DALLAS SL0012 (6366-31-001)

Items: 16

County: DALLAS
Length: N/A
Highway: SL0012
District: DALLAS
Control Number: 6366-31-001
DBE Goal: N/A
Project: RMC - 636631001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $3,254,060.00
Date: 09/03/2020 (5 years ago)
Contract Number: N/A
Type: FULL DEPTH CONCRETE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$3,254,060.00
$2,783,360.00
Over/Under Est: -14.47% -$470,700.00
Over/Under Est: -3.38% -$110,052.00
Amt Left: 12.96% $360,648.00
Over/Under Est: -2.02% -$65,800.00
Amt Left: 14.55% $404,900.00
Delta: -1.41% -$44,252.00
Over/Under Est: 0.11% $3,560.00
Amt Left: 17.04% $474,260.00
Delta: -2.18% -$69,360.00

Bid Items & Bid Tabulations

16 Total 0 of 16
DALLAS  |  SL0012  |  DALLAS  |  6366-31-001  |  09/03/2020  |  $3,254,060.00  |  RMC - 636631001  |  FULL DEPTH CONC REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
O. TREVINO CONSTRUCTION, LLC
ADVANCE CONTRACTING GROUP
GIBSON & ASSOCIATES, INC.
FULL - DEPTH REPAIR CRCP (9")
SY 1,200.000 $211.000 $225.000 $231.000 $225.000 $315.000
FULL - DEPTH REPAIR CRCP (10")
SY 2,172.000 $255.000 $230.000 $244.000 $230.000 $320.000
FULL - DEPTH REPAIR CRCP (13")
SY 1,400.000 $295.000 $250.000 $294.250 $330.000 $260.000
FULL - DEPTH REPAIR CPCD (10")
SY 2,240.000 $225.000 $195.000 $234.000 $215.000 $215.000
FULL - DEPTH REPAIR CPCD (13")
SY 300.000 $302.000 $215.000 $270.000 $237.000 $250.000
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 700.000 $430.000 $420.000 $480.000 $430.000 $420.000
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 1,100.000 $75.000 $70.000 $75.000 $70.000 $96.000
CONC STR REPAIR(DECK REP (FULL DEPTH))
SF 200.000 $160.000 $135.000 $165.000 $180.000 $275.000
CLEANING AND SEALING EXISTING JOINTS
LF 4,000.000 $10.000 $5.000 $13.870 $40.000 $21.000
MOBILIZATION (CALLOUT)
EA 12.000 $1,500.000 $350.000 $3,250.000 $3,000.000 $500.000
MOBILIZATION (EMERGENCY)
EA 24.000 $2,375.000 $500.000 $3,825.000 $4,000.000 $2,500.000
SPALLING REPAIR (POLYMERIC) (FLEXIBLE)
GAL 3,000.000 $50.000 $50.000 $52.000 $45.000 $55.000
BRIDGE JOINT REPAIR (ARMOR)
LF 1,000.000 $500.000 $250.000 $312.000 $300.000 $310.000
RAISING AND UNDERSEALING CONCRETE SLAB
LB 25,000.000 $6.500 $5.500 $5.790 $7.000 $4.500
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 168.000 $150.000 $500.000 $200.000 $100.000 $110.000
TMA (STATIONARY)
DAY 178.000 $400.000 $600.000 $200.000 $400.000 $300.000
Totals: $3,254,060.000 $2,783,360.000 $3,144,008.000 $3,188,260.000 $3,257,620.000