Show Job Controls
Bid Cobra

DALLAS IH 635 (2374-02-147)

Items: 96

County: DALLAS
Length: N/A
Highway: IH 635
District: DALLAS
Control Number: 2374-02-147
DBE Goal: N/A
Project: BR 1802(379)
Guaranty: N/A
Time: 208 WORKING DAYS
Engineer's Estimate: $7,643,990.60
Date: 07/11/2018 (7 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE DECK & REPAIR BRIDGE DECK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$7,643,990.60
$9,213,869.70
Over/Under Est: 20.54% $1,569,879.10
Over/Under Est: 51.53% $3,938,786.25
Amt Left: 25.71% $2,368,907.15

Bid Items & Bid Tabulations

96 Total 0 of 96
DALLAS  |  IH 635  |  DALLAS  |  2374-02-147  |  07/11/2018  |  $7,643,990.60  |  BR 1802(379)  |  REPLACE BRIDGE DECK & REPAIR BRIDGE...  |  208 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SEMA CONSTRUCTION, INC.
GIBSON & ASSOCIATES, INC.
COMPOST MANUF TOPSOIL (4")
SY 791.000 $3.000 $12.500 $3.300
BLOCK SODDING
SY 791.000 $5.000 $4.500 $5.500
VEGETATIVE WATERING
MG 126.000 $21.000 $50.000 $44.000
PLANE ASPH CONC PAV(0" TO 2")
SY 7,902.000 $1.400 $3.600 $6.240
CUT & RESTORE CONC PAVING
SY 20.000 $120.000 $240.000 $250.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 8.000 $160.000 $455.000 $478.500
CL K CONC (CAP)
CY 86.400 $2,000.000 $3,000.000 $5,775.000
CL K CONC (APPROACH SLAB) (ABC)
CY 306.800 $2,000.000 $550.000 $1,045.000
CL K CONC (ABUT) (EXTEND)
CY 0.600 $1,500.000 $7,750.000 $18,000.000
REINF CONC SLAB(PRCST SUPER ASSEM)(ABC)
SF 26,334.000 $30.000 $113.500 $138.000
CIP CLOSURE (ABC)
CY 113.200 $4,000.000 $1,250.000 $4,200.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 448.000 $300.000 $265.000 $128.000
CONC STR REP(DECK REP(FULL DEPTH))(ABC)
SF 4,742.000 $135.000 $35.000 $97.000
CONC STR REP(DECK REP(PAR DEPTH))(ABC)
SF 1,200.000 $120.000 $13.000 $130.000
RIPRAP (MOW STRIP)(4 IN)
CY 94.000 $600.000 $450.000 $875.000
ELASTOMERIC BEARING (LAMINATED) (ABC)
EA 108.000 $950.000 $1,000.000 $515.000
STR STEEL (PLATE GIRDER) (ABC)
LB 610,176.000 $2.000 $2.350 $3.050
STR STEEL (PEDESTAL) (ABC)
LB 8,692.000 $10.000 $13.000 $20.000
RAIL (TY T401)(HPC) (ABC)
LF 876.600 $150.000 $135.000 $264.000
RETROFIT RAIL (TY T221) (ABC)
LF 1,052.800 $200.000 $225.000 $286.000
RETROFIT RAIL (TY T401)(HPC) (ABC)
LF 144.000 $200.000 $440.000 $385.000
ARMOR JOINT (ABC)
LF 564.000 $220.000 $76.000 $120.000
DIAMOND GRINDING SLAB (ABC)
SY 3,406.000 $15.000 $5.500 $7.920
REMOV STR (APPROACH SLAB) (ABC)
EA 4.000 $3,000.000 $3,750.000 $13,000.000
REMOVSTR(BRIDGE 100-499 FT LENGTH)(ABC)
EA 2.000 $150,000.000 $563,800.000 $110,000.000
ADJUST STL SHOES
EA 35.000 $3,000.000 $750.000 $2,900.000
MOBILIZATION
LS 1.000 $1,200,000.000 $921,000.000 $1,150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $30,000.000 $30,000.000 $50,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 250.000 $5.750 $1.900 $3.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 250.000 $3.000 $0.500 $1.100
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 126.000 $2.750 $5.000 $3.250
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 200.000 $3.450 $5.500 $4.350
BIODEG EROSN CONT LOGS (REMOVE)
LF 326.000 $0.850 $1.350 $0.830
CONSTRUCTING DETOURS
SY 1,482.000 $100.000 $103.000 $235.000
PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL)
LF 700.000 $75.000 $34.000 $88.000
PTB (MOVE)(F SHAPE)(TY 1) OR (STL)
LF 600.000 $10.500 $9.000 $14.300
PTB (STKPL)(F SHAPE)(TY 1) OR (STL)
LF 600.000 $9.000 $11.000 $14.300
PTB (REMOVE)(F SHAPE)(TY 1) OR (STL)
LF 700.000 $16.700 $10.000 $16.500
CONCRETE MEDIAN (NOSE)
SY 10.000 $100.000 $130.000 $500.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,765.000 $24.000 $21.000 $19.250
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 14.000 $1,750.000 $1,300.000 $1,468.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 6.000 $1,000.000 $1,200.000 $1,072.500
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,300.000 $1,200.000 $632.500
REMOVE METAL BEAM GUARD FENCE
