PREPARING ROW
|
STA
|
416.000
|
$100,000.000
|
$129,781.820
|
$134,124.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
231,614.000
|
$3.850
|
$12.600
|
$10.400
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
18,325.000
|
$1.000
|
$8.260
|
$7.900
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
1,435.000
|
$4.000
|
$17.040
|
$29.800
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
1,466.000
|
$27.000
|
$29.780
|
$19.500
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
10,201.000
|
$27.000
|
$11.460
|
$15.200
|
|
|
REMOVING CONC (CURB)
|
LF
|
11,367.000
|
$7.250
|
$9.640
|
$4.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
19,072.000
|
$21.000
|
$9.640
|
$16.700
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
781.000
|
$37.500
|
$37.250
|
$24.300
|
|
|
REMOVING CONC (WHEELCHAIR RAMP)
|
SY
|
37.000
|
$38.000
|
$55.810
|
$85.250
|
|
|
REMOVE CONC (RAIL)
|
LF
|
5,819.000
|
$10.500
|
$10.510
|
$19.200
|
|
|
REMOVING CONC (FLUME)
|
SY
|
391.000
|
$17.000
|
$50.630
|
$16.700
|
|
|
REMOVE CONC (MISC)
|
EA
|
3.000
|
$2,500.000
|
$7,290.580
|
$8,370.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
1,256.000
|
$12.500
|
$5.260
|
$8.500
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-14")
|
SY
|
199.000
|
$20.000
|
$16.190
|
$18.500
|
|
|
REMOVE STAB BASE AND ASPH PAV (6"-20")
|
SY
|
35,374.000
|
$8.000
|
$9.780
|
$18.500
|
|
|
REMOVING STAB BASE & ASPH PAV (4"-12")
|
SY
|
38,542.000
|
$12.250
|
$8.070
|
$18.500
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-5")
|
SY
|
45,357.000
|
$1.500
|
$3.690
|
$18.500
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
1,795.000
|
$17.750
|
$13.110
|
$18.500
|
|
|
REMOVE TRT BASE & ASPH PAV (12"-20")
|
SY
|
1,426.000
|
$32.500
|
$13.700
|
$18.500
|
|
|
REMOV STAB BASE & ASPH PAV (18"-38")
|
SY
|
178,990.000
|
$8.000
|
$11.390
|
$35.250
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
607,316.000
|
$15.000
|
$21.700
|
$21.700
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
501,648.000
|
$18.000
|
$13.190
|
$16.900
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
108,320.000
|
$40.000
|
$81.000
|
$111.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C3)
|
CY
|
6,964.000
|
$45.000
|
$88.470
|
$46.750
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
437,989.000
|
$1.000
|
$6.180
|
$2.250
|
|
|
BLOCK SODDING
|
SY
|
437,989.000
|
$4.500
|
$5.150
|
$3.750
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
437,989.000
|
$0.250
|
$1.520
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
130,325.000
|
$20.000
|
$0.180
|
$2.250
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
2,017.000
|
$80.000
|
$200.000
|
$90.500
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(8")
|
SY
|
3,428.000
|
$13.000
|
$21.690
|
$23.600
|
|
|
FL BS (CMP IN PLC)(TY D GR1-2)(12")
|
SY
|
58,125.000
|
$25.000
|
$23.860
|
$20.600
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
31,968.000
|
$325.000
|
$313.940
|
$423.500
|
|
|
LIME TRT (EXST MATL) (6")
|
SY
|
12,362.000
|
$10.000
|
$9.000
|
$9.200
|
|
|
LIME TRT (EXST MATL) (12")
|
SY
|
35,937.000
|
$8.000
|
$6.900
|
$25.600
|
|
|
LIME TRT (EXIST MATL)(24")
|
SY
|
348,601.000
|
$6.000
|
$11.500
|
$25.600
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
23,020.000
|
$5.000
|
$6.840
|
$9.200
|
|
|
LIME TRT (EXST MATL)(21")
|
SY
|
16,518.000
|
$7.000
|
$36.700
|
$25.600
|
|
|
LIME TRT(EXIST MATL)(17")
|
SY
|
106,455.000
|
$5.000
|
$8.640
|
$25.600
|
|
|
CEM TRT(PLNT MX) (CL L)(TYD)(GR1-2)(6")
|
SY
|
297,079.000
|
$18.000
|
$24.330
|
$18.600
|
|
|
PRIME COAT (MC-30)
|
GAL
|
7,465.000
|
$6.000
|
$6.470
|
$7.500
|
|
|
PLANE & TEXT ASPH CONC PAV(2 1/4")
|
SY
|
112,748.000
|
$0.800
|
$2.960
|
$3.150
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
427.000
|
$200.000
|
$118.080
|
$284.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (10")
|
SY
|
18,628.000
|
$105.000
|
$115.650
|
$99.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (12")
|
SY
|
159,588.000
|
$105.000
|
$108.350
|
$98.750
|
|
|
CONC PVMT (CONT REINF - CRCP) (13")
|
SY
|
278,741.000
|
$100.000
|
$114.950
|
$103.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (15")
|
SY
|
16,970.000
|
$130.000
|
$135.760
|
$115.000
|
|
|
CURB (TYPE II)
|
LF
|
369.000
|
$27.000
|
$2.510
|
$15.000
|
|
|
CEM STABIL BKFL
|
CY
|
13,507.000
|
$83.250
|
$161.740
|
$149.000
|
|
|
CUT & RESTORING PAV
|
SY
|
142.000
|
$850.000
|
$500.000
|
$500.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
835.000
|
$300.000
|
$250.000
|
$250.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
71,705.000
|
$12.000
|
$1.000
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
183,612.000
|
$45.000
|
$69.110
|
$38.000
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
12.000
|
$15,000.000
|
$37,719.950
|
$21,170.000
|
|
|
SOIL NAIL ANCHORS
|
LF
|
117,284.000
|
$30.000
|
$43.710
|
$18.300
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
2,052.000
|
$85.000
|
$289.540
|
$103.000
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
1,931.000
|
$140.000
|
$291.970
|
$163.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
10,449.000
|
$270.000
|
$400.560
|
$215.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
5,111.000
|
$300.000
|
$519.380
|
$265.000
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
394.000
|
$861.300
|
$616.720
|
$355.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
35.000
|
$1,052.000
|
$872.300
|
$675.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
5,078.000
|
$838.800
|
$1,116.600
|
$615.000
|
|
|
DRILL SHAFT (72 IN)
|
LF
|
100.000
|
$1,500.000
|
$1,285.630
|
$825.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
42.000
|
$300.000
|
$303.090
|
$298.000
|
|
|
DRILL SHAFT (SIGN MTS) (30 IN)
|
LF
|
328.000
|
$225.000
|
$403.460
|
$396.000
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
26.000
|
$469.000
|
$464.450
|
$453.000
|
|
|
DRILL SHAFT (SIGN MTS) (42 IN)
|
LF
|
12.000
|
$708.200
|
$816.540
|
$801.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
209.000
|
$465.000
|
$777.880
|
$758.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
144.000
|
$571.000
|
$801.800
|
$776.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
30.000
|
$1,200.000
|
$816.850
|
$785.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
10.000
|
$640.000
|
$309.000
|
$301.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
12.000
|
$690.000
|
$817.130
|
$809.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
56.000
|
$633.750
|
$921.460
|
$910.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
88.000
|
$796.670
|
$1,014.380
|
$994.000
|
|
|
DRILL SHAFT (120 IN)
|
LF
|
5,796.000
|
$2,500.000
|
$3,152.740
|
$2,100.000
|
|
|
CL A CONC (FLUME)
|
CY
|
70.000
|
$760.000
|
$633.570
|
$450.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
