DALLAS S BELTLINE RD (0918-47-234)

Items: 131

County: DALLAS
Length: 0.2550 MILES
Highway: S BELTLINE RD
District: DALLAS
Control Number: 0918-47-234
DBE Goal: 7.0%
Project: BR 2B24(326)
Guaranty: $100,000.00
Time: 597 WORKING DAYS
Engineer's Estimate: $7,689,300.70
Date: 05/02/2025 (1 year ago)
Contract Number: 5253205
Type: BRIDGE REPLACEMENT
Project ID: A00064833
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
NATHAN PETTER
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$7,689,300.70
$8,168,666.00
Over/Under Est: 6.23% $479,365.30
Over/Under Est: 10.34% $795,077.80
Amt Left: 3.86% $315,712.50
$8,962,082.00
Over/Under Est: 16.55% $1,272,781.30
Amt Left: 9.71% $793,416.00
Delta: -5.63% -$477,703.50
$9,104,007.01
Over/Under Est: 18.4% $1,414,706.31
Amt Left: 11.45% $935,341.01
Delta: -1.58% -$141,925.01
Over/Under Est: 34.62% $2,662,211.42
Amt Left: 26.72% $2,182,846.12
Delta: -13.70% -$1,247,505.11
Over/Under Est: 41.12% $3,161,553.25
Amt Left: 32.84% $2,682,187.95
Delta: -4.82% -$499,341.83
Subcontractor Percentage Amount
PEACHTREE CONSTRUCTION, LTD. 2.65% $216,469.65
STRIPE-A-ZONE, LLC 0.76% $62,081.86
DIAMOND ELITE BARRICADES, LLC 0.45% $36,759.00
CIVIL TREE SOLUTIONS, LLC 0.18% $14,703.60
Total: 4.04% $330,014.11

Bid Items & Bid Tabulations

131 Total 0 of 131
DALLAS  |  S BELTLINE RD  |  DALLAS  |  0918-47-234  |  05/02/2025  |  $7,689,300.70  |  BR 2B24(326)  |  BRIDGE REPL  |  597 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HIGHWAY 19 CONSTRUCTION LLC
GREY SKY CONSTRUCTION LLC
IBCTX, LLC
ALTUS CONSTRUCTION LLC
RAGLE CONSTRUCTION, INC.
URBAN INFRACONSTRUCTION LLC
PREPARING ROW
STA 21.580 $12,000.000 $5,000.000 $35,000.000 $16,000.000 $41,765.140 $50,000.000 $15,000.000
REMOV CONC (PAV)
SY 4,456.000 $25.000 $55.000 $20.000 $30.000 $21.190 $13.000 $20.000
REMOV CONC (MEDIANS)
SY 105.000 $55.000 $25.000 $20.000 $30.000 $33.910 $20.000 $55.000
REMOV CONC (PAVERS)
SY 212.000 $35.000 $25.000 $20.000 $35.000 $10.340 $19.000 $65.000
REMOV CONC (CURB)
LF 1,554.000 $20.000 $10.000 $20.000 $18.000 $12.290 $8.000 $15.000
REMOV CONC (APPR SLAB)
SY 360.000 $185.000 $55.000 $100.000 $20.000 $317.880 $32.000 $35.000
REMOV CONC (RAIL W/ METAL ELEMENT)
LF 48.000 $30.000 $100.000 $50.000 $50.000 $42.380 $52.000 $55.000
RMV (10"-14") TRT/UNTRT BASE & ASPH PAV
SY 1,134.000 $50.000 $15.000 $20.000 $17.000 $13.940 $17.300 $25.000
EXCAV (ROADWAY)
CY 74.000 $35.000 $50.000 $20.000 $88.000 $20.170 $1,000.000 $190.000
EMBANK (FNL)(DC)(TY C)
CY 1,960.000 $40.000 $35.000 $40.000 $85.000 $23.160 $40.000 $95.000
COMPOST MANUF TOPSOIL (4")
SY 9,155.000 $5.000 $3.000 $6.000 $2.000 $2.870 $1.000 $8.000
BLOCK SODDING
SY 9,155.000 $11.000 $5.000 $6.000 $9.000 $6.870 $8.200 $7.000
DRILL SEED (TEMP_WARM_COOL)
SY 6,438.000 $0.500 $0.450 $0.500 $0.500 $0.250 $0.420 $1.000
VEGETATIVE WATERING
TGL 2,320.000 $36.000 $10.000 $20.000 $1.000 $31.010 $20.000 $60.000
FL BS (CMP IN PLC)(TY D GR 1-2) (8")
SY 1,084.000 $25.000 $35.000 $25.000 $25.000 $25.430 $26.000 $55.000
LIME (COM OR QK)(SLURRY)
