COMPOST MANUF TOPSOIL (4")
|
SY
|
791.000
|
$3.000
|
$12.500
|
$3.300
|
|
|
BLOCK SODDING
|
SY
|
791.000
|
$5.000
|
$4.500
|
$5.500
|
|
|
VEGETATIVE WATERING
|
MG
|
126.000
|
$21.000
|
$50.000
|
$44.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
7,902.000
|
$1.400
|
$3.600
|
$6.240
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
20.000
|
$120.000
|
$240.000
|
$250.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
8.000
|
$160.000
|
$455.000
|
$478.500
|
|
|
CL K CONC (CAP)
|
CY
|
86.400
|
$2,000.000
|
$3,000.000
|
$5,775.000
|
|
|
CL K CONC (APPROACH SLAB) (ABC)
|
CY
|
306.800
|
$2,000.000
|
$550.000
|
$1,045.000
|
|
|
CL K CONC (ABUT) (EXTEND)
|
CY
|
0.600
|
$1,500.000
|
$7,750.000
|
$18,000.000
|
|
|
REINF CONC SLAB(PRCST SUPER ASSEM)(ABC)
|
SF
|
26,334.000
|
$30.000
|
$113.500
|
$138.000
|
|
|
CIP CLOSURE (ABC)
|
CY
|
113.200
|
$4,000.000
|
$1,250.000
|
$4,200.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
448.000
|
$300.000
|
$265.000
|
$128.000
|
|
|
CONC STR REP(DECK REP(FULL DEPTH))(ABC)
|
SF
|
4,742.000
|
$135.000
|
$35.000
|
$97.000
|
|
|
CONC STR REP(DECK REP(PAR DEPTH))(ABC)
|
SF
|
1,200.000
|
$120.000
|
$13.000
|
$130.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
94.000
|
$600.000
|
$450.000
|
$875.000
|
|
|
ELASTOMERIC BEARING (LAMINATED) (ABC)
|
EA
|
108.000
|
$950.000
|
$1,000.000
|
$515.000
|
|
|
STR STEEL (PLATE GIRDER) (ABC)
|
LB
|
610,176.000
|
$2.000
|
$2.350
|
$3.050
|
|
|
STR STEEL (PEDESTAL) (ABC)
|
LB
|
8,692.000
|
$10.000
|
$13.000
|
$20.000
|
|
|
RAIL (TY T401)(HPC) (ABC)
|
LF
|
876.600
|
$150.000
|
$135.000
|
$264.000
|
|
|
RETROFIT RAIL (TY T221) (ABC)
|
LF
|
1,052.800
|
$200.000
|
$225.000
|
$286.000
|
|
|
RETROFIT RAIL (TY T401)(HPC) (ABC)
|
LF
|
144.000
|
$200.000
|
$440.000
|
$385.000
|
|
|
ARMOR JOINT (ABC)
|
LF
|
564.000
|
$220.000
|
$76.000
|
$120.000
|
|
|
DIAMOND GRINDING SLAB (ABC)
|
SY
|
3,406.000
|
$15.000
|
$5.500
|
$7.920
|
|
|
REMOV STR (APPROACH SLAB) (ABC)
|
EA
|
4.000
|
$3,000.000
|
$3,750.000
|
$13,000.000
|
|
|
REMOVSTR(BRIDGE 100-499 FT LENGTH)(ABC)
|
EA
|
2.000
|
$150,000.000
|
$563,800.000
|
$110,000.000
|
|
|
ADJUST STL SHOES
|
EA
|
35.000
|
$3,000.000
|
$750.000
|
$2,900.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,200,000.000
|
$921,000.000
|
$1,150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$30,000.000
|
$30,000.000
|
$50,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
250.000
|
$5.750
|
$1.900
|
$3.300
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
250.000
|
$3.000
|
$0.500
|
$1.100
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
126.000
|
$2.750
|
$5.000
|
$3.250
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
200.000
|
$3.450
|
$5.500
|
$4.350
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
326.000
|
$0.850
|
$1.350
|
$0.830
|
|
|
CONSTRUCTING DETOURS
|
SY
|
1,482.000
|
$100.000
|
$103.000
|
$235.000
|
|
|
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
700.000
|
$75.000
|
$34.000
|
$88.000
|
|
|
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
600.000
|
$10.500
|
$9.000
|
$14.300
|
|
|
PTB (STKPL)(F SHAPE)(TY 1) OR (STL)
|
LF
|
600.000
|
$9.000
|
$11.000
|
$14.300
|
|
|
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
|
LF
|
700.000
|
$16.700
|
$10.000
|
$16.500
|
|
|
CONCRETE MEDIAN (NOSE)
|
SY
|
10.000
|
$100.000
|
$130.000
|
$500.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,765.000
|
$24.000
|
$21.000
|
$19.250
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
14.000
|
$1,750.000
|
$1,300.000
|
$1,468.500
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
6.000
|
$1,000.000
|
$1,200.000
|
$1,072.500
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
1.000
|
$1,300.000
|
$1,200.000
|
$632.500
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,915.000
|
$5.000
|
$3.200
|
$2.200
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
6.000
|
$300.000
|
$215.000
|
$143.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
5.000
|
$2,700.000
|
$2,700.000
|
$2,805.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
5.000
|
$250.000
|
$295.000
|
$275.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
1.000
|
$10,000.000
|
$14,000.000
|
$14,300.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,400.000
