DALLAS IH 20 (2374-03-096)

Items: 48

County: DALLAS
Length: N/A
Highway: IH 20
District: DALLAS
Control Number: 2374-03-096
DBE Goal: N/A
Project: BR 2022(339)
Guaranty: N/A
Time: 209 WORKING DAYS
Engineer's Estimate: $7,800,926.99
Date: 02/04/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$7,800,926.99
$7,163,236.67
Over/Under Est: -8.17% -$637,690.32
Over/Under Est: 25.03% $1,952,396.61
Amt Left: 36.16% $2,590,086.93
$9,787,042.00
Over/Under Est: 25.46% $1,986,115.01
Amt Left: 36.63% $2,623,805.33
Delta: -0.35% -$33,718.40
$10,547,598.00
Over/Under Est: 35.21% $2,746,671.01
Amt Left: 47.25% $3,384,361.33
Delta: -7.77% -$760,556.00
$11,904,955.79
Over/Under Est: 52.61% $4,104,028.80
Amt Left: 66.2% $4,741,719.12
Delta: -12.87% -$1,357,357.79

Bid Items & Bid Tabulations

48 Total 0 of 48
DALLAS  |  IH 20  |  DALLAS  |  2374-03-096  |  02/04/2022  |  $7,800,926.99  |  BR 2022(339)  |  BRIDGE MAINT  |  209 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GIBSON & ASSOCIATES, INC.
SILVER CREEK CONSTRUCTION, INC.
FNH CONSTRUCTION, LLC
IBCTX, LLC
ALTUS CONSTRUCTION LLC
PAV JT UNDERSEAL (24")
LF 917.000 $20.000 $76.000 $20.000 $65.000 $50.000 $88.660
FULL-DPTH REP(BR APPROACH SLAB)(9"-13")
SY 38.000 $675.000 $800.000 $1,000.000 $1,000.000 $1,800.000 $1,626.680
FLOWABLE BACKFILL
CY 23.000 $160.000 $500.000 $1,000.000 $350.000 $450.000 $630.690
PENETRATING CONCRETE SURFACE TREATMENT
SY 14,516.000 $12.000 $7.010 $10.000 $10.000 $5.000 $11.990
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
SF 6,058.000 $115.000 $5.000 $75.000 $250.000 $18.000 $184.440
CONC STR REPR(RAPID DECK REP(FULL DPT))
SF 159.000 $210.000 $197.000 $175.000 $500.000 $270.000 $553.230
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 1,181.000 $170.000 $149.000 $175.000 $300.000 $200.000 $317.030
RIPRAP (MOW STRIP)(4 IN)
CY 384.000 $450.000 $748.000 $450.000 $500.000 $560.000 $623.970
CLEANING AND SEALING EXIST JOINTS(CL3)
LF 917.000 $15.000 $20.000 $30.000 $50.000 $17.000 $64.480
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 3,056.000 $38.000 $42.000 $30.000 $65.000 $43.000 $80.600
CONCRETE OVERLAY (2.5 IN)
SY 11,217.000 $95.000 $68.000 $109.000 $80.000 $65.000 $54.980
MULTI-LAYER POLYMER OVERLAY
SY 38.000 $47.000 $100.000 $350.000 $500.000 $180.000 $711.330
RETROFIT RAIL (TY SSTR)
LF 18,522.000 $154.500 $158.500 $200.000 $150.000 $225.000 $223.610
MILLING CONCRETE SLAB (1 IN)
SY 11,217.000 $7.000 $3.510 $10.000 $62.000 $15.000 $6.740
HYDRO-DEMOLITION (1 1/2 IN)
SY 11,217.000 $70.000 $61.200 $85.800 $65.000 $90.000 $136.120
MOBILIZATION
LS 1.000 $713,950.490 $594,300.000 $975,000.000 $900,000.000 $1,054,000.000 $1,178,839.230
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $15,000.000 $42,750.000 $50,000.000 $8,500.000 $150,000.000 $60,453.290
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 980.000 $3.200 $6.600 $5.000 $30.000 $8.000 $8.240
BIODEG EROSN CONT LOGS (REMOVE)
LF 980.000 $0.750 $1.100 $2.000 $15.000 $3.000 $1.990
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 1,500.000 $35.000 $27.500 $70.000 $85.000 $75.000 $115.120
