FLOWABLE BACKFILL
|
CY
|
90.000
|
$250.000
|
$300.000
|
$400.000
|
$330.920
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
50.000
|
$450.000
|
$500.000
|
$500.000
|
$754.130
|
|
|
MOBILIZATION (CALLOUT)
|
EA
|
300.000
|
$600.000
|
$1.000
|
$10.000
|
$1,658.670
|
|
|
CONC CURB (DOWEL) (TY II)
|
LF
|
500.000
|
$32.000
|
$1.000
|
$40.000
|
$28.670
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
250.000
|
$25.000
|
$60.000
|
$27.000
|
$38.530
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
350.000
|
$35.000
|
$70.000
|
$44.000
|
$48.170
|
|
|
TERMINAL ANCHOR SECTION
|
EA
|
10.000
|
$350.000
|
$1.000
|
$250.000
|
$3,277.100
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$1,500.000
|
$5,000.000
|
$3,000.000
|
$3,472.920
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
3.000
|
$500.000
|
$2,000.000
|
$1,500.000
|
$1,909.510
|
|
|
MTL W-BEAM GD FEN ADJUSTMENT
|
LF
|
250.000
|
$13.000
|
$5.000
|
$30.000
|
$19.330
|
|
|
SHORT RADIUS
|
LF
|
125.000
|
$30.000
|
$70.000
|
$50.000
|
$71.560
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$5.000
|
$8.000
|
$3.000
|
$4.250
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$200.000
|
$2,500.000
|
$200.000
|
$412.280
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$250.000
|
$1,000.000
|
$200.000
|
$458.690
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,500.000
|
$7,500.000
|
$4,500.000
|
$4,698.350
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$400.000
|
$1,500.000
|
$300.000
|
$466.490
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
20.000
|
$1,150.000
|
$25,000.000
|
$3,000.000
|
$2,172.330
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
2.000
|
$13,500.000
|
$1,000.000
|
$22,100.000
|
$44,042.500
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
18.000
|
$21,000.000
|
$1,000.000
|
$31,564.000
|
$41,428.630
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
40.000
|
$21,500.000
|
$1,000.000
|
$60,060.000
|
$26,121.300
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
|
EA
|
2.000
|
$11,000.000
|
$1,000.000
|
$22,100.000
|
$29,039.010
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
18.000
|
$16,000.000
|
$1,000.000
|
$31,564.000
|
$15,292.540
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
1,000.000
|
$20.000
|
$8.000
|
$30.000
|
$166.680
|
|
|
CHAIN LINK FENCE (REPAIR) (6')
|
LF
|
3,000.000
|
$12.000
|
$8.000
|
$30.000
|
$12.160
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
250.000
|
$5.000
|
$10.000
|
$6.000
|
$14.030
|
|
|
GATE (INSTALL) (DOUBLE) (6' X 14')
|
EA
|
1.000
|
$1,200.000
|
$2,500.000
|
$4,000.000
|
$2,155.520
|
|
|
GATE (REPAIR) (DOUBLE) (6' X 14')
|
EA
|
2.000
|
$1,000.000
|
$2,000.000
|
$3,000.000
|
$1,363.220
|
|
|
CHAIN LINK FENCE (REPAIR) (4')
|
LF
|
500.000
|
$10.000
|
$6.000
|
$15.000
|
$22.900
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
500.000
|
$10.000
|
$20.000
|
$20.000
|
$35.190
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
500.000
|
$10.000
|
$20.000
|
$20.000
|
$35.350
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
2,000.000
|
$8.000
|
$20.000
|
$20.000
|
$34.630
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
2,000.000
|
$45.000
|
$20.000
|
$65.000
|
$141.340
