Show Job Controls
Bid Cobra

DALLAS IH 20 (2374-04-086)

Items: 74

County: DALLAS
Length: N/A
Highway: IH 20
District: DALLAS
Control Number: 2374-04-086
DBE Goal: 0.0%
Project: C 2374-4-86
Guaranty: N/A
Time: 345 WORKING DAYS
Engineer's Estimate: $19,910,269.75
Date: 05/02/2024 (2 years ago) Changed
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$19,910,269.75
$18,745,268.24
Over/Under Est: -5.85% -$1,165,001.51
$19,889,485.75
Over/Under Est: -0.1% -$20,784.00
Amt Left: 6.1% $1,144,217.51
Over/Under Est: 0.3% $58,863.06
Amt Left: 6.53% $1,223,864.57
Delta: -0.40% -$79,647.06
Subcontractor Percentage Amount
JR WEST TEXAS CONCRETE LLC 12.26% $2,312,399.29
GIBSON & ASSOCIATES, INC. 6.46% $1,218,442.04
IBCTX, LLC 3.27% $616,765.55
LINEAR TRAFFIC MARKINGS LLC 1.83% $345,162.37
ACT SAW CUTTING & REMOVAL 1.71% $322,528.78
FORTSON CONTRACTING, INC. 1.42% $267,830.91
STRAIGHT LINE SAWING & SEALING, INC. 0.96% $181,068.79
TEXAS TRAFFIC AND BARRICADE, LLC 0.28% $52,811.73
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.21% $39,608.80
WEST TEXAS ROCK RESOURCES, LLC 0.12% $22,633.60
WOLFE CONSTRUCTION GROUP, INCORPORATED 0.04% $7,544.53
Total: 28.56% $5,386,796.39

