|
|
PREPARING ROW
|
STA
|
13.000
|
$17,211.000
|
$60,000.000
|
$62,973.560
|
$49,469.000
|
$15,750.000
|
$13,042.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
107.000
|
$65.000
|
$40.000
|
$19.090
|
$39.000
|
$42.000
|
$66.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
21.000
|
$31.000
|
$45.000
|
$28.210
|
$106.000
|
$157.500
|
$33.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
945.000
|
$25.000
|
$29.000
|
$23.510
|
$90.000
|
$57.750
|
$49.500
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
517.000
|
$18.000
|
$30.000
|
$20.560
|
$105.000
|
$42.000
|
$22.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
785.000
|
$17.000
|
$10.000
|
$10.110
|
$1.600
|
$15.750
|
$9.900
|
|
|
REMOVING CONC (CTB)
|
LF
|
598.000
|
$20.000
|
$32.000
|
$28.210
|
$23.000
|
$26.250
|
$52.800
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
264.000
|
$28.000
|
$30.000
|
$28.210
|
$23.000
|
$42.000
|
$22.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(7"-10")
|
SY
|
469.000
|
$20.000
|
$12.000
|
$13.790
|
$25.000
|
$31.500
|
$20.900
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,270.000
|
$18.000
|
$40.000
|
$18.810
|
$55.000
|
$15.000
|
$35.200
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
3,870.000
|
$22.000
|
$40.000
|
$59.930
|
$70.000
|
$52.500
|
$52.800
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
9,375.000
|
$1.310
|
$1.000
|
$2.370
|
$4.400
|
$1.540
|
$1.100
|
|
|
BLOCK SODDING
|
SY
|
9,375.000
|
$7.000
|
$6.250
|
$5.660
|
$3.870
|
$4.100
|
$4.730
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
9,375.000
|
$0.500
|
$0.250
|
$0.710
|
$0.260
|
$0.250
|
$0.280
|
|
|
VEGETATIVE WATERING
|
MG
|
2,794.000
|
$15.000
|
$5.000
|
$0.480
|
$24.000
|
$3.150
|
$52.530
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
942.000
|
$34.000
|
$30.000
|
$32.910
|
$28.000
|
$55.000
|
$125.400
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
4.600
|
$375.000
|
$260.000
|
$387.410
|
$375.000
|
$400.000
|
$880.000
|
|
|
LIME TRT (EXST MATL)(10")
|
SY
|
157.000
|
$5.500
|
$30.000
|
$9.400
|
$25.000
|
$43.280
|
$66.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
189.000
|
$8.000
|
$14.000
|
$16.930
|
$14.000
|
$26.250
|
$15.400
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
383.000
|
$400.000
|
$120.000
|
$190.390
|
$300.000
|
$210.000
|
$239.800
|
|
|
CONC PVMT (JOINTED - CPCD) (10")
|
SY
|
962.000
|
$380.000
|
$100.000
|
$154.190
|
$200.000
|
$168.000
|
$227.700
|
|
|
CEM STABIL BKFL
|
CY
|
210.000
|
$310.000
|
$125.000
|
$175.900
|
$228.000
|
$525.000
|
$302.500
|
|
|
FLOWABLE BACKFILL
|
CY
|
12.000
|
$550.000
|
$380.000
|
$141.730
|
$305.000
|
$945.000
|
$730.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
160.000
|
$180.000
|
$195.000
|
$113.020
|
$180.660
|
$178.650
|
$275.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
6.000
|
$240.000
|
$526.350
|
$660.730
|
$528.510
|
$309.750
|
$400.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
570.000
|
$183.670
|
$300.000
|
$489.670
|
$287.400
|
$293.510
|
$385.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
224.000
|
$350.000
|
$590.140
|
$987.920
|
$592.550
|
$336.000
|
$352.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
44.000
|
$850.000
|
$632.780
|
$793.630
|
$635.370
|
$787.500
|
$825.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
57.600
|
$1,304.780
|
$1,500.000
|
$1,698.440
|
$2,375.000
|
$2,000.000
|
$1,925.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
57.500
|
$1,304.780
|
$2,000.000
|
$2,240.460
|
$2,400.000
|
$2,100.000
|
$1,925.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
66.900
|
$1,304.780
|
$1,500.000
|
$1,884.950
|
$1,870.000
|
$1,700.000
|