TON 103.000 $400.000 $450.000 $400.000 $440.000 $297.590 $315.000 $375.000
LIME TRT (EXIST MATL)(6")
SY 1,084.000 $15.000 $11.000 $12.000 $20.000 $9.920 $11.000 $18.000
LIME TRT (EXIST MATL)(8")
SY 4,920.000 $15.000 $11.000 $12.000 $11.000 $5.510 $7.000 $15.000
PRIME COAT(MC-30 OR AE-P)
GAL 217.000 $10.000 $50.000 $10.000 $12.000 $6.190 $13.000 $25.000
SP MIXES SP-B PG64-22
TON 224.000 $170.000 $300.000 $200.000 $190.000 $114.440 $233.000 $195.000
SP MIXES SP-C SAC-B PG70-22
TON 112.000 $200.000 $320.000 $250.000 $225.000 $116.130 $180.000 $205.000
TACK COAT
GAL 65.000 $5.000 $5.000 $10.000 $28.000 $3.800 $20.000 $2.000
PLANE ASPH CONC PAV(0" TO 2")
SY 225.000 $8.000 $25.000 $20.000 $17.000 $6.500 $4.500 $20.000
PLANE ASPH CONC PAV(4")
SY 2,362.000 $14.000 $17.000 $20.000 $6.000 $6.500 $10.000 $15.000
CONC PVMT (CRCP) (9")
SY 4,247.000 $140.000 $117.000 $100.000 $176.000 $155.370 $94.000 $135.000
STRUCT EXCAV
CY 4,472.000 $35.000 $25.000 $50.000 $20.000 $29.670 $32.000 $35.000
CEM STABIL BKFL
CY 1,333.000 $240.000 $350.000 $250.000 $240.000 $139.510 $132.000 $210.000
TRENCH EXCAVATION PROTECTION
LF 161.000 $11.000 $10.000 $10.000 $20.000 $13.560 $0.010 $15.000
TEMPORARY SPL SHORING
SF 11,273.000 $35.000 $65.000 $55.000 $45.000 $180.840 $122.000 $45.000
DRILL SHAFT (18 IN)
LF 128.000 $145.000 $200.000 $200.000 $200.000 $160.200 $120.000 $195.000
DRILL SHAFT (24 IN)
LF 1,188.000 $145.000 $299.000 $250.000 $340.000 $131.990 $143.000 $200.000
DRILL SHAFT (36 IN)
LF 256.000 $230.000 $416.000 $350.000 $375.000 $214.240 $213.000 $295.000
CL C CONC (ABUT)(HPC)
CY 100.700 $1,700.000 $1,500.000 $2,000.000 $2,500.000 $1,706.350 $1,050.000 $3,000.000
CL C CONC (CAP)(HPC)
CY 38.200 $1,500.000 $1,700.000 $2,000.000 $3,000.000 $1,903.430 $2,100.000 $6,000.000
REINF CONC SLAB (HPC)
SF 4,500.000 $30.000 $29.000 $20.000 $45.000 $63.460 $34.000 $35.000
APPROACH SLAB (HPC)
CY 212.000 $810.000 $850.000 $2,000.000 $1,200.000 $738.450 $657.000 $1,235.000
BRIDGE MEDIAN (HPC)
SF 360.000 $20.000 $180.000 $20.000 $35.000 $11.020 $20.000 $25.000
BRIDGE SIDEWALK(HPC)
SF 1,020.000 $20.000 $85.000 $20.000 $35.000 $50.200 $16.500 $25.000
SLAB SPAN (HPC)
CY 236.000 $1,600.000 $1,900.000 $2,000.000 $3,000.000 $1,491.790 $2,300.000 $7,000.000
PRESTR CONC GIRDER (TX54)
LF 622.500 $200.000 $353.000 $225.000 $340.000 $319.430 $275.000 $390.000
RIPRAP (MOW STRIP)(4 IN)
CY 89.000 $750.000 $550.000 $550.000 $900.000 $448.960 $706.000 $1,142.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 970.000 $185.000 $180.000 $150.000 $185.000 $145.540 $183.000 $168.160
RIPRAP (STONE PROTECTION)(24 IN)
CY 138.000 $250.000 $250.000 $250.000 $200.000 $209.100 $194.000 $187.000
STR STEEL (MISC NON-BRIDGE)
LB 420.000 $25.000 $55.000 $20.000 $45.000 $16.950 $20.000 $37.000
RAIL (TY T223)(HPC)
LF 322.000 $170.000 $150.000 $250.000 $195.000 $181.770 $146.000 $365.000
RAIL (TY C223)(HPC)
LF 144.000 $200.000 $230.000 $250.000 $225.000 $181.770 $216.000 $500.000
TYPE A JOINT