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
|
EA
|
500.000
|
$35.000
|
$20.000
|
$65.000
|
$175.310
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
500.000
|
$25.000
|
$30.000
|
$40.000
|
$42.890
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
500.000
|
$20.000
|
$20.000
|
$40.000
|
$55.190
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
500.000
|
$25.000
|
$2.000
|
$40.000
|
$51.720
|
|
|
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
|
EA
|
500.000
|
$20.000
|
$2.000
|
$40.000
|
$52.320
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
25,000.000
|
$17.000
|
$45.000
|
$15.000
|
$32.360
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
30.000
|
$25.000
|
$50.000
|
$25.000
|
$157.290
|
|
|
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
|
LF
|
40.000
|
$25.000
|
$50.000
|
$25.000
|
$13.270
|
|
|
REM / REPL TIMBER POST W / O CONC FND
|
EA
|
1,500.000
|
$50.000
|
$40.000
|
$50.000
|
$123.080
|
|
|
REM / REPL STEEL POST W / O CONC FND
|
EA
|
25.000
|
$58.000
|
$100.000
|
$70.000
|
$150.300
|
|
|
REM / REPL TIMBER POST W / CONC FND
|
EA
|
175.000
|
$50.000
|
$600.000
|
$60.000
|
$131.850
|
|
|
REM / REPL STEEL POST W / CONC FND
|
EA
|
100.000
|
$93.000
|
$100.000
|
$85.000
|
$268.890
|
|
|
REPAIR STEEL POST WITH BASE PLATE
|
EA
|
30.000
|
$200.000
|
$1,200.000
|
$350.000
|
$204.400
|
|
|
REALIGN POSTS
|
EA
|
2,500.000
|
$25.000
|
$10.000
|
$20.000
|
$204.400
|
|
|
INSTALL BLOCKOUT (TYPE SPECIFIED)
|
EA
|
25.000
|
$25.000
|
$5.000
|
$50.000
|
$20.160
|
|
|
REMOVE & REPLACE BLOCKOUT
|
EA
|
1,500.000
|
$15.000
|
$10.000
|
$20.000
|
$40.730
|
|
|
REPLACE STL BLOCKOUTS W /WOOD BLOCKOUTS
|
EA
|
15.000
|
$20.000
|
$1.000
|
$30.000
|
$16.600
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
12,000.000
|
$25.000
|
$30.000
|
$15.000
|
$46.890
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
250.000
|
$40.000
|
$1.000
|
$500.000
|
$109.680
|
|
|
REPAIR OF TERMINAL ANCHORS POSTS
|
EA
|
3.000
|
$100.000
|
$50.000
|
$500.000
|
$69.790
|
|
|
REPLACE TERMINAL ANCHOR POSTS
|
EA
|
2.000
|
$100.000
|
$50.000
|
$250.000
|
$98.310
|
|
|
REPLACE HINGED TOP SGT STEEL POST
|
EA
|
15.000
|
$86.000
|
$400.000
|
$100.000
|
$524.320
|
|
|
REMOVE GDRAIL END TRT / REPL WITH SGT
|
EA
|
200.000
|
$2,900.000
|
$6,000.000
|
$3,300.000
|
$6,149.150
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
50.000
|
$1,250.000
|
$3,800.000
|
$1,000.000
|
$2,315.090
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
50.000
|
$100.000
|
$1.000
|
$100.000
|
$162.260
|
|
|
REPLACE SGT CABLE ASSEMBLY
|
EA
|
50.000
|
$80.000
|
$50.000
|
$75.000
|
$147.130
|
|
|
REPLACE SGT CABLE ANCHOR
|
EA
|
50.000
|
$100.000
|
$50.000
|
$75.000
|
$138.120
|
|
|
REPLACE SGT STRUT
|
EA
|
50.000
|
$100.000
|
$50.000
|
$100.000
|
$137.230
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
38.000
|
$30.000
|
$100.000
|
$50.000
|
$72.170
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
250.000
|
$3.000
|
$3.000
|
$3.000
|
$5.850
|
|
|
POST AND CABLE FENCE (REMV CONC ANCHOR)
|
EA
|
5.000
|
$150.000
|
$50.000
|
$50.000
|
$1,297.340
|
|
|
POST AND CABLE FENCE (NEW INSTALLATION)
|
LF
|
750.000
|
$10.000
|
$4.000
|
$10.000
|
$23.260
|
|
|
POST AND CABLE FENCE (NEW CONC ANCHOR)
|
EA
|
12.000