1,383.300
|
$900.000
|
$1,327.630
|
$1,530.000
|
|
|
CL C CONC (ABUT)(HPC)(EXTEND)
|
CY
|
84.600
|
$3,450.000
|
$2,258.010
|
$2,750.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
542.700
|
$1,900.000
|
$1,744.630
|
$1,950.000
|
|
|
CL C CONC (CAP)(HPC)(MASS)
|
CY
|
4,414.400
|
$800.000
|
$1,655.200
|
$1,410.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
824.600
|
$1,815.550
|
$2,333.400
|
$1,360.000
|
|
|
CL C CONC (COLUMN)(HPC)(MASS)
|
CY
|
7,794.500
|
$500.000
|
$1,545.420
|
$1,310.000
|
|
|
CL C CONC (FOOTING)(HPC)
|
CY
|
10.900
|
$4,000.000
|
$2,194.240
|
$3,310.000
|
|
|
CL C CONC (FOOTING)(MASS)
|
CY
|
2,049.900
|
$750.000
|
$1,273.170
|
$815.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
2,072.000
|
$931.500
|
$481.470
|
$622.000
|
|
|
CL C CONC (MISC)
|
CY
|
104.800
|
$5,305.000
|
$2,629.320
|
$1,780.000
|
|
|
CL K CONC (MISC)
|
CY
|
12.600
|
$3,500.000
|
$2,453.090
|
$3,130.000
|
|
|
CL C CONC (VEH DEFL WALL)
|
CY
|
48.800
|
$2,000.000
|
$1,073.560
|
$1,780.000
|
|
|
CL C CONC (VEH DEFL WALL)(HPC)
|
CY
|
149.100
|
$2,500.000
|
$1,155.860
|
$1,560.000
|
|
|
CL C CONC (CAP)(INVT)(HPC)(MASS)
|
CY
|
341.700
|
$1,000.000
|
$1,850.310
|
$1,930.000
|
|
|
CL F CONC (CAP)(INVT)(HPC)(MASS)
|
CY
|
692.700
|
$1,200.000
|
$2,001.140
|
$1,660.000
|
|
|
CL F CONC (PT CAP)(INVT)(HPC)(MASS)
|
CY
|
494.800
|
$1,400.000
|
$2,165.740
|
$1,980.000
|
|
|
CL C CONC (CAP)(STRDL)(HPC)(MASS)
|
CY
|
59.000
|
$2,500.000
|
$1,290.810
|
$2,840.000
|
|
|
CL F CONC (CAP)(STRDL)(HPC)(MASS)
|
CY
|
712.900
|
$100.000
|
$1,360.530
|
$1,470.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
718,314.000
|
$25.000
|
$28.540
|
$27.800
|
|
|
REINF CONC SLAB (EXTEND SLAB)(HPC)
|
SF
|
13,969.000
|
$55.000
|
$38.380
|
$31.500
|
|
|
BRIDGE MEDIAN (HPC)
|
SF
|
6,199.000
|
$12.000
|
$18.200
|
$15.400
|
|
|
BRIDGE SIDEWALK (HPC)
|
SF
|
2,262.000
|
$22.900
|
$12.430
|
$17.900
|
|
|
APPROACH SLAB (HPC)
|
CY
|
2,628.000
|
$554.000
|
$653.930
|
$624.000
|
|
|
APPROACH SLAB (EXTEND) (HPC)
|
CY
|
173.000
|
$1,120.000
|
$788.360
|
$795.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
253,593.000
|
$80.000
|
$91.500
|
$59.250
|
|
|
RETAINING WALL (SOIL NAIL)(FACIA)
|
SF
|
52,576.000
|
$100.800
|
$105.170
|
$113.000
|
|
|
PRESTR CONC GIRDER (TX34)
|
LF
|
12,087.450
|
$225.000
|
$189.970
|
$178.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
625.170
|
$475.000
|
$195.480
|
$189.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
8,667.680
|
$225.000
|
$210.820
|
$187.000
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
78,796.790
|
$180.000
|
$227.500
|
$198.000
|
|
|
PT FOR CAP
|
EA
|
3.000
|
$30,000.000
|
$80,464.710
|
$52,200.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
3,720.400
|
$550.000
|
$573.960
|
$420.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
211.000
|
$624.850
|
$805.930
|
$452.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
16.000
|
$650.000
|
$445.610
|
$304.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
1,183.000
|
$627.000
|
$231.640
|
$196.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
943.000
|
$750.000
|
$696.530
|
$475.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,097.000
|
$683.500
|
$733.820
|
$475.000
|
|
|
ELASTOMERIC BEARING (EE3)
|
EA
|
8.000
|
$4,061.500
|
$2,208.000
|
$2,400.000
|
|
|
ELASTOMERIC BEARING (EF3)
|
EA
|
8.000
|
$3,000.000
|
$2,207.000
|
$2,400.000
|
|
|
ELASTOMERIC BEARING (F7)
|
EA
|
4.000
|
$6,500.000
|
$5,123.000
|
$5,000.000
|
|
|
ELASTOMERIC BEARING(EE4)
|
EA
|
8.000
|
$3,500.000
|
$2,602.000
|
$2,400.000
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
1,005,043.000
|
$5.000
|
$2.150
|
$2.200
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
2,011.000
|
$105.000
|
$22.160
|
$32.000
|
|
|
RAIL (TY T221)(HPC)
|
LF
|
337.300
|
$200.000
|
$146.300
|
$87.000
|
|
|
RAIL (TY T411)
|
LF
|
243.000
|
$247.500
|
$253.890
|
$911.000
|
|
|
RAIL (TY T551)(HPC)
|
LF
|
239.900
|
$200.000
|
$134.910
|
$107.000
|
|
|
RAIL (TY T552)
|
LF
|
70.000
|
$250.000
|
$411.610
|
$213.000
|
|
|
RAIL (TY T552)(HPC)
|
LF
|
239.900
|
$200.000
|
$139.410
|
$213.000
|
|
|
RAIL (TY SSTR)
|
LF
|
64,708.000
|
$45.000
|
$69.110
|
$62.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
53,209.870
|
$80.000
|
$74.290
|
$62.000
|
|
|
RAIL (TY C221)
|
LF
|
86.000
|
$171.000
|
$313.840
|
$345.000
|
|
|
RAIL (TY C221)(HPC)
|
LF
|
303.300
|
$400.000
|
$206.490
|
$147.000
|
|
|
RAIL (TY C411)
|
LF
|
988.800
|
$225.000
|
$279.840
|
$620.000
|
|
|
RAIL (TY C411)(HPC)
|
LF
|
1,280.900
|
$300.000
|
$306.370
|
$620.000
|
|
|
RAIL (HANDRAIL)(TY E)
|
LF
|
442.000
|
$183.250
|
$163.330
|
$144.000
|
|
|
RAIL (HANDRAIL)(TY F)
|
LF
|
980.000
|
$186.260
|
$225.610
|
$138.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
17,697.000
|
$49.850
|
$77.430
|
$62.000
|
|
|
RAIL (TY C411) (MOD)
|
LF
|
305.600
|
$350.000
|
$340.710
|
$625.000
|
|
|
(PARAPET)
|
LF
|
17.000
|
$300.000
|
$317.540
|
$384.000
|
|
|
RAIL (TY SSTR)(MOD2)
|
LF
|
504.000
|
$200.000
|
$210.870
|
$92.500
|
|
|
RAIL (TY PR11)
|
LF
|
990.000
|
$98.900
|
$115.470
|
$100.000
|
|
|
RAIL (TY T80PP)
|
LF
|
5,453.000
|
$80.000
|
$137.390
|
$149.000
|
|
|
RAIL (TY T80PP-TS)
|
LF
|
1,251.000
|
$378.900
|
$631.860
|
$498.000
|
|
|
RAIL (TRAN SSTR TO T80PP)
|
LF
|
210.000
|
$300.000
|
$344.340
|
$312.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
206.000
|
$150.000
|
$142.600
|
$173.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
2,135.000
|
$120.000
|
$248.110
|
$262.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
2,381.000
|
$120.000
|
$282.900
|
$262.000
|
|
|
TYPE A JOINT
|
LF
|
100.000
|
$400.000
|
$32.300
|
$73.750
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
3,265.000
|
$255.750
|
$375.000
|
$401.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
126.000
|
$593.750
|
$400.000
|
$423.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
561.000
|
$558.800
|
$425.000
|
$451.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
566.000
|
$547.000
|
$450.000
|
$484.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
159.000
|
$476.500
|
$475.000
|
$513.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)
|
LF
|
1,194.000
|
$750.000
|
$500.000
|
$536.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
16.000
|
$681.000
|
$525.000
|
$998.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
361.000
|
$494.950
|
$575.000
|
$613.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
214.000
|
$1,000.000
|
$600.000
|
$628.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
1,116.000
|
$816.000
|
$650.000
|
$680.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
290.000
|
$1,200.000
|
$700.000
|
$761.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)
|
LF
|
23.000
|
$2,000.000
|
$800.000
|
$905.000
|
|
|
CONC BOX CULV (12 FT X 4 FT)
