DALLAS IH0030 (6324-43-001)

Items: 109

County: DALLAS
Length: N/A
Highway: IH0030
District: DALLAS
Control Number: 6324-43-001
DBE Goal: N/A
Project: RMC - 632443001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $7,140,180.00
Date: 05/02/2018 (8 years ago)
Contract Number: N/A
Type: PERF BASED OPER & MAINT OF MANAGED LANES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$7,140,180.00
$5,662,048.00
Over/Under Est: -20.7% -$1,478,132.00
$6,126,314.27
Over/Under Est: -14.2% -$1,013,865.73
Amt Left: 8.2% $464,266.27
$6,934,050.00
Over/Under Est: -2.89% -$206,130.00
Amt Left: 22.47% $1,272,002.00
Delta: -13.18% -$807,735.73
Over/Under Est: -1.64% -$117,320.00
Amt Left: 24.03% $1,360,812.00
Delta: -1.28% -$88,810.00

Bid Items & Bid Tabulations

109 Total 0 of 109
DALLAS  |  IH0030  |  DALLAS  |  6324-43-001  |  05/02/2018  |  $7,140,180.00  |  RMC - 632443001  |  PERF BASED OPER & MAINT OF MANAGED L...  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY JORGENSEN ASSOCIATES, INC.
DBI SERVICES, LLC
IIPL USA LLC
FIREMAN EXCAVATING, INC.
SUPERPAVE MIXTURES SP-D PG64-22
TON 50.000 $327.000 $200.000 $150.710 $300.000 $195.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(14")
SY 800.000 $80.000 $50.000 $102.910 $80.000 $100.000
FLEXIBLE PAV STR REPAIR 12"-TYPICAL A
SY 200.000 $188.000 $125.000 $91.470 $120.000 $115.000
FULL - DEPTH REPAIR CRCP (14")
SY 800.000 $150.000 $230.000 $229.990 $200.000 $400.000
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 200.000 $300.000 $450.000 $332.270 $500.000 $445.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 200.000 $200.000 $85.000 $145.860 $200.000 $200.000
CONC STR REPAIR (STANDARD)
SF 2,000.000 $50.000 $80.000 $76.230 $60.000 $85.000
CLEANING EXISTING JOINTS
LF 4,000.000 $4.000 $5.000 $4.030 $5.000 $10.000
MOBILIZATION-SITE 1
EA 1.000 $250,000.000 $100,000.000 $165,111.770 $500,000.000 $15,000.000
MOBILIZATION-SITE 2
EA 1.000 $150,000.000 $100,000.000 $165,111.770 $50,000.000 $15,000.000
MOBILIZATION-SITE 3
EA 1.000 $100,000.000 $100,000.000 $165,111.770 $50,000.000 $15,000.000
MOBILIZATION-SITE 4
EA 1.000 $25,000.000 $10,000.000 $1.000 $1,000.000 $5,000.000
MOBILIZATION-SITE 5
EA 1.000 $200,000.000 $5,000.000 $1.000 $1,000.000 $5,000.000
MOBILIZATION-SITE 6
EA 1.000 $25,000.000 $5,000.000 $1.000 $1,000.000 $5,000.000
PORT CTB (ALIGNING)
LF 10,000.000 $25.000 $10.000 $3.280 $10.000 $25.000
CONC CURB (TY II)
LF 50.000 $100.000 $16.000 $19.870 $120.000 $130.000
MTL W-BEAM GD FEN (TIM POST)
LF 600.000 $30.000 $30.000 $16.900 $30.000 $10.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $1,200.000 $1,000.000 $1,193.000 $2,000.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,500.000 $3,000.000 $2,261.010 $3,000.000 $1,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $200.000 $400.000 $176.200 $500.000 $100.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 400.000 $60.000 $35.000 $20.770 $25.000 $40.000
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 1,000.000 $40.000 $40.000 $21.900 $25.000 $40.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 20.000 $650.000 $400.000 $617.260 $500.000 $500.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 8.000 $750.000 $400.000 $908.420 $500.000 $700.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $1,500.000 $1,200.000 $788.980 $1,000.000 $1,400.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 4.000 $1,500.000 $1,200.000 $788.980 $1,000.000 $1,500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 200.000 $20.000 $6.000 $14.850 $10.000 $8.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 200.000 $30.000 $6.000 $12.920 $40.000 $8.000
