DALLAS SKILLMAN ST (0918-47-403)

Items: 111

County: DALLAS
Length: 0.0000 MILES
Highway: SKILLMAN ST
District: DALLAS
Control Number: 0918-47-403
DBE Goal: 7.5%
Project: STP 2025(611)VRUG
Guaranty: $87,000.00
Time: 220 WORKING DAYS
Engineer's Estimate: $4,366,292.00
Date: 04/03/2025 (1 year ago)
Contract Number: 4253017
Type: TRAFFIC SIGNAL IMPROVEMENTS
Project ID: A00184382
Contract Type: Federal
Project Description: TRAFFIC SIGNAL IMPROVEMENTS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
CHRISTOPHER BLAIN
ERIC HERMAN
ANTHONY BLOCK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$4,366,292.00
1
Awarded
$3,625,595.00
Over/Under Est: -16.96% -$740,697.00
Over/Under Est: 1.32% $57,796.00
Amt Left: 22.02% $798,493.00
Over/Under Est: 8.46% $369,567.00
Amt Left: 30.62% $1,110,264.00
Delta: -7.05% -$311,771.00
Over/Under Est: 10.76% $469,870.80
Amt Left: 33.39% $1,210,567.80
Delta: -2.12% -$100,303.80
Over/Under Est: 19.17% $836,809.40
Amt Left: 43.51% $1,577,506.40
Delta: -7.59% -$366,938.60
Subcontractor Percentage Amount
FC TRAFFIC CONTROL, INC. 0.82% $29,729.88
Total: 0.82% $29,729.88

Bid Items & Bid Tabulations

111 Total 0 of 111
DALLAS  |  SKILLMAN ST  |  DALLAS  |  0918-47-403  |  04/03/2025  |  $4,366,292.00  |  STP 2025(611)VRUG  |  TRAF SIGNAL IMPRVS  |  220 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
YUNEX LLC
GREY SKY CONSTRUCTION LLC
DURABLE SPECIALTIES, INC.
ED BELL CONSTRUCTION COMPANY
O. TREVINO CONSTRUCTION, LLC
REMOV CONC (MEDIANS)
SY 446.000 $80.000 $93.000 $50.000 $94.000 $134.620 $170.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 729.000 $80.000 $58.000 $50.000 $59.000 $102.950 $100.000
REMOV CONC (CURB & GUTTER)
LF 1,590.000 $35.000 $38.000 $50.000 $38.000 $56.640 $50.000
EXCAV (ROADWAY)
CY 303.000 $125.000 $95.000 $50.000 $94.000 $446.900 $250.000
BLOCK SODDING
SY 60.000 $40.000 $41.000 $10.000 $145.000 $51.320 $105.000
VEGETATIVE WATERING
TGL 0.600 $750.000 $425.000 $20.000 $3,000.000 $984.820 $2,000.000
REWORK BS MTL (TY C)(10")(ORD COMP)
SY 981.000 $125.000 $81.000 $20.000 $82.000 $19.930 $130.000
CONC PVMT (CRCP) (11")
SY 981.000 $400.000 $241.000 $200.000 $318.000 $510.120 $408.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 8.000 $550.000 $725.000 $450.000 $720.000 $557.850 $594.180
DRILL SHAFT (TRF SIG POLE) (30 IN)
LF 84.000 $600.000 $635.000 $450.000 $740.000 $731.550 $779.200
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 224.000 $790.000 $605.000 $550.000 $810.000 $758.710 $808.120
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 22.000 $900.000 $915.000 $750.000 $1,025.000 $991.620 $1,056.210
RIPRAP (CONC)(6 IN)
CY 34.000 $1,200.000 $1,100.000 $1,000.000 $1,110.000 $2,320.810 $1,250.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 6.000 $1,000.000 $2,850.000 $2,500.000 $2,875.000 $1,000.000 $10,200.000
MOBILIZATION
LS 1.000 $250,000.000 $300,500.000 $450,000.000 $390,000.000 $480,000.000 $519,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $20,000.000 $27,100.000 $15,000.000 $9,500.000 $25,000.000 $27,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 12.000 $200.000 $62.000 $150.000 $96.000 $375.000 $250.000