LF 150.000 $47.500 $180.000 $100.000 $40.000 $211.920 $67.000 $300.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 72.000 $260.000 $180.000 $100.000 $350.000 $280.570 $223.000 $395.000
CONC BOX CULV (9 FT X 7 FT)
LF 322.000 $1,500.000 $900.000 $1,500.000 $1,650.000 $787.720 $1,120.000 $3,500.000
RC PIPE (CL III)(15 IN)
LF 52.000 $120.000 $80.000 $85.000 $485.000 $55.540 $150.000 $275.000
RC PIPE (CL III)(18 IN)
LF 20.000 $120.000 $95.000 $95.000 $900.000 $58.390 $200.000 $305.000
RC PIPE (CL III)(24 IN)
LF 5.000 $140.000 $100.000 $105.000 $725.000 $84.020 $500.000 $762.000
INLET (COMPL)(PCO)(5FT)(NONE)
EA 6.000 $6,460.000 $9,500.000 $12,500.000 $8,600.000 $7,704.500 $6,000.000 $9,100.000
WINGWALL (FW - 0) (HW=16 FT)
EA 1.000 $100,000.000 $71,000.000 $100,000.000 $50,000.000 $72,992.020 $50,000.000 $93,500.000
WINGWALL (PW - 1) (HW=11 FT)
EA 1.000 $100,000.000 $75,000.000 $85,000.000 $45,000.000 $67,815.290 $50,000.000 $65,000.000
ADJUSTING MANHOLES
EA 2.000 $3,000.000 $1,000.000 $2,000.000 $2,000.000 $2,398.120 $1,700.000 $6,100.000
ADJUSTING INLETS
EA 1.000 $1,500.000 $5,000.000 $2,500.000 $5,200.000 $1,695.380 $1,500.000 $4,500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 1.000 $1,500.000 $500.000 $1,000.000 $1,250.000 $847.690 $3,500.000 $3,800.000
REMOV STR (INLET)
EA 6.000 $1,300.000 $1,000.000 $3,000.000 $2,900.000 $1,059.610 $1,000.000 $3,800.000
REMOV STR (WINGWALL)
EA 2.000 $2,500.000 $1,000.000 $3,000.000 $5,000.000 $2,119.230 $4,230.000 $6,000.000
REMOV STR (PIPE)
LF 48.000 $40.000 $50.000 $50.000 $30.000 $26.620 $31.000 $150.000
REMOV STR (BOX CULVERT)
LF 507.000 $100.000 $100.000 $100.000 $200.000 $89.010 $322.000 $150.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $70,000.000 $100,000.000 $65,000.000 $200,000.000 $33,907.650 $350,000.000 $115,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $90,000.000 $150,000.000 $200,000.000 $125,000.000 $79,732.140 $420,000.000 $8,100.000
MOBILIZATION
LS 1.000 $636,561.400 $600,000.000 $800,000.000 $896,000.000 $905,843.620 $1,000,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 30.000 $20,000.000 $10,000.000 $8,500.000 $10,000.000 $9,889.730 $45,250.000 $8,426.740
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $18,000.000 $15,000.000 $20,000.000 $32,500.000 $8,148.120 $25,000.000 $61,572.520
TMA (MOBILE OPERATION)
DAY 6.000 $400.000 $1,000.000 $550.000 $250.000 $211.920 $677.000 $173.480
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 81.000 $48.000 $55.000 $30.000 $30.000 $33.910 $43.000 $72.450
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 97.000 $95.000 $180.000 $50.000 $80.000 $78.590 $104.000 $141.040
ROCK FILTER DAMS (REMOVE)
LF 178.000 $25.000 $20.000 $20.000 $14.000 $14.440 $24.000 $54.980
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 936.000 $35.000 $35.000 $50.000 $40.000 $28.820 $35.000 $70.800
CONSTRUCTION EXITS (REMOVE)
SY 936.000 $15.000 $10.000 $20.000 $15.000 $10.730 $10.000 $52.530
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,455.000 $6.000 $4.000 $4.000 $8.000 $3.870 $3.600 $7.270