|
LF
|
177.000
|
$1,800.000
|
$1,000.000
|
$1,070.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
|
LF
|
7.000
|
$1,800.000
|
$1,000.000
|
$1,110.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
306.000
|
$3,200.000
|
$700.000
|
$736.000
|
|
|
CONC BOX CULV (8 FT X 7 FT)(EXTEND)
|
LF
|
195.000
|
$561.000
|
$800.000
|
$847.000
|
|
|
CONC BOX CULV (10 FT X 9 FT)(EXTEND)
|
LF
|
90.000
|
$1,900.000
|
$1,100.000
|
$1,160.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,582.000
|
$102.500
|
$105.000
|
$110.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
43,030.000
|
$125.000
|
$115.000
|
$124.000
|
|
|
RC PIPE (CL III)(27 IN)
|
LF
|
195.000
|
$400.000
|
$125.000
|
$154.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
8,223.000
|
$160.000
|
$140.000
|
$149.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
10,990.000
|
$130.000
|
$170.000
|
$192.000
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
1,642.000
|
$262.000
|
$225.000
|
$252.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
4,263.000
|
$208.750
|
$275.000
|
$296.000
|
|
|
RC PIPE (CL III)(54 IN)
|
LF
|
349.000
|
$488.330
|
$325.000
|
$381.000
|
|
|
RC PIPE (CL III)(60 IN)
|
LF
|
983.000
|
$352.000
|
$375.000
|
$431.000
|
|
|
RC PIPE (CL III)(72 IN)
|
LF
|
1,263.000
|
$600.000
|
$500.000
|
$538.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
568.000
|
$75.000
|
$120.000
|
$126.000
|
|
|
RC PIPE (CL IV)(24 IN)
|
LF
|
907.000
|
$97.590
|
$150.000
|
$159.000
|
|
|
RC PIPE (CL V)(18 IN)
|
LF
|
2,422.000
|
$100.000
|
$125.000
|
$134.000
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
3,196.000
|
$105.000
|
$155.000
|
$178.000
|
|
|
RC PIPE (CL V)(36 IN)
|
LF
|
71.000
|
$600.000
|
$250.000
|
$267.000
|
|
|
RC PIPE (CL V)(48 IN)
|
LF
|
76.000
|
$750.000
|
$400.000
|
$424.000
|
|
|
RC PIPE (CL V)(30 IN)
|
LF
|
736.000
|
$178.500
|
$175.000
|
$183.000
|
|
|
RC PIPE (CL V)(54 IN)
|
LF
|
30.000
|
$1,000.000
|
$460.000
|
$500.000
|
|
|
RC PIPE (CL V)(33 IN)
|
LF
|
94.000
|
$750.000
|
$225.000
|
$238.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
3.000
|
$7,040.800
|
$9,500.000
|
$11,000.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
1.000
|
$12,500.000
|
$10,000.000
|
$10,000.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
3.000
|
$10,000.000
|
$12,500.000
|
$14,000.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
62.000
|
$5,500.000
|
$6,000.000
|
$6,000.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
26.000
|
$9,118.900
|
$8,000.000
|
$8,000.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX5FT)
|
EA
|
1.000
|
$8,000.000
|
$7,000.000
|
$7,000.000
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
7.000
|
$11,218.250
|
$10,000.000
|
$10,000.000
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
3.000
|
$15,000.000
|
$11,000.000
|
$11,000.000
|
|
|
JCTBOX(COMPL)(PJB)(8FTX8FT)
|
EA
|
10.000
|
$15,342.700
|
$25,000.000
|
$25,000.000
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
3.000
|
$4,532.300
|
$6,000.000
|
$7,500.000
|
|
|
INLET (COMPL)(PCO)(3FT)(BOTH)
|
EA
|
3.000
|
$9,178.500
|
$7,000.000
|
$8,500.000
|
|
|
INLET (COMPL)(PCU)(3FT)(NONE)
|
EA
|
9.000
|
$11,250.000
|
$6,000.000
|
$7,500.000
|
|
|
INLET (COMPL)(PCU)(3FT)(LEFT)
|
EA
|
25.000
|
$11,000.000
|
$7,000.000
|
$8,500.000
|
|
|
INLET (COMPL)(PCU)(3FT)(RIGHT)
|
EA
|
20.000
|
$11,000.000
|
$7,000.000
|
$8,500.000
|
|
|
INLET (COMPL)(PCU)(3FT)(BOTH)
|
EA
|
97.000
|
$10,500.000
|
$8,000.000
|
$9,500.000
|
|
|
INLET (COMPL)(PCU)(4FT)(NONE)
|
EA
|
3.000
|
$15,000.000
|
$7,000.000
|
$8,500.000
|
|
|
INLET (COMPL)(PCU)(4FT)(LEFT)
|
EA
|
2.000
|
$15,000.000
|
$7,500.000
|
$9,000.000
|
|
|
INLET (COMPL)(PCU)(4FT)(RIGHT)
|
EA
|
5.000
|
$14,500.000
|
$7,500.000
|
$9,000.000
|
|
|
INLET (COMPL)(PCU)(4FT)(BOTH)
|
EA
|
5.000
|
$16,500.000
|
$8,000.000
|
$9,500.000
|
|
|
INLET (COMPL)(PCU)(5FT)(NONE)
|
EA
|
2.000
|
$7,000.000
|
$11,000.000
|
$12,500.000
|
|
|
INLET (COMPL)(PCU)(5FT)(LEFT)
|
EA
|
2.000
|
$22,500.000
|
$12,000.000
|
$13,500.000
|
|
|
INLET (COMPL)(PCU)(5FT)(RIGHT)
|
EA
|
2.000
|
$22,500.000
|
$12,000.000
|
$13,500.000
|
|
|
INLET (COMPL)(PCU)(5FT)(BOTH)
|
EA
|
1.000
|
$22,500.000
|
$12,000.000
|
$13,500.000
|
|
|
INLET (COMPL)(PCU)(6FT)(LEFT)
|
EA
|
1.000
|
$24,476.100
|
$12,000.000
|
$13,500.000
|
|
|
INLET (COMPL)(PCU)(6FT)(RIGHT)
|
EA
|
1.000
|
$23,456.000
|
$12,000.000
|
$13,500.000
|
|
|
INLET (COMPL)(PCU)(6FT)(BOTH)
|
EA
|
1.000
|
$26,515.000
|
$12,000.000
|
$13,500.000
|
|
|
INLET (COMPL)(POD)(FG)(3FTX3FT)
|
EA
|
3.000
|
$6,362.650
|
$4,000.000
|
$5,500.000
|
|
|
INLET (COMPL)(POD)(SFG)(4FTX4FT)
|
EA
|
1.000
|
$12,500.000
|
$5,000.000
|
$6,500.000
|
|
|
INLET (COMPL)(POD)(SFG)(3FTX5FT)
|
EA
|
57.000
|
$6,000.000
|
$5,000.000
|
$6,500.000
|
|
|
INLET (COMPL)(PSL)(RC)(4FTX4FT)
|
EA
|
13.000
|
$7,138.000
|
$7,000.000
|
$8,500.000
|
|
|
INLET (COMPL)(PSL)(RC)(5FTX5FT)
|
EA
|
7.000
|
$12,500.000
|
$10,000.000
|
$11,500.000
|
|
|
INLET (COMPL)(PSL)(RC)(6FTX6FT)
|
EA
|
3.000
|
$15,696.000
|
$14,000.000
|
$15,500.000
|
|
|
INLET (COMPL)(PSL)(RC)(8FTX8FT)
|
EA
|
3.000
|
$26,500.000
|
$25,000.000
|
$26,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
6.000
|
$9,165.000
|
$6,000.000
|
$7,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
15.000
|
$6,370.000
|
$8,317.590
|
$9,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
42.000
|
$7,125.750
|
$8,000.000
|
$9,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX3FT)
|
EA
|
17.000
|
$6,764.000
|
$6,000.000
|
$7,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX5FT)
|
EA
|
10.000
|
$5,528.000
|
$8,000.000
|
$9,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX5FT-3FTX5FT)
|
EA
|
5.000
|
$9,650.000
|
$8,500.000
|
$10,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX5FT-3FTX5FT)
|
EA
|
11.000
|
$8,619.000
|
$11,000.000
|
$12,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(6FTX6FT-4FTX4FT)
|
EA
|
1.000
|
$14,111.000
|
$11,500.000
|
$13,000.000
|
|
|
INLET (COMPL)(PSL)(FG)(6FTX6FT-3FTX5FT)
|
EA
|
5.000
|
$12,000.000
|
$12,000.000
|
$13,500.000
|
|
|
INLET (COMPL)(PSL)(FG)(8FTX8FT-3FTX3FT)
|
EA
|
1.000
|
$20,868.000
|
$17,000.000
|
$18,500.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
16.000
|
$6,052.500
|
$5,000.000
|
$6,500.000
|
|
|
INLET(COMPL)(PSL)(SFG)(4FTX4FT-4FTX4FT)
|
EA
|
6.000
|
$10,214.000
|
$7,000.000
|
$8,500.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
|
EA
|
262.000
|
$6,297.000
|
$8,000.000
|
$9,500.000
|
|
|
INLET (COMPL)(PAZD)(SL)(3FTX3FT)
|
EA
|
9.000
|
$4,500.000
|
$5,500.000
|
$6,490.000
|
|
|
INLET (COMPL)(PAZD)(RC)(3FTX3FT)
|
EA
|
1.000
|
$5,000.000
|
$6,500.000
|
$7,660.000
|
|
|
INLET (COMPL)(PAZD)(RC)(5FTX5FT)
|
EA
|
2.000
|
$18,357.000
|
$9,500.000
|
$10,470.000
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
10.000
|
$8,800.000
|
$9,500.000
|
$9,500.000