TMA (STATIONARY)
DAY 220.000 $290.000 $215.000 $250.000 $863.000 $375.000 $250.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 355.000 $5.000 $4.250 $18.000 $2.000 $18.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 355.000 $2.000 $2.150 $9.000 $1.000 $6.000 $3.000
CONC CURB (TY II)
LF 923.000 $107.000 $67.000 $65.000 $68.000 $51.780 $85.000
CONC CURB & GUTTER (TY II)
LF 1,437.000 $100.000 $77.000 $85.000 $78.000 $75.190 $90.000
CONC SIDEWALKS (6")
SY 446.000 $175.000 $148.000 $75.000 $150.000 $140.220 $450.000
CURB RAMPS (TY 1)
EA 2.000 $3,500.000 $5,225.000 $3,850.000 $10,580.000 $3,614.520 $6,670.000
CURB RAMPS (TY 2)
EA 20.000 $5,500.000 $5,500.000 $3,850.000 $5,520.000 $4,677.560 $4,500.000
CURB RAMPS (TY 3)
EA 8.000 $5,000.000 $5,800.000 $3,850.000 $5,865.000 $3,604.340 $5,800.000
CURB RAMPS (TY 5)
EA 7.000 $6,000.000 $6,400.000 $3,850.000 $6,440.000 $7,689.510 $7,500.000
CURB RAMPS (TY 22)
EA 2.000 $5,000.000 $7,100.000 $3,850.000 $7,130.000 $5,984.890 $8,000.000
CONC MEDIAN (MONO NOSE)
SY 118.000 $400.000 $200.000 $500.000 $200.000 $408.740 $450.000
RELOCATE RD IL ASM (SHOE-BASE)
EA 1.000 $3,000.000 $2,064.000 $6,500.000 $3,500.000 $2,516.060 $2,655.360
REMOVE RD IL ASM (SHOE-BASE)
EA 1.000 $2,000.000 $1,015.000 $1,500.000 $1,800.000 $1,299.830 $1,371.790
CONDT (PVC) (SCH 80) (2")
LF 750.000 $30.000 $24.000 $30.000 $44.000 $27.690 $29.220
CONDT (PVC) (SCH 80) (3")
LF 770.000 $36.000 $26.000 $40.000 $46.000 $29.390 $31.020
CONDT (PVC) (SCH 80) (3") (BORE)
LF 2,215.000 $60.000 $32.000 $80.000 $88.000 $42.920 $45.300
CONDT (PVC) (SCH 80) (4")
LF 230.000 $42.000 $31.000 $60.000 $49.000 $42.280 $44.620
CONDT (PVC) (SCH 80) (4") (BORE)
LF 1,790.000 $70.000 $42.500 $85.000 $91.000 $50.480 $53.280
ELEC CONDR (NO.14) INSULATED
LF 2,060.000 $2.500 $1.450 $3.000 $3.000 $2.340 $2.470
ELEC CONDR (NO.12) INSULATED
LF 1,910.000 $2.500 $1.550 $3.000 $3.000 $2.660 $2.810
ELEC CONDR (NO.8) INSULATED
LF 6,070.000 $3.000 $1.900 $3.000 $4.000 $2.980 $3.150
ELEC CONDR (NO.6) BARE
LF 4,750.000 $3.000 $2.150 $3.000 $5.000 $3.410 $3.600
ELEC CONDR (NO.6) INSULATED
LF 430.000 $4.000 $2.250 $3.000 $5.000 $4.150 $4.380
ITS GND BOX (POLY) TY 1 (243624)
EA 1.000 $5,000.000 $2,900.000 $3,500.000 $6,750.000 $4,534.240 $4,785.270
ITS GND BOX (POLY) TY 1 (243624)W/APRN
EA 5.000 $5,500.000 $5,000.000 $4,000.000 $9,000.000 $5,716.170 $6,032.640
GROUND BOX TY A (122311)
EA 6.000 $1,500.000 $950.000 $1,500.000 $2,265.000 $1,843.410 $1,945.470
GROUND BOX TY A (122311)W/APRON
EA 6.000 $2,000.000 $2,960.000 $1,650.000 $3,225.000 $2,173.990 $2,294.340
GROUND BOX TY D (162922)
EA 15.000 $2,000.000 $1,025.000 $1,500.000 $2,375.000 $1,843.410 $1,945.470
GROUND BOX TY D (162922)W/APRON
EA 10.000 $2,705.000 $3,050.000 $1,650.000 $3,340.000 $2,428.630 $2,563.080
REMOVE GROUND BOX
EA 34.000 $450.000 $860.000 $250.000 $810.000 $726.010 $766.210
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
EA 6.000 $12,000.000 $8,700.000 $12,000.000 $14,100.000 $11,204.330 $11,824.650
ALUMINUM SIGNS (TY A)
SF 550.000 $55.000 $34.000 $50.000 $45.000 $45.580 $49.230
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $1,500.000 $1,075.000 $1,500.000 $2,400.000 $793.460 $840.720