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 2,010.000 $10.000 $17.000 $40.000 $20.000 $50.000 $8.750
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 1,500.000 $10.000 $15.000 $12.000 $20.000 $25.000 $14.390
PERM CTB (TRAN SSCB TO SSTR) (MOD)
LF 140.000 $120.000 $352.000 $500.000 $250.000 $300.000 $201.510
MTL W-BEAM GD FEN (TIM POST)
LF 7,064.000 $22.000 $22.550 $26.000 $25.000 $31.000 $40.840
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 39.000 $1,700.000 $1,870.000 $2,000.000 $1,850.000 $2,400.000 $2,562.050
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 18.000 $1,200.000 $1,265.000 $1,500.000 $1,850.000 $1,500.000 $2,634.030
REMOVE METAL BEAM GUARD FENCE
LF 8,670.000 $2.400 $1.650 $2.000 $3.000 $3.000 $2.680
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 17.000 $190.000 $137.500 $250.000 $500.000 $220.000 $359.060
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $230.000 $165.000 $250.000 $500.000 $220.000 $440.180
GUARDRAIL END TREATMENT (INSTALL)
EA 19.000 $2,600.000 $2,997.500 $3,000.000 $3,200.000 $3,500.000 $4,569.710
GUARDRAIL END TREATMENT (REMOVE)
EA 7.000 $250.000 $165.000 $250.000 $1,500.000 $220.000 $1,251.670
CRASH CUSH ATTEN (MOVE & RESET)
EA 8.000 $1,500.000 $874.500 $1,500.000 $5,000.000 $2,000.000 $1,511.330
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $975.000 $550.000 $1,000.000 $2,500.000 $1,500.000 $1,007.550
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $8,000.000 $8,860.500 $12,000.000 $15,000.000 $10,000.000 $4,030.220
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 76.000 $22.000 $20.630 $20.000 $100.000 $28.000 $47.780
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 74.000 $21.000 $20.630 $20.000 $100.000 $28.000 $44.570
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 23.000 $20.450 $24.200 $25.000 $100.000 $38.000 $73.900
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 39.000 $20.000 $24.200 $25.000 $100.000 $38.000 $60.050
PAVEMENT SEALER 4"
LF 24,732.000 $0.150 $0.550 $1.000 $1.000 $1.000 $2.020
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 12,366.000 $0.350 $0.880 $1.000 $1.000 $1.000 $2.020
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 12,366.000 $0.340 $0.880 $1.000 $1.000 $1.000 $2.020
ELIM EXT PAV MRK & MRKS (4")
LF 24,732.000 $0.430 $0.830 $1.000 $1.000 $1.000 $2.020
PAV SURF PREP FOR MRK (4")
LF 24,732.000 $0.100 $0.110 $1.000 $1.000 $0.500 $1.810
JT / CRCK SEAL (HOT - POURED RUBBER)
LF 45.000 $5.530 $100.000 $20.000 $100.000 $55.000 $151.130
BRIDGE JOINT REPAIR (ARMOR)
LF 341.000 $450.000 $510.000 $600.000 $250.000 $350.000 $594.910
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $17,700.000 $20,000.000 $16,500.000 $25,000.000 $10,075.550
TMA (STATIONARY)
DAY 150.000 $148.000 $300.000 $200.000 $250.000 $125.000 $302.270
TMA (MOBILE OPERATION)
HR 8.000 $60.000 $350.000 $100.000 $85.000 $100.000 $251.890
Totals: $7,800,926.990 $7,163,236.670 $9,753,323.600 $9,787,042.000 $10,547,598.000 $11,904,955.790