LF 1,915.000 $5.000 $3.200 $2.200
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $300.000 $215.000 $143.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $2,700.000 $2,700.000 $2,805.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $250.000 $295.000 $275.000
CRASH CUSH ATTEN (INSTL)
EA 1.000 $10,000.000 $14,000.000 $14,300.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,400.000 $2,500.000 $1,650.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $700.000 $1,900.000 $1,320.000
RELOCATE RD IL ASM (TRANS-BASE)
EA 1.000 $1,600.000 $3,300.000 $3,135.000
REMOVE RD IL ASM (U/P)
EA 10.000 $500.000 $1,400.000 $1,347.500
CONDT (PVC) (SCH 40) (2")
LF 346.000 $7.500 $10.150 $10.450
CONDT (PVC) (SCH 40) (2") (BORE)
LF 107.000 $20.000 $22.250 $23.540
ELEC CONDR (NO.6) BARE
LF 453.000 $1.300 $1.650 $1.650
ELEC CONDR (NO.6) INSULATED
LF 906.000 $1.300 $2.100 $2.090
GROUND BOX TY A (122311)W/APRON
EA 1.000 $775.000 $1,300.000 $1,358.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $575.000 $780.000 $511.500
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 1.000 $1,600.000 $2,200.000 $2,145.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $2,150.000 $2,300.000 $2,145.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 6.000 $125.000 $68.000 $49.500
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 12.000 $125.000 $30.000 $20.350
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 19.000 $125.000 $19.000 $20.350
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 12.000 $125.000 $19.000 $20.350
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 16.000 $125.000 $21.000 $20.350
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 19.000 $125.000 $21.000 $27.500
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 16.000 $125.000 $21.000 $27.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 18,870.000 $1.300 $1.400 $1.380
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 450.000 $2.000 $3.150 $3.300
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 8,050.000 $1.300 $1.350 $1.380
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 795.000 $1.300 $1.250 $10.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,700.000 $2.000 $1.050 $1.100
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 674.000 $3.000 $5.800 $6.050
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 180.000 $2.000 $5.800 $6.050
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
LF 3,000.000 $2.000 $1.050 $1.100
PAVEMENT SEALER 4"
LF 3,000.000 $0.200 $0.550 $0.550
PAVEMENT SEALER 8"
LF 2,400.000 $0.250 $0.550 $0.550
PAVEMENT SEALER 24"
LF 854.000 $0.250 $2.100 $2.200
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,750.000 $0.800 $1.050 $1.100
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 8,500.000 $0.800 $1.050 $1.100
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 9,000.000 $0.400 $1.050 $1.100
REFL PAV MRKR TY II-C-R
EA 400.000 $4.000 $4.500 $4.400
ELIM EXT PAV MRK & MRKS (4")
LF 13,455.000 $0.920 $1.050 $1.100
ELIM EXT PAV MRK & MRKS (8")
LF 3,150.000 $0.850 $1.050 $1.100
ELIM EXT PAV MRK & MRKS (24")
LF 854.000 $0.850 $4.400 $4.400
PAV SURF PREP FOR MRK (4")
LF 24,250.000 $1.000 $0.120 $0.110
PAV SURF PREP FOR MRK (8")
LF 2,700.000 $1.000 $0.250 $0.220
PAV SURF PREP FOR MRK (24")
LF 854.000 $1.000 $1.100 $1.100
CONC CRCK REPR(DISCRETE)(ROUT AND SEAL)
LF 346.000 $58.000 $196.000 $25.000
REP STL BRIDGE MEMBER (DIAPHRAGM)
EA 3.000 $3,700.000 $5,600.000 $1,500.000
REP STL BRIDGE MEMBER (GIRDER END)
EA 30.000 $2,000.000 $750.000 $1,100.000
REPL STL MEMBER (SHOE ASSEMBLY)
EA 3.000 $12,000.000 $7,500.000 $8,000.000
BRIDGE JOINT REPAIR (CONCRETE) (ABC)
LF 272.000 $105.000 $115.000 $205.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 7.000 $10,500.000 $10,000.000 $17,500.000
TMA (STATIONARY)
EA 4.000 $10,500.000 $15,000.000 $26,000.000
TMA (MOBILE OPERATION)
DAY 25.000 $300.000 $300.000 $500.000
Totals: $7,643,990.600 $9,213,869.700 $11,582,776.850