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,455.000 $2.000 $1.000 $2.000 $4.000 $1.170 $1.250 $2.750
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 120.000 $10.000 $10.000 $18.000 $12.000 $6.400 $5.000 $17.710
BIODEG EROSN CONT LOGS (REMOVE)
LF 120.000 $2.000 $2.000 $9.000 $6.000 $1.700 $1.250 $8.550
CONSTRUCTING DETOURS
SY 1,789.000 $150.000 $110.000 $50.000 $135.000 $108.650 $200.000 $182.850
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 570.000 $60.000 $100.000 $100.000 $70.000 $10.990 $28.000 $83.670
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 820.000 $60.000 $100.000 $100.000 $70.000 $42.380 $39.000 $99.350
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 100.000 $100.000 $100.000 $100.000 $70.000 $73.660 $41.000 $92.020
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 570.000 $13.000 $25.000 $20.000 $20.000 $13.990 $11.000 $21.100
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,260.000 $15.000 $25.000 $20.000 $20.000 $12.720 $11.000 $33.240
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 120.000 $25.000 $25.000 $20.000 $20.000 $12.450 $11.500 $33.250
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 570.000 $15.000 $25.000 $20.000 $30.000 $17.830 $11.700 $20.770
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 820.000 $20.000 $25.000 $20.000 $30.000 $16.950 $14.000 $21.740
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 100.000 $30.000 $25.000 $20.000 $30.000 $17.230 $16.000 $21.750
PORT CTB(FUR & INSTL)(F-SHAPE)(TY T)
LF 60.000 $100.000 $150.000 $100.000 $100.000 $50.010 $111.000 $143.530
PORT CTB(MOVE)(F-SHAPE)(TY T)
LF 60.000 $50.000 $30.000 $20.000 $50.000 $11.870 $16.000 $21.070
PORT CTB(REMOVE)(F-SHAPE)(TY T)
LF 60.000 $50.000 $50.000 $20.000 $100.000 $11.870 $18.000 $20.740
CONC CURB (MONO) (TY II)
LF 1,019.000 $75.000 $25.000 $20.000 $22.000 $16.950 $14.000 $8.200
CONC CURB (DOWELED)
LF 2,605.000 $70.000 $35.000 $45.000 $37.000 $56.290 $25.000 $13.550
CONC CURB (SPECIAL)
LF 938.000 $55.000 $65.000 $100.000 $43.000 $127.150 $27.000 $15.300
DRIVEWAYS (CONC)
SY 209.000 $165.000 $120.000 $120.000 $145.000 $101.720 $107.000 $487.990
CONC SIDEWALKS (4")
SY 276.000 $150.000 $85.000 $65.000 $115.000 $76.290 $75.000 $120.370
CONC MEDIAN
SY 615.000 $150.000 $180.000 $150.000 $155.000 $67.160 $76.000 $118.100
MTL W-BEAM GD FEN (TIM POST)
LF 1,175.000 $30.000 $30.000 $30.000 $30.000 $24.320 $24.000 $32.370
MTL BEAM GD FEN TRANS (TL2)
EA 6.000 $1,800.000 $2,800.000 $1,850.000 $1,200.000 $1,271.540 $1,300.000 $1,954.680
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,400.000 $2,850.000 $1,850.000 $1,500.000 $1,271.540 $1,400.000 $2,260.100
REMOVE METAL BEAM GUARD FENCE
LF 62.000 $5.000 $10.000 $3.000 $10.000 $2.730 $2.500 $12.220
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,300.000 $3,850.000 $3,850.000 $3,500.000 $2,824.120 $3,100.000 $806.310
RELOCATE EXISTING MAILBOX
EA 1.000 $350.000 $350.000 $1,100.000 $800.000 $303.050 $325.000 $610.840
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $850.000 $1,100.000 $1,100.000 $1,000.000 $611.410 $725.000 $806.310
