Items: 44

County: DALLAS
Length: 1.5200 MILES
Highway: VARIOUS
District: DALLAS
Control Number: 0918-47-490
DBE Goal: 0.0%
Project: STP 2026(662)VRUG
Guaranty: $9,000.00
Time: 50 WORKING DAYS
Engineer's Estimate: $436,623.50
Date: 06/03/2026 (7 days ago)
Contract Number: 6263226
Type: INSTALL TRAFFIC SIGNAL
Project ID: A00206422
Contract Type: Federal
Project Description: INSTALL RECTANGULAR RAPID FLASHING BEACON (RRFB)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CHRISTOPHER BLAIN
ERIC HERMAN
ANTHONY BLOCK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$436,623.50
Over/Under Est: -18.93% -$82,642.10
Over/Under Est: -2.45% -$10,681.00
Amt Left: 20.33% $71,961.10
$434,096.50
Over/Under Est: -0.58% -$2,527.00
Amt Left: 22.63% $80,115.10
Delta: -1.91% -$8,154.00
Over/Under Est: 8.51% $37,173.60
Amt Left: 33.85% $119,815.70
Delta: -9.15% -$39,700.60
Over/Under Est: 28.26% $123,376.50
Amt Left: 58.2% $206,018.60
Delta: -18.19% -$86,202.90

