DALLAS IH0030 (6452-27-001)

Items: 188

County: DALLAS
Length: N/A
Highway: IH0030
District: DALLAS
Control Number: 6452-27-001
DBE Goal: 0.0%
Project: RMC - 645227001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $28,106,082.86
Date: 03/06/2024 (2 years ago)
Contract Number: N/A
Type: BUNDLED BID
Mail/Deliver Bids To: N/A
NATHAN PETTER
MICHAEL THOMAS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$28,106,082.86
$26,852,805.56
Over/Under Est: -4.46% -$1,253,277.30
Over/Under Est: 15.16% $4,261,521.54
Amt Left: 20.54% $5,514,798.84
Over/Under Est: 43.42% $12,204,107.28
Amt Left: 50.12% $13,457,384.58
Delta: -24.54% -$7,942,585.74
Subcontractor Percentage Amount
DALLAS LITE AND BARRICADE, INC. 0.00% $0.00
DUSTROL, INC. 0.00% $0.00
JACKSON EXCAVATION, LLC 0.00% $0.00
MORTON ENTERPRISE 0.00% $0.00
NORTEX CONCRETE LIFT & STABILIZATION, INC. 0.00% $0.00
O. TREVINO CONSTRUCTION, LLC 0.00% $0.00
PEACHTREE CONSTRUCTION, LTD. 0.00% $0.00
SWEEPING CORPORATION OF AMERICA, LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

188 Total 0 of 188
DALLAS  |  IH0030  |  DALLAS  |  6452-27-001  |  03/06/2024  |  $28,106,082.86  |  RMC - 645227001  |  BUNDLED BID  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
ROY JORGENSEN ASSOCIATES, INC.
GIBSON & ASSOCIATES, INC.
REMOVING CONC (CURB)
LF 600.000 $6.000 $8.000 $15.000 $17.600
REMOVING CONC (CURB AND GUTTER)
LF 700.000 $15.000 $15.000 $20.000 $22.000
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 500.000 $150.000 $75.000 $50.000 $66.000
BACKFILL (TY A)
STA 100.000 $144.000 $250.000 $310.000 $605.000
BACKFILL (TY B)
STA 100.000 $110.000 $250.000 $310.000 $550.000
BLADING
HR 30.000 $150.000 $1.000 $225.000 $216.000
BULLDOZER WORK
HR 30.000 $130.000 $1.000 $225.000 $216.000
SPEC EXCAV WORK (BACKHOE)
HR 30.000 $128.000 $1.000 $250.000 $180.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 30.000 $143.000 $1.000 $125.000 $216.000
SPEC EXCAV WORK (FRONT-END LOADER)
HR 100.000 $145.000 $1.000 $190.000 $216.000
FLEXIBLE PAV STR REPAIR 12"-TYPICAL A
SY 2,500.000 $120.000 $518.000 $496.000 $569.800
PLAN & TEXT ASPH CONC PAV(0" TO 4")
SY 26,000.000 $3.000 $6.000 $8.000 $4.840
PLAN & TEXT ASPH CONC PAV(4" TO 6")
SY 5,000.000 $3.000 $4.000 $8.000 $7.520
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 700.000 $415.000 $450.000 $650.000 $569.000
FULL-DEPTH REPAIR CRCP (8"-10")
SY 3,000.000 $286.000 $300.000 $320.000 $385.000
FULL-DEPTH REPAIR CPCD (11"-13")
SY 1,000.000 $275.000 $300.000 $300.000 $460.000
FULL DEPTH REPAIR CPCD (8"-10"
SY 2,000.000 $261.000 $250.000 $280.000 $404.000
FULL-DEPTH REPAIR CRCP (11" - 13")
SQ 1,300.000 $305.000 $250.000 $370.000 $445.000
FULL-DEPTH REPAIR CRCP (14" - 15")
SQ 200.000 $375.000 $200.000 $585.000 $496.500
FULL-DEPTH REPAIR CPCD (14" - 15")
SQ 200.000 $375.000 $200.000 $550.000 $510.000
FLOWABLE BACKFILL
CY 300.000 $360.000 $350.000 $415.000 $275.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 8,000.000 $125.000 $100.000 $150.000 $86.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 1,000.000 $200.000 $175.000 $150.000 $193.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 4,500.000 $180.000 $120.000 $200.000 $256.000
RIPRAP (CONC)(5 IN)