$1,925.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
40.000
|
$620.000
|
$610.000
|
$705.990
|
$1,050.000
|
$700.000
|
$825.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
12,404.000
|
$35.000
|
$30.000
|
$57.340
|
$26.000
|
$35.400
|
$31.900
|
|
|
APPROACH SLAB (HPC)
|
CY
|
50.000
|
$1,100.000
|
$750.000
|
$714.130
|
$1,325.000
|
$1,050.000
|
$1,100.000
|
|
|
BRIDGE SIDEWALK (LIGHTWEIGHT)
|
SF
|
5,805.000
|
$26.100
|
$14.000
|
$19.560
|
$16.000
|
$21.000
|
$17.600
|
|
|
BRIDGE MEDIAN (LIGHTWEIGHT)
|
SF
|
2,233.000
|
$28.100
|
$15.500
|
$19.560
|
$15.400
|
$25.200
|
$17.600
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
1,762.810
|
$196.000
|
$250.000
|
$268.870
|
$400.000
|
$350.000
|
$242.000
|
|
|
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
|
SF
|
40.000
|
$132.920
|
$200.000
|
$25.080
|
$150.000
|
$157.500
|
$150.000
|
|
|
CONC STR REPAIR(DECK REP (FULL DEPTH))
|
SF
|
10.000
|
$516.640
|
$250.000
|
$265.640
|
$300.000
|
$315.000
|
$300.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
271.000
|
$200.000
|
$145.000
|
$176.930
|
$235.000
|
$246.750
|
$240.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
58.800
|
$550.000
|
$630.000
|
$714.640
|
$650.000
|
$1,575.000
|
$671.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
655.000
|
$60.000
|
$36.000
|
$56.390
|
$55.000
|
$57.750
|
$55.000
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
302.000
|
$22.080
|
$19.000
|
$26.140
|
$38.000
|
$35.000
|
$37.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
1,220.000
|
$92.000
|
$75.000
|
$123.300
|
$105.000
|
$105.000
|
$181.500
|
|
|
RETROFIT RAIL (TY C221)(HPC)
|
LF
|
957.000
|
$212.680
|
$240.000
|
$169.260
|
$324.000
|
$241.500
|
$203.500
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
83.000
|
$215.790
|
$135.000
|
$214.550
|
$264.000
|
$210.000
|
$275.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
4.000
|
$3,000.000
|
$1,100.000
|
$3,184.860
|
$7,000.000
|
$6,300.000
|
$5,390.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$699,658.000
|
$780,000.000
|
$835,711.680
|
$820,000.000
|
$850,000.000
|
$1,220,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$20,000.000
|
$60,000.000
|
$11,703.850
|
$40,000.000
|
$52,500.000
|
$35,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
102.000
|
$38.000
|
$29.000
|
$76.160
|
$39.600
|
$29.400
|
$31.900
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
102.000
|
$14.000
|
$14.000
|
$52.660
|
$15.470
|
$15.750
|
$15.400
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,055.000
|
$3.260
|
$2.900
|
$4.340
|
$6.010
|
$2.890
|
$3.190
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,055.000
|
$0.780
|
$0.850
|
$1.910
|
$1.030
|
$1.050
|
$0.940
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
704.000
|
$5.070
|
$4.500
|
$6.520
|
$4.120
|
$4.730
|
$4.950
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
704.000
|
$1.480
|
$1.000
|
$1.840
|
$1.030
|
$2.360
|
$1.100
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,593.000
|
$65.000
|
$50.000
|
$77.380
|
$20.000
|
$42.000
|
$39.600
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,296.000
|
$50.000
|
$50.000
|
$85.180
|
$28.000
|
$26.250
|
$39.600
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$90.000
|
$50.000
|
$92.280
|
$28.000
|
$52.500
|
$39.600
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,593.000
|
$22.000
|
$12.000
|
$16.410
|
$12.000
|
$23.100
|
$19.800
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,296.000
|
$13.000
|
$12.000
|
$15.050
|
$19.000
|
$15.750
|
$19.800
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
40.000
|
$20.000
|
$12.000
|
$18.810
|
$19.000
|
$31.500
|
$19.800
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