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $1,000.000 $1,115.000 $1,100.000 $1,650.000 $617.170 $786.770
REMOVE SM RD SN SUP&AM
EA 1.000 $250.000 $106.000 $100.000 $600.000 $319.500 $129.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,870.000 $2.000 $1.500 $6.000 $2.000 $1.700 $1.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 3,570.000 $12.000 $9.700 $20.000 $9.000 $11.450 $12.080
PAVEMENT SLER 6"
LF 11,320.000 $0.250 $0.560 $2.000 $0.200 $0.850 $0.900
PAVEMENT SLER 8"
LF 2,870.000 $0.300 $0.560 $6.000 $0.300 $1.330 $1.400
PAVEMENT SLER 24"
LF 3,570.000 $3.000 $3.350 $20.000 $2.250 $2.660 $2.810
PAVEMENT SLER (ARROW)
EA 47.000 $22.000 $95.000 $250.000 $17.000 $95.850 $101.160
PAVEMENT SLER (DBL ARROW)
EA 6.000 $45.000 $95.000 $500.000 $34.000 $117.150 $123.640
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 4,120.000 $1.000 $1.150 $3.000 $1.500 $2.180 $2.300
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 5,600.000 $1.000 $1.150 $3.000 $1.500 $2.180 $2.300
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 2,670.000 $1.000 $1.150 $3.000 $1.500 $2.180 $2.300
PREFAB PM TY C (W)(ARROW)
EA 47.000 $300.000 $390.000 $250.000 $250.000 $282.230 $297.850
PREFAB PM TY C (W)(DBL ARROW)
EA 6.000 $500.000 $555.000 $500.000 $500.000 $314.180 $331.570
REFL PAV MRKR TY II-A-A
EA 40.000 $15.000 $10.000 $6.000 $1.000 $6.660 $7.020
REFL PAV MRKR TY II-C-R
EA 1,166.000 $15.000 $10.000 $6.000 $1.000 $6.660 $7.020
ELIM EXT PM & MRKS (4")
LF 12,450.000 $1.500 $1.150 $1.000 $0.500 $0.960 $1.010
ELIM EXT PM & MRKS (6")
LF 3,765.000 $1.000 $1.150 $3.000 $1.000 $0.960 $1.010
ELIM EXT PM & MRKS (8")
LF 2,500.000 $2.000 $2.150 $6.000 $1.000 $1.220 $1.290
ELIM EXT PM & MRKS (24")
LF 3,853.000 $5.000 $12.000 $20.000 $1.500 $3.200 $3.370
ELIM EXT PM & MRKS (ARROW)
EA 34.000 $65.000 $120.000 $250.000 $55.000 $95.850 $101.160
PAV SURF PREP FOR MRK (6")
LF 11,320.000 $0.500 $0.560 $2.000 $0.100 $0.270 $0.280
PAV SURF PREP FOR MRK (8")
LF 2,870.000 $0.500 $0.560 $5.000 $0.200 $0.430 $0.450
PAV SURF PREP FOR MRK (24")
LF 3,570.000 $1.000 $1.150 $10.000 $1.000 $1.600 $1.690
PAV SURF PREP FOR MRK (ARROW)
EA 47.000 $14.000 $56.000 $250.000 $12.000 $63.900 $67.440
PAV SURF PREP FOR MRK (DBL ARROW)
EA 6.000 $28.000 $56.000 $500.000 $24.000 $74.550 $78.680
REMOVING TRAFFIC SIGNALS
EA 6.000 $18,000.000 $19,625.000 $15,000.000 $8,500.000 $12,998.220 $13,717.850
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
EA 6.000 $40,000.000 $36,350.000 $50,000.000 $40,000.000 $45,987.770 $48,533.820
VEH SIG SEC (12")LED(GRN)
EA 68.000 $500.000 $325.000 $350.000 $900.000 $520.790 $549.620
VEH SIG SEC (12")LED(GRN ARW)
EA 22.000 $500.000 $325.000 $350.000 $900.000 $520.790 $549.620
VEH SIG SEC (12")LED(YEL)
EA 68.000 $500.000 $325.000 $350.000 $900.000 $520.790 $549.620
VEH SIG SEC (12")LED(YEL ARW)
EA 44.000 $500.000 $325.000 $350.000 $900.000 $520.790 $549.620
VEH SIG SEC (12")LED(RED)
EA 70.000 $500.000 $325.000 $350.000 $900.000 $520.790 $549.620
VEH SIG SEC (12")LED(RED ARW)
EA 40.000 $500.000 $325.000 $350.000 $900.000 $520.790 $549.620
PED SIG SEC (LED)(COUNTDOWN)