CY 200.000 $560.000 $400.000 $615.000 $770.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 200.000 $160.000 $200.000 $200.000 $220.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 2,500.000 $25.000 $30.000 $75.000 $79.000
CLEANING EXISTING JOINTS
LF 800.000 $30.000 $40.000 $50.000 $30.000
CLEANING AND SEALING JOINTS (FOAM)
LF 800.000 $500.000 $100.000 $91.000 $110.500
CLEANING AND SEALING EXIST JOINTS (SEJ)
LF 400.000 $700.000 $110.000 $341.000 $76.000
PIPE (PVC) (SCH 40) (6 IN)
LF 50.000 $165.000 $140.000 $125.000 $154.000
PIPE (PVC) (SCH 40) (8 IN)
LF 50.000 $160.000 $100.000 $160.000 $176.000
PIPE (PVC) (SCH 40) (10 IN)
LF 50.000 $220.000 $100.000 $220.000 $231.000
PIPE (PVC) (SCH 40) (12 IN)
LF 150.000 $265.000 $150.000 $265.000 $291.500
MOBILIZATION (CALLOUT 1)
EA 251.000 $80.000 $1.000 $1.000 $600.000
MOBILIZATION (CALLOUT 2)
EA 98.000 $84.000 $1.000 $750.000 $120.000
MOBILIZATION (CALLOUT 3)
EA 28.000 $95.000 $1,000.000 $1,000.000 $975.000
MOBILIZATION (CALLOUT 4)
EA 140.000 $45.000 $1.000 $1.000 $60.000
MOBILIZATION (CALLOUT 5)
EA 48.000 $5.250 $1.000 $1.000 $1,150.000
MOBILIZATION (CALLOUT 6)
EA 24.000 $1,637.000 $2,000.000 $3,500.000 $1,150.000
MOBILIZATION (CALLOUT 7)
EA 60.000 $75.000 $1.000 $1.000 $1,180.000
MOBILIZATION (CALLOUT 8)
EA 131.000 $52.000 $1.000 $1.000 $1,100.000
MOBILIZATION (CALLOUT 9)
EA 191.000 $332.000 $100.000 $850.000 $5,635.000
MOBILIZATION (CALLOUT 10)
EA 54.000 $1,430.000 $2,500.000 $1,750.000 $600.000
MOBILIZATION (CALLOUT 11)
EA 54.000 $125.000 $1.000 $1.000 $110.000
MOBILIZATION (CALLOUT 12)
EA 19.000 $689.000 $15,000.000 $15,000.000 $16,500.000
MOBILIZATION (CALLOUT 13)
EA 323.000 $24.000 $1.000 $650.000 $1.000
MOBILIZATION (CALLOUT 14)
EA 1,472.000 $48.000 $1.000 $250.000 $55.000
MOBILIZATION (CALLOUT 15)
EA 1,503.000 $48.000 $1.000 $1.000 $55.000
MOBILIZATION (CALLOUT 16)
EA 97.000 $10.500 $600.000 $500.000 $1,000.000
MOBILIZATION (CALLOUT 18)
EA 10.000 $52.000 $6,000.000 $5,200.000 $4,200.000
MOBILIZATION (EMERGENCY)
EA 48.000 $1,500.000 $2,000.000 $5,500.000 $2,000.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 200.000 $119.000 $80.000 $100.000 $245.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 300.000 $95.000 $60.000 $85.000 $165.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 200.000 $18.000 $25.000 $10.000 $15.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 300.000 $26.000 $25.000 $10.000 $15.000
PORT CTB (ALIGNING)
LF 4,000.000 $7.000 $9.000 $7.000 $11.000
CONC CURB (TY I)
LF 300.000 $26.000 $60.000 $50.000 $44.000
CONC CURB (TY II)
LF 300.000 $26.000 $64.000 $50.000 $55.000
CONC CURB & GUTTER (TY II)
LF 700.000 $43.000 $140.000 $50.000 $82.500
CHAIN LINK FENCE (REPAIR) (6')
LF 2,000.000 $15.000 $10.000 $1.000 $35.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 2.000 $800.000 $1,000.000 $800.000 $3,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 2,500.000 $8.000 $5.000 $15.000 $22.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 2,500.000 $6.000 $5.000 $15.000 $22.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 1,000.000 $23.000 $20.000 $23.000 $22.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 1,000.000 $15.000 $2.000 $23.000 $22.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 500.000 $11.000 $20.000 $32.000 $22.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)SRF