Bid Items & Bid Tabulations

44 Total 0 of 44
DALLAS  |  VARIOUS  |  DALLAS  |  0918-47-490  |  06/03/2026  |  $436,623.50  |  STP 2026(662)VRUG  |  INSTL TRAF SIGNAL  |  50 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ELECNOR BELCO ELECTRIC, INC.
DURABLE SPECIALTIES, INC.
YUNEX LLC
HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC
AMERICAN LIGHTING AND SIGNALIZATION, LLC
REMOV CONC (CURB & GUTTER)
LF 163.000 $45.000 $3.000 $45.000 $39.000 $35.900 $48.000
REMOV CONC (RAIL W/ METAL ELEMENT)
LF 17.000 $75.000 $12.000 $85.000 $73.000 $82.840 $90.000
RAIL (HANDRAIL)(TY A)
LF 17.000 $100.000 $251.000 $440.000 $356.000 $355.680 $443.000
MOBILIZATION
LS 1.000 $40,000.000 $66,000.000 $30,000.000 $66,762.000 $36,240.440 $35,656.500
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $9,000.000 $9,802.000 $2,400.000 $4,984.000 $3,353.030 $2,077.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 20.000 $150.000 $150.000 $85.000 $62.000 $68.750 $62.000
TMA (STATIONARY)
DAY 80.000 $250.000 $100.000 $200.000 $213.000 $212.500 $214.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 210.000 $8.000 $11.230 $1.000 $8.000 $10.940 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 210.000 $2.000 $5.400 $0.500 $2.000 $3.440 $0.600
REMOVE AND RELAY PAVERS
SY 82.500 $180.000 $113.000 $80.000 $67.000 $270.500 $83.000
CONC CURB (TY II)
LF 135.000 $50.000 $28.000 $70.000 $60.000 $109.140 $75.000
CONC CURB & GUTTER (TY II)
LF 115.000 $85.000 $33.000 $75.000 $65.000 $207.250 $80.000
CONC SIDEWALKS (6")
SY 47.000 $140.000 $172.000 $130.000 $106.000 $205.140 $130.000
CURB RAMPS (TY 2)
EA 2.000 $4,000.000 $2,187.000 $4,400.000 $3,667.000 $5,308.340 $4,570.000
CURB RAMPS (TY 6)
EA 6.000 $4,500.000 $2,660.000 $4,600.000 $3,889.000 $5,850.000 $4,800.000
CONC MEDIAN
SY 19.500 $200.000 $168.000 $375.000 $323.000 $266.660 $400.000
CONDT (PVC) (SCH 80) (3")
LF 585.000 $25.000 $16.000 $30.000 $33.000 $21.290 $30.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 325.000 $45.000 $37.000 $56.000 $51.000 $29.710 $30.000
CONDUIT (PREPARE)
LF 35.000 $4.000 $11.000 $2.000 $5.000 $12.840 $1.500
ELEC CONDR (NO.6) BARE
LF 945.000 $2.000 $3.000 $4.000 $3.000 $2.660 $3.400
ELEC CONDR (NO.6) INSULATED
LF 3,360.000 $3.000 $3.000 $4.000 $3.400 $3.260 $4.000
GROUND BOX TY A (122311)W/APRON
EA 12.000 $2,000.000 $2,128.000 $2,100.000 $2,550.000 $1,794.660 $1,700.000
ALUMINUM SIGNS (TY A)
SF 207.000 $45.000 $42.000 $35.000 $41.000 $47.010 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $1,000.000 $822.000 $1,000.000 $667.000 $816.700 $1,440.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $650.000 $651.000 $800.000 $551.000 $629.680 $540.000
REMOVE SM RD SN SUP&AM
EA 10.000 $150.000 $119.000 $375.000 $112.000 $170.430 $385.000
REFL PAV MRK TY I (W)12"(SLD)(090MIL)
LF 420.000 $4.000 $12.000 $5.000 $6.700 $7.500 $5.500
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 155.000 $8.000 $24.000 $10.000 $11.200 $12.500 $11.000
PAVEMENT SLER 12"
LF 420.000 $0.500 $6.000 $1.000 $1.100 $1.160 $0.700
PAVEMENT SLER 24"
LF 155.000 $1.250 $12.000 $3.000 $1.900 $2.060 $1.400
ELIM EXT PM & MRKS (4")
LF 80.000 $0.500 $3.600 $1.000 $0.700 $0.700 $1.000
ELIM EXT PM & MRKS (12")
LF 500.000 $1.500 $4.800 $3.000 $2.400 $2.690 $2.400
ELIM EXT PM & MRKS (24")
LF 85.000 $3.500 $8.000 $5.000 $4.800 $5.380 $4.900
ELIM EXT PM & MRKS (36")(YLD TRI)
EA 12.000 $15.000 $119.000 $30.000 $48.000 $53.750 $22.000
PAV SURF PREP FOR MRK (12")
LF 420.000 $0.300 $5.000 $1.000 $0.500 $0.540 $0.400
PAV SURF PREP FOR MRK (24")
LF 155.000 $0.750 $7.200 $1.000 $0.800 $0.840 $0.800
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 560.000 $2.500 $3.600 $3.000 $3.400 $3.760 $9.000
SPOT TREE TRIMMING / BRUSH REMOVAL
LF 125.000 $90.000 $32.000 $9.000 $24.000 $8.180 $221.000
GROUND BOX (PREPARE)
EA 1.000 $400.000 $350.600 $325.000 $512.000 $317.100 $600.000
SOLAR-POWERED RRFB (TWO-WAY WIRELESS)
EA 1.000 $11,000.000 $6,514.000 $16,810.000 $11,542.000 $17,110.890 $21,000.000
SOLAR-POWERED RRFB (ONE-WAY HARDWIRED)
EA 2.000 $10,500.000 $5,663.000 $16,050.000 $9,870.000 $16,448.390 $20,500.000
SOLAR-POWERED RRFB (ONE-WAY WIRELESS)
EA 2.000 $11,000.000 $6,495.000 $15,225.000 $9,870.000 $15,660.890 $21,500.000
RRFB (ONE-WAY HARDWIRED)
EA 8.000 $10,000.000 $5,420.000 $8,950.000 $9,024.000 $10,192.140 $16,500.000
RRFB (TWO-WAY HARDWIRED)
EA 2.000 $10,000.000 $5,420.000 $9,785.000 $10,916.000 $9,748.390 $17,500.000
Totals: $436,623.500 $353,981.400 $425,942.500 $434,096.500 $473,797.100 $560,000.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
Total: $2,000.00