|
|
REMOVING CONC (RIPRAP)
|
SY
|
73.000
|
$7.000
|
$195.000
|
$50.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
760.000
|
$15.000
|
$16.000
|
$50.000
|
|
|
PLAN & TEXT ASPH CONC PAV (0" TO 3/4")
|
SY
|
20,907.000
|
$4.000
|
$2.750
|
$4.000
|
|
|
FULL - DEPTH REPAIR CPCD (9")
|
SY
|
1,000.000
|
$325.000
|
$246.000
|
$250.000
|
|
|
FULL - DEPTH REPAIR CPJR (10")
|
SY
|
200.000
|
$370.000
|
$317.500
|
$300.000
|
|
|
FULL - DEPTH REPAIR CPJR (12")
|
SY
|
1,200.000
|
$375.000
|
$333.000
|
$400.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
12.000
|
$250.000
|
$550.000
|
$350.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
140.000
|
$242.000
|
$210.000
|
$500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
10.200
|
$250.000
|
$1,100.000
|
$650.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
33.000
|
$500.000
|
$1,200.000
|
$550.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
10,005.000
|
$12.000
|
$3.600
|
$20.000
|
|
|
CLEANING AND SEALING EXIST JOINTS(CL7)
|
LF
|
825.000
|
$46.000
|
$60.000
|
$100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$234,730.860
|
$250,000.000
|
$250,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$18,000.000
|
$20,000.000
|
$8,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,355.000
|
$4.000
|
$2.900
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,335.000
|
$1.000
|
$0.800
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,000.000
|
$5.000
|
$4.500
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,000.000
|
$1.000
|
$0.900
|
$9.000
|
|
|
TEMP SDMT CONT FENCE (INLET PROTECTION)
|
LF
|
1,000.000
|
$8.000
|
$8.000
|
$10.000
|
|
|
CONC CURB (TY II)
|
LF
|
150.000
|
$40.000
|
$30.000
|
$55.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
930.000
|
$25.000
|
$23.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,000.000
|
$2,800.000
|
$1,850.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
930.000
|
$3.000
|
$5.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
2.000
|
$450.000
|
$220.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,100.000
|
$3,100.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$350.000
|
$335.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
20.000
|
$800.000
|
$1,450.000
|
$1,100.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
12.000
|
$35.000
|
$27.000
|
$100.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
700.000
|
$1.500
|
$1.600
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,375.000
|
$1.000
|
$1.450
|
$1.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
949.000
|
$7.500
|
$7.100
|
$10.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
31.000
|
$145.000
|
$160.000
|
$250.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
9.000
|
$170.000
|
$175.000
|
$250.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
14.000
|
$170.000
|
$222.000
|
$250.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
357.000
|
$8.000
|
$7.500
|
$15.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
149,467.000
|
$0.350
|
$0.250
|
$0.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
4,375.000
|
$0.500
|
$0.500
|
$0.500
|
|
|
PAVEMENT SEALER 24"
|
LF
|
1,306.000
|
$1.000
|
$3.000
|
$1.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
31.000
|
$42.000
|
$40.000
|
$100.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
14.000
|
$20.000
|
$51.000
|
$100.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
9.000
|
$50.000
|
$51.000
|
$100.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
28,870.000
|
$0.650
|
$0.750
|
$1.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
57,088.000
|
$0.850
|
$0.700
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
13,390.000
|
$0.900
|
$0.750
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
57,088.000
|
$0.750
|
$0.700
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
184.000
|
$5.000
|
$5.800
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
530.000
|
$4.500
|
$5.500
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
149,467.000
|
$0.450
|
$0.500
|
$0.200
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
4,375.000
|
$0.750
|
$0.700
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
1,306.000
|
$2.500
|
$3.500
|
$5.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
31.000
|
$50.000
|
$58.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
9.000
|
$60.000
|
$79.000
|
$100.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
14.000
|
$60.000
|
$58.000
|
$150.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
149,467.000
|
$0.200
|
$0.040
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
4,375.000
|
$0.800
|
$0.170
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
1,306.000
|
$1.000
|
$0.330
|
$1.500
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
31.000
|
$34.000
|
$11.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
9.000
|
$36.000
|
$11.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
14.000
|
$35.000
|
$11.000
|
$30.000
|
|
|
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
|
GAL
|
220.000
|
$100.000
|
$90.000
|
$50.000
|
|
|
FIBER REINFORCED POLYMER PATCHING MATLS
|
LB
|
2,000.000
|
$5.000
|
$7.500
|
$25.000
|
|
|
CONCRETE RAIL REPLACEMENT (TYPE 501)
|
LF
|
116.000
|
$500.000
|
$625.000
|
$1,000.000
|
|
|
CNC CRACK REPAIR (DISCRETE)(INJECT)
|
LF
|
6.000
|
$150.000
|
$135.000
|
$1,000.000
|
|
|
TBWC (MEMBRANE)
|
GAL
|
4,190.000
|
$9.500
|
$4.150
|
$8.000
|
|
|
TBWC PG76-22 SAC-A TY C
|
TON
|
865.000
|
$195.000
|
$290.000
|
$160.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$8,000.000
|
$15,000.000
|
$16,500.000
|
|
|
CONDUIT (PREPARE)
|
LF
|
742.000
|
$3.000
|
$5.500
|
$10.000
|
|
|
GROUND BOX (PREPARE)
|
EA
|
12.000
|
$400.000
|
$500.000
|
$60.000
|
|
|
TMA (STATIONARY)
|
DAY
|
202.000
|
$150.000
|
$200.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
101.000
|
$600.000
|
$385.000
|
$350.000
|
|
|
RVDS(PRESENCE DETECTION ONLY)
|
EA
|
8.000
|
$12,000.000
|
$20,500.000
|
$15,000.000
|
|
|
LEAD LED CHEVRON
|
EA
|
4.000
|
$4,100.000
|
$8,100.000
|
$6,500.000
|
|
|
LED CHEVRON
|
EA
|
14.000
|
$2,600.000
|
$5,200.000
|
$6,500.000
|
|
|
REML & DISPL DRIFTWOOD & DEBRIS
|
CY
|
12.000
|
$200.000
|
$375.000
|
$500.000
|
|
Totals: |
$2,488,039.410
|
$2,499,926.460
|
$2,842,143.400
|