|
|
REMOVING CONC (PAV)
|
SY
|
124.000
|
$45.000
|
$80.000
|
$51.000
|
$10.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
SY
|
3.000
|
$250.000
|
$865.000
|
$181.200
|
$485.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
106.000
|
$18.000
|
$35.000
|
$11.400
|
$32.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
5.500
|
$100.000
|
$160.000
|
$243.500
|
$8.500
|
|
|
BLOCK SODDING
|
SY
|
93.000
|
$40.000
|
$50.000
|
$67.400
|
$3.000
|
|
|
VEGETATIVE WATERING
|
MG
|
6.000
|
$500.000
|
$250.000
|
$112.200
|
$10.000
|
|
|
REWORK BS MTL (TY C) (8") (ORD COMP)
|
SY
|
62.500
|
$40.000
|
$80.000
|
$186.900
|
$80.000
|
|
|
CONC PVMT (CONT REINF)(FAST TRK)(12")
|
SY
|
154.500
|
$200.000
|
$200.000
|
$152.900
|
$275.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (30 IN)
|
LF
|
11.000
|
$320.000
|
$300.000
|
$577.800
|
$325.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
208.000
|
$350.000
|
$325.000
|
$633.200
|
$365.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
110.000
|
$400.000
|
$375.000
|
$831.400
|
$405.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
9.000
|
$650.000
|
$1,850.000
|
$549.300
|
$720.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$65,000.000
|
$25,400.000
|
$146,450.750
|
$120,430.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$2,250.000
|
$2,000.000
|
$1,245.700
|
$6,500.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
500.000
|
$2.000
|
$1.000
|
$16.900
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
500.000
|
$1.000
|
$1.000
|
$16.900
|
$2.000
|
|
|
CONC CURB (TY II)
|
LF
|
32.000
|
$75.000
|
$35.000
|
$39.700
|
$40.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
387.500
|
$65.000
|
$75.000
|
$62.300
|
$55.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
384.500
|
$105.000
|
$140.000
|
$77.100
|
$135.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
1.000
|
$3,000.000
|
$2,900.000
|
$2,378.100
|
$3,000.000
|
|
|
CURB RAMPS (TY 3)
|
EA
|
2.000
|
$3,100.000
|
$3,100.000
|
$4,020.100
|
$3,290.000
|
|
|
CURB RAMPS (TY 5)
|
EA
|
11.000
|
$3,750.000
|
$3,800.000
|
$6,228.400
|
$3,000.000
|
|
|
CURB RAMPS (TY 7)
|
EA
|
14.000
|
$3,000.000
|
$2,900.000
|
$3,623.800
|
$2,800.000
|
|
|
CONC MEDIAN(MONO NOSE)
|
SY
|
74.000
|
$175.000
|
$100.000
|
$130.300
|
$200.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
410.000
|
$17.000
|
$20.000
|
$28.400
|
$14.000
|
|
|
CONDT (PVC) (SCH 80) (3")
|
LF
|
1,120.000
|
$18.000
|
$22.000
|
$33.200
|
$16.000
|
|
|
CONDT (PVC) (SCH 80) (3") (BORE)
|
LF
|
2,355.000
|
$32.000
|
$36.000
|
$26.600
|
$28.000
|
|
|
CONDT (PVC) (SCH 80) (4")
|
LF
|
110.000
|
$20.000
|
$24.000
|
$38.800
|
$18.000
|
|
|
CONDT (PVC) (SCH 80) (4") (BORE)
|
LF
|
2,415.000
|
$35.000
|
$38.000
|
$32.200
|
$32.000
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
1,360.000
|
$1.500
|
$1.000
|
$2.400
|
$2.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
4,160.000
|
$2.000
|
$1.000
|
$2.800
|
$2.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
3,585.000
|
$2.500
|
$2.000
|
$2.900
|
$2.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
330.000
|
$2.500
|
$2.000
|
$3.100
|
$2.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
4.000
|
$800.000
|
$1,140.000
|
$1,619.000
|
$950.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
24.000
|
$1,200.000
|
$1,190.000
|
$2,067.700
|
$1,150.000
|
|
|
REMOVE GROUND BOX
|
EA
|
20.000
|
$200.000
|
$175.000
|
$336.600
|
$250.000
|
|
|
ELC SRV TY D 120/240 070(NS)SS(E)PS(U)
|
EA
|
6.000
|
$6,500.000
|
$7,000.000
