DALLAS FM 1382 (1047-03-079)

Items: 64

County: DALLAS
Length: N/A
Highway: FM 1382
District: DALLAS
Control Number: 1047-03-079
DBE Goal: N/A
Project: STP 2024(350)TP
Guaranty: N/A
Time: 203 WORKING DAYS
Engineer's Estimate: $4,296,372.22
Date: 11/02/2023 (2 years ago)
Contract Number: N/A
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$4,296,372.22
$4,250,000.00
Over/Under Est: -1.08% -$46,372.22
Over/Under Est: 0.98% $42,115.89
Amt Left: 2.08% $88,488.11
Over/Under Est: 5.56% $238,718.81
Amt Left: 6.71% $285,091.03
Delta: -4.53% -$196,602.92
$4,857,411.00
Over/Under Est: 13.06% $561,038.78
Amt Left: 14.29% $607,411.00
Delta: -7.11% -$322,319.97
Over/Under Est: 39.05% $1,677,904.13
Amt Left: 40.57% $1,724,276.35
Delta: -22.99% -$1,116,865.35
Subcontractor Percentage Amount
QUALITY DUMP HAULERS, LLC 14.12% $600,100.00
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 7.91% $336,175.00
C T & S METAL FABRICATORS INC. 7.09% $301,325.00
FARR FOUNDATION, INC. 0.84% $35,700.00
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.75% $31,875.00
SUPERIOR TRAFFIC CONTROL, LLC 0.21% $8,925.00
Total: 30.92% $1,314,100.00