|
|
|
INLET (COMPL)(TY C)(1 GRATE)
|
EA
|
1.000
|
$12,500.000
|
$7,500.000
|
$7,500.000
|
|
|
INLET (RAIL & GRATE) (TY II)
|
EA
|
21.000
|
$3,979.000
|
$7,000.000
|
$8,000.000
|
|
|
INLET(COMPL)(EXT)(RAIL & GRATE)(TY II)
|
EA
|
23.000
|
$4,000.000
|
$12,000.000
|
$12,500.000
|
|
|
JCT BOX(CIP)(SPL)(COMPL)(12FTX7FT)
|
EA
|
1.000
|
$20,000.000
|
$25,000.000
|
$27,000.000
|
|
|
JCT BOX (CIP)(SPL)(COMPL)(16FTX5FT)
|
EA
|
1.000
|
$25,000.000
|
$20,000.000
|
$22,000.000
|
|
|
JCT BOX(CIP)(SPL)(COMPL)(22FTX19FT)
|
EA
|
1.000
|
$30,000.000
|
$65,000.000
|
$67,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 36 IN)
|
EA
|
1.000
|
$10,750.000
|
$5,418.830
|
$5,070.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$12,750.000
|
$9,418.830
|
$9,140.000
|
|
|
HEADWALL (CH - FW - 45) (DIA= 30 IN)
|
EA
|
1.000
|
$11,000.000
|
$5,418.830
|
$5,060.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
1.000
|
$16,553.850
|
$14,418.830
|
$14,230.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 48 IN)
|
EA
|
2.000
|
$17,337.000
|
$14,418.820
|
$14,230.000
|
|
|
WINGWALL (FW - 0) (HW=5 FT)
|
EA
|
1.000
|
$20,000.000
|
$11,418.830
|
$11,050.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
1.000
|
$21,500.000
|
$15,418.830
|
$15,190.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
1.000
|
$47,976.000
|
$100,418.830
|
$100,500.000
|
|
|
WINGWALL (PW - 1) (HW=13 FT)
|
EA
|
1.000
|
$2,401.000
|
$95,418.830
|
$95,500.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
2.000
|
$25,000.000
|
$12,418.820
|
$12,030.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$47,976.000
|
$30,418.830
|
$30,060.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$40,000.000
|
$30,418.830
|
$30,190.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$40,451.000
|
$46,418.830
|
$46,080.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
2.000
|
$11,000.000
|
$15,418.820
|
$15,060.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
3.000
|
$21,125.000
|
$22,418.830
|
$22,090.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$31,500.000
|
$25,418.830
|
$25,130.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
2.000
|
$25,410.000
|
$32,418.820
|
$32,160.000
|
|
|
WINGWALL(PW-1)(HW=19FT)(MOD)
|
EA
|
1.000
|
$75,000.000
|
$650,730.580
|
$731,200.000
|
|
|
SET (TY I) (24 IN) (4: 1) (C)
|
EA
|
2.000
|
$8,500.000
|
$2,209.420
|
$2,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$30,500.000
|
$12,209.410
|
$12,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
2.000
|
$30,500.000
|
$17,209.420
|
$17,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$2,629.000
|
$2,000.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$2,746.000
|
$2,000.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (5: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$2,000.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
5.000
|
$2,000.000
|
$2,000.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$2,660.000
|
$2,000.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (8: 1) (C)
|
EA
|
3.000
|
$3,000.000
|
$2,000.000
|
$2,000.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$2,075.000
|
$4,000.000
|
$4,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$8,800.000
|
$5,000.000
|
$5,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
3.000
|
$9,900.000
|
$6,000.000
|
$6,000.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$10,000.000
|
$6,000.000
|
$6,000.000
|
|
|
SET (TY II) (60 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$11,000.000
|
$9,000.000
|
$9,000.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
14.000
|
$4,500.000
|
$4,000.000
|
$3,870.000
|
|
|
SLOT DRAIN (GAL STL) (15 IN)
|
LF
|
300.000
|
$150.000
|
$400.000
|
$410.000
|
|
|
SLOT DRAIN OUTFALL (GAL STL) (15 IN)
|
LF
|
62.000
|
$300.000
|
$300.000
|
$332.000
|
|
|
SLOT DRAIN (GAL STL) (24 IN)
|
LF
|
30.000
|
$350.000
|
$500.000
|
$550.000
|
|
|
SLOT DRAIN OUTFALL (GAL STL) (24 IN)
|
LF
|
2.000
|
$1,000.000
|
$350.000
|
$850.000
|
|
|
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
|
LF
|
328.000
|
$1,000.000
|
$750.000
|
$1,160.000
|
|
|
JACK BOR OR TUN PIPE(42 IN)(RC)(CL III)
|
LF
|
159.000
|
$2,000.000
|
$1,000.000
|
$1,330.000
|
|
|
JACK BOR TUN BOX CULV (4 FT X 3 FT)
|
LF
|
100.000
|
$1,500.000
|
$1,500.000
|
$2,090.000
|
|
|
JACK BOR TUN BOX CULV (5 FT X 4 FT)
|
LF
|
165.000
|
$2,000.000
|
$2,000.000
|
$2,360.000
|
|
|
JACK BOR TUN BOX CULV (5 FT X 5 FT)
|
LF
|
148.000
|
$2,000.000
|
$2,500.000
|
$2,900.000
|
|
|
JACK BOR TUN BOX CULV (6 FT X 5 FT)
|
LF
|
60.000
|
$3,000.000
|
$2,600.000
|
$3,590.000
|
|
|
JACK BOR TUN BOX CULV (7 FT X 3 FT)
|
LF
|
178.000
|
$2,000.000
|
$2,700.000
|
$3,030.000
|
|
|
JACK BOR TUN BOX CULV (8 FT X 4 FT)
|
LF
|
177.000
|
$2,500.000
|
$3,000.000
|
$3,340.000
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
8.000
|
$3,500.000
|
$5,000.000
|
$6,500.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
6.000
|
$3,500.000
|
$1,750.000
|
$1,750.000
|
|
|
ADJUSTING INLET (CAP)
|
EA
|
6.000
|
$5,000.000
|
$5,000.000
|
$5,000.000
|
|
|
ADJUSTING MANHOLES(CAP)
|
EA
|
2.000
|
$2,500.000
|
$5,000.000
|
$5,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
5.000
|
$1,897.000
|
$22,541.520
|
$22,130.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
1,716.000
|
$50.000
|
$64.400
|
$140.000
|
|
|
REMOV STR (INLET)
|
EA
|
112.000
|
$450.000
|
$1,000.000
|
$1,100.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
11.000
|
$1,019.000
|
$1,000.000
|
$1,100.000
|
|
|
REMOV STR (SET)
|
EA
|
45.000
|
$1,250.000
|
$1,000.000
|
$1,080.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
30.000
|
$2,833.000
|
$3,500.000
|
$4,410.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
48.000
|
$2,969.000
|
$3,500.000
|
$3,800.000
|
|
|
REMOV STR (PIPE)
|
LF
|
21,719.000
|
$10.000
|
$50.000
|
$52.250
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
2,784.000
|
$78.000
|
$80.000
|
$95.250
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$180,000.000
|
$51,547.670
|
$221,100.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
9.000
|
$253,655.000
|
$174,000.000
|
$525,540.000
|
|
|
REMOV STR (BRIDGE 1000 FT OR GREATER)
|
EA
|
4.000
|
$532,930.000
|
$1,480,000.000
|
$1,550,325.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
29.000
|
$3,750.000
|
$1,818.300
|
$3,760.000
|
|
|
REMOV STR (LARGE)
|
EA
|
1.000
|
$15,000.000
|
$4,573.430
|
$55,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
1,073.000
|
$8.500
|
$6.200
|
$2.050
|
|
|
REMOV STR (TOP OF WALL)
|
LF
|
244.000
|
$80.000
|
$61.020
|
$35.000
|
|
|
REMOV STR (DRAINAGE FLUME)
|
EA
|
2.000
|
$1,500.000
|
$4,448.680
|
$3,110.000
|
|
|
REMOV STR (MASONARY)
|
LF
|
56.000
|
$99.700
|
$44.800
|
$19.000
|
|
|
REMOVE STR (GABION)
|
LF
|
137.000
|
$40.000
|
$108.110
|
$27.400
|
|
|
REMOVE STR (SOUNDWALL)
