Show Job Controls
Bid Cobra

DALLAS US0080 (6414-95-001)

Items: 39

County: DALLAS
Length: N/A
Highway: US0080
District: DALLAS
Control Number: 6414-95-001
DBE Goal: N/A
Project: RMC - 641495001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $2,390,150.00
Date: 09/07/2022 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,390,150.00
$1,740,500.00
Over/Under Est: -27.18% -$649,650.00
Over/Under Est: 23.69% $566,250.00
Amt Left: 69.86% $1,215,900.00

Bid Items & Bid Tabulations

39 Total 0 of 39
DALLAS  |  US0080  |  DALLAS  |  6414-95-001  |  09/07/2022  |  $2,390,150.00  |  RMC - 641495001  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FIREMAN EXCAVATING, INC.
ROY JORGENSEN ASSOCIATES, INC.
FLOWABLE BACKFILL
CY 20.000 $380.000 $500.000 $220.000
MOBILIZATION (CALLOUT)
EA 200.000 $600.000 $1.000 $1.000
SHORT RADIUS
LF 400.000 $30.000 $50.000 $50.000
CHAIN LINK FENCE (REPAIR) (6')
LF 1,500.000 $8.000 $6.000 $25.000
CHAIN LINK FENCE (REMOVE)
LF 500.000 $3.000 $2.000 $2.500
GATE (INSTALL) (DOUBLE) (6' X 14')
EA 5.000 $1,000.000 $400.000 $1,250.000
GATE (REPAIR) (DOUBLE) (6' X 14')
EA 5.000 $600.000 $250.000 $400.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 2,000.000 $8.000 $4.000 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 2,000.000 $8.000 $4.000 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 500.000 $18.000 $4.000 $5.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 600.000 $10.000 $7.000 $7.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 400.000 $15.000 $4.000 $15.000
INSTL DEL ASSM (D-DW)SZ 1(WFLX)GND
EA 200.000 $10.000 $12.000 $50.000
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND
EA 200.000 $10.000 $3.000 $50.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 25,000.000 $17.000 $5.000 $18.500
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 60.000 $25.000 $40.000 $35.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 70.000 $40.000 $40.000 $35.000
REM / REPL TIMBER POST W / O CONC FND
EA 4,000.000 $40.000 $30.000 $22.000
REM / REPL STEEL POST W / O CONC FND
EA 150.000 $40.000 $100.000 $80.000
REPAIR STEEL POST WITH BASE PLATE
EA 100.000 $100.000 $50.000 $250.000
REALIGN POSTS
EA 2,500.000 $10.000 $5.000 $11.000
REMOVE & REPLACE BLOCKOUT
EA 4,000.000 $15.000 $10.000 $20.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 3,500.000 $60.000 $94.000 $90.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 560.000 $50.000 $1.000 $100.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 10.000 $2,100.000 $6,500.000 $2,750.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 200.000 $900.000 $500.000 $1,050.000
REM & RESET SGT IMPACT HEAD
EA 50.000 $65.000 $100.000 $200.000
REPLACE SGT CABLE ASSEMBLY
EA 150.000 $80.000 $50.000 $80.000
REPLACE SGT CABLE ANCHOR
EA 150.000 $80.000 $50.000 $80.000
REPLACE SGT STRUT
EA 100.000 $80.000 $50.000 $80.000
REPLACE SGT OBJECT MARKER
EA 50.000 $50.000 $50.000 $25.000
REMOVE AND REPLACE DAT
EA 100.000 $1,350.000 $800.000 $1,250.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 175.000 $60.000 $60.000 $200.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 10.000 $100.000 $100.000 $250.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 10,000.000 $2.000 $1.000 $2.000
REM/REPLACE CURB GUIDANCE SYSTEM
EA 300.000 $100.000 $10.000 $180.000
REM/REPLACE DELINEATOR POST ASSEMBLY
EA 12,000.000 $50.000 $60.000 $60.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 260.000 $100.000 $1.000 $100.000
TMA (STATIONARY)
DAY 730.000 $250.000 $1.000 $600.000
Totals: $2,390,150.000 $1,740,500.000 $2,956,400.000