DALLAS FD (0918-47-359)

Items: 57

County: DALLAS
Length: N/A
Highway: FD
District: DALLAS
Control Number: 0918-47-359
DBE Goal: N/A
Project: C 918-47-359
Guaranty: N/A
Time: 105 WORKING DAYS
Engineer's Estimate: $1,732,200.85
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
NATHAN PETTER
DUNG NGUYEN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,732,200.85
$2,217,976.40
Over/Under Est: 28.04% $485,775.55
Over/Under Est: 61.79% $1,070,332.70
Amt Left: 26.36% $584,557.15
Subcontractor Percentage Amount
Q. ROBERTS TRUCKING INCORPORATED 3.38% $74,967.60
COWBOY TRUCKING 3.38% $74,967.60
STRIPE-A-ZONE, LLC 1.79% $39,701.78
WIMS ENVIRONMENTAL CONSTRUCTION, LTD. 1.37% $30,386.28
DIIBS SPECIALISTS, LLC 1.18% $26,172.12
TEXAS SELECT EROSION, LLC 0.79% $17,522.01
BUYERS BARRICADES, INC. 0.23% $5,101.35
Total: 12.12% $268,818.74

Bid Items & Bid Tabulations

57 Total 0 of 57
DALLAS  |  FD  |  DALLAS  |  0918-47-359  |  06/28/2023  |  $1,732,200.85  |  C 918-47-359  |  REHAB EXIST ROADWAY  |  105 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNH CONSTRUCTION, LLC
ED BELL CONSTRUCTION COMPANY
PREPARING ROW
STA 76.610 $500.000 $2,500.000 $1,600.000
REMOV STAB BASE AND ASPH PAV (10"-18")
SY 10,991.000 $12.000 $15.000 $17.500
EXCAVATION (ROADWAY)
CY 8,052.000 $12.000 $20.000 $30.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 5,945.000 $30.000 $30.000 $45.000
BACKFILL (TY A OR B)
STA 50.500 $265.000 $250.000 $500.000
COMPOST MANUF TOPSOIL (4")
SY 8,147.000 $4.600 $10.000 $1.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 8,147.000 $0.250 $1.000 $0.330
DRILL SEED (TEMP)(WARM OR COOL)
SY 8,147.000 $0.250 $1.000 $0.290
VEGETATIVE WATERING
MG 2,424.000 $2.000 $8.000 $2.100
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 1,842.000 $93.000 $80.000 $150.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 2,050.000 $65.000 $80.000 $165.000
CEMENT
TON 62.000 $300.000 $325.000 $400.000
CEMENT TREAT (NEW BASE) (6")
SY 12,296.000 $2.500 $8.000 $10.000
EMULS ASPH (PRIME)(MS-2 OR SS-1)
GAL 2,459.000 $5.500 $6.000 $14.000
ASPH (CRS-2P)
GAL 7,345.000 $4.500 $6.000 $5.510
ASPH (RC-250)
GAL 1,130.000 $6.500 $6.000 $10.250
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 32.000 $210.000 $300.000 $450.000
ASPH (AC-15P, AC-20-5TR OR AC-20XP)
GAL 1,696.000 $6.500 $6.000 $8.650
AGGR (TY-B GR-4 OR TY-L GR-4 SAC-B)
CY 101.000 $203.000 $300.000 $248.000
AGGR (TY-B GR-3 OR TY-L GR-3)(SAC-B)
CY 77.000 $195.000 $300.000 $468.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 387.000 $100.000 $85.000 $97.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 150.000 $165.000 $125.000 $175.000
PLANE ASPH CONC PAV(0" TO 2")
SY 7,737.000 $5.000 $6.000 $4.000
RIPRAP (CONC)(4 IN)
CY 9.000 $600.000 $550.000 $1,500.000
RIPRAP (MOW STRIP)(4 IN)
CY 18.000 $600.000 $550.000 $1,500.000
REMOVE STR (BOLLARD)
EA 4.000 $200.000 $150.000 $500.000
MOBILIZATION
LS 1.000 $147,927.350 $200,000.000 $279,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $15,000.000 $8,500.000 $17,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 60.000 $33.000 $40.000 $60.500
ROCK FILTER DAMS (REMOVE)
LF 60.000 $9.250 $15.000 $35.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 84.000 $23.000 $40.000 $26.400
CONSTRUCTION EXITS (REMOVE)
SY 84.000 $8.500 $20.000 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,142.000 $3.000 $4.000 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,142.000 $0.600 $2.000 $0.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 116.000 $4.500 $18.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 116.000 $1.000 $9.000 $1.500
MTL W-BEAM GD FEN (TIM POST)
LF 175.000 $23.000 $35.000 $22.220
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,200.000 $1,850.000 $1,100.000
REMOVE METAL BEAM GUARD FENCE
LF 660.000 $2.750 $3.000 $2.750
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 4.000 $160.000 $500.000 $137.500
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,100.000 $3,250.000 $3,052.500
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $240.000 $1,500.000 $275.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 18.000 $45.000 $40.000 $93.500
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 17.000 $500.000 $650.000 $660.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 6.000 $40.000 $100.000 $71.500
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $35.000 $100.000 $27.500
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 15,168.000 $0.300 $1.100 $0.880
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 766.000 $1.000 $6.000 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 74.000 $8.000 $20.000 $20.900
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 14,618.000 $0.700 $1.100 $0.920
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 15,168.000 $0.700 $1.100 $0.920
REFL PAV MRKR TY II-A-A
EA 190.000 $3.500 $5.000 $7.150
SP MIXES SP-C SAC-B PG64-22
TON 2,183.000 $125.000 $120.000 $145.000
TACK COAT
GAL 851.000 $3.500 $6.000 $1.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $10,000.000 $7,500.000
TMA (STATIONARY)
DAY 70.000 $250.000 $250.000 $175.000
TMA (MOBILE OPERATION)
DAY 6.000 $165.000 $550.000 $1,000.000
Totals: $1,732,200.850 $2,217,976.400 $2,802,533.550