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 19.000 $50.000 $35.000 $100.000 $30.000 $31.920 $25.000 $34.210
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI)
EA 8.000 $25.000 $55.000 $100.000 $30.000 $22.760 $23.000 $14.660
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 523.000 $1.500 $4.000 $3.000 $2.000 $1.530 $3.000 $3.670
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 9,243.000 $2.000 $1.150 $3.000 $2.000 $1.170 $1.150 $1.500
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 178.000 $2.800 $3.000 $6.000 $3.000 $2.250 $3.000 $3.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 16,177.000 $2.000 $1.150 $3.000 $2.000 $1.320 $1.150 $1.400
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 400.000 $2.200 $1.350 $6.000 $2.000 $1.100 $1.350 $1.650
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 43.000 $10.000 $15.000 $20.000 $11.000 $7.630 $15.000 $18.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $200.000 $1,000.000 $250.000 $375.000 $169.540 $200.000 $245.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $240.000 $1,000.000 $250.000 $500.000 $197.940 $325.000 $400.000
PAVEMENT SLER 6"
LF 4,544.000 $0.700 $0.450 $3.000 $0.500 $0.390 $0.450 $0.550
PAVEMENT SLER 8"
LF 400.000 $1.000 $1.000 $6.000 $0.500 $0.530 $1.000 $1.250
PAVEMENT SLER 24"
LF 43.000 $3.500 $3.000 $20.000 $3.000 $2.100 $3.000 $3.500
PAVEMENT SLER (ARROW)
EA 4.000 $55.000 $75.000 $250.000 $45.000 $33.910 $75.000 $92.000
PAVEMENT SLER (WORD)
EA 4.000 $65.000 $95.000 $250.000 $55.000 $38.150 $95.000 $115.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 2,894.000 $1.000 $2.000 $3.000 $2.000 $0.720 $2.000 $2.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 878.000 $1.000 $1.750 $3.000 $1.500 $0.680 $1.750 $2.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 2,428.000 $1.000 $175.000 $3.000 $1.500 $0.660 $1.750 $2.000
REFL PAV MRKR TY II-A-A
EA 10.000 $10.000 $6.000 $6.000 $15.000 $4.660 $6.000 $7.000
REFL PAV MRKR TY II-C-R
EA 188.000 $10.000 $6.000 $6.000 $15.000 $4.660 $6.000 $7.000
ELIM EXT PM & MRKS (4")
LF 1,337.000 $1.300 $3.000 $1.000 $2.000 $0.640 $3.000 $3.000
ELIM EXT PM & MRKS (8")
LF 200.000 $2.700 $6.000 $6.000 $2.000 $0.850 $6.000 $7.000
PAV SURF PREP FOR MRK (6")
LF 4,544.000 $0.500 $0.400 $1.000 $0.250 $0.170 $0.400 $0.500
PAV SURF PREP FOR MRK (8")
LF 400.000 $1.000 $0.750 $1.000 $0.500 $0.250 $0.750 $1.000
PAV SURF PREP FOR MRK (24")
LF 43.000 $2.000 $2.500 $10.000 $4.000 $0.870 $2.500 $3.000
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $50.000 $675.000 $150.000 $40.000 $17.800 $65.000 $80.000
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $65.000 $150.000 $150.000 $40.000 $22.890 $75.000 $90.000
POST AND CABLE FENCE (REMOVAL)
LF 1,152.000 $4.000 $15.000 $10.000 $8.000 $5.090 $2.600 $10.000
Totals: $7,689,300.700 $8,168,666.000 $8,484,378.500 $8,962,082.000 $9,104,006.997 $10,351,512.120 $10,850,853.950
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $100,000.00
Total: $200,000.00