REMOVING CONC (MISC)
|
SY
|
635.000
|
$20.000
|
$14.980
|
$26.600
|
$30.500
|
|
|
REMOVING STAB BASE AND ASPH PAV (4")
|
SY
|
668.000
|
$10.000
|
$15.590
|
$10.690
|
$10.700
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
64,242.000
|
$111.000
|
$116.250
|
$145.000
|
$154.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
2,719.000
|
$65.000
|
$75.000
|
$70.000
|
$82.500
|
|
|
PLAN ASPH CONC PAV(0" TO 2.25")
|
SY
|
480,672.000
|
$1.150
|
$2.000
|
$1.010
|
$1.750
|
|
|
FULL - DEPTH REPAIR CRCP (8")
|
SY
|
2,585.000
|
$170.000
|
$311.000
|
$330.000
|
$325.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
13.000
|
$488.000
|
$500.000
|
$515.000
|
$350.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
24,173.000
|
$6.000
|
$5.790
|
$4.250
|
$8.100
|
|
|
CONC STR REPAIR(RAPID DECK REP(PRT DPT)
|
SF
|
341.000
|
$145.000
|
$108.000
|
$168.000
|
$115.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
908.000
|
$235.000
|
$178.000
|
$183.000
|
$197.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
668.000
|
$550.000
|
$586.740
|
$565.000
|
$635.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
2,670.000
|
$30.000
|
$35.000
|
$32.000
|
$43.500
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
4,816.000
|
$175.000
|
$200.000
|
$115.000
|
$110.750
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
456.000
|
$380.000
|
$720.000
|
$425.000
|
$412.000
|
|
|
JOINT SEALANT
|
LF
|
1,824.000
|
$15.000
|
$46.000
|
$34.000
|
$31.600
|
|
|
ADJUST STL SHOES
|
EA
|
11.000
|
$6,000.000
|
$3,975.000
|
$5,825.000
|
$4,360.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,204,537.610
|
$1,530,830.000
|
$850,386.000
|
$1,500,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$15,000.000
|
$44,020.000
|
$14,000.000
|
$10,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$2.500
|
$5.350
|
$5.350
|
$5.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$0.560
|
$2.070
|
$2.070
|
$2.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,000.000
|
$3.000
|
$8.750
|
$8.750
|
$8.850
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,000.000
|
$0.900
|
$2.070
|
$2.070
|
$2.100
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
760.000
|
$40.000
|
$20.830
|
$43.000
|
$60.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
3,760.000
|
$4.000
|
$10.500
|
$19.000
|
$51.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
760.000
|
$25.000
|
$16.530
|
$19.000
|
$46.500
|
|
|
PERM CTB (TRAN SSCB TO SSTR) (MOD)
|
LF
|
160.000
|
$200.000
|
$283.230
|
$162.000
|
$487.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
117,952.000
|
$0.130
|
$0.080
|
$0.085
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
9,575.000
|
$23.000
|
$21.500
|
$23.000
|
$22.300
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
21.000
|
$1,800.000
|
$1,750.000
|
$1,862.000
|
$1,925.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
38.000
|
$1,200.000
|
$1,100.000
|
$1,160.000
|
$1,175.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
9,420.000
|
$3.000
|
$1.750
|
$1.850
|
$1.850
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
21.000
|
$220.400
|
$100.000
|
$106.000
|
$108.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
12.000
|
$200.000
|
$50.000
|
$53.000
|
$54.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$290.000
|
$200.000
|
$213.000
|
$215.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
35.000
|
$2,700.000
|
$2,700.000
|
$2,870.000
|
$2,940.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
36.000
|
$320.000
|
$200.000
|
$213.000
|
$218.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
14.000
|
$1,000.000
|
$2,033.390
|
$1,064.000
|
$1,050.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$900.000
|
$677.800
|
$790.000
|
$810.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$25,000.000
|
$31,933.410
|
$37,000.000
|
$37,685.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$8,500.000
|
$8,788.710
|
$8,150.000
|
$8,390.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
28.000
|
$26.000
|
$16.000
|
$17.000
|
$16.500
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
28.000
|
$25.000
|
$16.000
|
$17.000
|
$16.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
231.000
|
$32.000
|
$25.000
|
$26.000
|
$26.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
26,532.000
|
$1.000
|
$0.600
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
393.000
|
$3.600
|
$2.500
|
$1.950
|
$1.950
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
880.000
|
$3.900
|
$2.000
|
$3.800
|
$3.850
|
|
REFL PAV MRK TY I(W)(ENTR GORE)(100MIL)
|
EA
|
14.000
|
$825.000
|
$800.000
|
$935.000
|
$945.000
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
12.000
|
$720.000
|
$1,600.000
|
$1,025.000
|
$1,050.000
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
46,980.000
|
$0.750
|
$0.750
|
$0.660
|
$0.680
|
|
|
PAVEMENT SEALER 4"
|
LF
|
7,448.000
|
$0.250
|
$0.150
|
$0.120
|
$0.120
|
|
|
PAVEMENT SEALER 6"
|
LF
|
5,520.000
|
$0.210
|
$0.150
|
$0.145
|
$0.150
|
|
|
PAVEMENT SEALER 12"
|
LF
|
55.000
|
$0.990
|
$1.000
|
$0.690
|
$0.680
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
62,700.000
|
$0.400
|
$0.370
|
$0.480
|
$0.480
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
46,980.000
|
$0.740
|
$0.480
|
$0.680
|
$0.680
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
62,700.000
|
$0.420
|
$0.370
|
$0.470
|
$0.480
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,476.000
|
$4.340
|
$4.250
|
$3.820
|
$3.950
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,448.000
|
$0.460
|
$0.500
|
$0.360
|
$0.360
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
2,760.000
|
$0.750
|
$0.500
|
$0.360
|
$0.360
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
7,448.000
|
$0.070
|
$0.050
|
$0.011
|
$0.010
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
5,520.000
|
$0.100
|
$0.050
|
$0.021
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
55.000
|
$0.950
|
$0.500
|
$0.280
|
$0.280
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
24,648.000
|
$3.000
|
$4.000
|
$4.040
|
$6.120
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
8.000
|
$500.000
|
$850.000
|
$529.000
|
$945.000
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
150.000
|
$200.000
|
$40.000
|
$63.000
|
$44.250
|
|
|
REP STL BRIDGE MEMBER (WELD REPAIR)
|
LF
|
24.000
|
$250.000
|
$1.000
|
$0.010
|
$1.100
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
214.000
|
$550.000
|
$535.000
|
$505.000
|
$605.000
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
96,134.000
|
$3.000
|
$4.000
|
$3.500
|
$4.600
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$19,485.000
|
$17,500.000
|
$17,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
452.000
|
$250.000
|
$0.100
|
$730.000
|
$155.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
226.000
|
$250.000
|
$0.100
|
$730.000
|
$275.000
|
|
Totals: |
$13,249,913.750
|
$15,308,302.660
|
$15,547,931.078
|
$17,318,380.430
|