EA 500.000 $125.000 $20.000 $55.000 $27.500
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 500.000 $12.000 $2.000 $40.000 $27.500
POTHOLE REPAIR (STANDARD)
SY 3,000.000 $117.000 $120.000 $125.000 $132.000
POTHOLE REPAIR (SAW - CUT)
SY 500.000 $96.000 $130.000 $150.000 $143.000
SPALLING REPAIR (POLYMERIC) (FLEXIBLE)
GAL 2,500.000 $60.000 $35.000 $55.000 $87.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 8,000.000 $4.000 $4.000 $6.000 $17.950
SPOT MOWING
AC 420.000 $62.000 $100.000 $100.000 $86.250
FULL-WIDTH MOWING (URBAN)
AC 9,344.000 $60.000 $78.000 $85.000 $86.250
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 596.000 $630.000 $1,250.000 $500.000 $1,437.500
BROADCAST APPLICATION
AC 8,772.000 $140.000 $135.000 $100.000 $143.750
LITTER REMOVAL
AC 9,344.000 $24.000 $28.000 $50.000 $32.200
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
MI 24,413.600 $41.000 $79.000 $70.000 $86.900
DEBRIS REMOVAL (FRONTAGE ROADS)
MI 2,403.600 $45.000 $82.000 $150.000 $86.900
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
MI 4,241.600 $45.000 $82.000 $70.000 $86.900
DEBRIS REMOVAL (SPOT DEBRIS)
MI 200.000 $75.000 $82.000 $150.000 $86.900
DEBRIS REMOVAL (DIRECT CONNECTOR)
MI 5,004.000 $48.000 $82.000 $70.000 $86.900
DEBRIS REMOVAL BETWEEN BARRIERS
MI 30.000 $100.000 $82.000 $100.000 $86.900
CLEANING / SWEEPING (CENTER MEDIAN)
MI 3,370.800 $138.000 $202.000 $210.000 $218.900
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
MI 3,370.800 $137.000 $202.000 $210.000 $218.900
CLEANING / SWEEPING (FRONTAGE ROAD)
MI 2,691.600 $152.000 $202.000 $210.000 $218.900
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
MI 1,983.120 $148.000 $202.000 $205.000 $218.900
CLEANING / SWEEPING (AGGREGATE REMOVAL)
MI 2,700.000 $135.000 $202.000 $210.000 $218.900
CLEANING / SWEEPING (SPOT)
MI 100.000 $170.000 $202.000 $205.000 $218.900
CLEANING / SWEEPING (HANDWORK)
SY 15,000.000 $3.000 $1.000 $3.000 $1.100
CLEANING / SWEEPING (DIRECT CONNECTOR)
MI 1,240.560 $155.000 $202.000 $205.000 $218.900
CLEANING/SWEEPING(HOV LANE)
MI 120.000 $150.000 $202.000 $205.000 $218.900
GRAFFITI REMOVAL (BLAST CLEANING)
SF 10,000.000 $1.500 $1.000 $1.500 $0.980
GRAFFITI REMOVAL (PAINTING)
SF 150,000.000 $3.000 $0.500 $2.000 $1.210
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 2,000.000 $2.000 $0.600 $2.000 $1.090
TREE TRIMMING
MI 30.000 $2,300.000 $2,000.000 $2,000.000 $5,720.000
BRUSH REMOVAL
MI 20.000 $2,000.000 $2,000.000 $2,500.000 $5,720.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 30.000 $1,230.000 $1,500.000 $2,000.000 $2,860.000
TREE REMOVAL (4" - 12" DIA)
EA 50.000 $80.000 $75.000 $100.000 $660.000
TREE REMOVAL (12" - 18" DIA)
EA 30.000 $270.000 $150.000 $250.000 $1,375.000
TREE REMOVAL (18" - 24" DIA)
EA 8.000 $200.000 $200.000 $500.000 $2,200.000
TREE REMOVAL (24" - 30" DIA)
EA 4.000 $500.000 $300.000 $700.000 $3,080.000
STUMP REMOVAL
EA 20.000 $30.000 $100.000 $800.000 $357.500
DITCH CLEANING AND RESHAPING (FOOT)
LF 25,000.000 $14.000 $1.000 $14.000 $5.500
DRAIN INLET CLEANING
EA 800.000 $90.000 $100.000 $200.000 $132.000
DOWNSPOUT CLEANING