Bid Items & Bid Tabulations

74 Total 0 of 74
DALLAS  |  IH 20  |  DALLAS  |  2374-04-086  |  05/02/2024  |  $19,910,269.75  |  C 2374-4-86  |  REHAB EXIST ROADWAY  |  345 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOUTSCO PAVING COMPANY, LLC
FNH CONSTRUCTION, LLC
TEXAS MATERIALS GROUP, INC.
REMOVING CONC (RIPRAP)
SY 31.000 $150.000 $14.000 $100.000 $26.000
REMOVING CONCRETE(MOW STRIP)
LF 1,738.000 $10.000 $16.000 $50.000 $8.000
COMPOST MANUF TOPSOIL (4")
SY 5,156.000 $5.000 $2.000 $8.000 $4.280
BLOCK SODDING
SY 5,156.000 $8.000 $5.000 $8.000 $9.320
VEGETATIVE WATERING
MG 767.000 $10.000 $1.000 $1.000 $36.060
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 1,503.000 $135.000 $95.000 $110.000 $150.000
PLANE ASPH CONC PAV(0" TO 1")
SY 30,501.000 $1.750 $1.500 $2.000 $1.690
PLANE ASPH CONC PAV (0" TO 3/4")
SY 880,268.000 $2.000 $1.050 $2.000 $1.690
FULL - DEPTH REPAIR CRCP (10")
SY 200.000 $350.000 $500.000 $550.000 $625.000
FLOWABLE BACKFILL
CY 16.000 $550.000 $950.000 $350.000 $1,000.000
CONC STR REPAIR(CLEAN & COAT WTH EPOXY)
SF 63.000 $250.000 $160.000 $200.000 $175.000
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 384.000 $75.000 $120.000 $200.000 $135.000
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 73.000 $125.000 $210.000 $250.000 $235.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 622.000 $200.000 $185.000 $200.000 $210.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 2.000 $1,000.000 $1,200.000 $1,000.000 $1,350.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 11.000 $800.000 $350.000 $185.000 $400.000
RIPRAP (MOW STRIP)(4 IN)
CY 371.000 $600.000 $650.000 $500.000 $665.000
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 6,850.000 $35.000 $34.000 $55.000 $47.000
CLEANING AND SEALING JOINTS (FOAM)
LF 4,516.000 $75.000 $70.000 $80.000 $70.000
RETROFIT RAIL (TY SSTR)
LF 11,002.000 $155.000 $175.000 $200.000 $180.000
CLEAN EXIST CULVERTS
EA 1.000 $95,000.000 $4,500.000 $100,000.000 $5,000.000
REMOVE STR (CONC)
EA 1.000 $4,000.000 $35,000.000 $8,500.000 $7,500.000
MOBILIZATION
LS 1.000 $1,705,592.700 $1,500,000.000 $1,900,000.000 $1,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $44,000.000 $50,000.000 $35,000.000 $10,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 3,000.000 $4.000 $1.000 $4.000 $9.310
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,000.000 $1.500 $0.100 $2.000 $1.860
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 3,000.000 $6.500 $1.000 $18.000 $8.570
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,000.000 $1.500 $0.100 $9.000 $1.860
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 4,470.000 $50.000 $36.000 $85.000 $36.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 11,640.000 $35.000 $24.000 $20.000 $25.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 4,470.000 $20.000 $14.000 $20.000 $15.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 229,861.000 $0.200 $0.150 $0.250 $0.300
MTL W-BEAM GD FEN (TIM POST)
LF 4,838.000 $25.000 $22.000 $26.500 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 17.000 $1,850.000 $1,950.000 $1,850.000 $3,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 19.000 $1,850.000 $1,200.000 $1,850.000 $1,400.000
REMOVE METAL BEAM GUARD FENCE
LF 4,537.500 $5.000 $2.500 $5.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 19.000 $250.000 $150.000 $500.000 $175.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 14.000 $350.000 $250.000 $500.000 $300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $3,250.000 $3,000.000 $3,250.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 25.000 $500.000 $250.000 $1,500.000 $300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 19.000 $4,000.000 $2,000.000 $5,000.000 $2,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $2,000.000 $1,500.000 $2,500.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $15,000.000 $10,000.000 $30,000.000 $12,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 70.000 $25.000 $20.000 $100.000 $20.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 70.000 $25.000 $20.000 $100.000 $20.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 175.000 $50.000 $25.000 $100.000 $25.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 87,650.000 $0.400 $0.340 $0.850 $0.550
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 113,433.000 $0.400 $0.300 $0.850 $0.450
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 112,983.000 $0.400 $0.300 $0.850 $0.450
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 25,536.000 $1.200 $1.000 $2.000 $0.820
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 2,092.000 $3.000 $2.250 $5.000 $2.640
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,052.000 $3.100 $2.200 $5.000 $4.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 11.000 $150.000 $150.000 $250.000 $200.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 11.000 $165.000 $160.000 $250.000 $250.000
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
EA 18.000 $1,000.000 $800.000 $100.000 $900.000
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
EA 21.000 $1,650.000 $1,200.000 $1,650.000 $1,600.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 87,620.000 $0.800 $0.590 $0.900 $0.700
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 113,393.000 $0.800 $0.560 $0.900 $0.630
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 112,943.000 $0.800 $0.560 $0.900 $0.630
REFL PAV MRKR TY II-C-R
EA 4,506.000 $4.000 $3.880 $4.000 $6.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 1,750.000 $20.000 $12.000 $25.000 $13.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 33.000 $1,700.000 $1,400.000 $2,000.000 $1,750.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 761.000 $50.000 $41.000 $60.000 $50.000
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 1,910.000 $60.000 $35.000 $60.000 $40.000
BRIDGE JOINT REPAIR (ARMOR)
LF 430.000 $750.000 $710.000 $1,000.000 $840.000
BRIDGE JOINT REPAIR (PARTIAL DEPTH)
LF 3.000 $75.000 $750.000 $2,000.000 $850.000
CONCRETE BEAM REPAIR (CFRP)
EA 1.000 $5,000.000 $150,000.000 $35,000.000 $23,000.000
TBWC (MEMBRANE)
GAL 200,369.000 $4.000 $1.000 $5.000 $4.000
TBWC PG76-22 SAC-A TY C
TON 37,989.000 $225.000 $250.000 $182.500 $225.000
REPLACE ELASTOMERIC BEARING PADS
EA 11.000 $17,500.000 $15,000.000 $20,000.000 $18,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $16,500.000 $50,000.000 $16,500.000 $21,000.000
TMA (STATIONARY)
DAY 690.000 $225.000 $1.000 $250.000 $1,800.000
TMA (MOBILE OPERATION)
DAY 345.000 $400.000 $1.000 $550.000 $350.000
REML & DISPL DRIFTWOOD & DEBRIS
LS 1.000 $40,000.000 $50,000.000 $35,000.000 $15,000.000
Totals: $19,910,269.750 $18,745,268.240 $19,889,485.750 $19,969,132.810