|
$2,500.000
|
$1,650.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$700.000
|
$1,900.000
|
$1,320.000
|
|
|
RELOCATE RD IL ASM (TRANS-BASE)
|
EA
|
1.000
|
$1,600.000
|
$3,300.000
|
$3,135.000
|
|
|
REMOVE RD IL ASM (U/P)
|
EA
|
10.000
|
$500.000
|
$1,400.000
|
$1,347.500
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
346.000
|
$7.500
|
$10.150
|
$10.450
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
107.000
|
$20.000
|
$22.250
|
$23.540
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
453.000
|
$1.300
|
$1.650
|
$1.650
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
906.000
|
$1.300
|
$2.100
|
$2.090
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$775.000
|
$1,300.000
|
$1,358.500
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$575.000
|
$780.000
|
$511.500
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
1.000
|
$1,600.000
|
$2,200.000
|
$2,145.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
4.000
|
$2,150.000
|
$2,300.000
|
$2,145.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
6.000
|
$125.000
|
$68.000
|
$49.500
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
12.000
|
$125.000
|
$30.000
|
$20.350
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
19.000
|
$125.000
|
$19.000
|
$20.350
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
12.000
|
$125.000
|
$19.000
|
$20.350
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
16.000
|
$125.000
|
$21.000
|
$20.350
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
19.000
|
$125.000
|
$21.000
|
$27.500
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
16.000
|
$125.000
|
$21.000
|
$27.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
18,870.000
|
$1.300
|
$1.400
|
$1.380
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
450.000
|
$2.000
|
$3.150
|
$3.300
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,050.000
|
$1.300
|
$1.350
|
$1.380
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
795.000
|
$1.300
|
$1.250
|
$10.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,700.000
|
$2.000
|
$1.050
|
$1.100
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
674.000
|
$3.000
|
$5.800
|
$6.050
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
180.000
|
$2.000
|
$5.800
|
$6.050
|
|
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
|
LF
|
3,000.000
|
$2.000
|
$1.050
|
$1.100
|
|
|
PAVEMENT SEALER 4"
|
LF
|
3,000.000
|
$0.200
|
$0.550
|
$0.550
|
|
|
PAVEMENT SEALER 8"
|
LF
|
2,400.000
|
$0.250
|
$0.550
|
$0.550
|
|
|
PAVEMENT SEALER 24"
|
LF
|
854.000
|
$0.250
|
$2.100
|
$2.200
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
3,750.000
|
$0.800
|
$1.050
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
8,500.000
|
$0.800
|
$1.050
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
9,000.000
|
$0.400
|
$1.050
|
$1.100
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
400.000
|
$4.000
|
$4.500
|
$4.400
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
13,455.000
|
$0.920
|
$1.050
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
3,150.000
|
$0.850
|
$1.050
|
$1.100
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
854.000
|
$0.850
|
$4.400
|
$4.400
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
24,250.000
|
$1.000
|
$0.120
|
$0.110
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,700.000
|
$1.000
|
$0.250
|
$0.220
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
854.000
|
$1.000
|
$1.100
|
$1.100
|
|
|
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
|
LF
|
346.000
|
$58.000
|
$196.000
|
$25.000
|
|
|
REP STL BRIDGE MEMBER (DIAPHRAGM)
|
EA
|
3.000
|
$3,700.000
|
$5,600.000
|
$1,500.000
|
|
|
REP STL BRIDGE MEMBER (GIRDER END)
|
EA
|
30.000
|
$2,000.000
|
$750.000
|
$1,100.000
|
|
|
REPL STL MEMBER (SHOE ASSEMBLY)
|
EA
|
3.000
|
$12,000.000
|
$7,500.000
|
$8,000.000
|
|
|
BRIDGE JOINT REPAIR (CONCRETE) (ABC)
|
LF
|
272.000
|
$105.000
|
$115.000
|
$205.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
7.000
|
$10,500.000
|
$10,000.000
|
$17,500.000
|
|
|
TMA (STATIONARY)
|
EA
|
4.000
|
$10,500.000
|
$15,000.000
|
$26,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
25.000
|
$300.000
|
$300.000
|
$500.000
|
|
Totals: |
$7,643,990.600
|
$9,213,869.700
|
$11,582,776.850
|