EA 200.000 $190.000 $200.000 $75.000 $132.000
STORM SEWER CLEANING (PIPE)(12"-18"DIA)
LF 10,000.000 $8.000 $8.000 $5.250 $9.900
STORM SEWER CLEANING (PIPE)(19"-24"DIA)
LF 2,000.000 $7.000 $12.000 $7.000 $9.900
STORM SEWER CLEANING (PIPE)(25"-30"DIA)
LF 5,000.000 $7.000 $3.000 $10.000 $9.900
STORM SEWER CLEANING (PIPE)(31"-36"DIA)
LF 500.000 $8.000 $2.000 $12.000 $9.900
STORM SEWER CLEANING (PIPE)(43"-54"DIA)
LF 1,200.000 $11.000 $2.000 $18.000 $9.900
STORM SEWER CLEAN (BOX CULV)(24-<48 SF)
LF 300.000 $18.000 $20.000 $19.500 $9.900
STORM SEWER CLEAN (BOX CULV)(48-<96 SF)
LF 2,000.000 $23.000 $10.000 $26.000 $9.900
SLOTTED DRAIN CLEANING
LF 1,200.000 $8.000 $10.000 $8.000 $2.200
REPAIR RAIL ELEMENT (W - BEAM)
LF 52,000.000 $15.000 $40.000 $25.000 $55.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 1,000.000 $49.000 $25.000 $25.000 $110.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 540.000 $30.000 $25.000 $35.000 $110.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 3,300.000 $35.000 $25.000 $28.000 $27.500
REM / REPL TIMBER POST W / O CONC FND
EA 7,300.000 $63.000 $1.000 $22.000 $41.800
REM / REPL STEEL POST W / O CONC FND
EA 1,284.000 $71.000 $1.000 $56.000 $49.500
REALIGN POSTS
EA 3,000.000 $21.000 $1.000 $1.000 $11.000
REMOVE & REPLACE BLOCKOUT
EA 8,600.000 $37.000 $1.000 $22.000 $11.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 600.000 $3,128.000 $6,500.000 $4,000.000 $5,720.000
REPLACE SGT OBJECT MARKER
EA 50.000 $39.000 $1.000 $20.000 $33.000
REMOVE AND REPLACE DAT
EA 125.000 $1,025.000 $1.000 $1,025.000 $1,650.000
REPLACE POSTS (TL-3)
EA 150.000 $217.000 $1.000 $200.000 $198.000
REPLACE POSTS (TL-4)
EA 150.000 $246.000 $1.000 $250.000 $198.000
CABLE SPLICE / TURNBUCKLE (TL-3)
EA 20.000 $221.000 $100.000 $221.000 $330.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 20.000 $343.000 $100.000 $343.000 $330.000
REPAIR CONCRETE FOUNDATION (TL-3)
EA 25.000 $72.000 $10.000 $72.000 $110.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 25.000 $103.000 $10.000 $103.000 $110.000
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
EA 20.000 $1,688.000 $1,000.000 $7,500.000 $1,650.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,325.000 $1,000.000 $7,500.000 $1,650.000
CHECK / RE-TENSION CABLE
EA 72.000 $360.000 $100.000 $360.000 $550.000
POST AND CABLE FENCE (REMOVAL)
LF 250.000 $2.000 $3.000 $2.000 $3.300
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 20.000 $50.000 $100.000 $50.000 $60.500
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 10.000 $100.000 $50.000 $100.000 $110.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 3,000.000 $4.000 $3.000 $4.000 $4.400
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
EA 25.000 $250.000 $200.000 $500.000 $990.000
REPAIR (REACT)
EA 40.000 $2,351.000 $500.000 $800.000 $11,000.000
REPAIR (QUAD) (N) (BAY)
EA 80.000 $1,400.000 $50.000 $4,900.000 $660.000
REPAIR (QUAD) (W) (BAY)
EA 60.000 $336.000 $50.000 $4,900.000 $220.000
REPAIR (QUAD - ELITE) NARROW (BAY)
EA 30.000 $100.000 $50.000 $4,900.000 $880.000
REPAIR (QUAD - ELITE) WIDE (BAY)
EA 15.000 $1,295.000 $100.000 $4,900.000 $1,100.000
REMOVE AND REPLACE (SMTC) (N)
EA 80.000 $19,109.000 $6,000.000 $8,000.000 $29,700.000
REMOVE AND REPLACE (SMTC) (W)