|
$6,267.900
|
$6,459.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$1,000.000
|
$900.000
|
$1,463.700
|
$550.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$500.000
|
$50.600
|
$224.400
|
$140.000
|
|
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
|
LF
|
3,485.000
|
$1.500
|
$1.000
|
$0.900
|
$1.850
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
3,312.000
|
$1.500
|
$1.500
|
$1.200
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
3,652.000
|
$6.000
|
$6.000
|
$5.700
|
$8.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
6,429.000
|
$0.150
|
$0.100
|
$0.300
|
$0.500
|
|
|
PAVEMENT SEALER 6"
|
LF
|
3,485.000
|
$0.500
|
$0.200
|
$0.300
|
$0.500
|
|
|
PAVEMENT SEALER 8"
|
LF
|
3,312.000
|
$1.000
|
$0.250
|
$0.300
|
$0.500
|
|
|
PAVEMENT SEALER 24"
|
LF
|
3,652.000
|
$2.500
|
$2.000
|
$0.900
|
$1.800
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
60.000
|
$25.000
|
$17.000
|
$22.700
|
$27.000
|
|
|
PAVEMENT SEALER (DBL ARROW)
|
EA
|
2.000
|
$40.000
|
$35.000
|
$22.700
|
$40.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
|
LF
|
2,760.000
|
$1.000
|
$1.000
|
$0.900
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
2,702.000
|
$1.000
|
$1.000
|
$0.900
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
967.000
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
60.000
|
$250.000
|
$260.000
|
$254.800
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
2.000
|
$450.000
|
$515.000
|
$385.100
|
$465.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
97.000
|
$4.000
|
$4.000
|
$5.700
|
$6.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,472.000
|
$4.000
|
$4.000
|
$5.700
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
5,996.000
|
$1.000
|
$1.000
|
$0.400
|
$0.600
|
|
|
ELIM EXT PAV MRK & MRKS (6")
|
LF
|
2,911.000
|
$1.000
|
$1.000
|
$0.400
|
$1.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
2,855.000
|
$1.000
|
$1.500
|
$0.500
|
$1.300
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
3,268.000
|
$3.500
|
$4.000
|
$1.200
|
$7.000
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
26.000
|
$25.000
|
$35.000
|
$22.700
|
$55.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
2.000
|
$75.000
|
$55.000
|
$22.700
|
$78.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
6,429.000
|
$0.200
|
$0.100
|
$0.100
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
3,485.000
|
$0.250
|
$0.100
|
$0.100
|
$0.200
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
3,312.000
|
$0.250
|
$0.100
|
$0.100
|
$0.300
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
3,652.000
|
$1.000
|
$1.000
|
$1.200
|
$0.700
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
60.000
|
$15.000
|
$11.000
|
$17.000
|
$20.000
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
2.000
|
$30.000
|
$23.000
|
$17.000
|
$30.000
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
1,569.000
|
$0.750
|
$0.100
|
$0.200
|
$1.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
6.000
|
$5,000.000
|
$4,500.000
|
$10,095.900
|
$6,200.000
|
|
|
INS HY TRF SIG (DPT SUP CNT & CAB)(ISO)
|
EA
|
6.000
|
$14,500.000
|
$12,000.000
|
$19,686.300
|
$19,500.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
67.000
|
$325.000
|
$350.000
|
$211.300
|
$245.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
28.000
|
$325.000
|
$350.000
|
$214.700
|
$245.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
70.000
|
$325.000
|
$350.000
|
$211.300
|
$245.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
47.000
|