Bid Items & Bid Tabulations

64 Total 0 of 64
DALLAS  |  FM 1382  |  DALLAS  |  1047-03-079  |  11/02/2023  |  $4,296,372.22  |  STP 2024(350)TP  |  BICYCLE AND PEDESTRIAN IMPRVS  |  203 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS-REYES GROUP LTD.
ED BELL CONSTRUCTION COMPANY
RAGLE CONSTRUCTION, INC.
FNH CONSTRUCTION, LLC
HIGHWAY 19 CONSTRUCTION LLC
PREPARING ROW
STA 61.700 $6,300.000 $376.000 $3,333.330 $7,400.000 $7,300.000 $750.000
REMOVING CONC (RIPRAP)
SY 43.000 $12.000 $20.000 $58.000 $21.000 $50.000 $100.000
EXCAVATION (ROADWAY)
CY 13,949.000 $18.000 $20.000 $31.500 $30.000 $20.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 10,731.000 $28.000 $44.000 $52.500 $35.000 $35.000 $60.000
COMPOST MANUF TOPSOIL (4")
SY 17,522.000 $1.500 $1.000 $1.500 $3.000 $10.000 $6.000
BLOCK SODDING
SY 17,522.000 $5.000 $4.500 $5.000 $5.000 $10.000 $8.000
DRILL SEED (TEMP)(WARM OR COOL)
SY 17,522.000 $0.140 $0.250 $0.180 $0.180 $2.000 $0.450
VEGETATIVE WATERING
MG 5,213.100 $10.000 $58.000 $3.150 $40.000 $20.000 $65.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 1,390.000 $88.000 $92.000 $95.000 $125.000 $85.000 $100.000
TEMPORARY SPL SHORING
SF 1,002.000 $40.000 $31.000 $3.150 $8.000 $55.000 $65.000
DRILL SHAFT (18 IN)
LF 158.000 $150.000 $170.000 $200.000 $153.000 $350.000 $400.000
DRILL SHAFT (24 IN)
LF 172.000 $180.000 $194.000 $225.000 $156.000 $400.000 $600.000
CL C CONC (ABUT)(HPC)(SRC)
CY 27.000 $1,100.000 $1,509.000 $2,000.000 $1,450.000 $3,000.000 $2,500.000
RETAINING WALL (CAST - IN - PLACE)
SF 2,180.000 $85.000 $187.000 $150.000 $120.000 $85.000 $150.000
RETAINING WALL (SPECIAL)
SF 2,642.000 $115.000 $103.000 $110.000 $85.000 $95.000 $135.000
RIPRAP (STONE COMMON)(GROUT)(12 IN)
CY 32.000 $255.000 $407.000 $420.000 $397.000 $185.000 $375.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 260.000 $185.000 $342.000 $210.000 $123.000 $185.000 $200.000
RIPRAP (CONC)(FLUME)
CY 31.000 $700.000 $768.000 $900.000 $581.000 $650.000 $750.000
RIPRAP (MOW STRIP)(4 IN)
CY 8.000 $450.000 $893.000 $1,000.000 $631.000 $550.000 $1,200.000
RAIL(PEDESTRIAN)(SPL)
LF 346.900 $300.000 $197.000 $250.000 $203.000 $220.000 $225.000
RC PIPE (CL III)(18 IN)
LF 64.000 $65.000 $139.000 $150.000 $67.000 $120.000 $120.000
RC PIPE (CL III)(24 IN)
LF 74.000 $117.000 $194.000 $175.000 $83.000 $150.000 $180.000
RC PIPE (CL III)(30 IN)
LF 47.000 $105.000 $238.000 $200.000 $114.000 $200.000 $320.000
RC PIPE (CL III)(36 IN)
LF 84.000 $145.000 $362.000 $300.000 $137.000 $250.000 $360.000
INLET (COMPL)(PAZD)(RC)(3FTX3FT)
EA 1.000 $6,000.000 $7,222.000 $7,500.000 $4,850.000 $12,500.000 $4,200.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 1.000 $8,500.000 $27,497.000 $12,000.000 $19,600.000 $9,500.000 $4,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000 $1,150.000 $1,564.000 $1,000.000 $1,900.000 $1,850.000 $1,600.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $1,700.000 $1,943.000 $2,000.000 $2,600.000 $2,250.000 $2,600.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 1.000 $2,500.000 $3,036.000 $3,000.000 $2,900.000 $3,500.000 $4,000.000
PIPE (PVC) (SCH 40) (4 IN)
LF 60.000 $57.000 $69.000 $50.000 $69.000 $50.000 $100.000
REMOV STR (HEADWALL)
EA 1.000 $2,000.000 $625.000 $4,000.000 $1,321.000 $2,500.000 $2,500.000
MOBILIZATION
LS 1.000 $393,761.000 $386,677.950 $400,000.000 $450,000.000 $450,000.000 $430,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $10,000.000 $2,182.000 $10,500.000 $20,000.000 $8,500.000 $7,500.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 110.000 $35.000 $23.000 $55.000 $32.890 $30.000 $50.000
ROCK FILTER DAMS (REMOVE)
LF 110.000 $13.000 $11.000 $27.500 $10.650 $15.000 $24.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 983.000 $25.000 $27.000 $26.400 $32.750 $40.000 $39.000
CONSTRUCTION EXITS (REMOVE)
SY 983.000 $10.000 $9.000 $13.200 $9.540 $20.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,006.000 $3.000 $2.500 $4.000 $3.620 $4.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,006.000 $0.700 $0.750 $1.000 $0.590 $2.000 $1.800
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 718.000 $3.750 $3.500 $8.000 $0.360 $18.000 $4.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 718.000 $1.200 $0.750 $2.000 $0.320 $9.000 $1.800
CONC SIDEWALKS (6")
SY 7,009.000 $150.000 $87.000 $82.000 $55.000 $80.000 $200.000
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 1,287.000 $175.000 $105.000 $110.000 $71.000 $85.000 $225.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 2.250 $40.000 $76.000 $126.000 $25.500 $100.000 $75.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 14.000 $745.000 $706.000 $1,000.000 $673.500 $1,500.000 $795.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $650.000 $695.000 $1,000.000 $587.500 $1,100.000 $500.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 129.000 $7.290 $16.000 $8.800 $8.000 $20.000 $12.500
REFL PAV MRK TY II (W) 6" (SLD)
LF 1,117.000 $0.500 $2.000 $0.840 $0.760 $4.000 $5.000
REFL PAV MRK TY II (W) 12" (SLD)
LF 18.000 $1.750 $23.000 $4.130 $3.750 $6.000 $2.500
REFL PAV MRK TY II (W) 24" (SLD)
LF 129.000 $4.050 $14.000 $4.950 $4.500 $20.000 $10.000
REFL PAV MRK TY II (Y) 6" (BRK)
LF 1,518.000 $0.200 $3.000 $0.870 $0.790 $4.000 $1.000
REFL PAV MRK TY II (Y) 6" (SLD)
LF 40.000 $0.500 $2.500 $1.100 $1.000 $4.000 $1.000
TRAFFIC BUTTON TY I-A
EA 2.000 $10.000 $103.000 $11.000 $10.000 $6.000 $15.000
PAV SURF PREP FOR MRK (6")
LF 2,675.000 $0.100 $1.000 $0.330 $0.300 $4.000 $2.000
PAV SURF PREP FOR MRK (12")
LF 18.000 $0.500 $11.000 $0.550 $0.500 $6.000 $12.000
PAV SURF PREP FOR MRK (24")
LF 129.000 $1.500 $16.000 $0.550 $0.750 $20.000 $2.000
PAV SURF PREP FOR MRK (RPM)
EA 2.000 $0.190 $46.000 $1.100 $1.000 $250.000 $15.000
TREE PROTECTION
EA 5.000 $700.000 $179.000 $1,000.000 $1,000.000 $500.000 $500.000
PREFAB PED STL TRUSS BRG SPAN (130 FT)
EA 1.000 $300,000.000 $552,552.000 $450,000.000 $625,000.000 $750,000.000 $335,000.000
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 551.000 $5.000 $3.000 $4.000 $4.910 $10.000 $15.000
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 551.000 $2.000 $0.750 $1.000 $1.230 $2.000 $5.000
FOLDING BOLLARD
EA 1.000 $3,000.000 $447.000 $3,000.000 $2,800.000 $2,500.000 $1,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $10,000.000 $525.000 $10,000.000 $30,000.000 $20,000.000 $18,000.000
TMA (STATIONARY)
DAY 203.000 $135.000 $145.000 $150.000 $250.000 $250.000 $250.000
Totals: $4,296,372.220 $4,250,000.000 $4,338,488.116 $4,535,091.035 $4,857,411.000 $5,974,276.350