|
$50.000
|
$100.000
|
$250.000
|
$789.040
|
|
|
POST AND CABLE FENCE(REMV / REPL POSTS)
|
EA
|
100.000
|
$50.000
|
$60.000
|
$100.000
|
$87.390
|
|
|
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
|
EA
|
5.000
|
$145.000
|
$100.000
|
$300.000
|
$87.390
|
|
|
POST AND CABLE FENCE (REMV/ REPL CABLE)
|
LF
|
2,500.000
|
$3.000
|
$3.000
|
$3.000
|
$4.340
|
|
|
RMV/REPL(VIA-SAND FILL PLASTIC BARRELS)
|
EA
|
25.000
|
$425.000
|
$450.000
|
$600.000
|
$604.310
|
|
|
REPAIR (REACT)
|
EA
|
25.000
|
$1,700.000
|
$100.000
|
$2,000.000
|
$2,413.520
|
|
|
REPAIR (CATCB - FRNT SECT)
|
EA
|
5.000
|
$2,000.000
|
$200.000
|
$6,000.000
|
$2,162.340
|
|
|
REPAIR (CATCB - REAR SECT)
|
EA
|
2.000
|
$1,000.000
|
$200.000
|
$4,000.000
|
$1,147.180
|
|
|
REPAIR (NARROW QUAD)
|
EA
|
5.000
|
$1,800.000
|
$100.000
|
$3,000.000
|
$2,320.580
|
|
|
REPAIR REACT (N) (REAR SEC "S")
|
EA
|
5.000
|
$200.000
|
$100.000
|
$6,000.000
|
$215.710
|
|
|
REPAIR REACT (N) (FRONT SECTION)
|
EA
|
17.000
|
$500.000
|
$100.000
|
$8,000.000
|
$497.720
|
|
|
REPAIR REACT (N) (CYLINDERS)
|
EA
|
30.000
|
$2,500.000
|
$100.000
|
$4,500.000
|
$3,875.460
|
|
|
REPAIR (QUAD) (N) (BAY)
|
EA
|
13.000
|
$900.000
|
$100.000
|
$4,500.000
|
$1,498.560
|
|
|
REPAIR (QUAD) (W) (BAY)
|
EA
|
37.000
|
$1,000.000
|
$100.000
|
$4,500.000
|
$813.040
|
|
|
REPAIR REACT (W) (CYLINDERS)
|
EA
|
12.000
|
$1,500.000
|
$100.000
|
$4,000.000
|
$2,765.230
|
|
|
REPAIR (QUAD - ELITE) NARROW (BAY)
|
EA
|
12.000
|
$1,000.000
|
$100.000
|
$4,000.000
|
$3,549.680
|
|
|
REPAIR (QUAD - ELITE) WIDE (BAY)
|
EA
|
10.000
|
$1,000.000
|
$100.000
|
$5,000.000
|
$890.870
|
|
|
REPAIR (QUADGUARD - ELITE) (CYLINDER)
|
EA
|
1.000
|
$1,000.000
|
$100.000
|
$5,000.000
|
$272.190
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
38.000
|
$20,000.000
|
$10,000.000
|
$33,000.000
|
$24,031.130
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
20.000
|
$21,000.000
|
$12,000.000
|
$55,000.000
|
$28,462.840
|
|
|
REPAIR (TRACC) (BAY)
|
EA
|
500.000
|
$900.000
|
$100.000
|
$600.000
|
$320.330
|
|
|
REPAIR (WIDE TRACC) (BAY)
|
EA
|
100.000
|
$900.000
|
$100.000
|
$800.000
|
$298.550
|
|
|
REPAIR (SMTC) (N)
|
LF
|
420.000
|
$200.000
|
$400.000
|
$400.000
|
$483.740
|
|
|
REPAIR (SMTC) (W)
|
LF
|
420.000
|
$200.000
|
$200.000
|
$400.000
|
$1,165.150
|
|
|
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
|
EA
|
10.000
|
$17,000.000
|
$15,000.000
|
$30,000.000
|
$24,343.220
|
|
|
REPAIR (QUADGUARD)(MASH)(N)(BAY)
|
EA
|
50.000
|
$900.000
|
$1,200.000
|
$2,000.000
|
$1,092.320
|
|
|
REMOVE AND REPLACE (TAU)(MASH)(N)
|
EA
|
10.000
|
$17,000.000
|
$15,000.000
|
$22,000.000
|
$24,655.310
|
|
|
REPAIR (TAU)(MASH)(N)(BAY)
|
EA
|
50.000
|
$900.000
|
$1,200.000
|
$2,000.000
|
$617.400
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
60.000
|
$200.000
|
$200.000
|
$200.000
|
$202.360
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$25,000.000
|
$40,000.000
|
$15,000.000
|
$17,361.800
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$78,000.000
|
$50,000.000
|
$40,000.000
|
$63,400.380
|
|
|
TMA (STATIONARY)
|
DAY
|
130.000
|
$260.000
|
$200.000
|
$450.000
|
$916.270
|
|
Totals: |
$6,512,605.000
|
$5,695,050.000
|
$10,663,504.000
|
$10,962,417.770
|