$325.000
|
$350.000
|
$214.700
|
$245.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
72.000
|
$325.000
|
$350.000
|
$211.300
|
$245.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
44.000
|
$325.000
|
$350.000
|
$214.700
|
$245.000
|
|
|
PED SIG SEC (LED)(COUNTDOWN)
|
EA
|
42.000
|
$800.000
|
$750.000
|
$419.600
|
$850.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
71.000
|
$130.000
|
$140.000
|
$133.100
|
$143.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)ALUM
|
EA
|
7.000
|
$140.000
|
$150.000
|
$141.100
|
$155.000
|
|
|
BACKPLATE W/REFL BRDR(5 SEC)ALUM
|
EA
|
17.000
|
$150.000
|
$170.000
|
$168.200
|
$185.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
3,095.000
|
$2.500
|
$2.000
|
$3.200
|
$2.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
1,370.000
|
$2.500
|
$2.000
|
$3.400
|
$2.500
|
|
|
TRF SIG CBL (TY A)(14 AWG)(10 CONDR)
|
LF
|
3,260.000
|
$4.000
|
$4.000
|
$3.100
|
$3.500
|
|
|
TRF SIG CBL (TY A)(14 AWG)(20 CONDR)
|
LF
|
3,430.000
|
$6.000
|
$6.000
|
$6.100
|
$4.850
|
|
|
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
|
LF
|
6,665.000
|
$2.000
|
$2.000
|
$2.900
|
$2.300
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
1.000
|
$9,000.000
|
$9,100.000
|
$10,291.500
|
$8,690.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')
|
EA
|
1.000
|
$10,000.000
|
$9,300.000
|
$10,056.000
|
$8,232.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
1.000
|
$10,500.000
|
$10,400.000
|
$11,367.300
|
$9,640.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(44')LUM
|
EA
|
3.000
|
$12,500.000
|
$11,400.000
|
$12,387.600
|
$10,556.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')
|
EA
|
2.000
|
$14,000.000
|
$10,600.000
|
$12,670.300
|
$9,565.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
9.000
|
$15,000.000
|
$12,000.000
|
$14,059.800
|
$11,342.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')
|
EA
|
1.000
|
$27,000.000
|
$27,500.000
|
$28,785.700
|
$24,096.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(55')LUM
|
EA
|
1.000
|
$29,000.000
|
$29,800.000
|
$31,032.500
|
$26,530.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(60')LUM
|
EA
|
2.000
|
$30,000.000
|
$30,200.000
|
$32,091.700
|
$27,071.000
|
|
|
INS TRF SIG PL AM(S)2 ARM(65-36')LUM
|
EA
|
1.000
|
$30,000.000
|
$35,891.000
|
$37,454.800
|
$31,357.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
21.000
|
$2,500.000
|
$2,700.000
|
$1,787.700
|
$1,900.000
|
|
|
PED DETECT PUSH BUTTON (APS)
|
EA
|
42.000
|
$750.000
|
$700.000
|
$593.500
|
$900.000
|
|
|
PED DETECTOR CONTROLLER UNIT
|
EA
|
6.000
|
$3,250.000
|
$3,500.000
|
$2,676.000
|
$3,500.000
|
|
|
TREE TRIMMING AND BRUSH REMOVAL
|
LF
|
75.000
|
$50.000
|
$10.000
|
$112.200
|
$250.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
60.000
|
$100.000
|
$75.000
|
$90.600
|
$8,540.000
|
|
|
CCTV FIELD EQUIPMENT (DIGITAL)
|
EA
|
6.000
|
$6,500.000
|
$7,000.000
|
$6,110.000
|
$8,410.000
|
|
|
CCTV MOUNT (POLE)
|
EA
|
6.000
|
$500.000
|
$280.000
|
$788.400
|
$1,200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
36.000
|
$175.000
|
$120.000
|
$201.100
|
$230.000
|
|
|
ITS GND BOX (POLY) TY 1 (243624)W/APRN
|
EA
|
6.000
|
$3,000.000
|
$3,400.000
|
$4,793.000
|
$2,870.000
|
|
|
RVDS(PRESENCE DET ONLY)(INSTALL ONLY)
|
EA
|
3.000
|
$1,000.000
|
$900.000
|
$448.700
|
$1,240.000
|
|
|
RVDS(PRES AND ADV DET)(INSTALL ONLY)
|
EA
|
20.000
|
$1,000.000
|
$900.000
|
$448.700
|
$1,240.000
|
|
Totals: |
$1,780,638.150
|
$1,724,000.000
|
$1,999,500.000
|
$2,430,736.000
|