REFL PAV MRK TY I (W)12"(SLD)(060MIL)
LF 6,000.000 $3.000 $3.360 $1.580 $3.000 $3.210
REFL PAV MRK TY I (W)(WORD)(090MIL)
EA 40.000 $150.000 $178.500 $196.200 $170.000 $175.000
REFL PAV MRK TY I(W)(ENTR GORE)(090MIL)
EA 40.000 $400.000 $525.000 $2,523.350 $500.000 $520.000
REFL PAV MRK TY I(W)(EXIT GORE)(090MIL)
EA 40.000 $450.000 $525.000 $1,923.850 $500.000 $520.000
RE PV MRK TY I(BLACK)6"(SHADOW)(090MIL)
LF 15,000.000 $0.700 $0.735 $1.140 $0.700 $0.720
PAVEMENT SEALER 4"
LF 100,000.000 $0.150 $0.158 $0.220 $0.150 $0.180
PAVEMENT SEALER 6"
LF 45,000.000 $0.230 $0.263 $0.340 $0.250 $0.270
PAVEMENT SEALER 12"
LF 6,000.000 $1.000 $1.890 $0.650 $1.800 $1.820
PAVEMENT SEALER (ENTR GORE)
EA 30.000 $300.000 $262.500 $1,258.950 $250.000 $255.000
PAVEMENT SEALER (EXIT GORE)
EA 30.000 $400.000 $262.500 $926.500 $250.000 $255.000
REF PROF PAV MRK TY I(W)4"(SLD)(060MIL)
LF 80,000.000 $0.800 $1.050 $0.640 $0.500 $1.020
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
LF 80,000.000 $0.600 $1.050 $0.640 $0.500 $1.020
RE PM W/RET REQ TY I (W)4"(SLD)(060MIL)
LF 160,000.000 $0.240 $0.263 $0.270 $0.250 $0.270
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 160,000.000 $0.250 $0.347 $0.340 $0.300 $0.360
RE PM W/RET REQ TY I (W)6"(BRK)(060MIL)
LF 45,000.000 $0.420 $0.315 $0.540 $0.300 $0.330
RE PM W/RET REQ TY I (Y)4"(SLD)(060MIL)
LF 160,000.000 $0.150 $0.263 $0.270 $0.250 $0.270
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 160,000.000 $0.200 $0.347 $0.340 $0.200 $0.360
REFL PAV MRK TY I (W)12"(DOT)(060MIL)
LF 6,000.000 $2.750 $4.200 $1.580 $4.000 $4.020
REFL PAV MRKR TY I-C
EA 1,000.000 $4.000 $3.938 $7.630 $3.750 $4.000
REFL PAV MRKR TY I-R
EA 200.000 $4.200 $5.250 $38.150 $5.000 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 100,000.000 $0.400 $0.441 $0.570 $0.200 $0.440
ELIM EXT PAV MRK & MRKS (6")
LF 45,000.000 $0.450 $0.546 $0.770 $0.520 $0.540
ELIM EXT PAV MRK & MRKS (12")
LF 6,000.000 $2.000 $2.100 $5.450 $2.000 $2.020
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 30.000 $300.000 $367.500 $2,343.500 $350.000 $355.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 30.000 $400.000 $367.500 $2,915.750 $350.000 $355.000
PAV SURF PREP FOR MRK (4")
LF 100,000.000 $0.150 $0.053 $0.010 $0.050 $0.100
PAV SURF PREP FOR MRK (6")
LF 45,000.000 $0.200 $0.105 $0.020 $0.100 $0.150
PAV SURF PREP FOR MRK (12")
LF 6,000.000 $0.250 $0.525 $0.030 $0.500 $1.000
PAV SURF PREP FOR MRK (ENTR GORE)
EA 30.000 $150.000 $210.000 $54.500 $200.000 $250.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 30.000 $250.000 $210.000 $54.500 $200.000 $250.000
POTHOLE REPAIR (STANDARD)
SY 200.000 $85.000 $85.000 $43.970 $100.000 $200.000
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 4,000.000 $4.000 $6.000 $0.710 $5.000 $9.000
CRACK CLEANING AND SEALING (JCP)
LF 2,000.000 $8.000 $8.000 $2.530 $6.000 $5.000
SPALLING REPAIR (HYDRAULIC CEMENT)
CF 500.000 $212.000 $85.000 $80.860 $100.000 $150.000
PAVEMENT EDGES, STRUCTURES & FIXTURES
MI 160.000 $100.000 $200.000 $132.700 $200.000 $150.000
LITTER REMOVAL
CYC 104.000 $1,500.000 $800.000 $174.620 $2,000.000 $700.000
DEBRIS REMOVAL (SPOT DEBRIS)
MI 2,500.000 $100.000 $25.000 $7.250 $10.000 $10.000
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
CYC 52.000 $1,500.000 $3,000.000 $728.270 $2,500.000 $3,500.000
CLEANING / SWEEPING (AGGREGATE REMOVAL)
MI 80.000 $200.000 $250.000 $119.510 $250.000 $100.000
CLEANING / SWEEPING (HANDWORK)
SY 3,000.000 $2.000 $0.250 $1.680 $10.000 $0.500
CLEANING/SWEEPING(HOV LANE)