720.000
|
$200.000
|
$145.000
|
$92.850
|
$127.000
|
$100.000
|
$181.500
|
|
|
CONC CURB (TY II)
|
LF
|
958.000
|
$45.000
|
$16.000
|
$42.310
|
$7.000
|
$11.550
|
$41.800
|
|
|
CONCRETE CURB (SPECIAL)
|
LF
|
41.000
|
$51.500
|
$25.000
|
$102.420
|
$113.000
|
$126.000
|
$55.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
217.000
|
$95.000
|
$65.000
|
$92.150
|
$81.000
|
$151.960
|
$104.500
|
|
|
CURB RAMPS (TY 5)
|
EA
|
1.000
|
$3,500.000
|
$1,900.000
|
$2,820.960
|
$4,400.000
|
$5,432.660
|
$4,400.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
1.000
|
$3,200.000
|
$2,400.000
|
$2,606.040
|
$3,600.000
|
$2,884.110
|
$2,310.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
1.000
|
$3,500.000
|
$3,350.000
|
$2,562.370
|
$5,500.000
|
$2,565.190
|
$3,960.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
2.000
|
$3,900.000
|
$3,300.000
|
$2,933.790
|
$4,400.000
|
$5,237.160
|
$4,730.000
|
|
|
CONC MEDIAN
|
SY
|
67.000
|
$170.000
|
$90.000
|
$141.050
|
$167.000
|
$186.650
|
$148.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
224.000
|
$32.000
|
$32.000
|
$27.900
|
$38.500
|
$31.500
|
$42.350
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,800.000
|
$2,285.000
|
$2,043.630
|
$3,143.660
|
$3,841.270
|
$2,805.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,400.000
|
$1,550.000
|
$1,065.700
|
$1,280.000
|
$1,890.000
|
$1,408.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
210.000
|
$3.000
|
$13.000
|
$10.030
|
$4.000
|
$10.500
|
$4.400
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$2,800.000
|
$2,850.000
|
$2,877.380
|
$3,305.000
|
$3,150.000
|
$3,635.500
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
3.000
|
$250.000
|
$400.000
|
$877.630
|
$460.000
|
$315.000
|
$506.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
5.000
|
$1,000.000
|
$765.000
|
$949.720
|
$855.000
|
$945.000
|
$2,200.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
4.000
|
$30,000.000
|
$23,700.000
|
$25,498.190
|
$27,200.000
|
$23,100.000
|
$35,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
5.000
|
$9,000.000
|
$6,935.000
|
$7,647.940
|
$8,200.000
|
$9,450.000
|
$11,000.000
|
|
|
RELOCATE RD IL ASM (SHOE-BASE)
|
EA
|
1.000
|
$2,500.000
|
$7,545.940
|
$9,460.870
|
$7,576.790
|
$5,381.250
|
$5,637.500
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
12.000
|
$1,600.000
|
$1,230.570
|
$1,543.380
|
$1,235.600
|
$2,284.280
|
$2,393.050
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
26.000
|
$4,600.000
|
$4,650.690
|
$5,831.240
|
$4,669.700
|
$6,877.500
|
$7,205.000
|
|
|
IN RD IL (TY SA) 50T-8 (400W EQ) LED
|
EA
|
2.000
|
$4,360.000
|
$4,960.690
|
$6,219.900
|
$4,980.970
|
$7,612.500
|
$7,975.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
132.000
|
$25.000
|
$15.060
|
$18.880
|
$15.130
|
$18.380
|
$19.250
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
10,825.000
|
$20.000
|
$16.140
|
$20.240
|
$16.210
|
$21.530
|
$22.550
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,609.000
|
$20.000
|
$24.900
|
$31.220
|
$25.000
|
$31.500
|
$33.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
261.000
|
$28.000
|
$18.460
|
$23.160
|
$18.540
|
$36.750
|
$38.500
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
539.000
|
$45.000
|
$29.660
|
$37.190
|
$29.780
|
$45.150
|
$47.300
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
173.000
|
$40.000
|
$20.080
|
$25.190
|
$20.170
|
$38.850
|
$40.700
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
423.000
|
$48.500
|
$33.990
|
$42.630
|
$34.130
|
$64.050
|
$67.100
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
354.000
|
$30.000
|
$17.730
|
$22.230
|
$17.800
|
$25.730
|
$26.950
|
|
|
CONDT (RM) (1")
|
LF
|
1,020.000