|
LF
|
1,841.000
|
$250.000
|
$17.380
|
$264.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$44,000,000.000
|
$59,160,000.000
|
$55,795,700.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
58.000
|
$100,000.000
|
$85,000.000
|
$736,073.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
4,400.000
|
$20.000
|
$54.100
|
$54.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
665.000
|
$65.000
|
$128.340
|
$128.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
5,065.000
|
$10.000
|
$25.270
|
$25.300
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
4,712.000
|
$20.000
|
$36.700
|
$36.750
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
4,712.000
|
$10.000
|
$10.120
|
$10.100
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
39,636.000
|
$2.000
|
$6.140
|
$6.150
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
39,636.000
|
$0.750
|
$1.880
|
$1.900
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
22,555.000
|
$5.000
|
$6.710
|
$6.700
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
22,555.000
|
$1.500
|
$1.830
|
$1.850
|
|
|
CONSTRUCTING DETOURS
|
SY
|
130,783.000
|
$90.000
|
$127.000
|
$140.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
390.000
|
$150.000
|
$107.460
|
$84.500
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
110,820.000
|
$25.000
|
$85.000
|
$30.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
15,800.000
|
$45.000
|
$85.000
|
$30.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
980.000
|
$45.000
|
$85.000
|
$60.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
285,150.000
|
$4.000
|
$14.010
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
29,600.000
|
$4.000
|
$7.780
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
940.000
|
$4.000
|
$18.590
|
$30.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
110,820.000
|
$5.000
|
$8.200
|
$11.400
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
16,060.000
|
$6.000
|
$9.820
|
$16.700
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
980.000
|
$6.000
|
$9.820
|
$23.600
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
9,449.000
|
$97.250
|
$85.910
|
$70.750
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
472.000
|
$293.600
|
$390.950
|
$324.000
|
|
|
PERM CTB (F-SHAPE) (TY 1)
|
LF
|
5,800.000
|
$130.000
|
$76.380
|
$65.500
|
|
|
PERM CTB (F-SHAPE) (TY 3)
|
LF
|
692.000
|
$200.000
|
$463.720
|
$330.000
|
|
|
PERM CTB (SSCB)(TY 1)(MOD)
|
LF
|
674.000
|
$750.000
|
$135.910
|
$92.500
|
|
|
PERM CTB (F-SHAPE) (TY 1) (DB)
|
LF
|
608.000
|
$500.000
|
$305.690
|
$319.000
|
|
|
PERM CTB (TRAN SSCB TO CSB)
|
LF
|
100.000
|
$500.000
|
$316.950
|
$284.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
314.000
|
$1,350.000
|
$80.000
|
$305.000
|
|
|
CONC CURB (TY I)
|
LF
|
241.000
|
$37.500
|
$37.030
|
$35.000
|
|
|
CONC CURB (MONO) (TY I)
|
LF
|
83.000
|
$40.000
|
$50.000
|
$15.000
|
|
|
CONC CURB (MONO) (TY II)
|
LF
|
49,729.000
|
$6.900
|
$2.510
|
$3.050
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
810.000
|
$80.000
|
$51.600
|
$19.800
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
6,291.000
|
$44.000
|
$34.790
|
$19.800
|
|
|
CONC CURB (DOWEL) (TY II)
|
LF
|
1,477.000
|
$28.000
|
$30.000
|
$26.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
11,669.000
|
$75.000
|
$104.530
|
$126.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
17,537.000
|
$85.000
|
$78.160
|
$67.500
|
|
|
CONC SIDEWALKS (6")
|
SY
|
1,951.000
|
$80.000
|
$87.440
|
$75.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
3.000
|
$3,540.000
|
$3,852.800
|
$2,100.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
6.000
|
$3,207.500
|
$4,839.580
|
$2,560.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
1.000
|
$4,000.000
|
$7,382.490
|
$2,560.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
17.000
|
$1,695.000
|
$4,573.240
|
$3,150.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
8.000
|
$1,870.000
|
$4,573.100
|
$3,150.000
|
|
|
CURB RAMPS (TY 21)
|
EA
|
5.000
|
$3,000.000
|
$5,015.690
|
$3,150.000
|
|
|
CONC SIDEWALKS (10")
|
SY
|
50.000
|
$225.000
|
$286.880
|
$250.000
|
|
|
CONC SIDEWALK (SPECIAL)(RETAINING WALL)
|
SF
|
348.000
|
$150.000
|
$52.220
|
$73.250
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
21,723.000
|
$1.100
|
$0.130
|
$0.800
|
|
|
RUMBLE STRIPS (SHOULDER) CONCRETE
|
LF
|
36,822.000
|
$1.700
|
$0.610
|
$1.350
|
|
|
CONC MEDIAN
|
SY
|
1,263.000
|
$150.000
|
$104.920
|
$118.000
|
|
|
RIGHT OF WAY MARKERS
|
EA
|
63.000
|
$422.500
|
$250.000
|
$389.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
6,900.000
|
$25.000
|
$24.980
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
46.000
|
$1,600.000
|
$2,299.000
|
$2,300.000
|
|
|
MTL BEAM GD FEN TRANS (TL2)
|
EA
|
16.000
|
$1,000.000
|
$1,225.000
|
$1,230.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
17.000
|
$2,200.000
|
$1,269.000
|
$1,270.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
50.000
|
$23.000
|
$23.250
|
$23.300
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
9.000
|
$750.000
|
$895.000
|
$895.000
|
|
|
MTL BM GD FEN TRANS (31"-28")(25')
|
EA
|
1.000
|
$3,000.000
|
$685.000
|
$685.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
22,796.000
|
$2.800
|
$2.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
46.000
|
$161.450
|
$200.000
|
$200.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
21.000
|
$206.000
|
$200.000
|
$200.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$381.950
|
$200.000
|
$200.000
|
|
|
RM MTL BM GD FEN TRANS (T101)
|
EA
|
45.000
|
$150.000
|
$200.000
|
$200.000
|
|
|
REMOVE CABLE BARRIER
|
LF
|
5,262.000
|
$7.300
|
$7.500
|
$6.200
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
66.000
|
$1,000.000
|
$3,075.000
|
$3,080.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
78.000
|
$266.200
|
$200.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
192.000
|
$813.000
|
$1,125.000
|
$1,130.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
78.000
|
$8,900.000
|
$725.000
|
$725.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
10.000
|
$17,672.000
|
$25,500.000
|
$25,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
9.000
|
$28,902.200
|
$28,750.000
|
$28,750.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL2)
|
EA
|
3.000
|
$35,345.000
|
$39,900.000
|
$39,900.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$55,000.000
|
$38,950.000
|
$38,950.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
76.000
|
$6,935.000
|
$7,275.000
|
$7,280.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
2.000
|
$2,000.000
|
$5,500.000
|
$5,500.000
|
|
|
REMOVE RD IL ASM (CTB MOUNT)
|
EA
|
100.000
|
$600.000
|
$581.000
|
$581.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
45.000
|
$913.000
|
$581.000
|
$581.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