EA 25.000 $22,589.000 $6,000.000 $8,000.000 $35,200.000
REPAIR (TRACC) (BAY)
EA 350.000 $843.000 $10.000 $1.000 $440.000
REPAIR (WIDE TRACC) (BAY)
EA 80.000 $450.000 $10.000 $1.000 $880.000
REPAIR (SMTC) (N)
LF 5,000.000 $246.000 $72.000 $75.000 $220.000
REPAIR (SMTC) (W)
LF 600.000 $361.000 $72.000 $75.000 $220.000
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
EA 8.000 $10,250.000 $10,000.000 $10,250.000 $28,600.000
REPAIR (QUADGUARD)(MASH)(N)(BAY)
EA 20.000 $363.000 $1,200.000 $4,900.000 $770.000
REMOVE AND REPLACE (TAU)(MASH)(N)
EA 10.000 $14,000.000 $10,000.000 $24,000.000 $26,400.000
REPAIR (TAU)(MASH)(N)(BAY)
EA 20.000 $350.000 $1,200.000 $3,500.000 $1,100.000
REP (CONC PARAPETW/STL POST/RAIL-T4(S))
LF 1,200.000 $98.000 $80.000 $85.000 $161.000
CONCRETE RAIL REPAIR (MISC)
LF 500.000 $39.000 $40.000 $60.000 $5.000
BRIDGE JOINT REPAIR (ARMOR)
LF 1,200.000 $355.000 $400.000 $750.000 $995.000
BRIDGE JOINT REPAIR (SEJ)
LF 200.000 $750.000 $525.000 $1,000.000 $990.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 10,000.000 $6.500 $5.000 $25.000 $9.400
SP MIXES SP-C PG70-22
TON 2,600.000 $121.000 $285.000 $299.000 $328.900
TACK COAT
GAL 10,500.000 $10.000 $3.500 $3.500 $3.580
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 400.000 $337.000 $1.000 $50.000 $100.000
MODULAR GLARE SCREENS (FURN & INSTALL)
LF 5,000.000 $30.000 $30.000 $16.000 $28.500
MODULAR GLARE SCREENS (REMOVE)
LF 5,000.000 $5.000 $3.000 $5.000 $5.500
TMA (STATIONARY)
DAY 1,460.000 $650.000 $1.000 $500.000 $1.000
TMA (MOBILE OPERATION)
DAY 2,600.000 $400.000 $1.000 $150.000 $1.000
INCIDENT MANAGEMENT (TYPE A)
HR 45.000 $200.000 $350.000 $1.000 $275.000
INCIDENT MANAGEMENT (TYPE B)
HR 50.000 $200.000 $450.000 $1.000 $400.000
INCIDENT MANAGEMENT (TYPE C)
HR 20.000 $250.000 $440.000 $1.000 $485.000
INCIDENT MANAGEMENT (TYPE D)
HR 6.000 $250.000 $500.000 $1.000 $550.000
INCIDENT MANAGEMENT (TYPE E)
HR 50.000 $400.000 $600.000 $1.000 $650.000
INCIDENT MANAGEMENT (TYPE F)
HR 50.000 $100.000 $400.000 $1.000 $220.000
INCIDENT MANAGEMENT (TYPE G)
HR 30.000 $100.000 $200.000 $1.000 $220.000
INCIDENT MANAGEMENT (TYPE H)
HR 10.000 $100.000 $250.000 $1.000 $275.000
INCIDENT MANAGEMENT (TYPE I)
HR 10.000 $150.000 $300.000 $1.000 $330.000
INCIDENT MANAGEMENT (TYPE K)
HR 20.000 $150.000 $200.000 $1.000 $220.000
INCIDENT MANAGEMENT (TYPE L)
HR 10.000 $150.000 $250.000 $1.000 $275.000
INCIDENT MANAGEMENT (TYPE M)
EA 2.000 $250.000 $1,500.000 $1.000 $1,650.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 3,000.000 $90.000 $40.000 $50.000 $192.500
STORM SEWER (TELEVISION INSPECTION)
LF 4,000.000 $6.000 $2.000 $6.000 $3.300
CLEANING GUARDRAIL
LF 30,000.000 $4.000 $0.500 $3.000 $1.650
CLEANING ATTENUATOR
LF 4,000.000 $4.000 $5.000 $5.000 $4.400
CLEANING DRAINAGE FLUMES
LF 4,000.000 $3.000 $5.000 $8.000 $4.400
SNOW AND ICE CONTROL (SHADOW VEHICLE)
HR 1,728.000 $75.000 $50.000 $85.000 $108.000
SNOW AND ICE CONTROL (LOADER)
HR 1,152.000 $75.000 $1.000 $175.000 $130.000
SNOW AND ICE CONTROL (BLADE)
HR 1,152.000 $150.000 $1.000 $200.000 $200.000
SNOW AND ICE CONTROL SEASON
MO 4.000 $62,500.000 $30,000.000 $100,000.000 $30,000.000
Totals: $28,106,082.860 $26,852,805.560 $32,367,604.400 $40,310,190.152