|
$37.000
|
$24.260
|
$30.420
|
$24.350
|
$47.250
|
$49.500
|
|
|
CONDT (RM) (4")
|
LF
|
10.000
|
$56.490
|
$69.780
|
$87.490
|
$70.060
|
$210.000
|
$220.000
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
417.000
|
$1.570
|
$1.280
|
$1.600
|
$1.280
|
$1.470
|
$1.540
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
994.000
|
$2.500
|
$1.250
|
$1.570
|
$1.250
|
$1.630
|
$1.710
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
13,212.000
|
$2.500
|
$1.550
|
$1.960
|
$1.560
|
$2.310
|
$2.420
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
28,212.000
|
$3.250
|
$1.800
|
$2.260
|
$1.810
|
$2.360
|
$2.480
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,289.000
|
$5.000
|
$1.630
|
$2.040
|
$1.640
|
$3.150
|
$3.300
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
1,062.000
|
$3.000
|
$2.150
|
$2.710
|
$2.160
|
$3.310
|
$3.470
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
57.000
|
$4.000
|
$2.060
|
$2.580
|
$2.070
|
$3.890
|
$4.070
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
23.000
|
$1,481.250
|
$1,636.030
|
$2,052.400
|
$1,642.720
|
$1,811.250
|
$1,897.500
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
7.000
|
$1,500.000
|
$1,919.780
|
$2,407.220
|
$1,927.630
|
$1,890.000
|
$1,980.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)GC(U)
|
EA
|
2.000
|
$6,700.000
|
$5,798.760
|
$7,270.550
|
$5,822.470
|
$10,683.750
|
$11,192.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$875.000
|
$615.000
|
$771.060
|
$690.000
|
$682.500
|
$759.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
8.000
|
$925.000
|
$710.000
|
$890.170
|
$845.000
|
$913.500
|
$929.500
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$1,200.000
|
$885.000
|
$1,109.580
|
$1,150.000
|
$1,438.500
|
$1,265.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,300.000
|
$1,105.000
|
$1,385.400
|
$1,170.000
|
$1,512.000
|
$1,287.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$900.000
|
$545.000
|
$683.300
|
$1,075.000
|
$840.000
|
$1,182.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
4.000
|
$65.000
|
$45.000
|
$32.910
|
$35.000
|
$29.400
|
$250.000
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
1,090.000
|
$1.750
|
$0.810
|
$1.570
|
$0.810
|
$3.150
|
$0.890
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
46.000
|
$13.540
|
$4.650
|
$11.280
|
$4.650
|
$15.750
|
$5.120
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
8.000
|
$190.830
|
$87.000
|
$195.590
|
$87.000
|
$210.000
|
$95.700
|
|
|
WK ZN PAV MRK REMOV (W)(TPL ARROW)
|
EA
|
2.000
|
$275.000
|
$130.000
|
$470.160
|
$130.000
|
$630.000
|
$143.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
2.000
|
$250.000
|
$95.000
|
$219.940
|
$95.000
|
$246.750
|
$104.500
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
1,531.000
|
$1.750
|
$0.770
|
$1.360
|
$0.770
|
$2.100
|
$0.850
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
9.000
|
$3.500
|
$5.000
|
$1.410
|
$1.810
|
$16.330
|
$50.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
14.000
|
$2.500
|
$5.000
|
$1.500
|
$1.140
|
$20.430
|
$50.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
87.000
|
$1.800
|
$2.150
|
$1.880
|
$2.150
|
$4.200
|
$2.370
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,123.000
|
$2.100
|
$1.500
|
$1.220
|
$1.500
|
$1.580
|
$1.650
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
444.000
|
$12.000
|
$5.250
|
$8.690
|
$5.250
|
$13.650
|
$5.780
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
30.000
|
$192.000
|
$85.000
|
$181.480
|
$85.000
|
$210.000
|
$93.500
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
2.000
|
$250.000
|
$175.000
|
$188.060
|
$175.000
|
$378.000
|
$192.500
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