48.000
|
$750.000
|
$871.000
|
$871.000
|
|
|
IN RD IL (U/P) (TY 1) (150W EQ) LED
|
EA
|
69.000
|
$1,203.600
|
$1,757.000
|
$1,760.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
6.000
|
$1,800.000
|
$1,848.000
|
$1,850.000
|
|
|
HI MST IL POLE (175 FT)( 80 MPH)
|
EA
|
38.000
|
$60,000.000
|
$60,287.000
|
$60,300.000
|
|
|
LED HI MST IL ASM (6 FIXT)(SYM)(TY S)
|
EA
|
9.000
|
$25,000.000
|
$31,722.000
|
$31,720.000
|
|
|
LED HI MST IL AM(6 FIXT)ASYM(TY B)SHLD
|
EA
|
29.000
|
$8,952.000
|
$32,431.000
|
$32,430.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
21,345.000
|
$29.000
|
$18.020
|
$18.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
7,480.000
|
$42.000
|
$36.210
|
$36.250
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
35,300.000
|
$32.000
|
$26.230
|
$26.200
|
|
|
CONDT (PVC) (SCH 40) (3") (BORE)
|
LF
|
13,795.000
|
$55.000
|
$30.020
|
$30.000
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
320.000
|
$75.000
|
$83.600
|
$83.500
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
145.000
|
$32.000
|
$45.100
|
$45.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
925.000
|
$40.000
|
$47.300
|
$47.250
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
825.000
|
$50.000
|
$82.500
|
$82.500
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
445.000
|
$31.840
|
$49.500
|
$49.500
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
635.000
|
$120.000
|
$85.800
|
$85.750
|
|
|
CONDT (RM) (3/4")
|
LF
|
3,990.000
|
$17.000
|
$39.450
|
$39.500
|
|
|
CONDT (RM) (2")
|
LF
|
445.000
|
$50.500
|
$61.650
|
$61.750
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
3,990.000
|
$1.300
|
$2.250
|
$2.250
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
8,460.000
|
$1.800
|
$2.350
|
$2.350
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
7,610.000
|
$4.000
|
$2.650
|
$2.650
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
48,060.000
|
$2.500
|
$2.750
|
$2.750
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
22,735.000
|
$3.150
|
$3.250
|
$3.250
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
47,170.000
|
$3.000
|
$3.000
|
$3.000
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
8,185.000
|
$3.000
|
$3.250
|
$3.250
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
16,990.000
|
$3.000
|
$3.500
|
$3.500
|
|
|
ELEC CONDR (NO.2) BARE
|
LF
|
300.000
|
$5.000
|
$8.050
|
$4.550
|
|
|
ELEC CONDR (NO.2) INSULATED
|
LF
|
1,520.000
|
$4.500
|
$4.900
|
$4.900
|
|
|
ELEC CONDR (NO.2/0) BARE
|
LF
|
1,835.000
|
$8.400
|
$8.050
|
$8.050
|
|
|
ELEC CONDR (NO.2/0) INSULATED
|
LF
|
3,025.000
|
$8.000
|
$5.500
|
$8.500
|
|
|
TRAY CABLE (3 CONDR) (12 AWG)
|
LF
|
2,730.000
|
$2.700
|
$5.500
|
$5.500
|
|
|
GROUND BOX TY A (122311)
|
EA
|
1.000
|
$1,510.000
|
$1,530.000
|
$1,530.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
118.000
|
$850.000
|
$2,447.000
|
$2,450.000
|
|
|
GROUND BOX TY C (162911)
|
EA
|
9.000
|
$1,332.000
|
$2,285.000
|
$2,290.000
|
|
|
GROUND BOX TY C (162911)W/APRON
|
EA
|
7.000
|
$2,020.000
|
$3,210.000
|
$3,210.000
|
|
|
GROUND BOX TY D (162922)
|
EA
|
2.000
|
$2,513.000
|
$1,745.000
|
$1,750.000
|
|
|
REMOVE ELECTRICAL SERVICES
|
EA
|
9.000
|
$730.000
|
$871.000
|
$871.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)PS(U)
|
EA
|
12.000
|
$8,179.000
|
$13,630.000
|
$13,630.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(N)GC(O)
|
EA
|
1.000
|
$9,899.700
|
$9,775.000
|
$9,780.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
|
EA
|
2.000
|
$14,087.500
|
$14,300.000
|
$14,300.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(N)GC(O)
|
EA
|
1.000
|
$10,000.000
|
$9,855.000
|
$9,860.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
216.000
|
$43.000
|
$35.150
|
$22.300
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
1,087.750
|
$35.000
|
$24.300
|
$24.300
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
8,496.750
|
$31.000
|
$37.550
|
$37.500
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY G)
|
SF
|
360.250
|
$65.000
|
$26.400
|
$26.400
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
125.000
|
$794.000
|
$600.000
|
$615.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
172.000
|
$547.000
|
$730.000
|
$655.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,250.000
|
$930.000
|
$795.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
20.000
|
$625.000
|
$670.000
|
$625.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
78.000
|
$766.000
|
$815.000
|
$665.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
1.000
|
$1,394.000
|
$985.000
|
$795.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P-EXAL)
|
EA
|
6.000
|
$2,362.500
|
$2,500.000
|
$1,760.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SB(P-EXAL)
|
EA
|
3.000
|
$600.000
|
$2,650.000
|
$1,820.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
24.000
|
$1,064.000
|
$975.000
|
$985.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
6.000
|
$1,960.000
|
$1,085.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
1.000
|
$1,700.000
|
$1,150.000
|
$1,380.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
1.000
|
$1,900.000
|
$1,450.000
|
$1,430.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
6.000
|
$1,117.000
|
$1,075.000
|
$995.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
1.000
|
$1,200.000
|
$1,150.000
|
$1,330.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U-1EXT)
|
EA
|
2.000
|
$500.000
|
$1,250.000
|
$1,690.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
7.000
|
$2,209.000
|
$2,400.000
|
$1,990.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SB(P-EXAL)
|
EA
|
1.000
|
$2,400.000
|
$2,600.000
|
$2,140.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
31.000
|
$2,508.000
|
$2,200.000
|
$3,570.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
22.000
|
$2,315.000
|
$2,350.000
|
$3,690.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
13.000
|
$4,167.000
|
$3,995.000
|
$4,700.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
1.000
|
$883.000
|
$750.000
|
$790.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
261.000
|
$155.000
|
$75.000
|
$75.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
14.000
|
$700.000
|
$500.000
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM (SIGN ONLY)
|
EA
|
8.000
|
$126.000
|
$75.000
|
$60.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
3,075.000
|
$8.800
|
$7.200
|
$7.200
|
|
|
RELOCATE LRSA
|
EA
|
10.000
|
$5,800.000
|
$4,912.000
|
$4,910.000
|
|
|
REMOVE LRSA
|
EA
|
11.000
|
$1,369.000
|
$1,165.000
|
$1,170.000
|
|
|
INS OH SN SUP(30 FT BAL TEE)
|
EA
|
1.000
|
$52,938.000
|
$41,117.000
|
$41,120.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
10.000
|
$35,212.800
|
$47,995.000
|
$48,000.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
3.000
|
$42,782.000
|
