DALLAS FM 1382 (1047-03-074)

Items: 74

County: DALLAS
Length: N/A
Highway: FM 1382
District: DALLAS
Control Number: 1047-03-074
DBE Goal: N/A
Project: STP 2023(937)MM
Guaranty: N/A
Time: 101 WORKING DAYS
Engineer's Estimate: $2,488,039.41
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
NATHAN PETTER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$2,488,039.41
$2,499,926.46
Over/Under Est: 0.48% $11,887.05
$2,842,143.40
Over/Under Est: 14.23% $354,103.99
Amt Left: 13.69% $342,216.94

Bid Items & Bid Tabulations

74 Total 0 of 74
DALLAS  |  FM 1382  |  DALLAS  |  1047-03-074  |  05/04/2023  |  $2,488,039.41  |  STP 2023(937)MM  |  HAZARD ELIM & SAFETY  |  101 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
O. TREVINO CONSTRUCTION, LLC
FNH CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 73.000 $7.000 $195.000 $50.000
REMOVING CONCRETE(MOW STRIP)
LF 760.000 $15.000 $16.000 $50.000
PLAN & TEXT ASPH CONC PAV (0" TO 3/4")
SY 20,907.000 $4.000 $2.750 $4.000
FULL - DEPTH REPAIR CPCD (9")
SY 1,000.000 $325.000 $246.000 $250.000
FULL - DEPTH REPAIR CPJR (10")
SY 200.000 $370.000 $317.500 $300.000
FULL - DEPTH REPAIR CPJR (12")
SY 1,200.000 $375.000 $333.000 $400.000
FLOWABLE BACKFILL
CY 12.000 $250.000 $550.000 $350.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 140.000 $242.000 $210.000 $500.000
RIPRAP (CONC)(5 IN)
CY 10.200 $250.000 $1,100.000 $650.000
RIPRAP (MOW STRIP)(4 IN)
CY 33.000 $500.000 $1,200.000 $550.000
CLEANING AND SEALING EXISTING JOINTS
LF 10,005.000 $12.000 $3.600 $20.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 825.000 $46.000 $60.000 $100.000
MOBILIZATION
LS 1.000 $234,730.860 $250,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $18,000.000 $20,000.000 $8,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,355.000 $4.000 $2.900 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 3,335.000 $1.000 $0.800 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,000.000 $5.000 $4.500 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,000.000 $1.000 $0.900 $9.000
TEMP SDMT CONT FENCE (INLET PROTECTION)
LF 1,000.000 $8.000 $8.000 $10.000
CONC CURB (TY II)
LF 150.000 $40.000 $30.000 $55.000
MTL W-BEAM GD FEN (TIM POST)
LF 930.000 $25.000 $23.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 6.000 $2,000.000 $2,800.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 930.000 $3.000 $5.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $450.000 $220.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,100.000 $3,100.000 $3,250.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $350.000 $335.000 $1,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 20.000 $800.000 $1,450.000 $1,100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 12.000 $35.000 $27.000 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 700.000 $1.500 $1.600 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,375.000 $1.000 $1.450 $1.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 949.000 $7.500 $7.100 $10.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 31.000 $145.000 $160.000 $250.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 9.000 $170.000 $175.000 $250.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 14.000 $170.000 $222.000 $250.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 357.000 $8.000 $7.500 $15.000
PAVEMENT SEALER 6"
LF 149,467.000 $0.350 $0.250 $0.500
PAVEMENT SEALER 8"
LF 4,375.000 $0.500 $0.500 $0.500
PAVEMENT SEALER 24"
LF 1,306.000 $1.000 $3.000 $1.500
PAVEMENT SEALER (ARROW)
EA 31.000 $42.000 $40.000 $100.000
PAVEMENT SEALER (WORD)
EA 14.000 $20.000 $51.000 $100.000
PAVEMENT SEALER (DBL ARROW)
EA 9.000 $50.000 $51.000 $100.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 28,870.000 $0.650 $0.750 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 57,088.000 $0.850 $0.700 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 13,390.000 $0.900 $0.750 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 57,088.000 $0.750 $0.700 $1.000
REFL PAV MRKR TY II-A-A
EA 184.000 $5.000 $5.800 $6.000
REFL PAV MRKR TY II-C-R
EA 530.000 $4.500 $5.500 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 149,467.000 $0.450 $0.500 $0.200
ELIM EXT PAV MRK & MRKS (8")
LF 4,375.000 $0.750 $0.700 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 1,306.000 $2.500 $3.500 $5.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 31.000 $50.000 $58.000 $100.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 9.000 $60.000 $79.000 $100.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 14.000 $60.000 $58.000 $150.000
PAV SURF PREP FOR MRK (6")
LF 149,467.000 $0.200 $0.040 $0.250
PAV SURF PREP FOR MRK (8")
LF 4,375.000 $0.800 $0.170 $0.250
PAV SURF PREP FOR MRK (24")
LF 1,306.000 $1.000 $0.330 $1.500
PAV SURF PREP FOR MRK (ARROW)
EA 31.000 $34.000 $11.000 $30.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 9.000 $36.000 $11.000 $30.000
PAV SURF PREP FOR MRK (WORD)
EA 14.000 $35.000 $11.000 $30.000
SPALLING REPAIR (POLYMERIC) (SEMIRIGID)
GAL 220.000 $100.000 $90.000 $50.000
FIBER REINFORCED POLYMER PATCHING MATLS
LB 2,000.000 $5.000 $7.500 $25.000
CONCRETE RAIL REPLACEMENT (TYPE 501)
LF 116.000 $500.000 $625.000 $1,000.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 6.000 $150.000 $135.000 $1,000.000
TBWC (MEMBRANE)
GAL 4,190.000 $9.500 $4.150 $8.000
TBWC PG76-22 SAC-A TY C
TON 865.000 $195.000 $290.000 $160.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $15,000.000 $16,500.000
CONDUIT (PREPARE)
LF 742.000 $3.000 $5.500 $10.000
GROUND BOX (PREPARE)
EA 12.000 $400.000 $500.000 $60.000
TMA (STATIONARY)
DAY 202.000 $150.000 $200.000 $250.000
TMA (MOBILE OPERATION)
DAY 101.000 $600.000 $385.000 $350.000
RVDS(PRESENCE DETECTION ONLY)
EA 8.000 $12,000.000 $20,500.000 $15,000.000
LEAD LED CHEVRON
EA 4.000 $4,100.000 $8,100.000 $6,500.000
LED CHEVRON
EA 14.000 $2,600.000 $5,200.000 $6,500.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 12.000 $200.000 $375.000 $500.000
Totals: $2,488,039.410 $2,499,926.460 $2,842,143.400