28.000
|
$208.000
|
$95.000
|
$208.730
|
$95.000
|
$309.750
|
$104.500
|
|
|
PAVEMENT SEALER 6"
|
LF
|
5,125.000
|
$0.700
|
$0.400
|
$0.320
|
$0.400
|
$0.420
|
$0.440
|
|
|
PAVEMENT SEALER 8"
|
LF
|
3,480.000
|
$0.460
|
$0.400
|
$0.420
|
$0.400
|
$1.050
|
$0.440
|
|
|
PAVEMENT SEALER 24"
|
LF
|
451.000
|
$2.670
|
$0.400
|
$1.880
|
$0.400
|
$3.680
|
$0.440
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
28.000
|
$34.510
|
$9.000
|
$32.910
|
$9.000
|
$68.250
|
$9.900
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
24.000
|
$45.000
|
$10.000
|
$41.840
|
$10.000
|
$89.250
|
$11.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
2.000
|
$17.000
|
$32.000
|
$32.910
|
$32.000
|
$78.750
|
$35.200
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
1,565.000
|
$1.100
|
$1.050
|
$0.740
|
$1.050
|
$2.100
|
$1.160
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
2,852.000
|
$1.100
|
$1.050
|
$0.710
|
$1.050
|
$1.840
|
$1.160
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
2,490.000
|
$0.650
|
$1.050
|
$0.720
|
$1.050
|
$1.840
|
$1.160
|
|
REFL PAV MRKR TY I-C
|
EA
|
187.000
|
$4.500
|
$5.000
|
$4.700
|
$5.000
|
$7.350
|
$5.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,104.000
|
$1.000
|
$0.350
|
$0.570
|
$0.350
|
$1.050
|
$0.390
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
900.000
|
$1.500
|
$0.350
|
$0.940
|
$0.350
|
$2.100
|
$0.390
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
256.000
|
$2.000
|
$0.400
|
$1.880
|
$0.400
|
$3.150
|
$0.440
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
69.000
|
$4.000
|
$0.550
|
$3.480
|
$0.550
|
$6.300
|
$0.610
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$42.000
|
$25.000
|
$66.760
|
$25.000
|
$89.250
|
$27.500
|
|
|
ELIM EXT PAV MRK & MRKS (TPL ARROW)
|
EA
|
2.000
|
$75.000
|
$27.000
|
$100.720
|
$27.000
|
$110.250
|
$29.700
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$60.000
|
$25.000
|
$67.700
|
$25.000
|
$99.750
|
$27.500
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
4,328.000
|
$0.500
|
$0.180
|
$0.150
|
$0.180
|
$0.530
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,073.000
|
$0.500
|
$0.180
|
$0.190
|
$0.180
|
$1.050
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
140.000
|
$1.500
|
$0.220
|
$0.950
|
$0.220
|
$3.150
|
$0.240
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
20.000
|
$15.000
|
$12.000
|
$21.580
|
$12.000
|
$63.000
|
$13.200
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
20.000
|
$25.000
|
$15.000
|
$23.510
|
$15.000
|
$84.000
|
$16.500
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$6,500.000
|
$3,901.970
|
$4,892.170
|
$3,917.920
|
$16,275.000
|
$17,050.000
|
|
|
INSTALL HWY TRF SIG (UPGRADE)
|
EA
|
1.000
|
$6,500.000
|
$11,704.110
|
$14,675.260
|
$11,751.970
|
$37,905.000
|
$39,710.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
7.000
|
$325.000
|
$342.550
|
$435.050
|
$343.950
|
$441.000
|
$462.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
2.000
|
$325.000
|
$346.300
|
$435.050
|
$347.720
|
$441.000
|
$462.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
7.000
|
$325.000
|
$342.550
|
$435.050
|
$343.950
|
$441.000
|
$462.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
$325.000
|
$346.300
|
$435.050
|
$347.710
|
$441.000
|
$462.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
7.000
|
$325.000
|
$342.550
|
$435.050
|
$343.950
|
$441.000
|
$462.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
4.000
|
$325.000
|
$347.550
|
$435.050
|
$348.970
|
$441.000
|
$462.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
9.000
|
$1,137.000
|
$773.870
|
$970.410
|
$777.030
|
$1,102.500
|
$1,155.000
|
|
|
BACKPLATE W/REF BRDR(3 SEC)(VENT)ALUM