$48,395.000
|
$48,400.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
7.000
|
$55,975.000
|
$73,380.000
|
$73,400.000
|
|
|
INS OH SN SUP(60 FT BRDG)
|
EA
|
2.000
|
$40,075.000
|
$60,805.000
|
$60,800.000
|
|
|
INS OH SN SUP(65 FT BRDG)
|
EA
|
2.000
|
$51,100.000
|
$62,350.000
|
$62,400.000
|
|
|
INS OH SN SUP(75 FT BRDG)
|
EA
|
3.000
|
$57,729.000
|
$72,365.000
|
$72,400.000
|
|
|
INS OH SN SUP(80 FT BRDG)
|
EA
|
3.000
|
$70,005.000
|
$76,300.000
|
$76,300.000
|
|
|
INS OH SN SUP(85 FT BRDG)
|
EA
|
2.000
|
$67,176.000
|
$87,665.000
|
$87,700.000
|
|
|
INS OH SN SUP(95 FT BRDG)
|
EA
|
1.000
|
$82,575.000
|
$92,112.000
|
$92,100.000
|
|
|
INS OH SN SUP(100 FT BRDG)
|
EA
|
1.000
|
$86,550.000
|
$99,120.000
|
$99,100.000
|
|
|
INS OH SN SUP(105 FT BRDG)
|
EA
|
1.000
|
$99,462.000
|
$121,630.000
|
$121,600.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
15.000
|
$4,160.000
|
$8,935.000
|
$8,940.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
4.000
|
$2,000.000
|
$1,548.000
|
$1,550.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
698.000
|
$25.000
|
$25.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
472.000
|
$15.000
|
$26.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
411.000
|
$34.000
|
$25.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
98.000
|
$34.000
|
$25.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
95.000
|
$30.000
|
$25.000
|
$25.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
2.000
|
$279.000
|
$90.000
|
$105.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
3,895.000
|
$5.000
|
$4.000
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
77,853.000
|
$1.000
|
$4.000
|
$4.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
686.000
|
$2.000
|
$0.800
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
353,147.000
|
$0.950
|
$0.800
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
71,464.000
|
$2.300
|
$1.600
|
$1.600
|
|
|
WK ZN PAV MRK REMOV (W)12"(LNDP)
|
LF
|
5,925.000
|
$7.000
|
$3.800
|
$3.800
|
|
|
WK ZN PAV MRK REMOV (W)12"(SLD)
|
LF
|
2,750.000
|
$6.000
|
$3.800
|
$3.800
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
557.000
|
$8.000
|
$4.150
|
$4.150
|
|
|
WK ZN PAV MRK REMOV (W)(ARROW)
|
EA
|
17.000
|
$150.000
|
$190.000
|
$190.000
|
|
|
WK ZN PAV MRK REMOV (W)(WORD)
|
EA
|
17.000
|
$160.000
|
$250.000
|
$250.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(DOT)
|
LF
|
359.000
|
$1.100
|
$0.800
|
$0.800
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
398,381.000
|
$1.350
|
$0.800
|
$0.800
|
|
REFL PAV MRK TY I (W)6"(LNDP)(100MIL)
|
LF
|
1,133.000
|
$1.800
|
$1.500
|
$1.500
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
93.000
|
$2.800
|
$1.750
|
$1.750
|
|
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
|
LF
|
468.000
|
$2.500
|
$1.750
|
$1.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
44,120.000
|
$1.800
|
$1.450
|
$1.450
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
4,646.000
|
$2.950
|
$2.750
|
$2.750
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
18,248.000
|
$4.850
|
$2.750
|
$2.750
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,688.000
|
$11.600
|
$4.950
|
$4.950
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
54.000
|
$195.000
|
$160.000
|
$160.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
8.000
|
$279.500
|
$170.000
|
$170.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
9.000
|
$250.000
|
$225.000
|
$225.000
|
|
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
|
EA
|
12.000
|
$364.500
|
$215.000
|
$215.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
62.000
|
$213.800
|
$180.000
|
$180.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
245.000
|
$5.070
|
$2.800
|
$2.800
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
1,000.000
|
$0.700
|
$1.400
|
$1.400
|
|
|
PAVEMENT SEALER 6"
|
LF
|
368,345.000
|
$0.500
|
$0.570
|
$0.550
|
|
|
PAVEMENT SEALER 8"
|
LF
|
44,681.000
|
$0.650
|
$0.680
|
$0.700
|
|
|
PAVEMENT SEALER 12"
|
LF
|
23,139.000
|
$1.150
|
$0.900
|
$0.900
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,688.000
|
$4.000
|
$1.650
|
$1.650
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
54.000
|
$56.000
|
$80.000
|
$80.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
62.000
|
$71.000
|
$90.000
|
$90.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
8.000
|
$63.400
|
$95.000
|
$95.000
|
|
|
PAVEMENT SEALER (UTURN ARROW)
|
EA
|
9.000
|
$120.000
|
$189.000
|
$189.000
|
|
|
PAVEMENT SEALER (LNDP ARROW)
|
EA
|
12.000
|
$58.500
|
$169.000
|
$169.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
50,989.000
|
$1.200
|
$0.980
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
156,496.000
|
$1.300
|
$0.960
|
$0.950
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
159,727.000
|
$1.100
|
$0.960
|
$0.950
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
22.000
|
$6.400
|
$5.000
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
6,064.000
|
$2.500
|
$4.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
123,733.000
|
$0.250
|
$0.330
|
$0.350
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
29,933.000
|
$0.650
|
$0.370
|
$0.350
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
22,061.000
|
$1.000
|
$0.400
|
$0.400
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
5,211.000
|
$1.500
|
$0.430
|
$0.450
|
|
|
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
|
LF
|
48,987.000
|
$1.000
|
$2.000
|
$1.850
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,000.000
|
$0.200
|
$0.230
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
368,345.000
|
$0.300
|
$0.260
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
44,681.000
|
$0.300
|
$0.300
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
23,139.000
|
$0.450
|
$0.380
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,688.000
|
$1.850
|
$0.410
|
$0.400
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
66.000
|
$31.950
|
$15.000
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
8.000
|
$23.000
|
$17.000
|
$17.000
|
|
|
PAV SURF PREP FOR MRK (UTURN ARR)
|
EA
|
9.000
|
$33.000
|
$33.000
|
$33.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
62.000
|
$38.000
|
$22.000
|
$22.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
2.000
|
$4,750.000
|
$10,560.000
|
$10,560.000
|
|
|
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
|
EA
|
2.000
|
$37,000.000
|
$45,900.000
|
$45,900.000
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$192,500.000
|
$211,200.000
|
$211,200.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
24.000
|
$750.000
|
$825.000
|
$825.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
12.000
|
$524.000
|
$825.000
|
$825.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
33.000
|
$511.000
|
$825.000
|
$825.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