EA 48.000 $1,200.000 $680.000 $2,500.000 $1,615.000 $712.700 $752.160
BACKPLATE W/REFL BRDR(3 SEC)ALUM
EA 68.000 $300.000 $130.000 $250.000 $210.000 $267.950 $282.790
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 2.000 $375.000 $195.000 $260.000 $225.000 $328.770 $346.970
BACKPLATE W/REFL BRDR(5 SEC)ALUM
EA 20.000 $450.000 $200.000 $300.000 $250.000 $344.000 $363.040
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 2,590.000 $4.000 $2.550 $3.000 $4.000 $4.900 $5.170
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
LF 1,260.000 $4.000 $2.400 $3.000 $4.000 $5.110 $5.400
TRF SIG CBL (TY A)(14 AWG)(12 CONDR)
LF 4,005.000 $6.000 $3.250 $3.000 $8.000 $6.280 $6.630
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
LF 3,510.000 $9.000 $6.650 $3.000 $12.000 $12.140 $12.810
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 6,675.000 $4.000 $1.900 $3.000 $4.000 $3.300 $3.480
INS TRF SIG PL AM(S)1 ARM(24')LUM
EA 1.000 $14,000.000 $10,820.000 $16,500.000 $18,700.000 $20,333.410 $21,459.140
INS TRF SIG PL AM(S)1 ARM(28')LUM
EA 1.000 $15,000.000 $10,875.000 $17,500.000 $18,900.000 $20,754.610 $21,903.660
INS TRF SIG PL AM(S)1 ARM(32')
EA 1.000 $15,000.000 $9,325.000 $18,500.000 $17,700.000 $19,019.940 $20,084.200
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 4.000 $15,500.000 $11,875.000 $19,000.000 $19,600.000 $21,469.120 $22,657.740
INS TRF SIG PL AM(S)1 ARM(36')
EA 1.000 $16,000.000 $12,350.000 $20,000.000 $18,900.000 $21,090.510 $22,258.160
INS TRF SIG PL AM(S)1 ARM(36')LUM
EA 2.000 $16,500.000 $13,000.000 $20,500.000 $21,000.000 $23,708.390 $25,020.980
INS TRF SIG PL AM(S)1 ARM(40')LUM
EA 3.000 $18,000.000 $13,350.000 $22,000.000 $22,000.000 $24,098.390 $25,432.570
INS TRF SIG PL AM(S)1 ARM(48')
EA 1.000 $17,259.000 $14,125.000 $25,000.000 $20,900.000 $23,722.880 $25,036.270
INS TRF SIG PL AM(S)1 ARM(48')LUM
EA 9.000 $19,184.000 $15,850.000 $26,000.000 $22,900.000 $26,454.810 $27,919.450
INS TRF SIG PL AM(S)1 ARM(65')LUM
EA 1.000 $41,000.000 $36,500.000 $60,000.000 $51,200.000 $53,181.630 $56,125.970
PED POLE ASSEMBLY
EA 29.000 $5,315.000 $3,225.000 $2,850.000 $7,400.000 $4,794.520 $5,059.970
PED DETECT PUSH BUTTON (APS)
EA 48.000 $1,360.000 $840.000 $1,850.000 $1,500.000 $1,607.720 $1,696.730
PED DETECTOR CONTROLLER UNIT
EA 6.000 $4,630.000 $3,500.000 $6,500.000 $6,000.000 $5,818.840 $6,140.990
SPOT TREE TRIMMING / BRUSH REMOVAL
LF 75.000 $250.000 $125.000 $200.000 $15.000 $47.930 $61.820
RVDS (PRESENCE DET)(INSTALL ONLY)
EA 8.000 $3,000.000 $1,730.000 $3,500.000 $3,000.000 $2,576.870 $2,719.540
RVDS (PRES AND ADV)(INSTALL ONLY)
EA 16.000 $3,000.000 $1,625.000 $3,500.000 $3,000.000 $2,386.880 $2,519.020
REMOVE FIRE HYDRANT
EA 1.000 $5,000.000 $3,893.200 $5,000.000 $4,600.000 $5,893.960 $8,850.000
Totals: $4,366,292.000 $3,625,595.000 $4,424,088.000 $4,735,859.000 $4,836,162.802 $5,203,101.400
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
PUBLIC UTILITY FORCE ACCT WORK (PART) $3,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
MATERIALS FURNISHED BY CITY (PART) $124,633.84
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $500.00
Total: $133,633.84