|
EA
|
7.000
|
$200.000
|
$275.950
|
$346.040
|
$277.080
|
$262.500
|
$275.000
|
|
|
BACKPLATE W/REF BRDR(5 SEC)(VENT)ALUM
|
EA
|
2.000
|
$250.000
|
$298.800
|
$374.870
|
$300.020
|
$336.000
|
$352.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
|
LF
|
5,301.000
|
$3.000
|
$1.660
|
$2.080
|
$1.670
|
$3.360
|
$3.520
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
3,650.000
|
$3.000
|
$2.200
|
$2.750
|
$2.210
|
$4.200
|
$4.400
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
145.000
|
$5.000
|
$3.130
|
$3.920
|
$3.140
|
$4.830
|
$5.060
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
988.000
|
$5.000
|
$3.700
|
$4.640
|
$3.720
|
$5.150
|
$5.390
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
2,478.000
|
$6.640
|
$5.140
|
$6.440
|
$5.160
|
$7.460
|
$7.810
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
2.000
|
$36,000.000
|
$32,448.940
|
$40,683.260
|
$32,581.620
|
$47,250.000
|
$49,500.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
7.000
|
$3,200.000
|
$1,616.470
|
$2,027.330
|
$1,623.080
|
$4,042.500
|
$4,235.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
9.000
|
$1,100.000
|
$876.970
|
$1,099.550
|
$880.550
|
$1,260.000
|
$1,320.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$3,000.000
|
$500.000
|
$3,855.310
|
$3,700.000
|
$2,500.000
|
$3,300.000
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$1,500.000
|
$500.000
|
$1,858.070
|
$1,000.000
|
$3,500.000
|
$2,200.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
|
LF
|
714.000
|
$50.000
|
$50.000
|
$31.100
|
$42.000
|
$44.100
|
$43.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
143.000
|
$230.850
|
$70.000
|
$65.820
|
$115.000
|
$120.750
|
$115.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
90.000
|
$657.620
|
$350.000
|
$102.260
|
$920.000
|
$966.000
|
$920.000
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
260.000
|
$489.160
|
$350.000
|
$558.460
|
$1,050.000
|
$1,102.500
|
$1,050.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
886.300
|
$140.000
|
$159.250
|
$188.060
|
$159.250
|
$175.000
|
$175.180
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
144.000
|
$170.000
|
$184.150
|
$288.360
|
$184.150
|
$200.000
|
$202.570
|
|
|
TACK COAT
|
GAL
|
229.000
|
$5.000
|
$8.500
|
$6.270
|
$8.500
|
$10.000
|
$9.350
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
25.000
|
$3,306.160
|
$7,500.000
|
$6,413.910
|
$9,250.010
|
$9,712.500
|
$9,250.000
|
|
|
POLYESTER POLYMER CONC OVERLAY (3/4")
|
SY
|
5,805.000
|
$127.610
|
$145.000
|
$129.070
|
$104.000
|
$109.200
|
$104.000
|
|
|
SPECIAL SURFACE FILLER
|
GAL
|
12.000
|
$361.560
|
$1,200.000
|
$3,620.230
|
$1,350.000
|
$630.000
|
$1,350.000
|
|
|
SPECIAL PROTECTIOVE COAT
|
SY
|
99.000
|
$22.830
|
$125.000
|
$37.610
|
$160.000
|
$315.000
|
$160.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$15,000.000
|
$15,000.000
|
$22,442.300
|
$15,000.000
|
$15,750.000
|
$22,200.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
955.000
|
$5.650
|
$4.590
|
$5.750
|
$4.610
|
$7.880
|
$8.250
|
|
|
GROUND BOX (PREPARE)
|
EA
|
7.000
|
$550.000
|
$336.860
|
$422.520
|
$338.230
|
$819.000
|
$858.000
|
|
|
TMA (STATIONARY)
|
DAY
|
48.000
|
$169.500
|
$750.000
|
$188.060
|
$250.000
|
$420.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
48.000
|
$550.000
|
$750.000
|
$185.710
|
$500.000
|
$1,050.000
|
$300.000
|
|
|
VIVDS CAM ASSY FXD LNS
|
EA
|
4.000
|
$3,000.000
|
$2,217.630
|
$2,780.840
|
$2,226.700
|
$3,983.630
|
$4,179.620
|
|
|
VIVDS CABLING
|
LF
|
2,723.000
|
$3.000
|
$1.950
|
$2.460
|
$1.960
|
$5.040
|
$5.280
|
|
Totals: |
$7,255,093.240
|
$7,861,879.455
|
$8,527,915.860
|
$8,544,984.795
|
$8,577,447.800
|
$8,856,074.674
|