6.000
|
$923.000
|
$825.000
|
$825.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
33.000
|
$923.000
|
$825.000
|
$825.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
6.000
|
$923.000
|
$825.000
|
$825.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
18.000
|
$1,190.000
|
$1,540.000
|
$1,540.000
|
|
|
LOUVER (12") (ADJUSTABLE)
|
EA
|
6.000
|
$400.000
|
$556.000
|
$556.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
33.000
|
$250.000
|
$237.000
|
$237.000
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)ALUM
|
EA
|
3.000
|
$350.000
|
$270.000
|
$270.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
2,115.000
|
$3.300
|
$4.400
|
$4.400
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
680.000
|
$4.000
|
$5.500
|
$5.500
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
2,680.000
|
$3.000
|
$11.000
|
$11.000
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
6,395.000
|
$2.000
|
$4.400
|
$4.400
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM&ILSN
|
EA
|
1.000
|
$16,275.000
|
$21,890.000
|
$21,890.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM&ILSN
|
EA
|
1.000
|
$36,500.000
|
$23,540.000
|
$23,540.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM&ILSN
|
EA
|
1.000
|
$18,585.000
|
$24,530.000
|
$24,530.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM&ILSN
|
EA
|
2.000
|
$19,950.000
|
$25,630.000
|
$25,630.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM&ILSN
|
EA
|
1.000
|
$45,150.000
|
$55,440.000
|
$55,400.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM&ILSN
|
EA
|
2.000
|
$44,305.750
|
$56,430.000
|
$56,400.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(65')LUM&ILSN
|
EA
|
1.000
|
$53,728.000
|
$56,925.000
|
$56,900.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
11.000
|
$4,676.500
|
$8,250.000
|
$8,250.000
|
|
|
REMOVE PED POLE ASSEMBLY
|
EA
|
2.000
|
$657.000
|
$935.000
|
$935.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
28.000
|
$1,148.000
|
$1,980.000
|
$1,980.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
5.000
|
$1,940.000
|
$3,410.000
|
$3,410.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
26.000
|
$5,000.000
|
$6,000.000
|
$3,730.000
|
|
|
LITTER REMOVAL
|
CYC
|
34.000
|
$3,000.000
|
$1,000.000
|
$4,500.000
|
|
|
DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES)
|
CYC
|
34.000
|
$2,000.000
|
$1,000.000
|
$3,500.000
|
|
|
DEBRIS REMOVAL (FRONTAGE ROADS)
|
CYC
|
34.000
|
$2,000.000
|
$1,000.000
|
$4,500.000
|
|
|
DEBRIS REMOVAL (ENTRANCE/EXIT RAMPS)
|
CYC
|
34.000
|
$2,000.000
|
$1,000.000
|
$2,800.000
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
306,169.000
|
$0.900
|
$0.650
|
$0.650
|
|
|
NO. OF WORKING DAYS
|
$/D
|
36,500.000
|
$1,339.000
|
$1,122.000
|
$1,169.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
88,996.000
|
$130.000
|
$124.110
|
$158.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
10,936.000
|
$240.000
|
$164.010
|
$183.000
|
|
|
SP MIXES SP-D PG64-22
|
TON
|
19,632.000
|
$128.000
|
$143.470
|
$158.000
|
|
|
TACK COAT
|
GAL
|
25,947.000
|
$6.000
|
$5.000
|
$5.000
|
|
|
STONE-MTRX-ASPH SMA-C SAC-A PG76-22
|
TON
|
13,967.000
|
$140.000
|
$172.070
|
$210.000
|
|
|
NOISE WALL
|
SF
|
16,112.000
|
$50.000
|
$82.950
|
$57.500
|
|
|
NOISE WALL DECORATIVE END PANEL
|
SF
|
2,865.000
|
$75.000
|
$78.420
|
$56.250
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
129.000
|
$5,000.000
|
$5,018.180
|
$4,930.000
|
|
|
COMPACTION GROUTING
|
CF
|
33,480.000
|
$25.000
|
$4.900
|
$5.200
|
|
|
DRILLED HOLES
|
LF
|
6,696.000
|
$75.000
|
$94.580
|
$100.000
|
|
|
PATCHING MILLED CONCRETE RUMBLE STRIPS
|
LF
|
6,194.000
|
$45.000
|
$5.000
|
$16.900
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
15.000
|
$20,000.000
|
$19,485.000
|
$25,685.000
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
|
LF
|
44,505.000
|
$1.500
|
$2.790
|
$2.800
|
|
|
FIBER OPTIC CBL (SNGLE-MODE)(48 FIBER)
|
LF
|
55,465.000
|
$3.500
|
$2.940
|
$2.950
|
|
|
FIBER OPTIC PATCH PANEL (6 POSITION)
|
EA
|
1.000
|
$80.000
|
$1,860.000
|
$1,860.000
|
|
|
RELOCATE EXISTING COMMUNICATION CABINET
|
EA
|
1.000
|
$15,000.000
|
$37,640.000
|
$37,640.000
|
|
|
RELOCATE CCTV FIELD EQUIPMENT
|
EA
|
13.000
|
$470.500
|
$7,690.000
|
$7,690.000
|
|
|
ITS MULTI-DUCT CND (PVC-40)
|
LF
|
17,655.000
|
$25.000
|
$34.800
|
$34.750
|
|
|
ITS MULTI-DUCT CND (PVC-40)(BORE)
|
LF
|
6,400.000
|
$22.950
|
$36.010
|
$36.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
4,755.000
|
$3.000
|
$7.200
|
$7.200
|
|
|
JUNCTION BOX (INSTALL)
|
EA
|
12.000
|
$2,800.000
|
$853.000
|
$853.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
20.000
|
$616.300
|
$973.000
|
$973.000
|
|
|
SYSTEM INTEGRATION
|
LS
|
1.000
|
$50,000.000
|
$70,330.000
|
$70,400.000
|
|
|
RELOCATE ITS RADIO
|
EA
|
17.000
|
$758.000
|
$5,995.000
|
$6,000.000
|
|
|
REMOVE ITS RADIO
|
EA
|
6.000
|
$250.000
|
$2,775.000
|
$2,780.000
|
|
|
ITS POLE (40 FT)(REL)
|
EA
|
2.000
|
$2,179.860
|
$10,685.000
|
$10,690.000
|
|
|
ITS POLE (40 FT)(REM)
|
EA
|
4.000
|
$1,198.000
|
$1,165.000
|
$1,170.000
|
|
|
ITS POLE (60 FT)(REL)
|
EA
|
10.000
|
$2,824.000
|
$6,445.000
|
$6,450.000
|
|
|
ITS POLE MNT CAB (TY 3)(CONF 1)(REL)
|
EA
|
9.000
|
$2,500.000
|
$3,590.000
|
$3,590.000
|
|
|
RELOCATE EXISTING COMMUNICATION CABINET
|
EA
|
1.000
|
$5,000.000
|
$37,640.000
|
$37,640.000
|
|
|
REMOVE AND RELOCATE DMS SYSTEM
|
EA
|
2.000
|
$11,704.000
|
$72,030.000
|
$72,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
4,500.000
|
$272.000
|
$283.990
|
$583.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
1,050.000
|
$393.000
|
$777.890
|
$583.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)
|
EA
|
2.000
|
$5,535.700
|
$4,335.000
|
$4,340.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243660)W/APRN
|
EA
|
33.000
|
$5,189.000
|
$6,345.000
|
$6,350.000
|
|
|
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
|
EA
|
3.000
|
$10,000.000
|
$8,446.000
|
$8,450.000
|
|
|
REMOVE ITS GROUND BOX
|
EA
|
25.000
|
$818.000
|
$871.000
|
$871.000
|
|
|
ITS RVSD (DC & WWA) (RELOCATE)
|
EA
|
14.000
|
$3,740.000
|
$6,055.000
|
$6,060.000
|
|
|
ITS RVSD (DC & WWA) (REMOVE)
|
EA
|
1.000
|
$8,000.000
|
$3,996.000
|
$4,000.000
|
|
|
VIVDS TEMPORARY
|
EA
|
1.000
|
$32,250.000
|
$56,410.000
|
$56,400.000
|
|
|
VIVDS PROSR SYS (INSTALL ONLY)
|
EA
|
2.000
|
$2,500.000
|
$1,050.000
|
$1,050.000
|
|
|
VIVDS CAM ASSY (INSTALL ONLY)
|
EA
|
9.000
|
$1,800.000
|
$1,760.000
|
$1,760.000
|
|
|
VIVDS CABLING (INSTALL ONLY)
|
LF
|
3,170.000
|
$4.000
|
$2.200
|
$2.200
|
|
|
REMOVE HIGH MAST LIGHTING ASSEMBLY
|
EA
|
10.000
|
$1,800.000
|
$9,905.000
|
$9,910.000
|
|
|
RELOCATE HIGH MAST LIGHTING ASSEMBLY
|
EA
|
1.000
|
$39,821.000
|
$103,000.000
|
$103,000.000
|
|
Totals: |
$486,319,650.560
|
$580,617,225.214
|
$599,999,571.350
|