MI 1,872.000 $150.000 $125.000 $58.910 $130.000 $70.000
GRAFFITI REMOVAL (PAINTING)
SF 2,000.000 $10.000 $5.000 $1.410 $5.000 $3.000
SLOTTED DRAIN CLEANING
LF 500.000 $25.000 $5.000 $4.540 $20.000 $18.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,000.000 $40.000 $12.000 $8.530 $40.000 $15.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 700.000 $25.000 $25.000 $14.680 $25.000 $10.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 100.000 $50.000 $30.000 $22.950 $25.000 $10.000
REALIGN EXISTING RAIL
LF 1,000.000 $10.000 $10.000 $3.500 $5.000 $0.250
REM / REPL TIMBER POST W / O CONC FND
EA 25.000 $50.000 $50.000 $42.550 $20.000 $25.000
REM / REPL STEEL POST W / O CONC FND
EA 25.000 $50.000 $100.000 $61.190 $40.000 $25.000
REM / REPL TIMBER POST W / CONC FND
EA 25.000 $50.000 $100.000 $53.570 $20.000 $100.000
REM / REPL STEEL POST W / CONC FND
EA 20.000 $30.000 $100.000 $73.960 $40.000 $25.000
REPAIR STEEL POST WITH BASE PLATE
EA 25.000 $40.000 $400.000 $195.120 $200.000 $100.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 20.000 $10.000 $20.000 $7.780 $10.000 $5.000
REMOVE & REPLACE BLOCKOUT
EA 20.000 $20.000 $20.000 $7.780 $10.000 $10.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 100.000 $30.000 $54.000 $19.970 $10.000 $50.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 10.000 $60.000 $65.000 $47.150 $25.000 $80.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 10.000 $250.000 $100.000 $7.040 $100.000 $10.000
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $160.000 $100.000 $31.810 $200.000 $20.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 4.000 $3,500.000 $2,500.000 $2,158.500 $2,500.000 $4,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 4.000 $1,000.000 $1,500.000 $812.310 $800.000 $1,200.000
REM & RESET SGT IMPACT HEAD
EA 4.000 $200.000 $50.000 $33.560 $1,000.000 $200.000
REPLACE SGT CABLE ASSEMBLY
EA 4.000 $100.000 $200.000 $92.000 $100.000 $250.000
REPLACE SGT CABLE ANCHOR
EA 4.000 $100.000 $175.000 $106.160 $60.000 $250.000
REPLACE SGT STRUT
EA 4.000 $60.000 $200.000 $69.590 $100.000 $250.000
REPLACE SGT OBJECT MARKER
EA 10.000 $100.000 $20.000 $23.570 $50.000 $20.000
REPAIR SINGLE GUARDRAIL TERMINAL
EA 5.000 $2,000.000 $1,200.000 $1,467.210 $1,000.000 $4,000.000
REMOVE AND REPLACE (TRACC)
EA 70.000 $7,500.000 $2,500.000 $11,668.650 $7,000.000 $9,000.000
REMOVE AND REPLACE (WIDE TRACC)
EA 50.000 $500.000 $9,000.000 $11,668.650 $10,000.000 $11,000.000
REPAIR (TRACC) (BAY)
EA 150.000 $1,200.000 $1,000.000 $686.400 $500.000 $800.000
REPAIR (WIDE TRACC) (BAY)
EA 4.000 $24,000.000 $1,500.000 $686.400 $1,000.000 $1,000.000
REM/REPLACE CURB GUIDANCE SYSTEM
EA 100.000 $150.000 $195.000 $11.130 $100.000 $90.000
REM/REPLACE CURB
EA 500.000 $130.000 $165.000 $75.650 $90.000 $40.000
REM/REPLACE VISION STRIP
EA 20.000 $40.000 $1.000 $6.400 $50.000 $40.000
REM/REPLACE CURB TRANS END SECTION
EA 20.000 $275.000 $1.000 $6.400 $100.000 $100.000
REM/REPLACE DELINEATOR POST ASSEMBLY
EA 12,200.000 $101.000 $30.000 $25.880 $80.000 $120.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 250.000 $150.000 $85.000 $75.050 $10.000 $200.000
TMA (STATIONARY)
EA 2.000 $500.000 $7,500.000 $51,364.360 $500.000 $400.000
TMA (STATIONARY)
DAY 400.000 $500.000 $100.000 $122.500 $100.000 $300.000
CLEANING GUARDRAIL
LF 1,000.000 $2.000 $2.000 $1.910 $1.000 $4.000
CLEANING ATTENUATOR
LF 300.000 $3.000 $5.000 $5.450 $5.000 $20.000
PERF BASED OPER & MAINT MANAGED LANES
MO 24.000 $60,000.000 $72,500.000 $66,150.000 $80,000.000 $60,000.000
Totals: $7,140,180.000 $5,662,048.000 $6,126,314.270 $6,934,050.000 $7,022,860.000