)(N)
|
EA
|
10.000
|
$14,000.000
|
$10,000.000
|
$24,000.000
|
$26,400.000
|
|
|
REPAIR (TAU)(MASH)(N)(BAY)
|
EA
|
20.000
|
$350.000
|
$1,200.000
|
$3,500.000
|
$1,100.000
|
|
|
REP (CONC PARAPETW/STL POST/RAIL-T4(S))
|
LF
|
1,200.000
|
$98.000
|
$80.000
|
$85.000
|
$161.000
|
|
|
CONCRETE RAIL REPAIR (MISC)
|
LF
|
500.000
|
$39.000
|
$40.000
|
$60.000
|
$5.000
|
|
|
BRIDGE JOINT REPAIR (ARMOR)
|
LF
|
1,200.000
|
$355.000
|
$400.000
|
$750.000
|
$995.000
|
|
|
BRIDGE JOINT REPAIR (SEJ)
|
LF
|
200.000
|
$750.000
|
$525.000
|
$1,000.000
|
$990.000
|
|
|
RAISING AND UNDERSEALING CONCRETE SLAB
|
LB
|
10,000.000
|
$6.500
|
$5.000
|
$25.000
|
$9.400
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
2,600.000
|
$121.000
|
$285.000
|
$299.000
|
$328.900
|
|
|
TACK COAT
|
GAL
|
10,500.000
|
$10.000
|
$3.500
|
$3.500
|
$3.580
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
400.000
|
$337.000
|
$1.000
|
$50.000
|
$100.000
|
|
|
MODULAR GLARE SCREENS (FURN & INSTALL)
|
LF
|
5,000.000
|
$30.000
|
$30.000
|
$16.000
|
$28.500
|
|
|
MODULAR GLARE SCREENS (REMOVE)
|
LF
|
5,000.000
|
$5.000
|
$3.000
|
$5.000
|
$5.500
|
|
|
TMA (STATIONARY)
|
DAY
|
1,460.000
|
$650.000
|
$1.000
|
$500.000
|
$1.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
2,600.000
|
$400.000
|
$1.000
|
$150.000
|
$1.000
|
|
|
INCIDENT MANAGEMENT (TYPE A)
|
HR
|
45.000
|
$200.000
|
$350.000
|
$1.000
|
$275.000
|
|
|
INCIDENT MANAGEMENT (TYPE B)
|
HR
|
50.000
|
$200.000
|
$450.000
|
$1.000
|
$400.000
|
|
|
INCIDENT MANAGEMENT (TYPE C)
|
HR
|
20.000
|
$250.000
|
$440.000
|
$1.000
|
$485.000
|
|
|
INCIDENT MANAGEMENT (TYPE D)
|
HR
|
6.000
|
$250.000
|
$500.000
|
$1.000
|
$550.000
|
|
|
INCIDENT MANAGEMENT (TYPE E)
|
HR
|
50.000
|
$400.000
|
$600.000
|
$1.000
|
$650.000
|
|
|
INCIDENT MANAGEMENT (TYPE F)
|
HR
|
50.000
|
$100.000
|
$400.000
|
$1.000
|
$220.000
|
|
|
INCIDENT MANAGEMENT (TYPE G)
|
HR
|
30.000
|
$100.000
|
$200.000
|
$1.000
|
$220.000
|
|
|
INCIDENT MANAGEMENT (TYPE H)
|
HR
|
10.000
|
$100.000
|
$250.000
|
$1.000
|
$275.000
|
|
|
INCIDENT MANAGEMENT (TYPE I)
|
HR
|
10.000
|
$150.000
|
$300.000
|
$1.000
|
$330.000
|
|
|
INCIDENT MANAGEMENT (TYPE K)
|
HR
|
20.000
|
$150.000
|
$200.000
|
$1.000
|
$220.000
|
|
|
INCIDENT MANAGEMENT (TYPE L)
|
HR
|
10.000
|
$150.000
|
$250.000
|
$1.000
|
$275.000
|
|
|
INCIDENT MANAGEMENT (TYPE M)
|
EA
|
2.000
|
$250.000
|
$1,500.000
|
$1.000
|
$1,650.000
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
CY
|
3,000.000
|
$90.000
|
$40.000
|
$50.000
|
$192.500
|
|
|
STORM SEWER (TELEVISION INSPECTION)
|
LF
|
4,000.000
|
$6.000
|
$2.000
|
$6.000
|
$3.300
|
|
|
CLEANING GUARDRAIL
|
LF
|
30,000.000
|
$4.000
|
$0.500
|
$3.000
|
$1.650
|
|
|
CLEANING ATTENUATOR
|
LF
|
4,000.000
|
$4.000
|
$5.000
|
$5.000
|
$4.400
|
|
|
CLEANING DRAINAGE FLUMES
|
LF
|
4,000.000
|
$3.000
|
$5.000
|
$8.000
|
$4.400
|
|
|
SNOW AND ICE CONTROL (SHADOW VEHICLE)
|
HR
|
1,728.000
|
$75.000
|
$50.000
|
$85.000
|
$108.000
|
|
|
SNOW AND ICE CONTROL (LOADER)
|
HR
|
1,152.000
|
$75.000
|
$1.000
|
$175.000
|
$130.000
|
|
|
SNOW AND ICE CONTROL (BLADE)
|
HR
|
1,152.000
|
$150.000
|
$1.000
|
$200.000
|
$200.000
|
|
|
SNOW AND ICE CONTROL SEASON
|
MO
|
4.000
|
$62,500.000
|
$30,000.000
|
$100,000.000
|
$30,000.000
|
|
Totals: |
$28,106,082.860
|
$26,852,805.560
|
$32,367,604.400
|
$40,310,190.152
|